Squareyards Logo
Blogs
Sell or Rent Property
Login
Rera Banner
residential Under Construction Source: rera.ka

Birla Trimaya RERA Details - PRM/KA/RERA/1250/303/PR/290126/008436 Bangalore

View the RERA registration, promoter, approval, building, inventory, document and construction-progress disclosures for Birla Trimaya under registration PRM/KA/RERA/1250/303/PR/290126/008436 in Bangalore, Karnataka. Data is sourced from rera.ka.

RERA

RERA Snapshot

The most important statutory project disclosures, generated dynamically from available RERA fields.

  • RERA Number PRM/KA/RERA/1250/303/PR/290126/008436
  • Project Name BIRLA TRIMAYA PHASE-4
  • Project Type Residential/Group Housing
  • Project Status Under Construction
  • District Bengaluru Rural
  • Taluka Devanahalli
  • Original Completion 15 December 2031
  • Documents 82 Verified
Timeline

Project Timeline & Completion Details

Key statutory dates from registration through proposed completion and permit validity.

Proposed Start 20 November 2026 Expected commencement of civil works and foundation on site.
Original Completion 15 December 2031 Mandated date for project handover to the allottees and final compliance filing.
Promoter

Promoter, Organisation & Member Details

Declared promoter entity, address and corporate identifiers on file with the authority.

Primary Promoter

Birla Arnaa LLP
Registered Address Survey Nos. 2 and others, Akkalenahalli-Mallenahalli Village,Kasaba Hobli ,Devanahalli ,Bengaluru Rural-562110
Experience Details
Location

Land, Address & Location Details

Land parcel, zoning and geo-coordinates as recorded in the project filing.

Address Sy. Nos. 2,3/2,6,7,8/1,8/2,8/3,9/1,9/2,9/3,10,11,12/1,12/2,12/3(Old No. 12/2), 13/1, 13/2,14/1B,15/1,16,17,19,20,25,37/4 & 37/7 OF , AKALENAHALLI- MALLENAHALLI VILLAGE, KASABA HOBLI, DEVANAHALLI TALUK , Devanahalli , Bengaluru Rural, Karnataka - 562110

RERA Coordinates

Latitude, Longitude 13.187057, 77.669487
Plans

Plans & Approvals

Statutory approvals obtained or pending against the project site.

Plan Approval No. BIAAPA/TP/CC/428/2025-26/2851
Authority BIAPPA - Bangalore Airport Area Planning Authority
Approved Date 17 January 2026

Understand this Project's RERA details

Get clear answers and additional support from our RERA experts.

RERA Banner
Buildings

Buildings, Towers & Building-Level Details

Statutory building-level disclosures including tower height, sanctioned floors, structural counts and parking areas.

Building Detail
Name No. of Basements No. of Slab No. of Slits No. of Open Parking Building Type Height of Tower No. of Floors No. of Units
TOWER-1 2 15 0 104 Residential 43.95 14 104
TOWER-2 2 15 0 74 Residential 43.95 14 74
TOWER-3 2 15 0 59 Residential 43.95 14 59
TOWER-4 2 15 0 103 Residential 43.95 14 103
TOWER-5A 2 15 0 59 Residential 43.95 14 59
TOWER-5B 2 15 0 74 Residential 43.95 14 74
TOWER-6 2 15 0 75 Residential 43.95 14 75

Scroll horizontally to view all building-level fields. Values marked "-" were not disclosed in the source RERA record.

Inventory

Unit Inventory & Configuration Details

Configuration mix and floor-level disclosures with both grouped and raw RERA views.

