Squareyards Logo
Blogs
Sell or Rent Property
Login
Rera Banner
residential Ready to Move Source: rera.mh

CIDCO Scheme Kharghar RERA Details - P52000017448, Navi Mumbai

View the RERA registration, promoter, approval, building, inventory, document and construction-progress disclosures for CIDCO Scheme Kharghar under registration P52000017448 in Navi Mumbai, Maharashtra. Data is sourced from rera.mh.

RERA

RERA Snapshot

The most important statutory project disclosures, generated dynamically from available RERA fields.

  • RERA Number P52000017448
  • Project Name Sector 40 Kharghar
  • Project Type Others
  • Project Status Ready to Move
  • State Maharashtra
  • District Mumbai City
  • Taluka Mumbai City
  • Original Completion 31 October 2021
  • Revised Completion 30 April 2022
  • Project Area (in Sq.mt.) 38,538.16
  • Total Buildings/Towers 30
  • Documents 3 Verified
Timeline

Project Timeline & Completion Details

Key statutory dates from registration through proposed completion and permit validity.

Proposed Start 13 August 2018 Expected commencement of civil works and foundation on site.
Original Completion 31 October 2021 Mandated date for project handover to the allottees and final compliance filing.
Revised Completion 30 April 2022 No revision filed against the original committed handover date.
Promoter

Promoter, Organisation & Member Details

Declared promoter entity, address and corporate identifiers on file with the authority.

Organisation Type Company
Individule Name City and Industrial Development Corporation Of Mahrastra Ltd
Experience Details
Project NameAddressLand AreaProject StatusType of ProjectBuild Plot CountApartment countProposed Completion DateProject End DateLitigation PresentLitigation Details
Design and construction of 16 nos MIG type and 8 nos HIG type buildings Sect36 KhargharPlot 3 Sector 36 Kharghar64534.68CompletedIndustrial2412242014-05-022015-05-31NoNA
Construction of 32 Nos of LIG type and 22 EWS type Sector 36 KhargharPlot no 2 sector 36 Kharghar77038.91CompletedIndustrial5435902015-05-042016-06-30NoNA

Understand this Project's RERA details

Get clear answers and additional support from our RERA experts.

RERA Banner
Buildings

Buildings, Towers & Building-Level Details

Statutory building-level disclosures including tower height, sanctioned floors, structural counts and parking areas.

