Squareyards Logo
Blogs
Sell or Rent Property
Login
Rera Banner
residential Partially Ready To Move Source: rera.mh

Goka Gold Valley Konkan RERA Details - P52000005331, Navi Mumbai

View the RERA registration, promoter, approval, building, inventory, document and construction-progress disclosures for Goka Gold Valley Konkan under registration P52000005331 in Navi Mumbai, Maharashtra. Data is sourced from rera.mh.

RERA

RERA Snapshot

The most important statutory project disclosures, generated dynamically from available RERA fields.

  • RERA Number P52000005331
  • Project Name GOLD VALLEY KONKAN
  • Project Type Residential / Group Housing
  • Project Status Partially Ready To Move
  • State Maharashtra
  • District Raigarh
  • Taluka Mangaon
  • Village Sanaswadi
  • Original Completion 31 December 2017
  • Revised Completion 31 December 2017
  • Project Area (in Sq.mt.) 2,530.0
  • Total Buildings/Towers 6
  • Documents 2 Verified
Timeline

Project Timeline & Completion Details

Key statutory dates from registration through proposed completion and permit validity.

Proposed Start 13 November 2017 Expected commencement of civil works and foundation on site.
Original Completion 31 December 2017 Mandated date for project handover to the allottees and final compliance filing.
Revised Completion 31 December 2017 No revision filed against the original committed handover date.
Promoter

Promoter, Organisation & Member Details

Declared promoter entity, address and corporate identifiers on file with the authority.

Organisation Type Company
Individule Name GOKA ENGINEERING CO PVT LTD
Experience Details
Project NameAddressLand AreaProject StatusType of ProjectBuild Plot CountProposed Completion DateProject End DateLitigation PresentLitigation Details
GOLD VALLEY KONKANSANASWADI84453CompletedPlotted2212011-03-302011-03-30NoNA

Promoters, Co-promoters & Members

NameRoleAddress
PRAKASH VASANT KANEManaging DirectorPune, MAHARASHTRA

Understand this Project's RERA details

Get clear answers and additional support from our RERA experts.

RERA Banner
Buildings

Buildings, Towers & Building-Level Details

Statutory building-level disclosures including tower height, sanctioned floors, structural counts and parking areas.

Building Detail
Project Name Name No. of Open Parking No. of Closed Parking No. of Floors No. of Habitable Floor No. of Sanctioned Apartment Wing Name
GOLD VALLEY KONKAN SECTOR A2- A1 4 0 2 0 0 NA
GOLD VALLEY KONKAN GVK A2-A2 4 0 2 0 0 NA
GOLD VALLEY KONKAN GVK A2- D 4 0 2 0 0 NA
GOLD VALLEY KONKAN GVK A2-C1 4 0 2 0 0 NA
GOLD VALLEY KONKAN GVK A2-C2 4 0 2 0 0 NA
GOLD VALLEY KONKAN GVK A2-B 8 0 2 0 0 NA

Scroll horizontally to view all building-level fields. Values marked "-" were not disclosed in the source RERA record.

Inventory

Unit Inventory & Configuration Details

Configuration mix and floor-level disclosures with both grouped and raw RERA views.

Total Units 56
Configurations 1
Inventory Type RESIDENTIAL
Configuration Distribution
RESIDENTIAL 56 units · avg area 709.11 Sq.mt.
  • SECTOR A2- A1
  • GVK A2-A2
  • GVK A2- D
  • GVK A2-C1
  • GVK A2-C2
  • GVK A2-B
Floor-Wise Inventory Explorer
Apartment Type Carpet Area No. of Apartment No. of Booked Apartment
RESIDENTIAL 136.92 4 4
Development

Development Works & Common Area Disclosures

Project-level common infrastructure disclosures as reported by the developer to the RERA authority.

Internal Roads & Footpaths 100.0% Water Supply 100.0% Sewerage (Chamber, Lines, Septic Tank , Stp) 100.0%
Storm Water Drains 100.0% Landscaping & Tree Planting 100.0% Street Lighting 100.0%
Community Buildings % not reported Treatment And Disposal Of Sewage And Sullage Water % not reported Solid Waste Management And Disposal % not reported
Water Conservation /Rain Water Harvesting % not reported Energy Managemcnt % not reported Fire Protection And Fire Safety Requirements % not reported
Electrical Meter Room, Sub-station, Receiving Station 100.0% Aggregate Area Of Recreational Open Space 100.0% Open Parking 100.0%
Activity

Building Activity Progress

Statutory activity-wise construction progress as declared by the developer, per building/tower.

  • SECTOR A2- A1
  • GVK A2-A2
  • GVK A2- D
  • GVK A2-C1
  • GVK A2-C2
  • GVK A2-B
SECTOR A2- A1 · Overall Progress 82%
Excavation
Complete
% Work100%
Basement (if any)
Complete
% Work100%
Podiums (if any)
Not Started
% Work0%
Plinth
Complete
% Work100%
Stilt Floor
Not Started
% Work0%
Slabs of Super Structure
Complete
% Work100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Complete
% Work100%
Sanitary Fittings within the flats / premises
Complete
% Work100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Complete
% Work100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Complete
% Work100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Complete
% Work100%
Documents

RERA Documents & Filings

All statutory documents uploaded by the promoter to the authority portal.

Mh Certificate Pdf
Mh Details Html
Bank

Bank & Cost Disclosure

Declared project cost and the designated escrow account on file.

Project Account Bank BANK OF INDIA
IFSC BKID0001221
Branch Address DHATAV ROHA
Country/City