Squareyards Logo
Blogs
Sell or Rent Property
Login
Rera Banner
residential New Launch Source: rera.ka

Maitree Vajra RERA Details - PRM/KA/RERA/1251/446/PR/110526/008641 Bangalore

View the RERA registration, promoter, approval, building, inventory, document and construction-progress disclosures for Maitree Vajra under registration PRM/KA/RERA/1251/446/PR/110526/008641 in Bangalore, Karnataka. Data is sourced from rera.ka.

RERA

RERA Snapshot

The most important statutory project disclosures, generated dynamically from available RERA fields.

  • RERA Number PRM/KA/RERA/1251/446/PR/110526/008641
  • Project Name MAITREE VAJRA
  • Project Type Residential/Group Housing
  • Project Status New Launch
  • District Bengaluru Urban
  • Taluka Bengaluru East
  • Original Completion 31 March 2028
  • Documents 77 Verified
Timeline

Project Timeline & Completion Details

Key statutory dates from registration through proposed completion and permit validity.

Proposed Start 16 March 2026 Expected commencement of civil works and foundation on site.
Original Completion 31 March 2028 Mandated date for project handover to the allottees and final compliance filing.
Promoter

Promoter, Organisation & Member Details

Declared promoter entity, address and corporate identifiers on file with the authority.

Primary Promoter

MAITREE DEVELOPERS
Registered Address Unit 110,Maitree Vajra Apartment,,Sy no: 2/1,Halanayakanahalli,Sai Mandir ,Bengaluru East ,Bengaluru Urban-560035
Experience Details
Location

Land, Address & Location Details

Land parcel, zoning and geo-coordinates as recorded in the project filing.

Address Survey No.2/1, 2/5 , situated at Halanayakanahalli Village, Varthur Hobli , Bengaluru East , Bengaluru Urban, Karnataka - 560035

RERA Coordinates

Latitude, Longitude 12.90016570537716, 77.68939059615134
Plans

Plans & Approvals

Statutory approvals obtained or pending against the project site.

Plan Approval No. BDA/PS/EM/EO-05/TA-4/E/79/2025-26
Authority BDA - Bangalore Development Authority
Approved Date 16 March 2026

Understand this Project's RERA details

Get clear answers and additional support from our RERA experts.

RERA Banner
Buildings

Buildings, Towers & Building-Level Details

Statutory building-level disclosures including tower height, sanctioned floors, structural counts and parking areas.

Building Detail
Name No. of Basements No. of Slab No. of Slits No. of Open Parking Building Type Height of Tower No. of Floors No. of Units
Maitree Vajra 1 6 0 51 Residential 14.95 5 50

Scroll horizontally to view all building-level fields. Values marked "-" were not disclosed in the source RERA record.

Inventory

Unit Inventory & Configuration Details

Configuration mix and floor-level disclosures with both grouped and raw RERA views.

Total Units -
Configurations 2
Inventory Type RESIDENTIAL
Configuration Distribution
2 BHK 0 units
3 BHK 0 units
  • Maitree Vajra
Floor-Wise Inventory Explorer
Floor Apartment Type Carpet Area No. of Unit
GF 3 BHK 1002 101
GF 3 BHK 1002 102
GF 3 BHK 1002 103
GF 3 BHK 1108 104
GF 3 BHK 1376 105
GF 3 BHK 1067 106
GF 3 BHK 1133 107
GF 3 BHK 1045 108
GF 2 BHK 700 109
GF 2 BHK 541 110
1 3 BHK 1004 201
1 3 BHK 1002 202
1 3 BHK 1002 203
1 3 BHK 1108 204
1 3 BHK 1376 205
1 3 BHK 1067 206
1 3 BHK 1133 207
1 3 BHK 1045 208
1 2 BHK 629 209
1 2 BHK 718 210
2 3 BHK 1004 301
2 3 BHK 1002 302
2 3 BHK 1002 303
2 3 BHK 1108 304
2 3 BHK 1376 305
2 3 BHK 1067 306
2 3 BHK 1133 307
2 3 BHK 1045 308
2 2 BHK 629 309
2 2 BHK 718 310
3 3 BHK 1004 401
3 3 BHK 1002 402
3 3 BHK 1002 403
3 3 BHK 1108 404
3 3 BHK 1376 405
3 3 BHK 1067 406
3 3 BHK 1133 407
3 3 BHK 1045 408
3 2 BHK 629 409
3 2 BHK 718 410
4 3 BHK 1004 501
4 3 BHK 1002 502
4 3 BHK 1002 503
4 3 BHK 1108 504
4 3 BHK 1376 505
4 3 BHK 1067 506
4 3 BHK 1133 507
4 3 BHK 1045 508
4 2 BHK 629 509
4 2 BHK 718 510
Parking

Parking, Garage & Area Details

Parking provision declared in the sanctioned plan.