Total Units -
Configurations 6
Inventory Type RESIDENTIAL
Configuration Distribution
1B+1T 0 units
2B+2T 0 units
3B+3T+STUDY 0 units
3B+3T 0 units
3B+3T+MAID 0 units
4B+4T+PWD+STUDY+MAID 0 units
  • TOWER-1
  • TOWER-2
  • TOWER-3
  • TOWER-4
  • TOWER-5A
  • TOWER-5B
  • TOWER-6
Floor-Wise Inventory Explorer
Floor Apartment Type Carpet Area No. of Unit
-1 2B+2T 69.08 T1-002
-1 2B+2T 68.39 T1-003
-1 3B+3T+STUDY 99.32 T1-004
-1 3B+3T 90.16 T1-005
-1 3B+3T+STUDY 100.66 T1-006
-1 2B+2T 68.39 T1-007
GF 2B+2T 68.39 T1-101
GF 2B+2T 69.08 T1-102
GF 2B+2T 68.39 T1-103
GF 3B+3T+STUDY 99.32 T1-104
GF 3B+3T 90.16 T1-105
GF 3B+3T+STUDY 100.66 T1-106
GF 2B+2T 68.39 T1-107
1 2B+2T 68.39 T1-201
1 2B+2T 69.08 T1-202
1 2B+2T 68.39 T1-203
1 3B+3T+STUDY 99.32 T1-204
1 3B+3T 90.16 T1-205
1 3B+3T+STUDY 100.66 T1-206
1 2B+2T 68.39 T1-207
2 2B+2T 68.39 T1-301
2 2B+2T 69.08 T1-302
2 2B+2T 68.39 T1-303
2 3B+3T+STUDY 99.32 T1-304
2 3B+3T 90.16 T1-305
2 3B+3T+STUDY 100.66 T1-306
2 2B+2T 68.39 T1-307
3 2B+2T 68.39 T1-401
3 2B+2T 69.08 T1-402
3 2B+2T 68.39 T1-403
3 3B+3T+STUDY 99.32 T1-404
3 3B+3T 90.16 T1-405
3 3B+3T+STUDY 100.66 T1-406
3 2B+2T 68.39 T1-407
4 2B+2T 68.39 T1-501
4 2B+2T 69.08 T1-502
4 2B+2T 68.39 T1-503
4 3B+3T+STUDY 99.32 T1-504
4 3B+3T 90.16 T1-505
4 3B+3T+STUDY 100.66 T1-506
4 2B+2T 68.39 T1-507
5 2B+2T 68.39 T1-601
5 2B+2T 69.08 T1-602
5 2B+2T 68.39 T1-603
5 3B+3T+STUDY 99.32 T1-604
5 3B+3T 90.16 T1-605
5 3B+3T+STUDY 100.66 T1-606
5 2B+2T 68.39 T1-607
6 2B+2T 68.39 T1-701
6 2B+2T 69.08 T1-702
6 2B+2T 68.39 T1-703
6 3B+3T+STUDY 99.32 T1-704
6 3B+3T 90.16 T1-705
6 3B+3T+STUDY 100.66 T1-706
6 2B+2T 68.39 T1-707
7 2B+2T 68.39 T1-801
7 2B+2T 69.08 T1-802
7 2B+2T 68.39 T1-803
7 3B+3T+STUDY 99.32 T1-804
7 3B+3T 90.16 T1-805
7 3B+3T+STUDY 100.66 T1-806
7 2B+2T 68.39 T1-807
8 2B+2T 68.39 T1-901
8 2B+2T 69.08 T1-902
8 2B+2T 68.39 T1-903
8 3B+3T+STUDY 99.32 T1-904
8 3B+3T 90.16 T1-905
8 3B+3T+STUDY 100.66 T1-906
8 2B+2T 68.39 T1-907
9 2B+2T 68.39 T1-1001
9 2B+2T 69.08 T1-1002
9 2B+2T 68.39 T1-1003
9 3B+3T+STUDY 99.32 T1-1004
9 3B+3T 90.16 T1-1005
9 3B+3T+STUDY 100.66 T1-1006
9 2B+2T 68.39 T1-1007
10 2B+2T 68.39 T1-1101
10 2B+2T 69.08 T1-1102
10 2B+2T 68.39 T1-1103
10 3B+3T+STUDY 99.32 T1-1104
10 3B+3T 90.16 T1-1105
10 3B+3T+STUDY 100.66 T1-1106
10 2B+2T 68.39 T1-1107
11 2B+2T 68.39 T1-1201
11 2B+2T 69.08 T1-1202
11 2B+2T 68.39 T1-1203
11 3B+3T+STUDY 99.32 T1-1204
11 3B+3T 90.16 T1-1205
11 3B+3T+STUDY 100.66 T1-1206
11 2B+2T 68.39 T1-1207
12 2B+2T 68.39 T1-1301
12 2B+2T 69.08 T1-1302
12 2B+2T 68.39 T1-1303
12 3B+3T+STUDY 99.32 T1-1304
12 3B+3T 90.16 T1-1305
12 3B+3T+STUDY 100.66 T1-1306
12 2B+2T 68.39 T1-1307
13 2B+2T 68.39 T1-1401
13 2B+2T 69.08 T1-1402
13 2B+2T 68.39 T1-1403
13 3B+3T+STUDY 99.32 T1-1404
13 3B+3T 90.16 T1-1405
13 3B+3T+STUDY 100.66 T1-1406
13 2B+2T 68.39 T1-1407
Parking

Parking, Garage & Area Details

Parking provision declared in the sanctioned plan.

