Squareyards Logo
Blogs
Sell or Rent Property
Login
Rera Banner
residential New Launch Source: rera.ka

Adna Life Square RERA Details - PRM/KA/RERA/1251/308/PR/081025/008144 Bangalore

View the RERA registration, promoter, approval, building, inventory, document and construction-progress disclosures for Adna Life Square under registration PRM/KA/RERA/1251/308/PR/081025/008144 in Bangalore, Karnataka. Data is sourced from rera.ka.

RERA

RERA Snapshot

The most important statutory project disclosures, generated dynamically from available RERA fields.

  • RERA Number PRM/KA/RERA/1251/308/PR/081025/008144
  • Project Name ADNA LIFE SQUARE
  • Project Type Residential/Group Housing
  • Project Status New Launch
  • District Bengaluru Urban
  • Taluka Anekal
  • Original Completion 01 November 2029
  • Documents 80 Verified
Timeline

Project Timeline & Completion Details

Key statutory dates from registration through proposed completion and permit validity.

Proposed Start 01 August 2025 Expected commencement of civil works and foundation on site.
Original Completion 01 November 2029 Mandated date for project handover to the allottees and final compliance filing.
Promoter

Promoter, Organisation & Member Details

Declared promoter entity, address and corporate identifiers on file with the authority.

Primary Promoter

ADNA PROJECTS LLP
Registered Address 349, 17th C Main Road, 15th Cross Road,HSR Layout, Sector 4 ,Bengaluru South ,Bengaluru Urban-560102
Location

Land, Address & Location Details

Land parcel, zoning and geo-coordinates as recorded in the project filing.

Address Sy No 56, Iggaluru Village , Attibele Hobli , Anekal , Bengaluru Urban, Karnataka - 560099

RERA Coordinates

Latitude, Longitude 12.783047, 77.704587
Plans

Plans & Approvals

Statutory approvals obtained or pending against the project site.

Plan Approval No. CC-843/2024-25
Authority Anekal Planning Authority
Approved Date 12 March 2025

Understand this Project's RERA details

Get clear answers and additional support from our RERA experts.

RERA Banner
Buildings

Buildings, Towers & Building-Level Details

Statutory building-level disclosures including tower height, sanctioned floors, structural counts and parking areas.

Building Detail
Name No. of Basements No. of Slab No. of Slits No. of Open Parking Building Type Height of Tower No. of Floors No. of Units
TOWER 1 0 4 1 110 Residential 14.95 3 100

Scroll horizontally to view all building-level fields. Values marked "-" were not disclosed in the source RERA record.

Inventory

Unit Inventory & Configuration Details

Configuration mix and floor-level disclosures with both grouped and raw RERA views.