Type Proposed Booked Work Done
Garage - - -
Covered Parking - - -
Open Parking - - -
Development

Development Works & Common Area Disclosures

Project-level common infrastructure disclosures as reported by the developer to the RERA authority.

Sub Structure Earth Work And Other Leveling Preparation Work % not reported Sub Structure Foundation Footing Work % not reported Sub Structure Upto Plinth Level % not reported
Sub Structure Sub-structure Flooring (Parking Floor, More Than One Floor Below General Ground Level) % not reported Sub Structure Retaining Wall (All Types) % not reported Sup Structure Rcc Or Ms Framed Structure % not reported
Sup Structure Masonry Construction % not reported Sup Structure Plastering Inside , Outside & Ceiling % not reported Sup Structure Joinery: Doors, Windows, Ventilators Etc % not reported
Sup Structure Basic Work Of Water Supply, Sanitary And Electrification % not reported Sup Structure Dadoing, Skirting, Flooring, Tiles Work (All Types) % not reported Sup Structure Railing And Grill Fixing % not reported
Finishing Works Electrification, Water Supply And Sanitary Finishing % not reported Finishing Works Painting % not reported Finishing Works Fire Prevention And Fire Fighting Fitting And Fixture With Network % not reported
Finishing Works Weather Proof Work(tile,concrete) % not reported Finishing Works Wardrobe, Showcase, Kitchen Cabinet, Puja Work % not reported Finishing Works Elevation Work % not reported
Finishing Works Internal And External Work Including Landscapes As Per Sanctioned Drawings % not reported Internal Infrastructure Water Supply % not reported Internal Infrastructure Sewage And Drainage System % not reported
Internal Infrastructure Water Conservation/rain Water Harvesting/recharge Of Ground Water % not reported Internal Infrastructure Energy Management % not reported Internal Infrastructure Fire Protection And Fire Safety Requirements % not reported
Internal Infrastructure Solid Waste Management And Disposal % not reported Internal Infrastructure Emergency Evacuation Services % not reported External Infrastructure Water Supply % not reported
External Infrastructure Internal Roads & Footpaths % not reported External Infrastructure Sewage And Drainage System % not reported External Infrastructure Electricity Supply Transformer And Substation % not reported
External Infrastructure Solid Waste Management And Disposal % not reported External Infrastructure Emergency Evacuation Services % not reported External Infrastructure Storm Water Drains % not reported
External Infrastructure Use Of Renewable Energy % not reported External Infrastructure Water Conservation/rain Water Harvesting/recharge Of Ground Water % not reported External Infrastructure Fire Protection And Fire Safety Requirements % not reported
External Infrastructure Sewage Treatment Plant (Stp) % not reported External Infrastructure Parks & Tree Planting % not reported External Infrastructure Street Lighting % not reported
Amenities Electricity % not reported Amenities Smart Home Automation % not reported Amenities Cctv Surveillance % not reported
Amenities Club House % not reported Amenities Community Hall % not reported Amenities Outdoor Sports Facility % not reported
Amenities Indoor Sports Facility % not reported Amenities Swimming Pool % not reported Amenities Gym % not reported
Amenities Parks % not reported Amenities Power Backup % not reported Amenities Piped Gas % not reported
Amenities Water And Sanitation % not reported Amenities Air Conditioning % not reported Common Areas Staircases % not reported
Common Areas Lifts % not reported Common Areas Corridor/lobbies % not reported Common Areas Fire Escapes % not reported
Common Areas Common Entrance And Exit For The Building/common Portico/foyer/verandah % not reported Common Areas Basement % not reported Common Areas Terrace % not reported
Common Areas Outer Wall % not reported Common Areas Open Parking Areas % not reported Common Areas Provision For Lodging Of Management Staff And Security Staff % not reported
Common Areas Water Conservation And Renewable Energy % not reported Common Areas Common Storage Spaces % not reported
Documents

RERA Documents & Filings

All statutory documents uploaded by the promoter to the authority portal.

