Squareyards Logo
Blogs
Sell or Rent Property
Login
Rera Banner
commercial Ready to Move Source: rera.mh

Shivshahi S R Project At Shed Complex RERA Details - P51900006877, Mumbai

View the RERA registration, promoter, approval, building, inventory, document and construction-progress disclosures for Shivshahi S R Project At Shed Complex under registration P51900006877 in Mumbai, MAHARASHTRA. Data is sourced from rera.mh.

RERA

RERA Snapshot

The most important statutory project disclosures, generated dynamically from available RERA fields.

  • RERA Number P51900006877
  • Project Name S R PROJECT AT SHED COMPLEX DHARAVI
  • Project Type Others
  • Project Status Ready to Move
  • State MAHARASHTRA
  • District Mumbai City
  • Taluka Ward GNorth
  • Village GNorth-400017
  • Original Completion 31 December 2010
  • Revised Completion 30 December 2021
  • Project Area (in Sq.mt.) 2,893.65
  • Total Buildings/Towers 3
  • Documents 16 Verified
Timeline

Project Timeline & Completion Details

Key statutory dates from registration through proposed completion and permit validity.

Proposed Start 16 August 2017 Expected commencement of civil works and foundation on site.
Original Completion 31 December 2010 Mandated date for project handover to the allottees and final compliance filing.
Revised Completion 30 December 2021 No revision filed against the original committed handover date.
Promoter

Promoter, Organisation & Member Details

Declared promoter entity, address and corporate identifiers on file with the authority.

Organisation Type Company
Individule Name SHIVSHAHI PUNARVASAN PRAKALP LTD
Website www.sppl.biz
Other Description NA

Promoters, Co-promoters & Members

NameRole
vijaykumar NARAYAN shindeAuthorized Signatory

Understand this Project's RERA details

Get clear answers and additional support from our RERA experts.

RERA Banner
Buildings

Buildings, Towers & Building-Level Details

Statutory building-level disclosures including tower height, sanctioned floors, structural counts and parking areas.

Building Detail
Project Name Name No. of Basements No. of Plinth No. of Podium No. of Slab No. of Slits No. of Open Parking No. of Closed Parking
S R PROJECT AT SHED COMPLEX DHARAVI BUILDING NO SH1 0 1 0 8 0 0 0
S R PROJECT AT SHED COMPLEX DHARAVI BUILDING NO SH3 0 1 0 8 0 0 0
S R PROJECT AT SHED COMPLEX DHARAVI BUILDING NO SH6 0 1 0 7 0 0 0

Scroll horizontally to view all building-level fields. Values marked "-" were not disclosed in the source RERA record.

Inventory

Unit Inventory & Configuration Details

Configuration mix and floor-level disclosures with both grouped and raw RERA views.

Total Units 194
Configurations 2
Inventory Type COMMERCIAL
Configuration Distribution
1 ROOM KITCHEN 193 units · avg area 20.90 Sq.mt.
SALE SHOP 1 unit · avg area 11.47 Sq.mt.
  • BUILDING NO SH1
  • BUILDING NO SH3
  • BUILDING NO SH6
Floor-Wise Inventory Explorer
Apartment Type Carpet Area No. of Apartment No. of Booked Apartment
1 ROOM KITCHEN 20.90 115 115
Parking

Parking, Garage & Area Details

Parking provision declared in the sanctioned plan.

Type Proposed Booked Work Done
Garage 0 0 0
Covered Parking 0 0 0
Development

Development Works & Common Area Disclosures

Project-level common infrastructure disclosures as reported by the developer to the RERA authority.

Internal Roads Footpaths 100% Water Conservation Rainwater Harvesting % not reported Energy Management % not reported
Fire Protection And Fire Safety Requirements % not reported Electrical Meter Room Substation Receivingstation 100% Aggregate Area Of Recreational Open Space 100%
Open Parking % not reported Water Supply 100% Sewerage 100%
Storm Water Drains 100% Landscaping Tree Planting % not reported Street Lighting 100%
Community Buildings 100% Treatment And Disposal Of Sewage Sullage Water % not reported Solid Waste Management Disposal % not reported
Activity

Building Activity Progress

Statutory activity-wise construction progress as declared by the developer, per building/tower.

  • BUILDING NO SH1
  • BUILDING NO SH3
  • BUILDING NO SH6
BUILDING NO SH1 · Overall Progress 80%
Excavation
Complete
% Work100%
X number of Basement(s) and Plinth
Complete
% Work100%
X number of Podiums
Not Started
% Work0%
Stilt Floor
Not Started
% Work0%
X number of Slabs of Super Structure
Complete
% Work100%
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
Complete
% Work100%
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Complete
% Work100%
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
Complete
% Work100%
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
Complete
% Work100%
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Complete
% Work100%
Documents

RERA Documents & Filings

All statutory documents uploaded by the promoter to the authority portal.

Mh Details Html
Mh Certificate Pdf
Mh Details Pdf
1 Copy Of The Legal Title Report
1 Details Of Encumbrances
1 Copy Of Layout Approval (In Case Of Layout)
1 Building Plan Approval (IOD)
2 Building Plan Approval (IOD)
3 Building Plan Approval (IOD)
1 Commencement Certificates / NA Order For Plotted Development
1 Declaration In FORM B
1 Certificates Of Architect (Form 1)(Mandatory For Only Ongoing Project)
1 Certificates Of Engineer (Form 2)(Mandatory For Only Ongoing Project)
1 Certificates Of CA (Form 5)
1 Proforma Of Allotment Letter
1 Other
Bank

Bank & Cost Disclosure

Declared project cost and the designated escrow account on file.

Project Account Bank BANK OF MAHARASHTRA
IFSC MAHB0000164
Country/City