Type Proposed Booked Work Done
Garage - - -
Covered Parking - - -
Open Parking - - -
Development

Development Works & Common Area Disclosures

Project-level common infrastructure disclosures as reported by the developer to the RERA authority.

Sub Structure Earth Work And Other Leveling Preparation Work % not reported Sub Structure Foundation Footing Work % not reported Sub Structure Upto Plinth Level % not reported
Sub Structure Sub-structure Flooring (Parking Floor, More Than One Floor Below General Ground Level) % not reported Sub Structure Retaining Wall (All Types) % not reported Sup Structure Rcc Or Ms Framed Structure % not reported
Sup Structure Masonry Construction % not reported Sup Structure Plastering Inside , Outside & Ceiling % not reported Sup Structure Joinery: Doors, Windows, Ventilators Etc % not reported
Sup Structure Basic Work Of Water Supply, Sanitary And Electrification % not reported Sup Structure Dadoing, Skirting, Flooring, Tiles Work (All Types) % not reported Sup Structure Railing And Grill Fixing % not reported
Finishing Works Electrification, Water Supply And Sanitary Finishing % not reported Finishing Works Painting % not reported Finishing Works Fire Prevention And Fire Fighting Fitting And Fixture With Network % not reported
Finishing Works Weather Proof Work(tile,concrete) % not reported Finishing Works Wardrobe, Showcase, Kitchen Cabinet, Puja Work % not reported Finishing Works Elevation Work % not reported
Finishing Works Internal And External Work Including Landscapes As Per Sanctioned Drawings % not reported Internal Infrastructure Water Supply % not reported Internal Infrastructure Sewage And Drainage System % not reported
Internal Infrastructure Water Conservation/rain Water Harvesting/recharge Of Ground Water % not reported Internal Infrastructure Energy Management % not reported Internal Infrastructure Fire Protection And Fire Safety Requirements % not reported
Internal Infrastructure Solid Waste Management And Disposal % not reported Internal Infrastructure Emergency Evacuation Services % not reported External Infrastructure Water Supply % not reported
External Infrastructure Internal Roads & Footpaths % not reported External Infrastructure Sewage And Drainage System % not reported External Infrastructure Electricity Supply Transformer And Substation % not reported
External Infrastructure Solid Waste Management And Disposal % not reported External Infrastructure Emergency Evacuation Services % not reported External Infrastructure Storm Water Drains % not reported
External Infrastructure Use Of Renewable Energy % not reported External Infrastructure Water Conservation/rain Water Harvesting/recharge Of Ground Water % not reported External Infrastructure Fire Protection And Fire Safety Requirements % not reported
External Infrastructure Sewage Treatment Plant (Stp) % not reported External Infrastructure Parks & Tree Planting % not reported External Infrastructure Street Lighting % not reported
Amenities Electricity % not reported Amenities Smart Home Automation % not reported Amenities Cctv Surveillance % not reported
Amenities Club House % not reported Amenities Community Hall % not reported Amenities Outdoor Sports Facility % not reported
Amenities Indoor Sports Facility % not reported Amenities Swimming Pool % not reported Amenities Gym % not reported
Amenities Parks % not reported Amenities Power Backup % not reported Amenities Piped Gas % not reported
Amenities Water And Sanitation % not reported Amenities Air Conditioning % not reported Common Areas Staircases % not reported
Common Areas Lifts % not reported Common Areas Corridor/lobbies % not reported Common Areas Fire Escapes % not reported
Common Areas Common Entrance And Exit For The Building/common Portico/foyer/verandah % not reported Common Areas Basement % not reported Common Areas Terrace % not reported
Common Areas Outer Wall % not reported Common Areas Open Parking Areas % not reported Common Areas Provision For Lodging Of Management Staff And Security Staff % not reported
Common Areas Water Conservation And Renewable Energy % not reported Common Areas Common Storage Spaces % not reported
Documents

RERA Documents & Filings

All statutory documents uploaded by the promoter to the authority portal.

