RERA Snapshot
The most important statutory project disclosures, generated dynamically from available RERA fields.
- RERA Number P52100005657
- Project Name Cove - Lake District - Phase II
- Project Type Residential / Group Housing
- Project Status Ready to Move
- State Maharashtra
- District Pune
- Taluka Haveli
- Village YAWALEWADI
- Original Completion 30 March 2023
- Revised Completion 30 March 2023
- Project Area (in Sq.mt.) 4,605.0
- Total Buildings/Towers 2
- Documents 2 Verified
Project Timeline & Completion Details
Key statutory dates from registration through proposed completion and permit validity.
Promoter, Organisation & Member Details
Declared promoter entity, address and corporate identifiers on file with the authority.
Land, Address & Location Details
Land parcel, zoning and geo-coordinates as recorded in the project filing.
| Survey Number Survey No 16P i.e.16/1/8A/1,16/1/8A/2,16/1/8B/1 and 16/1/8B/2 | |
Boundary Details |
|
| Boundaries East Survey No 16-1-8B-1P and 16-1-8B-2P | Boundaries West Survey No 16-1-8A-1P and16-1-8A-2P and internal rd |
| Boundaries South Survey No 16-3 | Boundaries North Survey No 16-1-9 |
RERA Coordinates |
|
| Latitude, Longitude 18.425661000000000, 73.897482000000000 | |
Buildings, Towers & Building-Level Details
Statutory building-level disclosures including tower height, sanctioned floors, structural counts and parking areas.
Scroll horizontally to view all building-level fields. Values marked "-" were not disclosed in the source RERA record.
Unit Inventory & Configuration Details
Configuration mix and floor-level disclosures with both grouped and raw RERA views.
Development Works & Common Area Disclosures
Project-level common infrastructure disclosures as reported by the developer to the RERA authority.
| Internal Roads & Footpaths 40.0% | Water Supply 30.0% | Sewerage (Chamber, Lines, Septic Tank , Stp) % not reported |
| Storm Water Drains 30.0% | Landscaping & Tree Planting 10.0% | Street Lighting 30.0% |
| Community Buildings 100.0% | Treatment And Disposal Of Sewage And Sullage Water % not reported | Solid Waste Management And Disposal % not reported |
| Water Conservation /Rain Water Harvesting % not reported | Energy Managemcnt % not reported | Fire Protection And Fire Safety Requirements % not reported |
| Electrical Meter Room, Sub-station, Receiving Station 60.0% | Aggregate Area Of Recreational Open Space % not reported | Open Parking % not reported |
| Other Tennis Court Children Play Area Swimming Pool 100.0% |
Building Activity Progress
Statutory activity-wise construction progress as declared by the developer, per building/tower.
RERA Documents & Filings
All statutory documents uploaded by the promoter to the authority portal.
Bank & Cost Disclosure
Declared project cost and the designated escrow account on file.
| Project Account Bank | HDFC BANK |
|---|---|
| IFSC | HDFC0000007 |
| Branch Address | Laukik Apartments, Ground Floor, Plot No 3, CTS No 870, Bhandarkar Road, Pune - 411004, Maharashtra, |