residential New Launch Source: rera.ka

Sattva Vasanta Skye RERA Details - PRM/KA/RERA/1250/303/PR/080525/007730 Bangalore

View the RERA registration, promoter, approval, building, inventory, document and construction-progress disclosures for Sattva Vasanta Skye under registration PRM/KA/RERA/1250/303/PR/080525/007730 in Bangalore, Karnataka. Data is sourced from rera.ka.

RERA

RERA Snapshot

The most important statutory project disclosures, generated dynamically from available RERA fields.

  • RERA Number PRM/KA/RERA/1250/303/PR/080525/007730
  • Project Name Sattva Vasanta Skye
  • Project Type Residential/Group Housing
  • Project Status New Launch
  • District Bengaluru Rural
  • Taluka Devanahalli
  • Original Completion 06 May 2031
  • Documents 98 Verified
Timeline

Project Timeline & Completion Details

Key statutory dates from registration through proposed completion and permit validity.

Proposed Start 01 May 2025 Expected commencement of civil works and foundation on site.
Original Completion 06 May 2031 Mandated date for project handover to the allottees and final compliance filing.
Promoter

Promoter, Organisation & Member Details

Declared promoter entity, address and corporate identifiers on file with the authority.

Primary Promoter

Sattva Resi Private Limited
Registered Address 4th Floor, Sattva Windsor, No.3,,Ulsoor Road, Bengaluru ,Bengaluru North ,Bengaluru Urban-560042
Location

Land, Address & Location Details

Land parcel, zoning and geo-coordinates as recorded in the project filing.

Address KHATHA NO 4/112-6/128-34/113-45/90/P154-16/123-14/123 @ SY NO. 90(P), 112, 113(P), 123, 128(P), 130, 161 OF KANNAMANGALA VILLAGE , KASABA HOBLI, DEVANAHALLI TALUK , Devanahalli , Bengaluru Rural, Karnataka - 562110

RERA Coordinates

Latitude, Longitude 13.206808726361915, 77.65977815803362
Plans

Plans & Approvals

Statutory approvals obtained or pending against the project site.

Plan Approval No. BIAAPA/TP/CC/527/2024-25/143
Authority BIAPPA - Bangalore Airport Area Planning Authority
Approved Date 25 April 2025

Understand this Project's RERA details

Get clear answers and additional support from our RERA experts.

RERA Banner
Buildings

Buildings, Towers & Building-Level Details

Statutory building-level disclosures including tower height, sanctioned floors, structural counts and parking areas.

Building Detail
Name No. of Basements No. of Slab No. of Slits No. of Open Parking Building Type Height of Tower No. of Floors No. of Units
BLOCK A (WING 1) 1 14 0 56 Residential 45.0 13 56
BLOCK -A (WING 2) 1 14 0 56 Residential 45.0 13 56
BLOCK A (WING 3) 1 14 0 56 Residential 45.0 13 56
BLOCK A (WING 4) 1 14 0 56 Residential 45.0 13 56
BLOCK A (WING 5) 2 14 0 70 Residential 45.0 13 70
BLOCK A (WING 6) 2 14 0 56 Residential 45.0 13 56
BLOCK A (WING 7) 2 14 0 56 Residential 45.0 13 56
BLOCK A (WING 8) 2 14 0 56 Residential 45.0 13 56
BLOCK B (WING 9) 1 15 0 60 Residential 48.15 14 60
BLOCK B (WING 10) 1 15 0 60 Residential 48.15 14 60
BLOCK B (WING 11) 2 15 0 60 Residential 48.15 14 60
BLOCK B (WING 12) 2 15 0 70 Residential 48.15 14 75
BLOCK B (WING 13) 2 15 0 60 Residential 48.15 14 60
BLOCK C (WING 14) 2 15 0 60 Residential 48.15 14 60
BLOCK C (WING 15) 2 15 0 105 Residential 48.15 14 120
BLOCK C (WING 16) 2 15 0 105 Residential 48.15 14 120

Scroll horizontally to view all building-level fields. Values marked "-" were not disclosed in the source RERA record.

Inventory

Unit Inventory & Configuration Details

Configuration mix and floor-level disclosures with both grouped and raw RERA views.