Promoter Registration Certificate
Promoter Pan Card
Promoter Address Proof
Affidavit
Fd 1 Birla Arana LLP FS Signed Mar 25.Pdf
Fd 2 Arnaa Audit Report FY 23-24.Pdf
Fd 3 Birla Arnaa Signed Financial Mar-2023.Pdf
Fd 4 Birla Arana LLP FS Signed Mar 25.Pdf
Fd 5 Arnaa Audit Report FY 23-24.Pdf
Fd 6 Birla Arnaa Signed Financial Mar-2023.Pdf
Fd 7 Birla Arnaa LLP Income Tax Ack AY 2526.Pdf
Fd 8 Birla Arnaa LLP Income Tax Ack FY 23-24.Pdf
Fd 9 Birla Arnaa LLP Income Tax Ack AY2324.Pdf
Pd 1 Commencement Certificate( Annexure - 80 )
Pd 2 Approved Building Plan( Annexure - 81 )
Pd 3 Sectional Drawing Of The Apartments( Annexure - 82 )
Pd 4 Certificate From Registered Engineer Indicating The Structural Safety Of The Building( Annexure - 83 )
Pd 5 Project Specifications( Annexure - 84 )
Pd 6 Brochure( Annexure - 85 )
Pd 7 Relinquishment Deed( Annexure - 86 )
Pd 8 Proforma Of Agreement For Sale( Annexure - 87 )
Pd 9 Proforma Of Allotment Letter( Annexure - 88 )
Dc 1 Declaration (Form B)( Annexure - 89 )
Dc 2 Section 3(1) Notarized Affidavit( Annexure - 90 )
Dc 3 JD AFFIDAVIT CUM DECLARATION( Annexure - 91 )
Dc 4 Advocate Search Report( Annexure - 92 )
Noc 1 ESCOM Electricity( Annexure - 95 )
Noc 2 KWSSB Water( Annexure - 96 )
Noc 3 KSPCB( Annexure - 97 )
Noc 4 SEIAA( Annexure - 98 )
Noc 5 Fire Force Department( Annexure - 99 )
Noc 6 Airport Authority Of India( Annexure - 100 )
Photo 1 Project Photo
Photo 2 Project Photo
Od 1 Birla DP Plan.Pdf
Od 2 Birla Dp Order.Pdf
Od 3 MSR CLU Order.Pdf
Od 4 Trimaya Site On CDP.Pdf
Od 5 Coloured Village Map Of Akkalenahalli-Mallenahalli.Pdf
Od 6 Cost Of Construction Abstract Trimaya Phase-4.Pdf
Od 7 Birla Trimaya Ph 04 - STP Location Drawing.Pdf
Od 8 GPA.Pdf
Od 9 D 35 MSR Realty LLP Agreement 11356 15-16 Dt 20-11-2015.Pdf
Od 10 2nd Supplementary Agreement Dt 09-08-2016.Pdf
Od 11 3rd Supplementary Agreement Dt 30-10-2018.Pdf
Od 12 Hissa Tippani Sy No 12-2 (New Sy No 12-3).Pdf
Od 13 Hissa Tippani For Sy NO 15-1.Pdf
Od 14 Tippani Sy No 17.Pdf
Od 15 Tippani Sy No 16.Pdf
Od 16 NOC-From HQ Training Command IAF.Pdf
Od 17 1 Site Plan.Pdf
Od 18 2 Basement Plan.Pdf
Od 19 3 Basement-2.Pdf
Od 20 4 Ground Floor Plan.Pdf
Od 21 5 Tower 1,2,3,4,5-1st - 14th Typical Floor Plan.Pdf
Od 22 6 Tower 6th - 2nd, 4th, 6th, 8th, 10th, 12th, 14th Floor Plan.Pdf
Od 23 7 Terrace Floor Plan.Pdf
Od 24 8 Section And Elevation.Pdf
Od 25 Land Cost Calculation Sheet With Guidance Value.Pdf
Od 26 PH4-Demarcation In DP.Pdf
Od 27 Clarification About Sold And Unsold Units.Pdf
Od 28 PH4 Apartment Unitwise Details VER D.Pdf
Od 29 MR Copies Of Title Flow.Pdf
Od 30 Area (Phasewise) Bifurcation Details.Pdf
Od 31 Phase 4 List Of Amenities.Pdf
Ed 1 28-01-2026
Ed 2 28-01-2026
Ed 3 28-01-2026
Ed 4 28-01-2026
Ed 5 28-01-2026
Ed 6 28-01-2026
Ed 7 28-01-2026
Ed 8 28-01-2026
Ed 9 28-01-2026
Ed 10 28-01-2026
Ed 11 28-01-2026
Ed 12 28-01-2026
Ld Rtc
Ld Mutation
Ld Encumbrance Certificate
Ld Conversion Order
Ld Khatha
Bank

Bank & Cost Disclosure

Declared project cost and the designated escrow account on file.

Project Account Bank ICICI Bank
Account Number (RERA) 777705150812
IFSC ICIC0001937
Branch Address KH Road
Country/City