RERA Snapshot
The most important statutory project disclosures, generated dynamically from available RERA fields.
- RERA Number PRM/KA/RERA/1251/309/PR/310123/005671
- Project Name Thirumalaadhari
- Project Type Residential/Group Housing
- Project Status Ready to Move
- District Bengaluru Urban
- Taluka Bengaluru East
- Original Completion 22 February 2025
- Documents 81 Verified
Project Timeline & Completion Details
Key statutory dates from registration through proposed completion and permit validity.
Promoter, Organisation & Member Details
Declared promoter entity, address and corporate identifiers on file with the authority.
Primary Promoter
THIRUMALA DEVELOPERSLand, Address & Location Details
Land parcel, zoning and geo-coordinates as recorded in the project filing.
| Address THIRUMALAADHARI, KHATHA NO 477-37-5, Converted Sy No. 37-5, , Situated at Battarahalli Village, Bidarahalli Hobli, Bangalore East Taluk, Bangalore , Bengaluru East , Bengaluru Urban, Karnataka - 560049 |
RERA Coordinates |
|
| Latitude, Longitude 13.016460, 77.709178 | |
Plans & Approvals
Statutory approvals obtained or pending against the project site.
| Plan Approval No. | BBMP/Ad.Com./MDP/0605/21-22 |
|---|---|
| Authority | BBMP - Bruhat Bengaluru Mahanagara Palike |
| Approved Date | 23 February 2022 |
Buildings, Towers & Building-Level Details
Statutory building-level disclosures including tower height, sanctioned floors, structural counts and parking areas.
Scroll horizontally to view all building-level fields. Values marked "-" were not disclosed in the source RERA record.
Unit Inventory & Configuration Details
Configuration mix and floor-level disclosures with both grouped and raw RERA views.
Parking, Garage & Area Details
Parking provision declared in the sanctioned plan.
| Type | Proposed | Booked | Work Done |
|---|---|---|---|
| Garage | - | - | - |
| Covered Parking | - | - | - |
| Open Parking | - | - | - |
Development Works & Common Area Disclosures
Project-level common infrastructure disclosures as reported by the developer to the RERA authority.
| Sub Structure Earth Work And Other Leveling Preparation Work % not reported | Sub Structure Foundation Footing Work % not reported | Sub Structure Upto Plinth Level % not reported |
| Sub Structure Sub-structure Flooring (Parking Floor, More Than One Floor Below General Ground Level) % not reported | Sub Structure Retaining Wall (All Types) % not reported | Sup Structure Rcc Or Ms Framed Structure % not reported |
| Sup Structure Masonry Construction % not reported | Sup Structure Plastering Inside , Outside & Ceiling % not reported | Sup Structure Joinery: Doors, Windows, Ventilators Etc % not reported |
| Sup Structure Basic Work Of Water Supply, Sanitary And Electrification % not reported | Sup Structure Dadoing, Skirting, Flooring, Tiles Work (All Types) % not reported | Sup Structure Railing And Grill Fixing % not reported |
| Finishing Works Electrification, Water Supply And Sanitary Finishing % not reported | Finishing Works Painting % not reported | Finishing Works Fire Prevention And Fire Fighting Fitting And Fixture With Network % not reported |
| Finishing Works Weather Proof Work(tile,concrete) % not reported | Finishing Works Wardrobe, Showcase, Kitchen Cabinet, Puja Work % not reported | Finishing Works Elevation Work % not reported |
| Finishing Works Internal And External Work Including Landscapes As Per Sanctioned Drawings % not reported | Internal Infrastructure Water Supply % not reported | Internal Infrastructure Sewage And Drainage System % not reported |
| Internal Infrastructure Water Conservation/rain Water Harvesting/recharge Of Ground Water % not reported | Internal Infrastructure Energy Management % not reported | Internal Infrastructure Fire Protection And Fire Safety Requirements % not reported |
| Internal Infrastructure Solid Waste Management And Disposal % not reported | Internal Infrastructure Emergency Evacuation Services % not reported | External Infrastructure Water Supply % not reported |
| External Infrastructure Internal Roads & Footpaths % not reported | External Infrastructure Sewage And Drainage System % not reported | External Infrastructure Electricity Supply Transformer And Substation % not reported |
| External Infrastructure Solid Waste Management And Disposal % not reported | External Infrastructure Emergency Evacuation Services % not reported | External Infrastructure Storm Water Drains % not reported |
| External Infrastructure Use Of Renewable Energy % not reported | External Infrastructure Water Conservation/rain Water Harvesting/recharge Of Ground Water % not reported | External Infrastructure Fire Protection And Fire Safety Requirements % not reported |
| External Infrastructure Sewage Treatment Plant (Stp) % not reported | External Infrastructure Parks & Tree Planting % not reported | External Infrastructure Street Lighting % not reported |
| Amenities Electricity % not reported | Amenities Smart Home Automation % not reported | Amenities Cctv Surveillance % not reported |
| Amenities Club House % not reported | Amenities Community Hall % not reported | Amenities Outdoor Sports Facility % not reported |
| Amenities Indoor Sports Facility % not reported | Amenities Swimming Pool % not reported | Amenities Gym % not reported |
| Amenities Parks % not reported | Amenities Power Backup % not reported | Amenities Piped Gas % not reported |
| Amenities Water And Sanitation % not reported | Amenities Air Conditioning % not reported | Common Areas Staircases % not reported |
| Common Areas Lifts % not reported | Common Areas Corridor/lobbies % not reported | Common Areas Fire Escapes % not reported |
| Common Areas Common Entrance And Exit For The Building/common Portico/foyer/verandah % not reported | Common Areas Basement % not reported | Common Areas Terrace % not reported |
| Common Areas Outer Wall % not reported | Common Areas Open Parking Areas % not reported | Common Areas Provision For Lodging Of Management Staff And Security Staff % not reported |
| Common Areas Water Conservation And Renewable Energy % not reported | Common Areas Common Storage Spaces % not reported |
RERA Documents & Filings
All statutory documents uploaded by the promoter to the authority portal.
Bank & Cost Disclosure
Declared project cost and the designated escrow account on file.
| Project Account Bank | CITY UNION BANK |
|---|---|
| Account Number (RERA) | 51090901213343 |
| IFSC | CIUB0000054 |
| Branch Address | SULTANPET BANGALORE |