Total Units -
Configurations 3
Inventory Type RESIDENTIAL
Configuration Distribution
2 BHK 0 units
3 BHK 0 units
5 BHK 0 units
  • TOWER 1
Floor-Wise Inventory Explorer
Floor Apartment Type Carpet Area No. of Unit
-1 3 BHK 89.24 001
-1 3 BHK 95.95 002
-1 3 BHK 99.25 003
-1 3 BHK 74.28 004
-1 3 BHK 99.25 005
-1 3 BHK 82.82 006
-1 2 BHK 58.34 007
-1 3 BHK 89.18 008
-1 3 BHK 81.70 009
-1 3 BHK 89.11 010
-1 3 BHK 81.70 011
-1 3 BHK 89.11 012
-1 3 BHK 81.70 013
-1 3 BHK 89.11 014
-1 3 BHK 89.11 015
-1 3 BHK 91.32 016
-1 3 BHK 91.54 017
-1 3 BHK 92.81 018
-1 3 BHK 77.29 019
-1 2.5 BHK 73.57 020
-1 3 BHK 94.12 021
-1 3 BHK 94.12 022
-1 3 BHK 89.39 023
-1 3 BHK 94.12 024
-1 3 BHK 77.45 025
GF 3 BHK 89.24 101
GF 3 BHK 98.23 102
GF 3 BHK 99.25 103
GF 3 BHK 74.28 104
GF 3 BHK 99.25 105
GF 3 BHK 82.82 106
GF 2 BHK 58.34 107
GF 3 BHK 89.18 108
GF 3 BHK 81.70 109
GF 3 BHK 89.11 110
GF 3 BHK 81.70 111
GF 3 BHK 89.11 112
GF 3 BHK 81.70 113
GF 3 BHK 89.11 114
GF 3 BHK 89.11 115
GF 3 BHK 91.54 116
GF 3 BHK 91.54 117
GF 3 BHK 92.81 118
GF 3 BHK 77.29 119
GF 2.5 BHK 73.57 120
GF 3 BHK 94.12 121
GF 3 BHK 94.12 122
GF 3 BHK 89.39 123
GF 3 BHK 94.12 124
GF 3 BHK 77.45 125
1 3 BHK 89.24 201
1 3 BHK 98.23 202
1 3 BHK 99.25 203
1 3 BHK 74.28 204
1 3 BHK 99.25 205
1 3 BHK 82.82 206
1 2 BHK 58.34 207
1 3 BHK 89.18 208
1 3 BHK 81.70 209
1 3 BHK 89.11 210
1 3 BHK 81.70 211
1 3 BHK 89.11 212
1 3 BHK 81.70 213
1 3 BHK 89.11 214
1 3 BHK 89.11 215
1 3 BHK 91.54 216
1 3 BHK 91.54 217
1 3 BHK 92.81 218
1 3 BHK 77.29 219
1 2.5 BHK 73.57 220
1 3 BHK 94.12 221
1 3 BHK 94.12 222
1 3 BHK 89.39 223
1 3 BHK 94.12 224
1 3 BHK 77.45 225
2 3 BHK 89.24 301
2 3 BHK 98.23 302
2 3 BHK 99.25 303
2 3 BHK 74.28 304
2 3 BHK 99.25 305
2 3 BHK 82.82 306
2 2 BHK 58.34 307
2 3 BHK 89.18 308
2 3 BHK 81.70 309
2 3 BHK 89.11 310
2 3 BHK 81.70 311
2 3 BHK 89.11 312
2 3 BHK 81.70 313
2 3 BHK 89.11 314
2 3 BHK 89.11 315
2 3 BHK 91.54 316
2 3 BHK 91.54 317
2 3 BHK 92.81 318
2 3 BHK 77.29 319
2 2.5 BHK 73.57 320
2 3 BHK 94.12 321
2 3 BHK 94.12 322
2 3 BHK 89.39 323
2 3 BHK 94.12 324
2 3 BHK 77.45 325
Parking

Parking, Garage & Area Details

Parking provision declared in the sanctioned plan.

Type Proposed Booked Work Done
Garage - - -
Covered Parking - - -
Open Parking - - -
Development

Development Works & Common Area Disclosures

Project-level common infrastructure disclosures as reported by the developer to the RERA authority.

