Squareyards Logo
Blogs
Sell or Rent Property
Login
Rera Banner
residential Under Construction Source: rera.ka

Birla Trimaya RERA Details - PRM/KA/RERA/1250/303/PR/040924/006988 Bangalore

View the RERA registration, promoter, approval, building, inventory, document and construction-progress disclosures for Birla Trimaya under registration PRM/KA/RERA/1250/303/PR/040924/006988 in Bangalore, Karnataka. Data is sourced from rera.ka.

RERA

RERA Snapshot

The most important statutory project disclosures, generated dynamically from available RERA fields.

  • RERA Number PRM/KA/RERA/1250/303/PR/040924/006988
  • Project Name BIRLA TRIMAYA PHASE-2
  • Project Type Residential/Group Housing
  • Project Status Under Construction
  • District Bengaluru Rural
  • Taluka Devanahalli
  • Original Completion 20 June 2029
  • Documents 103 Verified
Timeline

Project Timeline & Completion Details

Key statutory dates from registration through proposed completion and permit validity.

Proposed Start 04 February 2025 Expected commencement of civil works and foundation on site.
Original Completion 20 June 2029 Mandated date for project handover to the allottees and final compliance filing.
Promoter

Promoter, Organisation & Member Details

Declared promoter entity, address and corporate identifiers on file with the authority.

Primary Promoter

BIRLA ARNAA LLP
Registered Address Sy No 2 and other Sy nos, Akkalenahalli, Malenahalli Village,Kasaba Hobli, Taluk ,Devanahalli ,Bengaluru Rural-562110
Experience Details
Location

Land, Address & Location Details

Land parcel, zoning and geo-coordinates as recorded in the project filing.

Address KHATHA No. 103, PID No. 150300201900320102, SY. No. 2, 3/2, 6, 7, 8/1, 8/2, 8/3, 9/1, 9/2, 9/3, 10, 11, 12/1, 12/2, 12/3, (old Sy. No. 12/2) 13/1, , 13/2, 14/1B, 15/1, 16, 17, 19, 20, 25, 37/4 & 37/7 OF AKALENAHALLI-MALLENAHALLI VILLAGE , Devanahalli , Bengaluru Rural, Karnataka - 562110

RERA Coordinates

Latitude, Longitude 13.187972319504938, 77.66752481460571
Plans

Plans & Approvals

Statutory approvals obtained or pending against the project site.

Plan Approval No. NA
Authority BIAPPA - Bangalore Airport Area Planning Authority
Approved Date 14 August 2024

Understand this Project's RERA details

Get clear answers and additional support from our RERA experts.

RERA Banner
Buildings

Buildings, Towers & Building-Level Details

Statutory building-level disclosures including tower height, sanctioned floors, structural counts and parking areas.

Building Detail
Name No. of Basements No. of Slab No. of Slits No. of Open Parking Building Type Height of Tower No. of Floors No. of Units
Tower 11 1 15 0 83 Residential 41.3 13 83
Tower 12 1 15 0 83 Residential 41.3 13 83
Tower-22 1 14 0 90 Residential 38.35 12 90
Tower-23 1 14 0 90 Residential 38.35 12 90
Tower-24 1 14 0 90 Residential 38.35 12 90
Tower-31B 1 5 0 32 Residential 14.05 3 16
Tower-31C 1 5 0 24 Residential 14.05 3 12
Tower-34 1 3 0 18 Residential 7.15 1 9

Scroll horizontally to view all building-level fields. Values marked "-" were not disclosed in the source RERA record.

Inventory

Unit Inventory & Configuration Details

Configuration mix and floor-level disclosures with both grouped and raw RERA views.

