Squareyards Logo
Blogs
Sell or Rent Property
Login
Rera Banner
residential Ready to Move Source: rera.mh

Metro Tulsi Anmol RERA Details - P52000015079, Navi Mumbai

View the RERA registration, promoter, approval, building, inventory, document and construction-progress disclosures for Metro Tulsi Anmol under registration P52000015079 in Navi Mumbai, MAHARASHTRA. Data is sourced from rera.mh.

RERA

RERA Snapshot

The most important statutory project disclosures, generated dynamically from available RERA fields.

  • RERA Number P52000015079
  • Project Name TULSI ANMOL
  • Project Type Residential
  • Project Status Ready to Move
  • State MAHARASHTRA
  • District Raigarh
  • Taluka Uran
  • Village Bokadvira
  • Original Completion 30 March 2023
  • Project Area (in Sq.mt.) 1,350
  • Total Buildings/Towers 1
  • Documents 47 Verified
Timeline

Project Timeline & Completion Details

Key statutory dates from registration through proposed completion and permit validity.

Proposed Start 23 January 2018 Expected commencement of civil works and foundation on site.
Original Completion 30 March 2023 Mandated date for project handover to the allottees and final compliance filing.
Promoter

Promoter, Organisation & Member Details

Declared promoter entity, address and corporate identifiers on file with the authority.

Organisation Type Company
Individule Name ASHA ENTRADE PVT LTD
Experience Details
Project NameAddressLand AreaType of ProjectBuild Plot CountApartment countProject End Date
TULSI MAHAKPLOT NO 62 SECTOR 17 ULWE750Residential1422013-12-31
TULSI GAURAVPLOT NO 170 SECTOR 02 ULWE2348Others1582016-12-21
Other Description NA

Promoters, Co-promoters & Members

NameRole
RAJESH J SURANAManaging Director
SURESH P JAINManaging Director
UGAMRAJ K DHOKAManaging Director
ASHOK D JAINManaging Director
RAJESH J SURANAAuthorized Signatory

Understand this Project's RERA details

Get clear answers and additional support from our RERA experts.

RERA Banner
Buildings

Buildings, Towers & Building-Level Details

Statutory building-level disclosures including tower height, sanctioned floors, structural counts and parking areas.

Building Detail
Project Name Name Date of Completion No. of Basements No. of Plinth No. of Podium No. of Slab No. of Slits No. of Open Parking No. of Closed Parking
TULSI ANMOL TULSI ANMOL 2022-03-31 1 1 1 23 1 0 24

Scroll horizontally to view all building-level fields. Values marked "-" were not disclosed in the source RERA record.

Inventory

Unit Inventory & Configuration Details

Configuration mix and floor-level disclosures with both grouped and raw RERA views.

Total Units 42
Configurations 1
Inventory Type RESIDENTIAL
Configuration Distribution
2 BHK 42 units · avg area 45.60 Sq.mt.
  • TULSI ANMOL
Floor-Wise Inventory Explorer
Apartment Type Carpet Area No. of Apartment No. of Booked Apartment
2BHK 45.6 42 38
Parking

Parking, Garage & Area Details

Parking provision declared in the sanctioned plan.

Type Proposed Booked Work Done
Garage 0 0 0
Covered Parking 21 0 50
Development

Development Works & Common Area Disclosures

Project-level common infrastructure disclosures as reported by the developer to the RERA authority.

Internal Roads Footpaths 60% Water Conservation Rainwater Harvesting 70% Energy Management % not reported
Fire Protection And Fire Safety Requirements 50% Electrical Meter Room Substation Receivingstation 70% Aggregate Area Of Recreational Open Space % not reported
Open Parking % not reported Water Supply 70% Sewerage 70%
Storm Water Drains 70% Landscaping Tree Planting 20% Street Lighting % not reported
Community Buildings % not reported Treatment And Disposal Of Sewage Sullage Water % not reported Solid Waste Management Disposal % not reported
Activity

Building Activity Progress

Statutory activity-wise construction progress as declared by the developer, per building/tower.

  • TULSI ANMOL
TULSI ANMOL · Overall Progress 83%
Excavation
Complete
% Work100%
X number of Basement(s) and Plinth
Complete
% Work100%
X number of Podiums
Complete
% Work100%
Stilt Floor
Complete
% Work100%
X number of Slabs of Super Structure
Complete
% Work100%
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
In Progress
% Work80%
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
In Progress
% Work40%
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
Complete
% Work100%
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
In Progress
% Work80%
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
In Progress
% Work30%
Documents

RERA Documents & Filings

All statutory documents uploaded by the promoter to the authority portal.

Mh Details Html
Mh Certificate Pdf
Mh Details Pdf
1 Copy Of The Legal Title Report
2 Copy Of The Legal Title Report
1 Details Of Encumbrances
2 Details Of Encumbrances
3 Details Of Encumbrances
1 Copy Of Layout Approval (In Case Of Layout)
1 Building Plan Approval (IOD)
2 Building Plan Approval (IOD)
3 Building Plan Approval (IOD)
1 Commencement Certificates / NA Order For Plotted Development
1 Declaration About Commencement Certificate
1 Declaration In FORM B
2 Declaration In FORM B
1 Certificates Of Architect (Form 1)(Mandatory For Only Ongoing Project)
2 Certificates Of Architect (Form 1)(Mandatory For Only Ongoing Project)
3 Certificates Of Architect (Form 1)(Mandatory For Only Ongoing Project)
4 Certificates Of Architect (Form 1)(Mandatory For Only Ongoing Project)
1 Certificates Of Engineer (Form 2)(Mandatory For Only Ongoing Project)
1 Engineers Certificate On Quality Assurance (Form 2A FY 2019-20)
2 Engineers Certificate On Quality Assurance (Form 2A FY 2019-20)
3 Engineers Certificate On Quality Assurance (Form 2A FY 2019-20)
1 Engineers Certificate On Quality Assurance (Form 2A FY 2020-21)
1 Engineers Certificate On Quality Assurance (Form 2A FY 2021-22)
2 Engineers Certificate On Quality Assurance (Form 2A FY 2021-22)
1 Engineers Certificate On Quality Assurance (Form 2A FY 2022-23)
2 Engineers Certificate On Quality Assurance (Form 2A FY 2022-23)
1 Disclosure Of Sold/ Booked Inventory
2 Disclosure Of Sold/ Booked Inventory
3 Disclosure Of Sold/ Booked Inventory
4 Disclosure Of Sold/ Booked Inventory
1 Annual Audit Report Of Statutory CA (Form 5) (FY 2017-18)
1 Annual Audit Report Of Statutory CA (Form 5) (FY 2018-19)
1 Annual Audit Report Of Statutory CA (Form 5) (FY 2019-20)
1 Annual Audit Report Of Statutory CA (Form 5) (FY 2020-21)
1 Annual Audit Report Of Statutory CA (Form 5) (FY 2021-22)
1 Annual Audit Report Of Statutory CA (Form 5) (FY 2022-23)
1 Annual Audit Report Of Statutory CA (Form 5) (FY 2023-24)
1 Proforma Of Allotment Letter
2 Proforma Of Allotment Letter
3 Proforma Of Allotment Letter
4 Proforma Of Allotment Letter
1 Other
2 Other
3 Other
Bank

Bank & Cost Disclosure

Declared project cost and the designated escrow account on file.

Project Account Bank BANK OF INDIA
IFSC BKID0000138
Country/City