Squareyards Logo
Blogs
Sell or Rent Property
Login
Rera Banner
residential New Launch Source: rera.ka

Ruchira The Rise RERA Details - PRM/KA/RERA/1251/446/PR/160726/008812 Bangalore

View the RERA registration, promoter, approval, building, inventory, document and construction-progress disclosures for Ruchira The Rise under registration PRM/KA/RERA/1251/446/PR/160726/008812 in Bangalore, Karnataka. Data is sourced from rera.ka.

RERA

RERA Snapshot

The most important statutory project disclosures, generated dynamically from available RERA fields.

  • RERA Number PRM/KA/RERA/1251/446/PR/160726/008812
  • Project Name RUCHIRA THE RISE
  • Project Type Residential/Group Housing
  • Project Status New Launch
  • District Bengaluru Urban
  • Taluka Bengaluru East
  • Original Completion 30 October 2031
  • Documents 108 Verified
Timeline

Project Timeline & Completion Details

Key statutory dates from registration through proposed completion and permit validity.

Proposed Start 01 August 2026 Expected commencement of civil works and foundation on site.
Original Completion 30 October 2031 Mandated date for project handover to the allottees and final compliance filing.
Promoter

Promoter, Organisation & Member Details

Declared promoter entity, address and corporate identifiers on file with the authority.

Primary Promoter

Ruchira Developers LLP
Registered Address 3rd floor, No-12/03, Agasthya Spaces, Pattandur Agrahara Village,Whitefield, Survey No-4 ,Bengaluru East ,Bengaluru Urban-560066
Experience Details
Location

Land, Address & Location Details

Land parcel, zoning and geo-coordinates as recorded in the project filing.

Address Sy No 2/2, 2/3, 2/4 & 2/5 KONDASANAPURA VILLAGE , BIDARAHALLI HOBLI , Bengaluru East , Bengaluru Urban, Karnataka - 560049

RERA Coordinates

Latitude, Longitude 13.046377343995502, 77.751187484354
Plans

Plans & Approvals

Statutory approvals obtained or pending against the project site.

Plan Approval No. BDA/PS/EM/EO-5/TE-4/EAST/13/2026-27
Authority BDA - Bangalore Development Authority
Approved Date 17 June 2026

Understand this Project's RERA details

Get clear answers and additional support from our RERA experts.

RERA Banner
Buildings

Buildings, Towers & Building-Level Details

Statutory building-level disclosures including tower height, sanctioned floors, structural counts and parking areas.

Building Detail
Name No. of Basements No. of Slab No. of Slits No. of Open Parking Building Type Height of Tower No. of Floors No. of Units
WING-A 2 45 2 220 Residential 148.15 42 220
WING-B 2 37 2 122 Residential 120.15 34 122

Scroll horizontally to view all building-level fields. Values marked "-" were not disclosed in the source RERA record.

Inventory

Unit Inventory & Configuration Details

Configuration mix and floor-level disclosures with both grouped and raw RERA views.

