Squareyards Logo
Blogs
Sell or Rent Property
Login
Rera Banner
residential Under Construction Source: rera.ka

Affinity Vaishnavi Harmony RERA Details - PRM/KA/RERA/1251/446/PR/270325/007631 Bangalore

View the RERA registration, promoter, approval, building, inventory, document and construction-progress disclosures for Affinity Vaishnavi Harmony under registration PRM/KA/RERA/1251/446/PR/270325/007631 in Bangalore, Karnataka. Data is sourced from rera.ka.

RERA

RERA Snapshot

The most important statutory project disclosures, generated dynamically from available RERA fields.

  • RERA Number PRM/KA/RERA/1251/446/PR/270325/007631
  • Project Name Vaishnavi Harmony
  • Project Type Residential/Group Housing
  • Project Status Under Construction
  • District Bengaluru Urban
  • Taluka Bengaluru East
  • Original Completion 01 December 2027
  • Documents 40 Verified
Timeline

Project Timeline & Completion Details

Key statutory dates from registration through proposed completion and permit validity.

Proposed Start 01 February 2025 Expected commencement of civil works and foundation on site.
Original Completion 01 December 2027 Mandated date for project handover to the allottees and final compliance filing.
Promoter

Promoter, Organisation & Member Details

Declared promoter entity, address and corporate identifiers on file with the authority.

Primary Promoter

AFFINITY PROJECTS
Registered Address A1 Block1 Samhita Green Oaks 4th A Cross ,Kaggadaspura C.V.Raman Nagar ,Bengaluru East ,Bengaluru Urban-560093
Experience Details
Location

Land, Address & Location Details

Land parcel, zoning and geo-coordinates as recorded in the project filing.

Address Khata No. 1619 ,Sy.No.22/2 chinnappanahalli village, K.R. Puram Hobli, Bangalore East Taluk, , Ward-085 , Bengaluru East , Bengaluru Urban, Karnataka - 560037

RERA Coordinates

Latitude, Longitude 12.961892495738907, 77.70541668586723
Plans

Plans & Approvals

Statutory approvals obtained or pending against the project site.

Plan Approval No. BBMP/Addl.Dir/JDNORTH/0014/23-24
Authority BBMP - Bruhat Bengaluru Mahanagara Palike
Approved Date 01 May 2024

Understand this Project's RERA details

Get clear answers and additional support from our RERA experts.

RERA Banner
Buildings

Buildings, Towers & Building-Level Details

Statutory building-level disclosures including tower height, sanctioned floors, structural counts and parking areas.

Building Detail
Name No. of Basements No. of Slab No. of Slits No. of Open Parking Building Type Height of Tower No. of Floors No. of Units
Vaishnavi Harmony 1 5 0 48 Residential 14.99 5 48

Scroll horizontally to view all building-level fields. Values marked "-" were not disclosed in the source RERA record.

Inventory

Unit Inventory & Configuration Details

Configuration mix and floor-level disclosures with both grouped and raw RERA views.

Total Units -
Configurations 2
Inventory Type RESIDENTIAL
Configuration Distribution
2 BHK 0 units
3 BHK 0 units
  • Vaishnavi Harmony
Floor-Wise Inventory Explorer
Floor Apartment Type Carpet Area No. of Unit
-1 3 BHK 106.35 1
-1 2 BHK 76.11 2
-1 2 BHK 63.88 3
-1 2 BHK 76.11 4
-1 2 BHK 78.15 6
-1 2 BHK 78.15 8
-1 2 BHK 69.99 9
-1 3 BHK 95.47 10
GF 3 BHK 115.52 101
GF 2 BHK 83.92 102
GF 2 BHK 82.56 103
GF 2 BHK 83.92 104
GF 2 BHK 83.58 105
GF 2 BHK 85.62 106
GF 2 BHK 82.56 107
GF 2 BHK 85.62 108
GF 2 BHK 80.52 109
GF 3 BHK 106.69 110
1 3 BHK 115.52 201
1 2 BHK 83.92 202
1 2 BHK 82.56 203
1 2 BHK 83.92 204
1 2 BHK 83.58 205
1 2 BHK 85.62 206
1 2 BHK 82.56 207
1 2 BHK 85.62 208
1 2 BHK 80.52 209
1 3 BHK 106.69 210
2 3 BHK 115.52 301
2 2 BHK 83.92 302
2 2 BHK 82.56 303
2 2 BHK 83.92 304
2 2 BHK 83.58 305
2 2 BHK 85.62 306
2 2 BHK 82.56 307
2 2 BHK 85.62 308
2 2 BHK 80.52 309
2 3 BHK 106.69 310
3 3 BHK 115.52 401
3 2 BHK 83.92 402
3 2 BHK 82.56 403
3 2 BHK 83.92 404
3 2 BHK 83.58 405
3 2 BHK 85.62 406
3 2 BHK 82.56 407
3 2 BHK 85.62 408
3 2 BHK 80.52 409
3 3 BHK 106.69 410
Parking

Parking, Garage & Area Details

Parking provision declared in the sanctioned plan.

Type Proposed Booked Work Done
Garage - - -
Covered Parking - - -
Open Parking - - -
Development

Development Works & Common Area Disclosures

Project-level common infrastructure disclosures as reported by the developer to the RERA authority.