Total Units -
Configurations 5
Inventory Type RESIDENTIAL
Configuration Distribution
1 BHK 0 units
2 BHK 0 units
3 BHK 0 units
4 BHK 0 units
STUDIO 0 units
  • BLOCK A (WING 1)
  • BLOCK -A (WING 2)
  • BLOCK A (WING 3)
  • BLOCK A (WING 4)
  • BLOCK A (WING 5)
  • BLOCK A (WING 6)
  • BLOCK A (WING 7)
  • BLOCK A (WING 8)
  • BLOCK B (WING 9)
  • BLOCK B (WING 10)
  • BLOCK B (WING 11)
  • BLOCK B (WING 12)
  • BLOCK B (WING 13)
  • BLOCK C (WING 14)
  • BLOCK C (WING 15)
  • BLOCK C (WING 16)
Floor-Wise Inventory Explorer
Floor Apartment Type Carpet Area No. of Unit
-1 4 BHK 141.19 W1 - 001
-1 4 BHK 136.36 W1 - 002
-1 4 BHK 141.02 W1 - 003
-1 3 BHK 112.52 W1 - 004
GF 4 BHK 141.19 W1 - 101
GF 4 BHK 136.36 W1 - 102
GF 4 BHK 141.02 W1 - 103
GF 3 BHK 112.52 W1 - 104
1 4 BHK 141.19 W1 - 201
1 4 BHK 136.36 W1 - 202
1 4 BHK 141.02 W1 - 203
1 4 BHK 137.27 W1 - 204
2 4 BHK 141.19 W1 - 301
2 4 BHK 136.36 W1 - 302
2 4 BHK 141.02 W1 - 303
2 4 BHK 137.27 W1 - 304
3 4 BHK 141.19 W1 - 401
3 4 BHK 136.36 W1 - 402
3 4 BHK 141.02 W1 - 403
3 4 BHK 137.27 W1 - 404
4 4 BHK 141.19 W1 - 501
4 4 BHK 136.36 W1 - 502
4 4 BHK 141.02 W1 - 503
4 4 BHK 137.27 W1 - 504
5 4 BHK 141.19 W1 - 601
5 4 BHK 136.36 W1 - 602
5 4 BHK 141.02 W1 - 603
5 4 BHK 137.27 W1 - 604
6 4 BHK 141.19 W1 - 701
6 4 BHK 136.36 W1 - 702
6 4 BHK 141.02 W1 - 703
6 4 BHK 137.27 W1 - 704
7 4 BHK 141.19 W1 - 801
7 4 BHK 136.36 W1 - 802
7 4 BHK 141.02 W1 - 803
7 4 BHK 137.27 W1 - 804
8 4 BHK 141.19 W1 - 901
8 4 BHK 136.36 W1 - 902
8 4 BHK 141.02 W1 - 903
8 4 BHK 137.27 W1 - 904
9 4 BHK 141.19 W1 - 1001
9 4 BHK 136.36 W1 - 1002
9 4 BHK 141.02 W1 - 1003
9 4 BHK 137.27 W1 - 1004
10 4 BHK 141.19 W1 - 1101
10 4 BHK 136.36 W1 - 1102
10 4 BHK 141.02 W1 - 1103
10 4 BHK 137.27 W1 - 1104
11 4 BHK 141.19 W1 - 1201
11 4 BHK 136.36 W1 - 1202
11 4 BHK 141.02 W1 - 1203
11 4 BHK 137.27 W1 - 1204
12 4 BHK 141.19 W1 - 1301
12 4 BHK 136.36 W1 - 1302
12 4 BHK 141.02 W1 - 1303
12 4 BHK 137.27 W1 - 1304
Parking

Parking, Garage & Area Details

Parking provision declared in the sanctioned plan.

Type Proposed Booked Work Done
Garage - - -
Covered Parking - - -
Open Parking - - -
Development

Development Works & Common Area Disclosures

Project-level common infrastructure disclosures as reported by the developer to the RERA authority.