Total Units -
Configurations 4
Inventory Type RESIDENTIAL
Configuration Distribution
2 BHK 0 units
3 BHK 0 units
4 BHK 0 units
5 BHK 0 units
  • WING-A
  • WING-B
Floor-Wise Inventory Explorer
Floor Apartment Type Carpet Area No. of Unit
2 3 BHK 114.31 1031
2 3 BHK 113.77 1032
2 2 BHK 87.34 1033
2 2 BHK 87.33 1034
3 3 BHK 114.16 1041
3 3 BHK 113.61 1042
3 2 BHK 87.34 1043
3 2 BHK 87.34 1044
3 3 BHK 121.026 1045
3 3 BHK 121.026 1046
4 3 BHK 114.16 1051
4 3 BHK 113.61 1052
4 2 BHK 87.34 1053
4 2 BHK 87.34 1054
4 3 BHK 121.026 1055
4 3 BHK 121.026 1056
5 3 BHK 114.16 1061
5 3 BHK 113.61 1062
5 2 BHK 87.34 1063
5 2 BHK 87.34 1064
5 3 BHK 121.026 1065
5 3 BHK 121.026 1066
6 3 BHK 114.16 1071
6 3 BHK 113.61 1072
6 2 BHK 87.34 1073
6 2 BHK 87.34 1074
6 3 BHK 121.026 1075
6 3 BHK 121.026 1076
7 3 BHK 114.16 1081
7 3 BHK 113.61 1082
7 2 BHK 87.34 1083
7 2 BHK 87.34 1084
7 3 BHK 121.026 1085
7 3 BHK 121.026 1086
8 3 BHK 114.16 1091
8 3 BHK 113.61 1092
8 2 BHK 87.34 1093
8 2 BHK 87.34 1094
8 3 BHK 121.026 1095
8 3 BHK 121.026 1096
9 3 BHK 114.16 1101
9 3 BHK 113.61 1102
9 2 BHK 87.34 1103
9 2 BHK 87.34 1104
9 3 BHK 121.026 1105
9 3 BHK 121.026 1106
10 3 BHK 114.16 1111
10 3 BHK 113.61 1112
10 2 BHK 87.34 1113
10 2 BHK 87.34 1114
10 3 BHK 121.026 1115
10 3 BHK 121.026 1116
11 3 BHK 114.16 1121
11 3 BHK 113.61 1122
11 2 BHK 87.34 1123
11 2 BHK 87.34 1124
11 3 BHK 121.026 1125
11 3 BHK 121.026 1126
12 3 BHK 114.16 1131
12 3 BHK 113.61 1132
12 2 BHK 87.34 1133
12 2 BHK 87.34 1134
12 3 BHK 121.026 1135
12 3 BHK 121.026 1136
13 3 BHK 114.16 1141
13 3 BHK 113.61 1142
13 2 BHK 87.34 1143
13 2 BHK 87.34 1144
13 3 BHK 121.026 1145
13 3 BHK 121.026 1146
14 3 BHK 114.16 1151
14 3 BHK 113.61 1152
14 2 BHK 87.34 1153
14 2 BHK 87.34 1154
14 3 BHK 121.026 1155
14 3 BHK 121.026 1156
15 3 BHK 114.16 1161
15 3 BHK 113.61 1162
15 2 BHK 87.34 1163
15 2 BHK 87.34 1164
15 3 BHK 121.026 1165
15 3 BHK 121.026 1166
16 3 BHK 114.16 1171
16 3 BHK 113.61 1172
16 2 BHK 87.34 1173
16 2 BHK 87.34 1174
16 3 BHK 121.026 1175
16 2 BHK 102.866 1176
17 3 BHK 114.16 1181
17 3 BHK 113.61 1182
17 2 BHK 87.34 1183
17 2 BHK 87.34 1184
17 3 BHK 121.026 1185
17 3 BHK 121.026 1186
18 3 BHK 114.16 1191
18 3 BHK 113.61 1192
18 2 BHK 87.34 1193
18 2 BHK 87.34 1194
18 3 BHK 121.026 1195
18 3 BHK 121.026 1196
19 3 BHK 114.16 1201
19 3 BHK 113.61 1202
19 2 BHK 87.34 1203
19 2 BHK 87.34 1204
19 3 BHK 121.026 1205
19 3 BHK 121.026 1206
20 3 BHK 114.16 1211