Building Detail
Project Name Name No. of Open Parking No. of Closed Parking No. of Floors No. of Habitable Floor No. of Sanctioned Apartment Wing Name
Sector 40 Kharghar LIG 1 PHASE 1 23 0 15 0 0 NA
Sector 40 Kharghar LIG 2 PHASE 1 23 0 15 0 0 NA
Sector 40 Kharghar LIG 3 PHASE 1 23 0 15 0 0 NA
Sector 40 Kharghar LIG 4 PHASE 1 GROUND TO 12 TH FLOOR 19 0 13 0 0 NA
Sector 40 Kharghar LIG 5 PHASE 1 21 0 14 0 0 NA
Sector 40 Kharghar LIG 6 PHASE 1 21 0 14 0 0 NA
Sector 40 Kharghar LIG 7 PHASE 1 22 0 15 0 0 NA
Sector 40 Kharghar LIG 8 PHASE 1 25 0 15 0 0 NA
Sector 40 Kharghar LIG 9 PHASE 1 22 0 15 0 0 NA
Sector 40 Kharghar LIG 10 PHASE 1 22 0 15 0 0 NA
Sector 40 Kharghar LIG 11 PHASE 1 GROUND TO 12 TH FLOOR 19 0 13 0 0 NA
Sector 40 Kharghar LIG 12 PHASE 1 23 0 15 0 0 NA
Sector 40 Kharghar LIG 13 PHASE 1 23 0 15 0 0 NA
Sector 40 Kharghar LIG 14 PHASE 1 23 0 15 0 0 NA
Sector 40 Kharghar LIG 15 PHASE 1 GROUND TO 7 TH FLOOR 12 0 8 0 0 NA
Sector 40 Kharghar EWS 1 PHASE 1 GROUND TO 7 TH FLOOR 12 0 8 0 0 NA
Sector 40 Kharghar EWS 2 PHASE 1 GROUND TO 7 TH FLOOR 12 0 8 0 0 NA
Sector 40 Kharghar EWS 3 PHASE 1 22 0 15 0 0 NA
Sector 40 Kharghar EWS 4 PHASE 1 22 0 15 0 0 NA
Sector 40 Kharghar EWS 5 PHASE 1 GROUND TO 13 TH FLOOR 21 0 14 0 0 NA
Sector 40 Kharghar EWS 6 PHASE 1 GROUND TO 13 TH FLOOR 21 0 14 0 0 NA
Sector 40 Kharghar EWS 7 PHASE 1 22 0 15 0 0 NA
Sector 40 Kharghar EWS 8 PHASE 1 22 0 15 0 0 NA
Sector 40 Kharghar LIG 4 PHASE 2- 13TH AND 14TH FLOOR 3 0 2 0 0 NA
Sector 40 Kharghar LIG 11 PHASE 2 - 13 TH AND 14TH FLOOR 3 0 2 0 0 NA
Sector 40 Kharghar LIG 15 PHASE 2 - 8 TH TO 14 TH FLOOR 10 0 7 0 0 NA
Sector 40 Kharghar EWS 1 PHASE 2- 8 TH TO 14 TH FLOOR 10 0 7 0 0 NA
Sector 40 Kharghar EWS 2 PHASE 2- 8 TH TO 14 TH FLOOR 10 0 7 0 0 NA
Sector 40 Kharghar EWS 5 PHASE 2 - 14 TH FLOOR 1 0 1 0 0 NA
Sector 40 Kharghar EWS 6 PHASE 2 - 14 TH FLOOR 1 0 1 0 0 NA

Scroll horizontally to view all building-level fields. Values marked "-" were not disclosed in the source RERA record.

Inventory

Unit Inventory & Configuration Details

Configuration mix and floor-level disclosures with both grouped and raw RERA views.

Total Units 1962
Configurations 8
Inventory Type RESIDENTIAL
Configuration Distribution
S1 6 units · avg area 29.09 Sq.mt.
S2 6 units · avg area 42.10 Sq.mt.
S3 6 units · avg area 35.70 Sq.mt.
S4 6 units · avg area 35.70 Sq.mt.
S5 6 units · avg area 42.10 Sq.mt.
S6 6 units · avg area 29.09 Sq.mt.
LIG 1206 units · avg area 29.82 Sq.mt.
EWS 720 units · avg area 25.81 Sq.mt.
  • LIG 1 PHASE 1
  • LIG 2 PHASE 1
  • LIG 3 PHASE 1
  • LIG 4 PHASE 1 GROUND TO 12 TH FLOOR
  • LIG 5 PHASE 1
  • LIG 6 PHASE 1
  • LIG 7 PHASE 1
  • LIG 9 PHASE 1
  • LIG 10 PHASE 1
  • LIG 11 PHASE 1 GROUND TO 12 TH FLOOR
  • LIG 12 PHASE 1
  • LIG 13 PHASE 1
  • LIG 14 PHASE 1
  • LIG 15 PHASE 1 GROUND TO 7 TH FLOOR
  • EWS 1 PHASE 1 GROUND TO 7 TH FLOOR
  • EWS 2 PHASE 1 GROUND TO 7 TH FLOOR
  • EWS 3 PHASE 1
  • EWS 4 PHASE 1
  • EWS 5 PHASE 1 GROUND TO 13 TH FLOOR
  • EWS 6 PHASE 1 GROUND TO 13 TH FLOOR
  • EWS 7 PHASE 1
  • EWS 8 PHASE 1
  • LIG 4 PHASE 2- 13TH AND 14TH FLOOR
  • LIG 11 PHASE 2 - 13 TH AND 14TH FLOOR
  • LIG 15 PHASE 2 - 8 TH TO 14 TH FLOOR
  • EWS 1 PHASE 2- 8 TH TO 14 TH FLOOR
  • EWS 2 PHASE 2- 8 TH TO 14 TH FLOOR
  • EWS 5 PHASE 2 - 14 TH FLOOR
  • EWS 6 PHASE 2 - 14 TH FLOOR
Floor-Wise Inventory Explorer
Apartment Type Carpet Area No. of Apartment No. of Booked Apartment
S5 42.1 1 0
LIG 29.82 84 49
S6 29.09 1 0
S1 29.09 1 0
S2 42.1 1 0
S3 35.7 1 0
S4 35.7 1 0
Development