Sub Structure Earth Work And Other Leveling Preparation Work % not reported Sub Structure Foundation Footing Work % not reported Sub Structure Upto Plinth Level % not reported
Sub Structure Sub-structure Flooring (Parking Floor, More Than One Floor Below General Ground Level) % not reported Sub Structure Retaining Wall (All Types) % not reported Sup Structure Rcc Or Ms Framed Structure % not reported
Sup Structure Masonry Construction % not reported Sup Structure Plastering Inside , Outside & Ceiling % not reported Sup Structure Joinery: Doors, Windows, Ventilators Etc % not reported
Sup Structure Basic Work Of Water Supply, Sanitary And Electrification % not reported Sup Structure Dadoing, Skirting, Flooring, Tiles Work (All Types) % not reported Sup Structure Railing And Grill Fixing % not reported
Finishing Works Electrification, Water Supply And Sanitary Finishing % not reported Finishing Works Painting % not reported Finishing Works Fire Prevention And Fire Fighting Fitting And Fixture With Network % not reported
Finishing Works Weather Proof Work(tile,concrete) % not reported Finishing Works Wardrobe, Showcase, Kitchen Cabinet, Puja Work % not reported Finishing Works Elevation Work % not reported
Finishing Works Internal And External Work Including Landscapes As Per Sanctioned Drawings % not reported Internal Infrastructure Water Supply % not reported Internal Infrastructure Sewage And Drainage System % not reported
Internal Infrastructure Water Conservation/rain Water Harvesting/recharge Of Ground Water % not reported Internal Infrastructure Energy Management % not reported Internal Infrastructure Fire Protection And Fire Safety Requirements % not reported
Internal Infrastructure Solid Waste Management And Disposal % not reported Internal Infrastructure Emergency Evacuation Services % not reported External Infrastructure Water Supply % not reported
External Infrastructure Internal Roads & Footpaths % not reported External Infrastructure Sewage And Drainage System % not reported External Infrastructure Electricity Supply Transformer And Substation % not reported
External Infrastructure Solid Waste Management And Disposal % not reported External Infrastructure Emergency Evacuation Services % not reported External Infrastructure Storm Water Drains % not reported
External Infrastructure Use Of Renewable Energy % not reported External Infrastructure Water Conservation/rain Water Harvesting/recharge Of Ground Water % not reported External Infrastructure Fire Protection And Fire Safety Requirements % not reported
External Infrastructure Sewage Treatment Plant (Stp) % not reported External Infrastructure Parks & Tree Planting % not reported External Infrastructure Street Lighting % not reported
Amenities Electricity % not reported Amenities Smart Home Automation % not reported Amenities Cctv Surveillance % not reported
Amenities Club House % not reported Amenities Community Hall % not reported Amenities Outdoor Sports Facility % not reported
Amenities Indoor Sports Facility % not reported Amenities Swimming Pool % not reported Amenities Gym % not reported
Amenities Parks % not reported Amenities Power Backup % not reported Amenities Piped Gas % not reported
Amenities Water And Sanitation % not reported Amenities Air Conditioning % not reported Common Areas Staircases % not reported
Common Areas Lifts % not reported Common Areas Corridor/lobbies % not reported Common Areas Fire Escapes % not reported
Common Areas Common Entrance And Exit For The Building/common Portico/foyer/verandah % not reported Common Areas Basement % not reported Common Areas Terrace % not reported
Common Areas Outer Wall % not reported Common Areas Open Parking Areas % not reported Common Areas Provision For Lodging Of Management Staff And Security Staff % not reported
Common Areas Water Conservation And Renewable Energy % not reported Common Areas Common Storage Spaces % not reported
Documents

RERA Documents & Filings

All statutory documents uploaded by the promoter to the authority portal.