20 3 BHK 113.61 1212
20 2 BHK 87.34 1213
20 2 BHK 87.34 1214
20 3 BHK 121.026 1215
20 3 BHK 121.026 1216
21 3 BHK 114.16 1221
21 3 BHK 113.61 1222
21 2 BHK 87.34 1223
21 2 BHK 87.34 1224
21 3 BHK 121.026 1225
21 3 BHK 121.026 1226
22 3 BHK 114.16 1231
22 3 BHK 113.61 1232
22 2 BHK 87.34 1233
22 2 BHK 87.34 1234
22 3 BHK 121.026 1235
22 3 BHK 121.026 1236
23 3 BHK 114.16 1241
23 3 BHK 113.61 1242
23 2 BHK 87.34 1243
23 2 BHK 87.34 1244
23 3 BHK 121.026 1245
23 3 BHK 121.026 1246
24 3 BHK 114.16 1251
24 3 BHK 113.61 1252
24 2 BHK 87.34 1253
24 2 BHK 87.34 1254
24 3 BHK 121.026 1255
24 3 BHK 121.026 1256
25 3 BHK 114.16 1261
25 3 BHK 113.61 1262
25 2 BHK 87.34 1263
25 2 BHK 87.34 1264
25 3 BHK 121.026 1265
25 2 BHK 102.866 1266
26 3 BHK 114.16 1271
26 3 BHK 113.61 1272
26 2 BHK 87.34 1273
26 2 BHK 87.34 1274
26 3 BHK 121.026 1275
26 3 BHK 121.026 1276
27 3 BHK 114.16 1281
27 3 BHK 113.61 1282
27 2 BHK 87.34 1283
27 2 BHK 87.34 1284
27 3 BHK 121.026 1285
27 3 BHK 121.026 1286
28 3 BHK 114.16 1291
28 3 BHK 113.61 1292
28 2 BHK 87.34 1293
28 2 BHK 87.34 1294
28 3 BHK 121.026 1295
28 3 BHK 121.026 1296
29 3 BHK 114.16 1301
29 3 BHK 113.61 1302
29 2 BHK 87.34 1303
29 2 BHK 87.34 1304
29 3 BHK 121.026 1305
29 3 BHK 121.026 1306
30 3 BHK 114.16 1311
30 3 BHK 113.61 1312
30 2 BHK 87.34 1313
30 2 BHK 87.34 1314
30 3 BHK 121.026 1315
30 3 BHK 121.026 1316
31 3 BHK 114.16 1321
31 3 BHK 113.61 1322
31 2 BHK 87.34 1323
31 2 BHK 87.34 1324
31 3 BHK 121.026 1325
31 3 BHK 121.026 1326
32 3 BHK 114.16 1331
32 3 BHK 113.61 1332
32 2 BHK 87.34 1333
32 2 BHK 87.34 1334
32 3 BHK 121.026 1335
32 2 BHK 102.866 1336
34 3 BHK 114.17 1351
34 3 BHK 113.41 1352
34 DUPLEX-4 BHK 371.6 1353
34 3 BHK 121.17 1355
34 3 BHK 121.17 1356
35 3 BHK 114.16 1361
35 3 BHK 113.61 1362
35 3 BHK 121.026 1365
35 3 BHK 121.026 1366
36 3 BHK 114.16 1371
36 3 BHK 113.61 1372
36 DUPLEX-4 BHK 371.29 1373
36 3 BHK 121.026 1375
36 3 BHK 121.026 1376
37 3 BHK 114.16 1381
37 3 BHK 113.61 1382
37 3 BHK 121.026 1375
37 3 BHK 121.026 1376
38 3 BHK 114.16 1391
38 3 BHK 113.61 1392
38 DUPLEX-4 BHK 371.29 1393
38 3 BHK 121.026 1395
38 3 BHK 121.026 1396
39 3 BHK 114.16 1401
39 3 BHK 113.61 1402
39 3 BHK 121.026 1405
39 3 BHK 121.026 1406
40 3 BHK 114.16 1411
40 3 BHK 113.61 1412
40 DUPLEX-4 BHK 371.29 1413
40 3 BHK 121.026 1415
40 2 BHK 102.866 1416
41 3 BHK 114.16 1421
41 3 BHK 113.61 1422
41 3 BHK 121.026 1425
41 3 BHK 121.026 1426
Parking

