Squareyards Logo
Blogs
Download App Sell or Rent Property
Login
Rera Banner
residential New Launch Source: rera.ka

Sattva Aangane RERA Details - PRM/KA/RERA/1251/446/PR/180926/008944 Bangalore

View the RERA registration, promoter, approval, building, inventory, document and construction-progress disclosures for Sattva Aangane under registration PRM/KA/RERA/1251/446/PR/180926/008944 in Bangalore, Karnataka. Data is sourced from rera.ka.

RERA

RERA Snapshot

The most important statutory project disclosures, generated dynamically from available RERA fields.

  • RERA Number PRM/KA/RERA/1251/446/PR/180926/008944
  • Project Name SATTVA AANGANE
  • Project Type Residential/Group Housing
  • Project Status New Launch
  • District Bengaluru Urban
  • Taluka Bengaluru East
  • Original Completion 21 October 2032
  • Documents 93 Verified
Timeline

Project Timeline & Completion Details

Key statutory dates from registration through proposed completion and permit validity.

Proposed Start 01 October 2026 Expected commencement of civil works and foundation on site.
Original Completion 21 October 2032 Mandated date for project handover to the allottees and final compliance filing.
Promoter

Promoter, Organisation & Member Details

Declared promoter entity, address and corporate identifiers on file with the authority.

Primary Promoter

Sattva Resi Private Limited
Registered Address 4th Floor, Sattva Windsor, No.3,,Ulsoor Road, Bengaluru ,Bengaluru North ,Bengaluru Urban-560042
Experience Details
Location

Land, Address & Location Details

Land parcel, zoning and geo-coordinates as recorded in the project filing.

RERA Coordinates

Latitude, Longitude 13.039249, 77.742784
Plans

Plans & Approvals

Statutory approvals obtained or pending against the project site.

Plan Approval No. BDA/NAMA/AA.SA/A.A-5/TA.SA-4/PU/66/2025-26
Authority BDA - Bangalore Development Authority
Approved Date 02 February 2026

Understand this Project's RERA details

Get clear answers and additional support from our RERA experts.

RERA Banner
Buildings

Buildings, Towers & Building-Level Details

Statutory building-level disclosures including tower height, sanctioned floors, structural counts and parking areas.

Building Detail
Name No. of Basements No. of Slab No. of Slits No. of Open Parking Building Type Height of Tower No. of Floors No. of Units
Tower - 1 4 10 0 39 Residential 33.3 9 39
Tower - 2 4 34 0 131 Residential 112.5 33 130
Tower - 3 4 37 0 143 Residential 122.35 36 142
Tower - 4 4 40 0 155 Residential 132.25 39 155
Tower - 7 4 43 0 167 Residential 143.35 42 159

Scroll horizontally to view all building-level fields. Values marked "-" were not disclosed in the source RERA record.

Inventory

Unit Inventory & Configuration Details

Configuration mix and floor-level disclosures with both grouped and raw RERA views.

