residential Ready to Move Source: rera.mh

Reliable Balaji Aura RERA Details - P51700003428, Navi Mumbai

View the RERA registration, promoter, approval, building, inventory, document and construction-progress disclosures for Reliable Balaji Aura under registration P51700003428 in Navi Mumbai, Maharashtra. Data is sourced from rera.mh.

RERA

RERA Snapshot

The most important statutory project disclosures, generated dynamically from available RERA fields.

  • RERA Number P51700003428
  • Project Name BALAJI AURA
  • Project Type Others
  • Project Status Ready to Move
  • State Maharashtra
  • District Raigarh
  • Taluka Panvel
  • Village Taloje Panchnad
  • Original Completion 30 September 2022
  • Revised Completion 30 August 2024
  • Project Area (in Sq.mt.) 1,949.5
  • Total Buildings/Towers 1
  • Documents 3 Verified
Timeline

Project Timeline & Completion Details

Key statutory dates from registration through proposed completion and permit validity.

Proposed Start 05 August 2017 Expected commencement of civil works and foundation on site.
Original Completion 30 September 2022 Mandated date for project handover to the allottees and final compliance filing.
Revised Completion 30 August 2024 No revision filed against the original committed handover date.
Promoter

Promoter, Organisation & Member Details

Declared promoter entity, address and corporate identifiers on file with the authority.

Organisation Type Individual
Experience Details
Project NameAddressLand AreaProject StatusType of ProjectBuild Plot CountApartment countProposed Completion DateProject End DateLitigation PresentLitigation Details
BALAJI ANCHALPLOT NO B46 ULWE PANVEL 410206950CompletedIndustrial1422018-12-312018-12-31NoNA

Understand this Project's RERA details

Get clear answers and additional support from our RERA experts.

RERA Banner
Buildings

Buildings, Towers & Building-Level Details

Statutory building-level disclosures including tower height, sanctioned floors, structural counts and parking areas.

Building Detail
Project Name Name No. of Open Parking No. of Closed Parking No. of Floors No. of Habitable Floor No. of Sanctioned Apartment Wing Name
BALAJI AURA BALAJI AURA 0 39 23 0 0 NA

Scroll horizontally to view all building-level fields. Values marked "-" were not disclosed in the source RERA record.

Inventory

Unit Inventory & Configuration Details

Configuration mix and floor-level disclosures with both grouped and raw RERA views.

Total Units 96
Configurations 3
Inventory Type RESIDENTIAL
Configuration Distribution
1 BHK 38 units · avg area 24.35 Sq.mt.
2 BHK 38 units · avg area 39.14 Sq.mt.
Shop 20 units · avg area 21.14 Sq.mt.
  • BALAJI AURA
Floor-Wise Inventory Explorer
Apartment Type Carpet Area No. of Apartment No. of Booked Apartment
2BHK 39.27 19 17
1BHK 24.05 19 14
1BHK 24.65 19 14
2BHK 39.01 19 18
Shop 33.37 1 1
Shop 27.55 1 1
Shop 28.08 1 0
Shop 18.09 2 0
Shop 8.43 2 0
Shop 27.93 1 1
Shop 25.29 1 1
Shop 25.24 1 1
Shop 18.2 2 0
Shop 17.63 2 0
Shop 24.77 1 0
Shop 9.06 2 2
Shop 37.73 1 1
Shop 23.41 1 1
Shop 26.51 1 1
Development

Development Works & Common Area Disclosures

Project-level common infrastructure disclosures as reported by the developer to the RERA authority.

Internal Roads & Footpaths % not reported Water Supply 100.0% Sewerage (Chamber, Lines, Septic Tank , Stp) 100.0%
Storm Water Drains 100.0% Landscaping & Tree Planting 100.0% Street Lighting % not reported
Community Buildings 100.0% Treatment And Disposal Of Sewage And Sullage Water % not reported Solid Waste Management And Disposal % not reported
Water Conservation /Rain Water Harvesting 100.0% Energy Managemcnt % not reported Fire Protection And Fire Safety Requirements 100.0%
Electrical Meter Room, Sub-station, Receiving Station 100.0% Aggregate Area Of Recreational Open Space % not reported Open Parking % not reported
Water Supply 100.0%
Activity

Building Activity Progress

Statutory activity-wise construction progress as declared by the developer, per building/tower.

  • BALAJI AURA
BALAJI AURA · Overall Progress 98%
Excavation
Complete
% Work100%
Basement (if any)
Complete
% Work100%
Podiums (if any)
Complete
% Work100%
Plinth
Complete
% Work100%
Stilt Floor
In Progress
% Work90%
Slabs of Super Structure
Complete
% Work100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Complete
% Work100%
Sanitary Fittings within the flats / premises
In Progress
% Work95%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
In Progress
% Work95%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
In Progress
% Work95%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Complete
% Work100%
Documents

RERA Documents & Filings

All statutory documents uploaded by the promoter to the authority portal.

Mh Certificate Pdf
Mh Extension Certificate Pdf
Mh Details Html
Bank

Bank & Cost Disclosure

Declared project cost and the designated escrow account on file.

Project Account Bank DCB BANK LIMITED
IFSC DCBL0000030
Branch Address SECTOR 17 VASHI NAVI MUMBAI
Country/City