Sub Structure Earth Work And Other Leveling Preparation Work % not reported Sub Structure Foundation Footing Work % not reported Sub Structure Upto Plinth Level % not reported
Sub Structure Sub-structure Flooring (Parking Floor, More Than One Floor Below General Ground Level) % not reported Sub Structure Retaining Wall (All Types) % not reported Sup Structure Rcc Or Ms Framed Structure % not reported
Sup Structure Masonry Construction % not reported Sup Structure Plastering Inside , Outside & Ceiling % not reported Sup Structure Joinery: Doors, Windows, Ventilators Etc % not reported
Sup Structure Basic Work Of Water Supply, Sanitary And Electrification % not reported Sup Structure Dadoing, Skirting, Flooring, Tiles Work (All Types) % not reported Sup Structure Railing And Grill Fixing % not reported
Finishing Works Electrification, Water Supply And Sanitary Finishing % not reported Finishing Works Painting % not reported Finishing Works Fire Prevention And Fire Fighting Fitting And Fixture With Network % not reported
Finishing Works Weather Proof Work(tile,concrete) % not reported Finishing Works Wardrobe, Showcase, Kitchen Cabinet, Puja Work % not reported Finishing Works Elevation Work % not reported
Finishing Works Internal And External Work Including Landscapes As Per Sanctioned Drawings % not reported Internal Infrastructure Water Supply % not reported Internal Infrastructure Sewage And Drainage System % not reported
Internal Infrastructure Water Conservation/rain Water Harvesting/recharge Of Ground Water % not reported Internal Infrastructure Energy Management % not reported Internal Infrastructure Fire Protection And Fire Safety Requirements % not reported
Internal Infrastructure Solid Waste Management And Disposal % not reported Internal Infrastructure Emergency Evacuation Services % not reported External Infrastructure Water Supply % not reported
External Infrastructure Internal Roads & Footpaths % not reported External Infrastructure Sewage And Drainage System % not reported External Infrastructure Electricity Supply Transformer And Substation % not reported
External Infrastructure Solid Waste Management And Disposal % not reported External Infrastructure Emergency Evacuation Services % not reported External Infrastructure Storm Water Drains % not reported
External Infrastructure Use Of Renewable Energy % not reported External Infrastructure Water Conservation/rain Water Harvesting/recharge Of Ground Water % not reported External Infrastructure Fire Protection And Fire Safety Requirements % not reported
External Infrastructure Sewage Treatment Plant (Stp) % not reported External Infrastructure Parks & Tree Planting % not reported External Infrastructure Street Lighting % not reported
Amenities Electricity % not reported Amenities Smart Home Automation % not reported Amenities Cctv Surveillance % not reported
Amenities Club House % not reported Amenities Community Hall % not reported Amenities Outdoor Sports Facility % not reported
Amenities Indoor Sports Facility % not reported Amenities Swimming Pool % not reported Amenities Gym % not reported
Amenities Parks % not reported Amenities Power Backup % not reported Amenities Piped Gas % not reported
Amenities Water And Sanitation % not reported Amenities Air Conditioning % not reported Common Areas Staircases % not reported
Common Areas Lifts % not reported Common Areas Corridor/lobbies % not reported Common Areas Fire Escapes % not reported
Common Areas Common Entrance And Exit For The Building/common Portico/foyer/verandah % not reported Common Areas Basement % not reported Common Areas Terrace % not reported
Common Areas Outer Wall % not reported Common Areas Open Parking Areas % not reported Common Areas Provision For Lodging Of Management Staff And Security Staff % not reported
Common Areas Water Conservation And Renewable Energy % not reported Common Areas Common Storage Spaces % not reported Common Areas Stilt Floor % not reported
Documents

RERA Documents & Filings

All statutory documents uploaded by the promoter to the authority portal.

