Raheja Tesla Industrial RERA Details - P51700019181, Navi Mumbai

View the RERA registration, promoter, approval, building, inventory, document and construction-progress disclosures for Raheja Tesla Industrial under registration P51700019181 in Navi Mumbai, Maharashtra. Data is sourced from rera.mh.

RERA

RERA Snapshot

The most important statutory project disclosures, generated dynamically from available RERA fields.

  • RERA Number P51700019181
  • Project Name Tesla - Building No.2
  • Project Type Mixed
  • Project Status Under Construction
  • State Maharashtra
  • District Thane
  • Taluka Thane
  • Village Navi Mumbai (M Corp.)
  • Original Completion 30 December 2024
  • Revised Completion 30 December 2025
  • Project Area (in Sq.mt.) 4,745.0
  • Total Buildings/Towers 1
  • Documents 106 Verified
Timeline

Project Timeline & Completion Details

Key statutory dates from registration through proposed completion and permit validity.

Proposed Start 09 January 2019 Expected commencement of civil works and foundation on site.
Original Completion 30 December 2024 Mandated date for project handover to the allottees and final compliance filing.
Revised Completion 30 December 2025 No revision filed against the original committed handover date.
Promoter

Promoter, Organisation & Member Details

Declared promoter entity, address and corporate identifiers on file with the authority.

Organisation Type Company
Individule Name Raheja Universal (Pvt.) Ltd.
Experience Details
Project NameAddressLand AreaProject StatusType of ProjectBuild Plot CountApartment countProposed Completion DateProject End DateLitigation PresentLitigation Details
Raheja Reflections - OdysseyKandivali East Mumbai546.19CompletedResidential / Group Housing1622017-01-312017-04-11NoNA
Raheja Reflections - EternityKandivali East Mumbai1434.79CompletedResidential / Group Housing12292016-03-312016-03-23NoNA
Raheja Waterfront - AtlanticKulai Manglore1505.4CompletedResidential / Group Housing12282014-12-312016-03-02NoNA
Raheja XionByculla - Mumbai3040.66CompletedCommercial1122013-04-302013-04-17NoNA
Raheja RidgewoodGoregaon East - Mumbai11324.2CompletedResidential / Group Housing12782017-03-312017-04-24NoNA
Raheja Waterfront - PacificKulai - Mangalore1505.4CompletedResidential / Group Housing12922014-12-312017-04-26NoNA
Raheja Reflection PlazaKandivali East540.4CompletedCommercial112012-02-232012-02-23NoNA
Raheja Reflections - SerenityKandivali East1119.46CompletedResidential / Group Housing12562014-05-312014-10-01NoNA
Raheja Exotica - Amalfi Sicily and Capri - Phase - IIIMadh Island - Malad West2009.89CompletedResidential / Group Housing33112013-04-302014-06-27NoNA
Tesla Building No 1 - Formerly known as EDISONJuinagar - Navi Mumbai9240.61CompletedOthers12592018-04-202018-04-20NoNA
Raheja Exotica - Sorento 5AMadh Island - Malad West996.48CompletedResidential / Group Housing12112017-10-312017-04-27NoNA
Raheja Exotica - Sorento 5BMadh Island - Malad West754.52CompletedResidential / Group Housing11652017-10-312017-04-27NoNA
Tesla Building No 1 - Formerly known as EDISONJuinagar - Navi Mumbai9240.61CompletedOthers12592018-04-202018-04-20NoNA

Promoters, Co-promoters & Members

NameRoleAddress
ASHISH SURESH RAHEJADIRECTOR Mumbai City, MAHARASHTRA

Understand this Project's RERA details

Get clear answers and additional support from our RERA experts.

RERA Banner
Buildings

Buildings, Towers & Building-Level Details

Statutory building-level disclosures including tower height, sanctioned floors, structural counts and parking areas.

Building Detail
Project Name Name No. of Open Parking No. of Closed Parking No. of Floors CC Issued No. of Habitable Floor No. of Sanctioned Apartment Wing Name
Tesla - Building No.2 Tesla Building No2 0 324 5 5 5 324 NA

Scroll horizontally to view all building-level fields. Values marked "-" were not disclosed in the source RERA record.

Inventory

Unit Inventory & Configuration Details

Configuration mix and floor-level disclosures with both grouped and raw RERA views.

Total Units 324
Configurations 4
Inventory Type COMMERCIAL
Configuration Distribution
A 26 units · avg area 59.16 Sq.mt.
B 28 units · avg area 48.36 Sq.mt.
C 140 units · avg area 63.08 Sq.mt.
D 130 units · avg area 77.38 Sq.mt.
  • Tesla Building No2
Floor-Wise Inventory Explorer
Apartment Type Carpet Area No. of Apartment No. of Booked Apartment
A 59.16 26 25
B 48.36 28 28
C 63.08 140 140
D 77.38 130 130
Development

Development Works & Common Area Disclosures

Project-level common infrastructure disclosures as reported by the developer to the RERA authority.