Total Units -
Configurations 4
Inventory Type RESIDENTIAL
Configuration Distribution
1 BHK 0 units
2 BHK 0 units
3 BHK 0 units
4 BHK 0 units
  • Tower 11
  • Tower 12
  • Tower-22
  • Tower-23
  • Tower-24
  • Tower-31B
  • Tower-31C
  • Tower-34
Floor-Wise Inventory Explorer
Floor Apartment Type Carpet Area No. of Unit
-1 3 BHK 91.63 2
-1 3 BHK 103.6 3
-1 3 BHK 103.88 4
-1 3 BHK 100.16 5
-1 3 BHK 91.63 6
GF 2 BHK 75.18 1
GF 3 BHK 91.63 2
GF 3 BHK 103.6 3
GF 3 BHK 103.88 4
GF 3 BHK 100.21 5
GF 3 BHK 91.63 6
1 2 BHK 75.18 1
1 3 BHK 91.63 2
1 3 BHK 103.6 3
1 3 BHK 103.88 4
1 3 BHK 100.21 5
1 3 BHK 91.63 6
2 2 BHK 75.18 1
2 3 BHK 91.63 2
2 3 BHK 103.6 3
2 3 BHK 103.88 4
2 3 BHK 100.21 5
2 3 BHK 91.63 6
3 2 BHK 75.18 1
3 3 BHK 91.63 2
3 3 BHK 103.6 3
3 3 BHK 103.88 4
3 3 BHK 100.21 5
3 3 BHK 91.63 6
4 2 BHK 75.18 1
4 3 BHK 91.63 2
4 3 BHK 103.6 3
4 3 BHK 103.88 4
4 3 BHK 100.21 5
4 3 BHK 91.63 6
5 2 BHK 75.18 1
5 3 BHK 91.63 2
5 3 BHK 103.6 3
5 3 BHK 103.88 4
5 3 BHK 100.21 5
5 3 BHK 91.63 6
6 2 BHK 75.18 1
6 3 BHK 91.63 2
6 3 BHK 103.6 3
6 3 BHK 103.88 4
6 3 BHK 100.21 5
6 3 BHK 91.63 6
7 2 BHK 75.18 1
7 3 BHK 91.63 2
7 3 BHK 103.6 3
7 3 BHK 103.88 4
7 3 BHK 100.21 5
7 3 BHK 91.63 6
8 2 BHK 75.18 1
8 3 BHK 91.63 2
8 3 BHK 103.6 3
8 3 BHK 103.88 4
8 3 BHK 100.21 5
8 3 BHK 91.63 6
9 2 BHK 75.18 1
9 3 BHK 91.63 2
9 3 BHK 103.6 3
9 3 BHK 103.88 4
9 3 BHK 100.21 5
9 3 BHK 91.63 6
10 2 BHK 75.18 1
10 3 BHK 91.63 2
10 3 BHK 103.6 3
10 3 BHK 103.88 4
10 3 BHK 100.21 5
10 3 BHK 91.63 6
11 2 BHK 75.18 1
11 3 BHK 91.63 2
11 3 BHK 103.6 3
11 3 BHK 103.88 4
11 3 BHK 100.21 5
11 3 BHK 91.63 6
12 2 BHK 75.18 1
12 3 BHK 91.63 2
12 3 BHK 103.6 3
12 3 BHK 103.88 4
12 3 BHK 100.21 5
12 3 BHK 91.63 6
Parking

Parking, Garage & Area Details

Parking provision declared in the sanctioned plan.

Type Proposed Booked Work Done
Garage - - -
Covered Parking - - -
Open Parking - - -
Development

Development Works & Common Area Disclosures

Project-level common infrastructure disclosures as reported by the developer to the RERA authority.