Promoter Registration Certificate
Promoter Pan Card
Promoter Address Proof
Affidavit
1 Completion Certificate
Fd 1 Balance Sheet AY 2025-26 Maitree Signed.Pdf
Fd 2 Balance Sheet AY 2024-25 Maitree.Pdf
Fd 3 Maitree BS AY 2023-2024.Pdf
Fd 4 Profit &Loss Account AY 2025-26 Maitree Signed.Pdf
Fd 5 Profit&Loss Account AY 2024-25 Maitree.Pdf
Fd 6 Maitree PL AY 2023-2024.Pdf
Fd 7 ACK929451910110925 AY 2025-2026.Pdf
Fd 8 ACK744987621081224 AY 2024-2025.Pdf
Fd 9 ACK329120901280923 AY 2023-2024.Pdf
Pd 1 Commencement Certificate( Annexure - 80 )
Pd 2 Approved Building Plan( Annexure - 81 )
Pd 3 Sectional Drawing Of The Apartments( Annexure - 82 )
Pd 4 Certificate From Registered Engineer Indicating The Structural Safety Of The Building( Annexure - 83 )
Pd 5 Project Specifications( Annexure - 84 )
Pd 6 Brochure( Annexure - 85 )
Pd 7 Relinquishment Deed( Annexure - 86 )
Pd 8 Proforma Of Agreement For Sale( Annexure - 87 )
Pd 9 Proforma Of Allotment Letter( Annexure - 88 )
Dc 1 Declaration (Form B)( Annexure - 89 )
Dc 2 Section 3(1) Notarized Affidavit( Annexure - 90 )
Dc 3 JD AFFIDAVIT CUM DECLARATION( Annexure - 91 )
Dc 4 Advocate Search Report( Annexure - 92 )
Noc 1 ESCOM Electricity( Annexure - 95 )
Noc 2 KWSSB Water( Annexure - 96 )
Noc 3 KSPCB( Annexure - 97 )
Noc 4 SEIAA( Annexure - 98 )
Noc 5 Fire Force Department( Annexure - 99 )
Noc 6 Airport Authority Of India( Annexure - 100 )
Noc 7 BSNL( Annexure - 101 )
Noc 8 Lift Authorities( Annexure - 102 )
Noc 9 BMRCL( Annexure - 103 )
Noc 10 NOC In Case Of Building Proposals Abutting To Neighbouring Properties( Annexure - 104 )
Noc 11 Bangalore Urban Arts Commission( Annexure - 105 )
Noc 12 Inspector Of Factories Controller Of Explosives Railways( Annexure - 106 )
Noc 13 Coastal Regulation Zone Authority( Annexure - 107 )
Photo 1 Project Photo
Od 1 NA.Pdf
Ed 1 31-03-2026
Ed 2 31-03-2026
Ed 3 31-03-2026
Ed 4 31-03-2026
Ed 5 31-03-2026
Ed 6 31-03-2026
Ed 7 31-03-2026
Ed 8 31-03-2026
Ed 9 31-03-2026
Ed 10 31-03-2026
Ed 11 31-03-2026
Ed 12 31-03-2026
Ed 13 31-03-2026
Ed 14 31-03-2026
Ed 15 31-03-2026
Ed 16 31-03-2026
Ed 17 31-03-2026
Ed 18 31-03-2026
Ed 19 31-03-2026
Ed 20 31-03-2026
Ed 21 27-04-2026
Ed 22 27-04-2026
Ed 23 27-04-2026
Ed 24 27-04-2026
Ed 25 27-04-2026
Ed 26 27-04-2026
Ed 27 27-04-2026
Ed 28 07-05-2026
Ed 29 07-05-2026
Ed 30 11-05-2026
Ld Rtc
Ld Mutation
Ld Encumbrance Certificate
Ld Conversion Order
Ld Khatha
Bank

Bank & Cost Disclosure

Declared project cost and the designated escrow account on file.

Project Account Bank DCB Bank
Account Number (RERA) 03824600000028
IFSC DCBL0000071
Branch Address Rajaji Nagar
Country/City