Promoter Registration Certificate
Promoter Pan Card
Promoter Address Proof
Affidavit
Fd 1 ADNA Projects LLP Balance Sheet FY 23-24.Pdf
Fd 2 Adna Projects LLP Balance Sheet FY 22-23.Pdf
Fd 3 Adna Projects LLP Balance Sheet FY 21-22.Pdf
Fd 4 ADNA Projects LLP Profit And Loss FY 23-24.Pdf
Fd 5 Adna Projects LLP Profit And Loss FY 22-23.Pdf
Fd 6 Adna Projects LLP Profit And Loss FY 21-22.Pdf
Fd 7 AY 2024-25 ITR.Pdf
Fd 8 AY 2023-24 ITR.Pdf
Fd 9 AY 2022-23 ITR.Pdf
Pd 1 Commencement Certificate( Annexure - 80 )
Pd 2 Approved Building Plan( Annexure - 81 )
Pd 3 Sectional Drawing Of The Apartments( Annexure - 82 )
Pd 4 Certificate From Registered Engineer Indicating The Structural Safety Of The Building( Annexure - 83 )
Pd 5 Project Specifications( Annexure - 84 )
Pd 6 Brochure( Annexure - 85 )
Pd 7 Relinquishment Deed( Annexure - 86 )
Pd 8 Proforma Of Agreement For Sale( Annexure - 87 )
Pd 9 Proforma Of Allotment Letter( Annexure - 88 )
Dc 1 Declaration (Form B)( Annexure - 89 )
Dc 2 Section 3(1) Notarized Affidavit( Annexure - 90 )
Dc 3 JD AFFIDAVIT CUM DECLARATION( Annexure - 91 )
Dc 4 Advocate Search Report( Annexure - 92 )
Noc 1 ESCOM Electricity( Annexure - 95 )
Noc 2 KWSSB Water( Annexure - 96 )
Noc 3 KSPCB( Annexure - 97 )
Photo 1 Project Photo
Photo 2 Project Photo
Photo 3 Project Photo
Od 1 Adna Projects LLP Single Site Plan Approval Letter.Pdf
Od 2 Adna Projects LLP Stilt Floor Plan.Pdf
Od 3 Adna Projects LLP Single Site Plan Approval.Pdf
Od 4 GPA Addendum Adna Projects LLP - Apartment.Pdf
Od 5 Adna Projects LLP Akarabandh Sy No 56.Pdf
Od 6 Adna Projects LLP ADLR Sketch.Pdf
Od 7 Adna Projects LLP Original Tippani.Pdf
Od 8 Adna Projects LLP Sy No 56 Survey Records.Pdf
Od 9 Adna Project LLP No Mortgage AFFIDAVIT.Pdf
Od 10 Adna Project LLP - KSPCB NOC Declaration.Pdf
Od 11 Adna Projects LLP Title Deed - Partition Deed.Pdf
Od 12 Adna Projects LLP STP Drawing 60KLD.Pdf
Od 13 Adna Projects LLP Land Calculation.Pdf
Od 14 Balance Sheet Inventory Declaration.Pdf
Od 15 Adna Projects LLP Sy No 56 CLU Order Copy.Pdf
Od 16 CDP Adna Projects LLP Marked.Pdf
Od 17 CDP Extract Adna Projects LLP.Jpg
Od 18 Village Map Adna Projects LLP Marked.Pdf
Od 19 Adna Projects LLP ADLR Sketch Sy No 56.Pdf
Od 20 GPA Adna Projects LLP Old.Pdf
Od 21 JDA Adna Projects LLP Old.Pdf
Od 22 Adna Projects LLP Carpet Area.Pdf
Od 23 Adna Projects LLP Common Areas & Amenities.Pdf
Ed 1 15-09-2025
Ed 2 15-09-2025
Ed 3 15-09-2025
Ed 4 15-09-2025
Ed 5 15-09-2025
Ed 6 15-09-2025
Ed 7 15-09-2025
Ed 8 15-09-2025
Ed 9 15-09-2025
Ed 10 15-09-2025
Ed 11 15-09-2025
Ed 12 15-09-2025
Ed 13 15-09-2025
Ed 14 15-09-2025
Ed 15 15-09-2025
Ed 16 15-09-2025
Ed 17 15-09-2025
Ed 18 15-09-2025
Ed 19 15-09-2025
Ed 20 30-09-2025
Ld Rtc
Ld Mutation
Ld Encumbrance Certificate
Ld Conversion Order
Ld Khatha
Bank

Bank & Cost Disclosure

Declared project cost and the designated escrow account on file.

Project Account Bank STATE BANK OF INDIA
Account Number (RERA) 44112961234
IFSC SBIN0008577
Branch Address SME Kumarapark Branch
Country/City