Sub Structure Earth Work And Other Leveling Preparation Work % not reported Sub Structure Foundation Footing Work % not reported Sub Structure Upto Plinth Level % not reported
Sub Structure Sub-structure Flooring (Parking Floor, More Than One Floor Below General Ground Level) % not reported Sub Structure Retaining Wall (All Types) % not reported Sup Structure Rcc Or Ms Framed Structure % not reported
Sup Structure Masonry Construction % not reported Sup Structure Plastering Inside , Outside & Ceiling % not reported Sup Structure Joinery: Doors, Windows, Ventilators Etc % not reported
Sup Structure Basic Work Of Water Supply, Sanitary And Electrification % not reported Sup Structure Dadoing, Skirting, Flooring, Tiles Work (All Types) % not reported Sup Structure Railing And Grill Fixing % not reported
Finishing Works Electrification, Water Supply And Sanitary Finishing % not reported Finishing Works Painting % not reported Finishing Works Fire Prevention And Fire Fighting Fitting And Fixture With Network % not reported
Finishing Works Weather Proof Work(tile,concrete) % not reported Finishing Works Wardrobe, Showcase, Kitchen Cabinet, Puja Work % not reported Finishing Works Elevation Work % not reported
Finishing Works Internal And External Work Including Landscapes As Per Sanctioned Drawings % not reported Internal Infrastructure Water Supply % not reported Internal Infrastructure Sewage And Drainage System % not reported
Internal Infrastructure Water Conservation/rain Water Harvesting/recharge Of Ground Water % not reported Internal Infrastructure Energy Management % not reported Internal Infrastructure Fire Protection And Fire Safety Requirements % not reported
Internal Infrastructure Solid Waste Management And Disposal % not reported Internal Infrastructure Emergency Evacuation Services % not reported External Infrastructure Water Supply % not reported
External Infrastructure Internal Roads & Footpaths % not reported External Infrastructure Sewage And Drainage System % not reported External Infrastructure Electricity Supply Transformer And Substation % not reported
External Infrastructure Solid Waste Management And Disposal % not reported External Infrastructure Emergency Evacuation Services % not reported External Infrastructure Storm Water Drains % not reported
External Infrastructure Use Of Renewable Energy % not reported External Infrastructure Water Conservation/rain Water Harvesting/recharge Of Ground Water % not reported External Infrastructure Fire Protection And Fire Safety Requirements % not reported
External Infrastructure Sewage Treatment Plant (Stp) % not reported External Infrastructure Parks & Tree Planting % not reported External Infrastructure Street Lighting % not reported
Amenities Electricity % not reported Amenities Smart Home Automation % not reported Amenities Cctv Surveillance % not reported
Amenities Club House % not reported Amenities Community Hall % not reported Amenities Outdoor Sports Facility % not reported
Amenities Indoor Sports Facility % not reported Amenities Swimming Pool % not reported Amenities Gym % not reported
Amenities Parks % not reported Amenities Power Backup % not reported Amenities Piped Gas % not reported
Amenities Water And Sanitation % not reported Amenities Air Conditioning % not reported Common Areas Staircases % not reported
Common Areas Lifts % not reported Common Areas Corridor/lobbies % not reported Common Areas Fire Escapes % not reported
Common Areas Common Entrance And Exit For The Building/common Portico/foyer/verandah % not reported Common Areas Basement % not reported Common Areas Terrace % not reported
Common Areas Outer Wall % not reported Common Areas Open Parking Areas % not reported Common Areas Provision For Lodging Of Management Staff And Security Staff % not reported
Common Areas Water Conservation And Renewable Energy % not reported Common Areas Common Storage Spaces % not reported
Documents

RERA Documents & Filings

All statutory documents uploaded by the promoter to the authority portal.

