Squareyards Logo
Blogs
Sell or Rent Property
Login
Rera Banner
residential Under Construction Source: rera.ka

Sattva Forest Ridge RERA Details - PRM/KA/RERA/1251/310/PR/241224/007315 Bangalore

View the RERA registration, promoter, approval, building, inventory, document and construction-progress disclosures for Sattva Forest Ridge under registration PRM/KA/RERA/1251/310/PR/241224/007315 in Bangalore, Karnataka. Data is sourced from rera.ka.

RERA

RERA Snapshot

The most important statutory project disclosures, generated dynamically from available RERA fields.

  • RERA Number PRM/KA/RERA/1251/310/PR/241224/007315
  • Project Name Sattva Forest Ridge
  • Project Type Residential/Group Housing
  • Project Status Under Construction
  • District Bengaluru Urban
  • Taluka Bengaluru South
  • Original Completion 31 December 2029
  • Documents 79 Verified
Timeline

Project Timeline & Completion Details

Key statutory dates from registration through proposed completion and permit validity.

Proposed Start 01 January 2025 Expected commencement of civil works and foundation on site.
Original Completion 31 December 2029 Mandated date for project handover to the allottees and final compliance filing.
Promoter

Promoter, Organisation & Member Details

Declared promoter entity, address and corporate identifiers on file with the authority.

Primary Promoter

Sattva Resi Private Limited
Registered Address 4th Floor, Sattva Windsor, No.3,Ulsoor Road, Bengaluru ,Bengaluru East ,Bengaluru Urban-560042
Location

Land, Address & Location Details

Land parcel, zoning and geo-coordinates as recorded in the project filing.

Address Survey No.43/3, presently bearing BBMP Khata No. 114/43/3, situated at Anjanapura Village, Uttarahalli Hobli , Anjanapura 80 Feet Road, Ward No. 196, Bangalore , Bengaluru South , Bengaluru Urban, Karnataka - 560062

RERA Coordinates

Latitude, Longitude 12.862791841200565, 77.55759716033936
Plans

Plans & Approvals

Statutory approvals obtained or pending against the project site.

Plan Approval No. BBMP/Adl.Dir/JDSOUTH/0059/23-24
Authority BBMP - Bruhat Bengaluru Mahanagara Palike
Approved Date 13 December 2024

Understand this Project's RERA details

Get clear answers and additional support from our RERA experts.

RERA Banner
Buildings

Buildings, Towers & Building-Level Details

Statutory building-level disclosures including tower height, sanctioned floors, structural counts and parking areas.

Building Detail
Name No. of Basements No. of Slab No. of Slits No. of Open Parking Building Type Height of Tower No. of Floors No. of Units
1 Wing 1 2 32 1 120 Residential 95.7 30 120
1 Wing 2 2 32 1 120 Residential 95.7 30 120
2 2 30 1 167 Residential 89.7 28 167

Scroll horizontally to view all building-level fields. Values marked "-" were not disclosed in the source RERA record.

Inventory

Unit Inventory & Configuration Details

Configuration mix and floor-level disclosures with both grouped and raw RERA views.