Total Units -
Configurations 3
Inventory Type RESIDENTIAL
Configuration Distribution
3 BHK 0 units
4 BHK 0 units
5 BHK 0 units
  • Tower - 1
  • Tower - 2
  • Tower - 3
  • Tower - 4
  • Tower - 7
Floor-Wise Inventory Explorer
Floor Apartment Type Carpet Area No. of Unit
-1 3BHK+3T+3BC-TYP 02 120.19 T-1001
-1 3BHK+3T+2BC-TYP 04 101.77 T-1002
-1 3BHK+3T+3BC-TYP 01 108.13 T-1004
GF 3BHK+3T+3BC-TYP 02 120.19 T-1011
GF 3BHK+3T+2BC-TYP 04 101.77 T-1012
GF 3BHK+3T+3BC-TYP 03c 119.27 T-1013
GF 3BHK+3T+3BC-TYP 01 108.13 T-1014
1 3BHK+3T+3BC-TYP 02 120.19 T-1021
1 3BHK+3T+2BC-TYP 04 101.77 T-1022
1 4BHK+4T+3BC-TYP 02b 149.25 T-1023
1 3BHK+3T+3BC-TYP 01 108.13 T-1024
2 3BHK+3T+3BC-TYP 02 120.19 T-1031
2 3BHK+3T+2BC-TYP 04 101.77 T-1032
2 4BHK+4T+3BC-TYP 02 149.25 T-1033
2 3BHK+3T+3BC-TYP 01 108.13 T-1034
3 3BHK+3T+3BC-TYP 02 120.19 T-1041
3 3BHK+3T+2BC-TYP 04 101.77 T-1042
3 4BHK+4T+3BC-TYP 02 149.25 T-1043
3 3BHK+3T+3BC-TYP 01 108.13 T-1044
4 3BHK+3T+3BC-TYP 02 120.19 T-1051
4 3BHK+3T+2BC-TYP 04 101.77 T-1052
4 4BHK+4T+3BC-TYP 02 149.25 T-1053
4 3BHK+3T+3BC-TYP 01 108.13 T-1054
5 3BHK+3T+3BC-TYP 02 120.19 T-1061
5 3BHK+3T+2BC-TYP 04 101.77 T-1062
5 4BHK+4T+3BC-TYP 02 149.25 T-1063
5 3BHK+3T+3BC-TYP 01 108.13 T-1064
6 3BHK+3T+3BC-TYP 02 120.19 T-1071
6 3BHK+3T+2BC-TYP 04 101.77 T-1072
6 4BHK+4T+3BC-TYP 02 149.25 T-1073
6 3BHK+3T+3BC-TYP 01 108.13 T-1074
7 3BHK+3T+3BC-TYP 02 120.19 T-1081
7 3BHK+3T+2BC-TYP 04 101.77 T-1082
7 4BHK+4T+3BC-TYP 02 149.25 T-1083
7 3BHK+3T+3BC-TYP 01 108.13 T-1084
8 3BHK+3T+3BC-TYP 02a 121.85 T-1091
8 3BHK+3T+2BC-TYP 04a 103.61 T-1092
8 4BHK+3T+3BC-TYP 02a 150.04 T-1093
8 3BHK+3T+3BC-TYP 01a 109.97 T-1094
Parking

Parking, Garage & Area Details

Parking provision declared in the sanctioned plan.

Type Proposed Booked Work Done
Garage - - -
Covered Parking - - -
Open Parking - - -
Development

Development Works & Common Area Disclosures

Project-level common infrastructure disclosures as reported by the developer to the RERA authority.