Photo 2 Project Photo
Photo 1 Project Photo
Promoter Registration Certificate
Promoter Pan Card
Promoter Address Proof
Fd 1 BS & Sch -23-24.Pdf
Fd 2 Balance Sheet FY 2022-23.Pdf
Fd 3 Vasanta Skye-Financial Data.Pdf
Fd 4 PL & Sch -23-24.Pdf
Fd 5 Vasanta Skye-Financial Data.Pdf
Fd 6 Vasanta Skye-Financial Data.Pdf
Fd 7 FY 2023 - 24 ITR ACK.Pdf
Fd 8 FY 2022 - 23 ITR.Pdf
Fd 9 Vasanta Skye-Financial Data.Pdf
Fd 10 Board Report 2023-24.Pdf
Fd 11 Director'S Report FY 22-23.Pdf
Fd 12 Vasanta Skye-Financial Data.Pdf
Fd 13 CFS -23-24.Pdf
Fd 14 Vasanta Skye-Financial Data.Pdf
Fd 15 Vasanta Skye-Financial Data.Pdf
Fd 16 Auditors Report -23-24.Pdf
Fd 17 Audited Profit And Loss Statement FY 22 - 23.Pdf
Fd 18 Vasanta Skye-Financial Data.Pdf
Pd 1 Commencement Certificate( Annexure - 80 )
Pd 2 Approved Building Plan( Annexure - 81 )
Pd 3 Sectional Drawing Of The Apartments( Annexure - 82 )
Pd 4 Certificate From Registered Engineer Indicating The Structural Safety Of The Building( Annexure - 83 )
Pd 5 Project Specifications( Annexure - 84 )
Pd 6 Brochure( Annexure - 85 )
Pd 7 Relinquishment Deed( Annexure - 86 )
Pd 8 Proforma Of Agreement For Sale( Annexure - 87 )
Pd 9 Proforma Of Allotment Letter( Annexure - 88 )
Dc 1 Declaration (Form B)( Annexure - 89 )
Dc 2 Section 3(1) Notarized Affidavit( Annexure - 90 )
Dc 4 Advocate Search Report( Annexure - 92 )
Noc 1 ESCOM Electricity( Annexure - 95 )
Noc 2 KWSSB Water( Annexure - 96 )
Noc 3 KSPCB( Annexure - 97 )
Noc 4 SEIAA( Annexure - 98 )
Noc 5 Fire Force Department( Annexure - 99 )
Noc 6 Airport Authority Of India( Annexure - 100 )
Noc 7 BSNL( Annexure - 101 )
Photo 3 Project Photo
Photo 4 Project Photo
Photo 5 Project Photo
Photo 6 Project Photo
Photo 7 Project Photo
Photo 8 Project Photo
Photo 9 Project Photo
Photo 10 Project Photo
Photo 11 Project Photo
Photo 12 Project Photo
Photo 13 Project Photo
Photo 14 Project Photo
Photo 15 Project Photo
Photo 16 Project Photo
Photo 17 Project Photo
Photo 18 Project Photo
Od 1 Kannamangala 90 LU.Pdf
Od 2 Kannamangala 90 RC.Pdf
Od 3 Kannamangala 90 SR.Pdf
Od 4 BIAAPA Approved DP Vasanta Skye.Pdf
Od 5 BIAAPA DP Work Order Vasanta Skye.Pdf
Od 6 Vasanta Skye-Stability Certificate.Pdf
Od 7 Sale Deed -15616-2024-2025-Ozone Urbana-Sy No 90, 130 & 161.Pdf
Od 8 Sale Deed 3672-2007-2008 Ozone Urbana Sy No 112.Pdf
Od 9 Sale Deed 8372-2012-2013 Ozone Urbana Sy No 113.Pdf
Od 10 Sale Deed Ozone Urbana Sy No 123.Pdf
Od 11 Sale Deed - 9501 -2006-2007 Ozone Urbana Sy No 128.Pdf
Od 12 Cost Estimation For Sattva Vasante Skye.Pdf
Od 13 CLU Order For Residential.Pdf
Od 14 Plan Sanction 2.Pdf
Od 15 Plan Sanction 3.Pdf
Od 16 Plan Sanction 4.Pdf
Od 17 Plan Sanction 5.Pdf
Od 18 Plan Sanction 6.Pdf
Od 19 Plan Sanction 7.Pdf
Od 20 Plan Sanction 8.Pdf
Od 21 Plan Sanction 9.Pdf
Od 22 Plan Sanction 10.Pdf
Od 23 Plan Sanction 11.Pdf
Od 24 Plan Sanction 12.Pdf
Od 25 Plan Sanction 13.Pdf
Od 26 Plan Sanction 14.Pdf
Od 27 Plan Sanction 15.Pdf
Od 28 Plan Sanction 16.Pdf
Od 29 Plan Sanction 17.Pdf
Od 30 Vasanta Skye - Saleable Area (Signed).Pdf
Od 31 Letter For Amenities And FAcilities-Vasanta Skye.Pdf
Od 32 AFFIDAVIT-Nil Litigation.Pdf
Od 33 STP DESIGN-Vasanta Skye.Pdf
Ed 1 08-05-2025
Ld Rtc
Ld Mutation
Ld Encumbrance Certificate
Ld Conversion Order
Ld Sale Deed
Ld Khatha
Bank

Bank & Cost Disclosure

Declared project cost and the designated escrow account on file.

Project Account Bank ICICI Bank
Account Number (RERA) 777705351321
IFSC ICIC0000002
Branch Address MG Road
Country/City