Total Units -
Configurations 4
Inventory Type RESIDENTIAL
Configuration Distribution
1 BHK 0 units
2 BHK 0 units
3 BHK 0 units
5 BHK 0 units
  • 1 Wing 1
  • 1 Wing 2
  • 2
Floor-Wise Inventory Explorer
Floor Apartment Type Carpet Area No. of Unit
GF 3 BHK 95.01 A - 101
GF 3 BHK 111.61 A - 102
GF 3 BHK 112.5 A - 103
GF 2.5 BHK 94.42 A - 104
1 3 BHK 95.01 A - 201
1 3 BHK 111.61 A - 202
1 3 BHK 112.5 A - 203
1 3 BHK 101.4 A - 204
2 3 BHK 95.01 A - 301
2 3 BHK 111.61 A - 302
2 3 BHK 112.5 A - 303
2 3 BHK 101.4 A - 304
3 3 BHK 95.01 A - 401
3 3 BHK 111.61 A - 402
3 3 BHK 112.5 A - 403
3 3 BHK 101.4 A - 404
4 3 BHK 95.01 A - 501
4 3 BHK 111.61 A - 502
4 3 BHK 112.5 A - 503
4 3 BHK 101.4 A - 504
5 3 BHK 95.01 A - 601
5 3 BHK 111.61 A - 602
5 3 BHK 112.5 A - 603
5 3 BHK 101.4 A - 604
6 3 BHK 95.01 A - 701
6 3 BHK 111.61 A - 702
6 3 BHK 112.5 A - 703
6 3 BHK 101.4 A - 704
7 3 BHK 95.01 A - 801
7 3 BHK 111.61 A - 802
7 3 BHK 112.5 A - 803
7 3 BHK 101.4 A - 804
8 3 BHK 95.01 A - 901
8 3 BHK 111.61 A - 902
8 3 BHK 112.5 A - 903
8 3 BHK 101.4 A - 904
9 3 BHK 95.01 A - 1001
9 3 BHK 111.61 A - 1002
9 3 BHK 112.5 A - 1003
9 3 BHK 101.4 A - 1004
10 3 BHK 95.01 A - 1101
10 3 BHK 111.61 A - 1102
10 3 BHK 112.5 A - 1103
10 3 BHK 101.4 A - 1104
11 3 BHK 95.01 A - 1201
11 3 BHK 111.61 A - 1202
11 3 BHK 112.5 A - 1203
11 3 BHK 101.4 A - 1204
12 3 BHK 95.01 A - 1301
12 3 BHK 111.61 A - 1302
12 3 BHK 112.5 A - 1303
12 3 BHK 101.4 A - 1304
13 3 BHK 95.01 A - 1401
13 3 BHK 111.61 A - 1402
13 3 BHK 112.5 A - 1403
13 3 BHK 101.4 A - 1404
14 3 BHK 95.01 A - 1501
14 3 BHK 111.61 A - 1502
14 3 BHK 112.5 A - 1503
14 3 BHK 101.4 A - 1504
15 3 BHK 95.01 A - 1601
15 3 BHK 111.61 A - 1602
15 3 BHK 112.5 A - 1603
15 3 BHK 101.4 A - 1604
16 3 BHK 95.01 A - 1701
16 3 BHK 111.61 A - 1702
16 3 BHK 112.5 A - 1703
16 3 BHK 101.4 A - 1704
17 3 BHK 95.01 A - 1801
17 3 BHK 111.61 A - 1802
17 3 BHK 112.5 A - 1803
17 3 BHK 101.4 A - 1804
18 3 BHK 95.01 A - 1901
18 3 BHK 111.61 A - 1902
18 3 BHK 112.5 A - 1903
18 3 BHK 101.4 A - 1904
19 3 BHK 95.01 A - 2001
19 3 BHK 111.61 A - 2002
19 3 BHK 112.5 A - 2003
19 3 BHK 101.4 A - 2004
20 3 BHK 95.01 A - 2101
20 3 BHK 111.61 A - 2102
20 3 BHK 112.5 A - 2103
20 3 BHK 101.4 A - 2104
21 3 BHK 95.01 A - 2201
21 3 BHK 111.61 A - 2202
21 3 BHK 112.5 A - 2203
21 3 BHK 101.4 A - 2204
22 3 BHK 95.01 A - 2301
22 3 BHK 111.61 A - 2302
22 3 BHK 112.5 A - 2303
22 3 BHK 101.4 A - 2304
23 3 BHK 95.01 A - 2401
23 3 BHK 111.61 A - 2402
23 3 BHK 112.5 A - 2403
23 3 BHK 101.4 A - 2404
24 3 BHK 95.01 A - 2501
24 3 BHK 111.61 A - 2502
24 3 BHK 112.5 A - 2503
24 3 BHK 101.4 A - 2504
25 3 BHK 95.01 A - 2601
25 3 BHK 111.61 A - 2602
25 3 BHK 112.5 A - 2603
25 3 BHK 101.4 A - 2604
26 3 BHK 95.01 A - 2701
26 3 BHK 111.61 A - 2702
26 3 BHK 112.5 A - 2703
26 3 BHK 101.4 A - 2704
27 3 BHK 95.01 A - 2801
27 3 BHK 111.61 A - 2802
27 3 BHK 112.5 A - 2803
27 3 BHK 101.4 A - 2804
28 3 BHK 95.01 A - 2901
28 3 BHK 111.61 A - 2902
28 3 BHK 112.5 A - 2903
28 3 BHK 101.4 A - 2904
29 3 BHK 95.01 A - 3001
29 3 BHK 111.61 A - 3002
29 3 BHK 112.5 A - 3003
29 3 BHK 101.4 A - 3004
Parking

Parking, Garage & Area Details

Parking provision declared in the sanctioned plan.