Internal Roads & Footpaths 60.0% Water Supply 70.0% Sewerage (Chamber, Lines, Septic Tank , Stp) 90.0%
Storm Water Drains 30.0% Landscaping & Tree Planting 90.0% Street Lighting % not reported
Community Buildings % not reported Treatment And Disposal Of Sewage And Sullage Water 100.0% Solid Waste Management And Disposal % not reported
Water Conservation /Rain Water Harvesting % not reported Energy Managemcnt % not reported Fire Protection And Fire Safety Requirements 90.0%
Electrical Meter Room, Sub-station, Receiving Station 25.0% Aggregate Area Of Recreational Open Space % not reported Open Parking % not reported
Activity

Building Activity Progress

Statutory activity-wise construction progress as declared by the developer, per building/tower.

  • Tesla Building No2
Tesla Building No2 · Overall Progress 73%
Excavation
Complete
% Work100%
Basement (if any)
Complete
% Work100%
Podiums (if any)
Not Started
% Work0%
Plinth
Complete
% Work100%
Stilt Floor
Not Started
% Work0%
Slabs of Super Structure
Complete
% Work100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
In Progress
% Work95%
Sanitary Fittings within the flats / premises
In Progress
% Work35%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
In Progress
% Work95%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
In Progress
% Work90%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
In Progress
% Work90%
Documents

RERA Documents & Filings

All statutory documents uploaded by the promoter to the authority portal.