Sub Structure Earth Work And Other Leveling Preparation Work % not reported Sub Structure Foundation Footing Work % not reported Sub Structure Upto Plinth Level % not reported
Sub Structure Sub-structure Flooring (Parking Floor, More Than One Floor Below General Ground Level) % not reported Sub Structure Retaining Wall (All Types) % not reported Sup Structure Rcc Or Ms Framed Structure % not reported
Sup Structure Masonry Construction % not reported Sup Structure Plastering Inside , Outside & Ceiling % not reported Sup Structure Joinery: Doors, Windows, Ventilators Etc % not reported
Sup Structure Basic Work Of Water Supply, Sanitary And Electrification % not reported Sup Structure Dadoing, Skirting, Flooring, Tiles Work (All Types) % not reported Sup Structure Railing And Grill Fixing % not reported
Finishing Works Electrification, Water Supply And Sanitary Finishing % not reported Finishing Works Painting % not reported Finishing Works Fire Prevention And Fire Fighting Fitting And Fixture With Network % not reported
Finishing Works Weather Proof Work(tile,concrete) % not reported Finishing Works Wardrobe, Showcase, Kitchen Cabinet, Puja Work % not reported Finishing Works Elevation Work % not reported
Finishing Works Internal And External Work Including Landscapes As Per Sanctioned Drawings % not reported Internal Infrastructure Water Supply % not reported Internal Infrastructure Sewage And Drainage System % not reported
Internal Infrastructure Water Conservation/rain Water Harvesting/recharge Of Ground Water % not reported Internal Infrastructure Energy Management % not reported Internal Infrastructure Fire Protection And Fire Safety Requirements % not reported
Internal Infrastructure Solid Waste Management And Disposal % not reported Internal Infrastructure Emergency Evacuation Services % not reported External Infrastructure Water Supply % not reported
External Infrastructure Internal Roads & Footpaths % not reported External Infrastructure Sewage And Drainage System % not reported External Infrastructure Electricity Supply Transformer And Substation % not reported
External Infrastructure Solid Waste Management And Disposal % not reported External Infrastructure Emergency Evacuation Services % not reported External Infrastructure Storm Water Drains % not reported
External Infrastructure Use Of Renewable Energy % not reported External Infrastructure Water Conservation/rain Water Harvesting/recharge Of Ground Water % not reported External Infrastructure Fire Protection And Fire Safety Requirements % not reported
External Infrastructure Sewage Treatment Plant (Stp) % not reported External Infrastructure Parks & Tree Planting % not reported External Infrastructure Street Lighting % not reported
Amenities Electricity % not reported Amenities Smart Home Automation % not reported Amenities Cctv Surveillance % not reported
Amenities Club House % not reported Amenities Community Hall % not reported Amenities Outdoor Sports Facility % not reported
Amenities Indoor Sports Facility % not reported Amenities Swimming Pool % not reported Amenities Gym % not reported
Amenities Parks % not reported Amenities Power Backup % not reported Amenities Piped Gas % not reported
Amenities Water And Sanitation % not reported Amenities Air Conditioning % not reported Common Areas Staircases % not reported
Common Areas Lifts % not reported Common Areas Corridor/lobbies % not reported Common Areas Fire Escapes % not reported
Common Areas Common Entrance And Exit For The Building/common Portico/foyer/verandah % not reported Common Areas Basement % not reported Common Areas Terrace % not reported
Common Areas Outer Wall % not reported Common Areas Open Parking Areas % not reported Common Areas Provision For Lodging Of Management Staff And Security Staff % not reported
Common Areas Water Conservation And Renewable Energy % not reported Common Areas Common Storage Spaces % not reported
Documents

RERA Documents & Filings

All statutory documents uploaded by the promoter to the authority portal.