Type Proposed Booked Work Done
Garage - - -
Covered Parking - - -
Open Parking - - -
Development

Development Works & Common Area Disclosures

Project-level common infrastructure disclosures as reported by the developer to the RERA authority.

Sub Structure Earth Work And Other Leveling Preparation Work % not reported Sub Structure Foundation Footing Work % not reported Sub Structure Upto Plinth Level % not reported
Sub Structure Sub-structure Flooring (Parking Floor, More Than One Floor Below General Ground Level) % not reported Sub Structure Retaining Wall (All Types) % not reported Sup Structure Rcc Or Ms Framed Structure % not reported
Sup Structure Masonry Construction % not reported Sup Structure Plastering Inside , Outside & Ceiling % not reported Sup Structure Joinery: Doors, Windows, Ventilators Etc % not reported
Sup Structure Basic Work Of Water Supply, Sanitary And Electrification % not reported Sup Structure Dadoing, Skirting, Flooring, Tiles Work (All Types) % not reported Sup Structure Railing And Grill Fixing % not reported
Finishing Works Electrification, Water Supply And Sanitary Finishing % not reported Finishing Works Painting % not reported Finishing Works Fire Prevention And Fire Fighting Fitting And Fixture With Network % not reported
Finishing Works Weather Proof Work(tile,concrete) % not reported Finishing Works Wardrobe, Showcase, Kitchen Cabinet, Puja Work % not reported Finishing Works Elevation Work % not reported
Finishing Works Internal And External Work Including Landscapes As Per Sanctioned Drawings % not reported Internal Infrastructure Water Supply % not reported Internal Infrastructure Sewage And Drainage System % not reported
Internal Infrastructure Water Conservation/rain Water Harvesting/recharge Of Ground Water % not reported Internal Infrastructure Energy Management % not reported Internal Infrastructure Fire Protection And Fire Safety Requirements % not reported
Internal Infrastructure Solid Waste Management And Disposal % not reported Internal Infrastructure Emergency Evacuation Services % not reported External Infrastructure Water Supply % not reported
External Infrastructure Internal Roads & Footpaths % not reported External Infrastructure Sewage And Drainage System % not reported External Infrastructure Electricity Supply Transformer And Substation % not reported
External Infrastructure Solid Waste Management And Disposal % not reported External Infrastructure Emergency Evacuation Services % not reported External Infrastructure Storm Water Drains % not reported
External Infrastructure Use Of Renewable Energy % not reported External Infrastructure Water Conservation/rain Water Harvesting/recharge Of Ground Water % not reported External Infrastructure Fire Protection And Fire Safety Requirements % not reported
External Infrastructure Sewage Treatment Plant (Stp) % not reported External Infrastructure Parks & Tree Planting % not reported External Infrastructure Street Lighting % not reported
Amenities Electricity % not reported Amenities Smart Home Automation % not reported Amenities Cctv Surveillance % not reported
Amenities Club House % not reported Amenities Community Hall % not reported Amenities Outdoor Sports Facility % not reported
Amenities Indoor Sports Facility % not reported Amenities Swimming Pool % not reported Amenities Gym % not reported
Amenities Parks % not reported Amenities Power Backup % not reported Amenities Piped Gas % not reported
Amenities Water And Sanitation % not reported Amenities Air Conditioning % not reported Common Areas Staircases % not reported
Common Areas Lifts % not reported Common Areas Corridor/lobbies % not reported Common Areas Fire Escapes % not reported
Common Areas Common Entrance And Exit For The Building/common Portico/foyer/verandah % not reported Common Areas Basement % not reported Common Areas Terrace % not reported
Common Areas Outer Wall % not reported Common Areas Open Parking Areas % not reported Common Areas Provision For Lodging Of Management Staff And Security Staff % not reported
Common Areas Water Conservation And Renewable Energy % not reported Common Areas Common Storage Spaces % not reported
Documents

RERA Documents & Filings

All statutory documents uploaded by the promoter to the authority portal.