Parking, Garage & Area Details

Parking provision declared in the sanctioned plan.

Type Proposed Booked Work Done
Garage - - -
Covered Parking - - -
Open Parking - - -
Development

Development Works & Common Area Disclosures

Project-level common infrastructure disclosures as reported by the developer to the RERA authority.

Sub Structure Earth Work And Other Leveling Preparation Work % not reported Sub Structure Foundation Footing Work % not reported Sub Structure Upto Plinth Level % not reported
Sub Structure Sub-structure Flooring (Parking Floor, More Than One Floor Below General Ground Level) % not reported Sub Structure Retaining Wall (All Types) % not reported Sup Structure Rcc Or Ms Framed Structure % not reported
Sup Structure Masonry Construction % not reported Sup Structure Plastering Inside , Outside & Ceiling % not reported Sup Structure Joinery: Doors, Windows, Ventilators Etc % not reported
Sup Structure Basic Work Of Water Supply, Sanitary And Electrification % not reported Sup Structure Dadoing, Skirting, Flooring, Tiles Work (All Types) % not reported Sup Structure Railing And Grill Fixing % not reported
Finishing Works Electrification, Water Supply And Sanitary Finishing % not reported Finishing Works Painting % not reported Finishing Works Fire Prevention And Fire Fighting Fitting And Fixture With Network % not reported
Finishing Works Weather Proof Work(tile,concrete) % not reported Finishing Works Wardrobe, Showcase, Kitchen Cabinet, Puja Work % not reported Finishing Works Elevation Work % not reported
Finishing Works Internal And External Work Including Landscapes As Per Sanctioned Drawings % not reported Internal Infrastructure Water Supply % not reported Internal Infrastructure Sewage And Drainage System % not reported
Internal Infrastructure Water Conservation/rain Water Harvesting/recharge Of Ground Water % not reported Internal Infrastructure Energy Management % not reported Internal Infrastructure Fire Protection And Fire Safety Requirements % not reported
Internal Infrastructure Solid Waste Management And Disposal % not reported Internal Infrastructure Emergency Evacuation Services % not reported External Infrastructure Water Supply % not reported
External Infrastructure Internal Roads & Footpaths % not reported External Infrastructure Sewage And Drainage System % not reported External Infrastructure Electricity Supply Transformer And Substation % not reported
External Infrastructure Solid Waste Management And Disposal % not reported External Infrastructure Emergency Evacuation Services % not reported External Infrastructure Storm Water Drains % not reported
External Infrastructure Use Of Renewable Energy % not reported External Infrastructure Water Conservation/rain Water Harvesting/recharge Of Ground Water % not reported External Infrastructure Fire Protection And Fire Safety Requirements % not reported
External Infrastructure Sewage Treatment Plant (Stp) % not reported External Infrastructure Parks & Tree Planting % not reported External Infrastructure Street Lighting % not reported
Amenities Electricity % not reported Amenities Smart Home Automation % not reported Amenities Cctv Surveillance % not reported
Amenities Club House % not reported Amenities Community Hall % not reported Amenities Outdoor Sports Facility % not reported
Amenities Indoor Sports Facility % not reported Amenities Swimming Pool % not reported Amenities Gym % not reported
Amenities Parks % not reported Amenities Power Backup % not reported Amenities Piped Gas % not reported
Amenities Water And Sanitation % not reported Amenities Air Conditioning % not reported Common Areas Staircases % not reported
Common Areas Lifts % not reported Common Areas Corridor/lobbies % not reported Common Areas Fire Escapes % not reported
Common Areas Common Entrance And Exit For The Building/common Portico/foyer/verandah % not reported Common Areas Basement % not reported Common Areas Terrace % not reported
Common Areas Outer Wall % not reported Common Areas Open Parking Areas % not reported Common Areas Provision For Lodging Of Management Staff And Security Staff % not reported
Common Areas Water Conservation And Renewable Energy % not reported Common Areas Common Storage Spaces % not reported
Documents

RERA Documents & Filings

All statutory documents uploaded by the promoter to the authority portal.