Promoter Registration Certificate
Promoter Pan Card
Promoter Address Proof
Affidavit
7 Completion Certificate
Fd 1 BS - 24-25.Pdf
Fd 2 BS -23-24.Pdf
Fd 3 BS - 22-23.Pdf
Fd 4 P&L - 24-25.Pdf
Fd 5 P&L - 23-24.Pdf
Fd 6 Aangane-Financial Details.Pdf
Fd 7 ITR - 25.Pdf
Fd 8 ITR - 24.Pdf
Fd 9 ITR - 23.Pdf
Fd 10 Director Report Sattva Resi 24-25.Pdf
Fd 11 Director Report - 23-24.Pdf
Fd 12 Director Report - 22-23.Pdf
Fd 13 CF - 24-25.Pdf
Fd 14 CF-23-24.Pdf
Fd 15 Aangane-Financial Details.Pdf
Fd 16 Auditors Report - 24-25.Pdf
Fd 17 Auditors Report - 23-24.Pdf
Fd 18 Auditors Report - 23.Pdf
Pd 1 Commencement Certificate( Annexure - 80 )
Pd 2 Approved Building Plan( Annexure - 81 )
Pd 3 Sectional Drawing Of The Apartments( Annexure - 82 )
Pd 4 Certificate From Registered Engineer Indicating The Structural Safety Of The Building( Annexure - 83 )
Pd 5 Project Specifications( Annexure - 84 )
Pd 6 Brochure( Annexure - 85 )
Pd 7 Relinquishment Deed( Annexure - 86 )
Pd 8 Proforma Of Agreement For Sale( Annexure - 87 )
Pd 9 Proforma Of Allotment Letter( Annexure - 88 )
Dc 1 Declaration (Form B)( Annexure - 89 )
Dc 2 Section 3(1) Notarized Affidavit( Annexure - 90 )
Dc 3 JD AFFIDAVIT CUM DECLARATION( Annexure - 91 )
Dc 4 Advocate Search Report( Annexure - 92 )
Noc 1 ESCOM Electricity( Annexure - 95 )
Noc 2 KWSSB Water( Annexure - 96 )
Noc 3 KSPCB( Annexure - 97 )
Noc 4 SEIAA( Annexure - 98 )
Noc 5 Fire Force Department( Annexure - 99 )
Noc 6 Airport Authority Of India( Annexure - 100 )
Noc 7 BSNL( Annexure - 101 )
Photo 1 Project Photo
Photo 2 Project Photo
Od 1 STP - Demarcation.Pdf
Od 2 Aangane - Approved DP Plan.Pdf
Od 3 T7 ELEVATION & SECTION.Pdf
Od 4 BASEMENT 1.Pdf
Od 5 BASEMENT 2.Pdf
Od 6 BASEMENT 3.Pdf
Od 7 BASEMENT 4.Pdf
Od 8 AMINITY 1.Pdf
Od 9 AMINITY 2.Pdf
Od 10 T1 & T2 - GROUND & FIRST FLOOR.Pdf
Od 11 T1 & T2 - SECTION.Pdf
Od 12 T1 & T2 2-8TH FLOOR.Pdf
Od 13 T2 11 - 19, 22-25 FLOOR PLAN.Pdf
Od 14 T2 26- 32 FLOOR PLAN.Pdf
Od 15 Aangane - CDP.Pdf
Od 16 Village Map.Pdf
Od 17 Google Map - Demarcated.Pdf
Od 18 Aangane-Undertaking-Channel Partner.Pdf
Od 19 Aangane-Amenities.Pdf
Od 20 ADLR Sketch.Pdf
Od 21 No Sale Declaration.Pdf
Od 22 8 T1 & T2 - 9TH 10 FLOOR- T1 TERRACE FLOOR.Pdf
Od 23 11 T2 33 & TERRACE T1 & T2 ELEVATION.Pdf
Od 24 13 T 3 & 4 - G 1 FLOOR PLAN.Pdf
Od 25 14 T 3& 4 2-8 TH FLOOR.Pdf
Od 26 15 T 3&4 - 9,10 & 11 FLOOR PLAN.Pdf
Od 27 16 T 3&4 - 12-14 FLOOR PLAN.Pdf
Od 28 17 T 3&4 - 15 16 & 23 FLOOR PLAN.Pdf
Od 29 Sheet 18.Pdf
Od 30 19 T 3&4 -26, 27 & 34 FLOOR PLAN.Pdf
Od 31 20 T 3 &4- 35 &36 FLOOR PLAN.Pdf
Od 32 Sheet 21.Pdf
Od 33 22 T3 & T4 - TERRACE FLOOR PLAN.Pdf
Od 34 Sheet 24.Pdf
Od 35 Sheet 25.Pdf
Od 36 Sheet 26.Pdf
Od 37 Sheet 30.Pdf
Od 38 DP Sanction Letter.Pdf
Od 39 Estimation Summary.Pdf
Od 40 Land Cost Calculation.Pdf
Ed 1 17-09-2026
Ed 2 17-09-2026
Ld Rtc
Ld Mutation
Ld Encumbrance Certificate
Ld Conversion Order
Ld Sale Deed
Ld Khatha
Bank

Bank & Cost Disclosure

Declared project cost and the designated escrow account on file.

Project Account Bank ICICI Bank
Account Number (RERA) 777705323023
IFSC ICIC0000002
Branch Address Commissariat Road
Country/City