Mh Certificate Pdf
Mh Extension Certificate Pdf
Mh Details Html
1 1 Copy Of The Legal Title Report.Pdf
2 1 Details Of Encumbrances.Pdf
3 1 Copy Of Layout Approval (In Case Of Layout).Pdf
4 2 Copy Of Layout Approval (In Case Of Layout).Pdf
5 3 Copy Of Layout Approval (In Case Of Layout).Pdf
6 1 Building Plan Approval (IOD).Pdf
7 2 Building Plan Approval (IOD).Pdf
8 1 Commencement Certificates NA Order For Plotted Development.Pdf
9 2 Commencement Certificates NA Order For Plotted Development.Pdf
10 1 Declaration About Commencement Certificate.Pdf
11 1 Declaration In FORM B.Pdf
12 1 Architect’S Certificate Of Percentage Of Completion Of Work (Form 1).Pdf
13 2 Architect’S Certificate Of Percentage Of Completion Of Work (Form 1).Pdf
14 3 Architect’S Certificate Of Percentage Of Completion Of Work (Form 1).Pdf
15 4 Architect’S Certificate Of Percentage Of Completion Of Work (Form 1).Pdf
16 5 Architect’S Certificate Of Percentage Of Completion Of Work (Form 1).Pdf
17 6 Architect’S Certificate Of Percentage Of Completion Of Work (Form 1).Pdf
18 7 Architect’S Certificate Of Percentage Of Completion Of Work (Form 1).Pdf
19 8 Architect’S Certificate Of Percentage Of Completion Of Work (Form 1).Pdf
20 9 Architect’S Certificate Of Percentage Of Completion Of Work (Form 1).Pdf
21 10 Architect’S Certificate Of Percentage Of Completion Of Work (Form 1).Pdf
22 11 Architect’S Certificate Of Percentage Of Completion Of Work (Form 1).Pdf
23 12 Architect’S Certificate Of Percentage Of Completion Of Work (Form 1).Pdf
24 13 Architect’S Certificate Of Percentage Of Completion Of Work (Form 1).Pdf
25 14 Architect’S Certificate Of Percentage Of Completion Of Work (Form 1).Pdf
26 15 Architect’S Certificate Of Percentage Of Completion Of Work (Form 1).Pdf
27 16 Architect’S Certificate Of Percentage Of Completion Of Work (Form 1).Pdf
28 17 Architect’S Certificate Of Percentage Of Completion Of Work (Form 1).Pdf
29 18 Architect’S Certificate Of Percentage Of Completion Of Work (Form 1).Pdf
30 19 Architect’S Certificate Of Percentage Of Completion Of Work (Form 1).Pdf
31 20 Architect’S Certificate Of Percentage Of Completion Of Work (Form 1).Pdf
32 21 Architect’S Certificate Of Percentage Of Completion Of Work (Form 1).Pdf
33 22 Architect’S Certificate Of Percentage Of Completion Of Work (Form 1).Pdf
34 23 Architect’S Certificate Of Percentage Of Completion Of Work (Form 1).Pdf
35 1 Engineer’S Certificate On Cost Incurred On Project (Form 2).Pdf
36 2 Engineer’S Certificate On Cost Incurred On Project (Form 2).Pdf
37 3 Engineer’S Certificate On Cost Incurred On Project (Form 2).Pdf
38 4 Engineer’S Certificate On Cost Incurred On Project (Form 2).Pdf
39 5 Engineer’S Certificate On Cost Incurred On Project (Form 2).Pdf
40 6 Engineer’S Certificate On Cost Incurred On Project (Form 2).Pdf
41 7 Engineer’S Certificate On Cost Incurred On Project (Form 2).Pdf
42 8 Engineer’S Certificate On Cost Incurred On Project (Form 2).Pdf
43 9 Engineer’S Certificate On Cost Incurred On Project (Form 2).Pdf
44 10 Engineer’S Certificate On Cost Incurred On Project (Form 2).Pdf
45 11 Engineer’S Certificate On Cost Incurred On Project (Form 2).Pdf
46 12 Engineer’S Certificate On Cost Incurred On Project (Form 2).Pdf
47 13 Engineer’S Certificate On Cost Incurred On Project (Form 2).Pdf
48 14 Engineer’S Certificate On Cost Incurred On Project (Form 2).Pdf
49 15 Engineer’S Certificate On Cost Incurred On Project (Form 2).Pdf
50 16 Engineer’S Certificate On Cost Incurred On Project (Form 2).Pdf
51 17 Engineer’S Certificate On Cost Incurred On Project (Form 2).Pdf
52 1 Form 2A.Pdf
53 2 Form 2A.Pdf
54 3 Form 2A.Pdf
55 4 Form 2A.Pdf
56 5 Form 2A.Pdf
57 1 Disclosure Of Sold Booked Inventory.Pdf
58 2 Disclosure Of Sold Booked Inventory.Pdf
59 3 Disclosure Of Sold Booked Inventory.Pdf
60 4 Disclosure Of Sold Booked Inventory.Pdf
61 5 Disclosure Of Sold Booked Inventory.Pdf
62 6 Disclosure Of Sold Booked Inventory.Pdf
63 7 Disclosure Of Sold Booked Inventory.Pdf
64 8 Disclosure Of Sold Booked Inventory.Pdf
65 1 Certificates Of CA (Form 3).Pdf
66 2 Certificates Of CA (Form 3).Pdf
67 3 Certificates Of CA (Form 3).Pdf
68 4 Certificates Of CA (Form 3).Pdf
69 5 Certificates Of CA (Form 3).Pdf
70 6 Certificates Of CA (Form 3).Pdf
71 7 Certificates Of CA (Form 3).Pdf
72 8 Certificates Of CA (Form 3).Pdf
73 9 Certificates Of CA (Form 3).Pdf
74 10 Certificates Of CA (Form 3).Pdf
75 11 Certificates Of CA (Form 3).Pdf
76 12 Certificates Of CA (Form 3).Pdf
77 13 Certificates Of CA (Form 3).Pdf
78 14 Certificates Of CA (Form 3).Pdf
79 15 Certificates Of CA (Form 3).Pdf
80 16 Certificates Of CA (Form 3).Pdf
81 17 Certificates Of CA (Form 3).Pdf
82 18 Certificates Of CA (Form 3).Pdf
83 19 Certificates Of CA (Form 3).Pdf
84 20 Certificates Of CA (Form 3).Pdf
85 21 Certificates Of CA (Form 3).Pdf
86 22 Certificates Of CA (Form 3).Pdf
87 23 Certificates Of CA (Form 3).Pdf
88 24 Certificates Of CA (Form 3).Pdf
89 1 Annual Audit Report Of Statutory CA (Form 5).Pdf
90 1 Annual Audit Report Of Statutory CA (Form 5) (FY 2018 19).Pdf
91 1 Annual Audit Report Of Statutory CA (Form 5) (FY 2019 20).Pdf
92 1 Annual Audit Report Of Statutory CA (Form 5) (FY 2020 21).Pdf
93 1 Annual Audit Report Of Statutory CA (Form 5) (FY 2021 22).Pdf
94 1 Annual Audit Report Of Statutory CA (Form 5) (FY 2022 23).Pdf
95 1 Proforma Of Allotment Letter.Pdf
96 2 Proforma Of Allotment Letter.Pdf
97 1 Other.Pdf
98 2 Other.Pdf
105 1 Engineers Certificate On Quality Assurance (Form 2A FY 2023 24).Pdf
106 1 Annual Audit Report Of Statutory CA (Form 5) (FY 2023 24).Pdf
107 Withdrawal Update Form 1.Pdf
118 Withdrawal Update Form 2.Pdf
129 Withdrawal Update Form 3.Pdf
Bank

Bank & Cost Disclosure

Declared project cost and the designated escrow account on file.

Project Account Bank HDFC BANK
IFSC HDFC0000060
Branch Address Ground Floor, Jehangir Bldg, MG Road, Fort, Mumbai 400001
Country/City