Promoter Registration Certificate
Promoter Pan Card
Promoter Address Proof
Affidavit
Fd 1 Ruchira Developers LLP AY 2025-26-BS.Pdf
Fd 2 3 2 Ruchira BS AY 2024-25.Pdf
Fd 3 2 2 Ruchira BS AY-2023-24.Pdf
Fd 4 Ruchira Developers LLP AY 2025-26-PL.Pdf
Fd 5 3 1 Ruchira P And L AY 2024-25.Pdf
Fd 6 2 1 Ruchira P And L AY-2023-24.Pdf
Fd 7 Ruchira Developers LLP AY 2025-26-ITR.Pdf
Fd 8 3 0 Ruchira ITR AY-2024-25.Pdf
Fd 9 2 0 Ruchira ITR AY-2023-24.Pdf
Pd 2 Approved Building Plan( Annexure - 81 )
Pd 3 Sectional Drawing Of The Apartments( Annexure - 82 )
Pd 4 Certificate From Registered Engineer Indicating The Structural Safety Of The Building( Annexure - 83 )
Pd 5 Project Specifications( Annexure - 84 )
Pd 8 Proforma Of Agreement For Sale( Annexure - 87 )
Pd 9 Proforma Of Allotment Letter( Annexure - 88 )
Dc 1 Declaration (Form B)( Annexure - 89 )
Dc 2 Section 3(1) Notarized Affidavit( Annexure - 90 )
Dc 4 Advocate Search Report( Annexure - 92 )
Noc 1 ESCOM Electricity( Annexure - 95 )
Noc 2 KWSSB Water( Annexure - 96 )
Noc 3 KSPCB( Annexure - 97 )
Noc 4 SEIAA( Annexure - 98 )
Noc 5 Fire Force Department( Annexure - 99 )
Noc 6 Airport Authority Of India( Annexure - 100 )
Noc 7 BSNL( Annexure - 101 )
Photo 1 Project Photo
Photo 2 Project Photo
Photo 3 Project Photo
Photo 4 Project Photo
Photo 5 Project Photo
Od 1 3 BSNL NOC.Pdf
Od 2 2 BESCOM NOC And Fees Receipt.Pdf
Od 3 4 2 PCB CFE PAYMENT RECEIPT.Pdf
Od 4 6 3 MOEF Fees Challan.Pdf
Od 5 1 1 OMR DP Plan.Pdf
Od 6 1 2 OMR DP Order Copy.Pdf
Od 7 1 3 DP Fees Paid Receipt .Pdf
Od 8 BDA PLAN - ALL FLOORS - Colour.Pdf
Od 9 BDA PLAN - ALL FLOORS - BW.Pdf
Od 10 3 2 BDA Buliding Plan Sanction Letter .Pdf
Od 11 3 3 Fees Receipt Buliding Plan.Pdf
Od 12 Flat Areas Statements-Wing A-B.Pdf
Od 13 SIGNED STP LAYOUT DRAWING -RERA.Pdf
Od 14 STP Marking In Plan.Pdf
Od 15 Cost Breakup Letter.Pdf
Od 16 7 Guidelines Value Report Konadaspura.Pdf
Od 17 4 Guidance Value Calculation.Pdf
Od 18 Konadasapura - CDP.Pdf
Od 19 Konadaspura Village Map.Pdf
Od 20 Konadasapura - CDP.Pdf
Od 21 Konadasapura Village Map Site Marked.Pdf
Od 22 Nala Shifting Order No LND(E)CR 40-2017-18.Pdf
Od 23 Nala Shifted Sketch Order Signed .Pdf
Od 24 0 Sale Deed Ruchira - 374-24-25.Pdf
Od 25 OMR MOTD Tata Capital.Pdf
Od 26 TATA MOTD 2.Pdf
Od 27 Doc No 1632-2018-19 Relinquishment Deed.Pdf
Od 28 Cancellation Of Relinquishment.Pdf
Od 29 1 Gift Deed - Vanaja Choudhaury - 759.Pdf
Od 30 2 2 Sy No 2-3 - 34146 -2006-2007.Pdf
Od 31 2 1 Sy No 2-2 - 34921 -2006-2007.Pdf
Od 32 2 3 Sy No 2-4 - 34148 -2006-2007.Pdf
Od 33 2 4 Sy No 2-5 - 34147 -2006-2007.Pdf
Od 34 Akarband1 To 6.Pdf
Od 35 Sy No 2 Survey Records.Pdf
Od 36 2 1-13 Site Plan.Pdf
Od 37 2 2 Basement 2 Plan.Pdf
Od 38 2 3 Basement 1 Plan.Pdf
Od 39 2 4 Ground Floor Plan.Pdf
Od 40 2 5 First Floor Plan(Podium-01).Pdf
Od 41 2 6 Second Floor Plan(Podium-02).Pdf
Od 42 2 7 Third Floor Plan.Pdf
Od 43 2 8 Typical Floor Plans.Pdf
Od 44 2 9 Typical Floor Plans.Pdf
Od 45 2 10 Typical Floor Plans.Pdf
Od 46 2 11 Typical Floor Plans.Pdf
Od 47 2 12 Section Plan.Pdf
Od 48 2 13 Elevation Plan.Pdf
Od 49 5 Regd Project Sales.Pdf
Od 50 7 Source Of Funds- New Format.Pdf
Od 51 8 TATA CAPITAL-Loan Closing Letter.Pdf
Ed 1 07-07-2026
Ed 2 07-07-2026
Ed 3 07-07-2026
Ed 4 07-07-2026
Ed 5 07-07-2026
Ed 6 07-07-2026
Ed 7 07-07-2026
Ed 8 07-07-2026
Ed 9 07-07-2026
Ed 10 07-07-2026
Ed 11 07-07-2026
Ed 12 07-07-2026
Ed 13 07-07-2026
Ed 14 07-07-2026
Ed 15 07-07-2026
Ed 16 07-07-2026
Ed 17 07-07-2026
Ld Rtc
Ld Mutation
Ld Encumbrance Certificate
Ld Conversion Order
Ld Sale Deed
Ld Khatha
Bank

Bank & Cost Disclosure

Declared project cost and the designated escrow account on file.

Project Account Bank HDFC
Account Number (RERA) 502001110543798
IFSC HDFC0004182
Branch Address Whitefield, Bangalore
Country/City