Sub Structure Earth Work And Other Leveling Preparation Work % not reported Sub Structure Foundation Footing Work % not reported Sub Structure Upto Plinth Level % not reported
Sub Structure Sub-structure Flooring (Parking Floor, More Than One Floor Below General Ground Level) % not reported Sub Structure Retaining Wall (All Types) % not reported Sup Structure Rcc Or Ms Framed Structure % not reported
Sup Structure Masonry Construction % not reported Sup Structure Plastering Inside , Outside & Ceiling % not reported Sup Structure Joinery: Doors, Windows, Ventilators Etc % not reported
Sup Structure Basic Work Of Water Supply, Sanitary And Electrification % not reported Sup Structure Dadoing, Skirting, Flooring, Tiles Work (All Types) % not reported Sup Structure Railing And Grill Fixing % not reported
Finishing Works Electrification, Water Supply And Sanitary Finishing % not reported Finishing Works Painting % not reported Finishing Works Fire Prevention And Fire Fighting Fitting And Fixture With Network % not reported
Finishing Works Weather Proof Work(tile,concrete) % not reported Finishing Works Wardrobe, Showcase, Kitchen Cabinet, Puja Work % not reported Finishing Works Elevation Work % not reported
Finishing Works Internal And External Work Including Landscapes As Per Sanctioned Drawings % not reported Internal Infrastructure Water Supply % not reported Internal Infrastructure Sewage And Drainage System % not reported
Internal Infrastructure Water Conservation/rain Water Harvesting/recharge Of Ground Water % not reported Internal Infrastructure Energy Management % not reported Internal Infrastructure Fire Protection And Fire Safety Requirements % not reported
Internal Infrastructure Solid Waste Management And Disposal % not reported Internal Infrastructure Emergency Evacuation Services % not reported External Infrastructure Water Supply % not reported
External Infrastructure Internal Roads & Footpaths % not reported External Infrastructure Sewage And Drainage System % not reported External Infrastructure Electricity Supply Transformer And Substation % not reported
External Infrastructure Solid Waste Management And Disposal % not reported External Infrastructure Emergency Evacuation Services % not reported External Infrastructure Storm Water Drains % not reported
External Infrastructure Use Of Renewable Energy % not reported External Infrastructure Water Conservation/rain Water Harvesting/recharge Of Ground Water % not reported External Infrastructure Fire Protection And Fire Safety Requirements % not reported
External Infrastructure Sewage Treatment Plant (Stp) % not reported External Infrastructure Parks & Tree Planting % not reported External Infrastructure Street Lighting % not reported
Amenities Electricity % not reported Amenities Smart Home Automation % not reported Amenities Cctv Surveillance % not reported
Amenities Club House % not reported Amenities Community Hall % not reported Amenities Outdoor Sports Facility % not reported
Amenities Indoor Sports Facility % not reported Amenities Swimming Pool % not reported Amenities Gym % not reported
Amenities Parks % not reported Amenities Power Backup % not reported Amenities Piped Gas % not reported
Amenities Water And Sanitation % not reported Amenities Air Conditioning % not reported Common Areas Staircases % not reported
Common Areas Lifts % not reported Common Areas Corridor/lobbies % not reported Common Areas Fire Escapes % not reported
Common Areas Common Entrance And Exit For The Building/common Portico/foyer/verandah % not reported Common Areas Basement % not reported Common Areas Terrace % not reported
Common Areas Outer Wall % not reported Common Areas Open Parking Areas % not reported Common Areas Provision For Lodging Of Management Staff And Security Staff % not reported
Common Areas Water Conservation And Renewable Energy % not reported Common Areas Common Storage Spaces % not reported
Documents

RERA Documents & Filings

All statutory documents uploaded by the promoter to the authority portal.

Promoter Registration Certificate
Promoter Pan Card
Promoter Address Proof
Affidavit
1 Completion Certificate
Fd 1 PL 21-22.Pdf
Fd 2 BS 21-22.Pdf
Fd 3 BS 20-21 With Schedules.Pdf
Fd 4 FY 2021-22.Pdf
Fd 5 PL 20-21 With Schedules.Pdf
Fd 6 PL 20-21.Pdf
Fd 7 Sudhakar-ITR.Pdf
Fd 8 Ack 2020 2021.Pdf
Fd 9 Ack 2020 2021.Pdf
Pd 2 Approved Building Plan( Annexure - 81 )
Pd 3 Sectional Drawing Of The Apartments( Annexure - 82 )
Noc 1 ESCOM Electricity( Annexure - 95 )
Noc 2 KWSSB Water( Annexure - 96 )
Noc 3 KSPCB( Annexure - 97 )
Photo 1 Project Photo
Ed 1 04-03-2025
Ed 2 04-03-2025
Ed 3 04-03-2025
Ed 4 04-03-2025
Ed 5 04-03-2025
Ed 6 04-03-2025
Ed 7 04-03-2025
Ed 8 04-03-2025
Ed 9 04-03-2025
Ed 10 23-03-2025
Ed 11 23-03-2025
Ed 12 23-03-2025
Ed 13 23-03-2025
Ed 14 23-03-2025
Ed 15 23-03-2025
Ld Rtc
Ld Mutation
Ld Encumbrance Certificate
Ld Conversion Order
Ld Khatha
Bank

Bank & Cost Disclosure

Declared project cost and the designated escrow account on file.

Project Account Bank Axis Bank
Account Number (RERA) 923020008337124
IFSC UTIB0000096
Branch Address Old Madras Road
Country/City