Development Works & Common Area Disclosures

Project-level common infrastructure disclosures as reported by the developer to the RERA authority.

Internal Roads & Footpaths % not reported Water Supply % not reported Sewerage (Chamber, Lines, Septic Tank , Stp) % not reported
Storm Water Drains % not reported Landscaping & Tree Planting % not reported Street Lighting % not reported
Community Buildings % not reported Treatment And Disposal Of Sewage And Sullage Water % not reported Solid Waste Management And Disposal % not reported
Water Conservation /Rain Water Harvesting % not reported Energy Managemcnt % not reported Fire Protection And Fire Safety Requirements % not reported
Electrical Meter Room, Sub-station, Receiving Station % not reported Aggregate Area Of Recreational Open Space % not reported Open Parking % not reported
Activity

Building Activity Progress

Statutory activity-wise construction progress as declared by the developer, per building/tower.

  • LIG 1 PHASE 1
  • LIG 2 PHASE 1
  • LIG 3 PHASE 1
  • LIG 4 PHASE 1 GROUND TO 12 TH FLOOR
  • LIG 5 PHASE 1
  • LIG 6 PHASE 1
  • LIG 7 PHASE 1
  • LIG 8 PHASE 1
  • LIG 9 PHASE 1
  • LIG 10 PHASE 1
  • LIG 11 PHASE 1 GROUND TO 12 TH FLOOR
  • LIG 12 PHASE 1
  • LIG 13 PHASE 1
  • LIG 14 PHASE 1
  • LIG 15 PHASE 1 GROUND TO 7 TH FLOOR
  • EWS 1 PHASE 1 GROUND TO 7 TH FLOOR
  • EWS 2 PHASE 1 GROUND TO 7 TH FLOOR
  • EWS 3 PHASE 1
  • EWS 4 PHASE 1
  • EWS 5 PHASE 1 GROUND TO 13 TH FLOOR
  • EWS 6 PHASE 1 GROUND TO 13 TH FLOOR
  • EWS 7 PHASE 1
  • EWS 8 PHASE 1
  • LIG 4 PHASE 2- 13TH AND 14TH FLOOR
  • LIG 11 PHASE 2 - 13 TH AND 14TH FLOOR
  • LIG 15 PHASE 2 - 8 TH TO 14 TH FLOOR
  • EWS 1 PHASE 2- 8 TH TO 14 TH FLOOR
  • EWS 2 PHASE 2- 8 TH TO 14 TH FLOOR
  • EWS 5 PHASE 2 - 14 TH FLOOR
  • EWS 6 PHASE 2 - 14 TH FLOOR
LIG 1 PHASE 1 · Overall Progress 82%
Stilt Floor
Not Started
% Work0%
Excavation
Complete
% Work100%
Basement (if any)
Complete
% Work100%
Podiums (if any)
Not Started
% Work0%
Plinth
Complete
% Work100%
Slabs of Super Structure
Complete
% Work100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Complete
% Work100%
Sanitary Fittings within the flats / premises
Complete
% Work100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Complete
% Work100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Complete
% Work100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Complete
% Work100%
Documents

RERA Documents & Filings

All statutory documents uploaded by the promoter to the authority portal.

Mh Certificate Pdf
Mh Extension Certificate Pdf
Mh Details Html
Bank

Bank & Cost Disclosure

Declared project cost and the designated escrow account on file.

Project Account Bank AXIS BANK
IFSC UTIB0000072
Branch Address Plot No 84, vardhman Chamber CHS, Sector-17 Vashi Navi Mumbai
Country/City