Promoter Registration Certificate
Promoter Pan Card
Promoter Address Proof
Affidavit
3 Completion Certificate
Fd 1 Financials - Birla Arnaa LLP 2022-23.Pdf
Fd 2 Financials - Birla Arnaa LLP 2021-22.Pdf
Fd 3 Not Avaialable.Jpg
Fd 4 Financials - Birla Arnaa LLP 2022-23.Pdf
Fd 5 Financials - Birla Arnaa LLP 2021-22.Pdf
Fd 6 Not Avaialable.Jpg
Fd 7 Financials - Birla Arnaa LLP 2022-23.Pdf
Fd 8 Financials - Birla Arnaa LLP 2021-22.Pdf
Fd 9 Not Avaialable.Jpg
Fd 10 Financials - Birla Arnaa LLP 2022-23.Pdf
Fd 11 Financials - Birla Arnaa LLP 2021-22.Pdf
Fd 12 Not Avaialable.Jpg
Fd 13 Financials - Birla Arnaa LLP 2022-23.Pdf
Fd 14 Financials - Birla Arnaa LLP 2021-22.Pdf
Fd 15 Not Avaialable.Jpg
Fd 16 ITR FY 2022-23.Pdf
Fd 17 ITR FY 2021-22.Pdf
Fd 18 Not Avaialable.Jpg
Pd 1 Self Attested PAN Card*( Annexure - 66 )
Pd 2 Commencement Certificate*( Annexure - 67 )
Pd 3 Electricity Permission Letter*( Annexure - 68 )
Pd 4 Water Permission Letter*( Annexure - 69 )
Pd 6 Approved Building Plotting Plan*( Annexure - 71 )
Pd 8 Existing Section Plan And Specification( Annexure - 73 )
Pd 9 Sectional Drawing Of The Apartments*( Annexure - 74 )
Pd 10 Project Specifications*( Annexure - 75 )
Pd 11 Approved Section Of Building Infrastructure Plan Of Plotting*( Annexure - 76 )
Pd 12 Area Development Plan Of Project Area*( Annexure - 77 )
Pd 13 Certificate From Registered Engineer Indicating The Structural Safety Of The Building*( Annexure - 78 )
Pd 14 Advocate Search Report*( Annexure - 79 )
Pd 16 Collaboration Agreement Development Agreement Joint Development Agreement Other Agreement*( Annexure - 81 )
Pd 19 Conversion Certificate Under Section 95 Of The KLR Act 1964*( Annexure - 84 )
Pd 20 Any Other Document (Rights Title Interest Name)*( Annexure - 85 )
Pd 21 Proforma Of Agreement For Sale*( Annexure - 86 )
Pd 22 Proforma Of Allotment Letter*( Annexure - 87 )
Dc 1 Declaration (Form B)*( Annexure - 90 )
Dc 2 Section 3(1) Notarized Affidavit*( Annexure - 91 )
Dc 3 JD AFFIDAVIT CUM DECLARATION*( Annexure - 92 )
Noc 1 ESCOM Electricity*( Annexure - 93 )
Noc 2 KWSSB Water*( Annexure - 94 )
Noc 5 Fire Force Department( Annexure - 97 )
Noc 6 Airport Authority Of India( Annexure - 98 )
Noc 7 KSPCB( Annexure - 99 )
Noc 8 SEIAA( Annexure - 100 )
Dr 3 Relinquishment Deed( Annexure - 110 )
Photo 1 Project Photo
Od 1 Birla Arnaa LLP GST Certifcate.Pdf
Od 2 MR No 19-2005-06 Sy No 9-2.Pdf
Od 3 MR 16-2005-06 Sy No 10.Pdf
Od 4 Akarabhandh.Pdf
Od 5 Arrangement Cum-Partition Deed-4097-2005-06.Pdf
Od 6 Cancelation Deed.Pdf
Od 7 Gift Deed 3467 05-06 Dt 10-10-2005.Pdf
Od 8 Gift Deed 3469 05-06 Dt 10-10-2005.Pdf
Od 9 Hissa Tippani & RR Bhalabhagada Nakalu SY No 9.Pdf
Od 10 MSSRLLP Partnershipdeed.Pdf
Od 11 RTCs Survey No 6.Pdf
Od 12 RTCs Survey No 9 1.Pdf
Od 13 RTCs Survey No 9 3.Pdf
Od 14 RTCs Sy No 9 2.Pdf
Od 15 RTCs Sy No 10.Pdf
Od 16 Tippani Sy No 6.Pdf
Od 17 Tippani Sy No 10.Pdf
Od 18 Tippani Sy No 9.Pdf
Od 19 GPA-MSR To Birla Arnaa Dt 21 03 2022.Pdf
Od 20 Guideline Value Of Akkalenahalli-Mallenahalli.Pdf
Od 21 Birla Phase 2 Building Plan CC.Pdf
Od 22 Area Statement Certfied By Architect.PDF
Od 23 Birla Dp Order.Pdf
Od 24 Birla DP Plan.Pdf
Od 25 GOOGLE MAP OVERLAP- BIRLA PH 2.Pdf
Od 26 LAND COST CALCULATION SHEET.Pdf
Od 27 MSR CLU Order.Pdf
Od 28 STP Drawing Signed.Pdf
Od 29 STP Location.Pdf
Od 30 Trimaya Site On CDP.Pdf
Od 31 Village Map Of Akkalenahalli-Mallenahalli.Pdf
Od 32 Birla Ph2 1 Site Plan.Pdf
Od 33 Birla Ph2 2 Block 8,19 Basement Floor Plan.Pdf
Od 34 Birla Ph2 3 Block 8 Ground Floor Plan.Pdf
Od 35 Birla Ph2 4 Block 8 Floor Plan, Terrace And Section Plan.Pdf
Od 36 Birla Ph2 5 Block 19 Ground Floor, Foor Plan.Pdf
Od 37 Birla Ph2 6 Block 13,16B,16C Basement Floor Plan.Pdf
Od 38 Birla Ph2 7 Block 13 Ground Floor, Terrace Floor And Secction Plan.Pdf
Od 39 Birla Ph2 8 Block 16B, 16C Ground Floor, Terrace Floor And Section Plan.Pdf
Od 40 Certificate Of Engineer- Civil Cost Breakup.Pdf
Od 41 Cost Of Construction Abstract.Pdf
Ed 1 29-08-2024
Ed 2 29-08-2024
Ed 3 29-08-2024
Ed 4 29-08-2024
Ed 5 29-08-2024
Ed 6 29-08-2024
Ld Rtc
Ld Mutation
Ld Encumbrance Certificate
Ld Conversion Order
Ld Khatha
Bank

Bank & Cost Disclosure

Declared project cost and the designated escrow account on file.

Project Account Bank ICICI Bank
Account Number (RERA) 777705250201
IFSC ICIC0000269
Branch Address RD RICHMOND
Country/City