Promoter Registration Certificate
Promoter Pan Card
Promoter Address Proof
Affidavit
Fd 1 BS & Sch -23-24.Pdf
Fd 2 Balance Sheet FY 2022-23.Pdf
Fd 3 Forest Ridge-Financials.Pdf
Fd 4 PL & Sch -23-24.Pdf
Fd 5 Audited Profit And Loss Statement FY 22 - 23.Pdf
Fd 6 Forest Ridge-Financials.Pdf
Fd 7 FY 2023 - 24 ITR ACK.Pdf
Fd 8 FY 2022 - 23 ITR.Pdf
Fd 9 Forest Ridge-Financials.Pdf
Fd 10 Board Report 2023-24.Pdf
Fd 11 Director'S Report FY 22-23.Pdf
Fd 12 Forest Ridge-Financials.Pdf
Fd 13 CFS -23-24.Pdf
Fd 14 NOT APPLICABLE.Pdf
Fd 15 Forest Ridge-Financials.Pdf
Fd 16 Auditors Report -23-24.Pdf
Fd 17 Auditor'S Report FY 2022-2023.Pdf
Fd 18 Forest Ridge-Financials.Pdf
Pd 1 Commencement Certificate( Annexure - 80 )
Pd 2 Approved Building Plan( Annexure - 81 )
Pd 3 Sectional Drawing Of The Apartments( Annexure - 82 )
Pd 4 Certificate From Registered Engineer Indicating The Structural Safety Of The Building( Annexure - 83 )
Pd 5 Project Specifications( Annexure - 84 )
Pd 6 Brochure( Annexure - 85 )
Pd 7 Relinquishment Deed( Annexure - 86 )
Pd 8 Proforma Of Agreement For Sale( Annexure - 87 )
Pd 9 Proforma Of Allotment Letter( Annexure - 88 )
Dc 1 Declaration (Form B)( Annexure - 89 )
Dc 2 Section 3(1) Notarized Affidavit( Annexure - 90 )
Dc 3 JD AFFIDAVIT CUM DECLARATION( Annexure - 91 )
Dc 4 Advocate Search Report( Annexure - 92 )
Noc 1 ESCOM Electricity( Annexure - 95 )
Noc 2 KWSSB Water( Annexure - 96 )
Noc 3 KSPCB( Annexure - 97 )
Noc 4 SEIAA( Annexure - 98 )
Noc 5 Fire Force Department( Annexure - 99 )
Noc 6 Airport Authority Of India( Annexure - 100 )
Noc 7 BSNL( Annexure - 101 )
Photo 1 Project Photo
Photo 2 Project Photo
Photo 3 Project Photo
Photo 4 Project Photo
Photo 5 Project Photo
Photo 6 Project Photo
Od 1 Anjanapura 43 LU.Pdf
Od 2 Anjanapura 43 RC.Pdf
Od 3 Anjanapura 43 SR.Pdf
Od 4 STP Forest Ridge.Pdf
Od 5 Anjanapura- HAL Noc.Pdf
Od 6 Forest Ridge-Channel Partners.Pdf
Od 7 Additional Documents1.Pdf
Od 8 Additional Documents2.Pdf
Od 9 Additional Documents3.Pdf
Od 10 Additional Documents4.Pdf
Od 11 Additional Documents5.Pdf
Od 12 Additional Documents6.Pdf
Od 13 Additional Documents7.Pdf
Od 14 Additional Documents8.Pdf
Od 15 Additional Documents9.Pdf
Od 16 Additional Documents10.Pdf
Od 17 Additional Documents11.Pdf
Od 18 Additional Documents12.Pdf
Od 19 Additional Documents13.Pdf
Od 20 Additional Documents14.Pdf
Od 21 Affidavit For Non-Litigation Details- With JDA.Pdf
Od 22 Estimated Cost Forest Ridge.Pdf
Od 23 Area Statement.Pdf
Ed 1 21-12-2024
Ed 2 21-12-2024
Ld Rtc
Ld Mutation
Ld Encumbrance Certificate
Ld Conversion Order
Ld Sale Deed
Ld Khatha
Bank

Bank & Cost Disclosure

Declared project cost and the designated escrow account on file.

Project Account Bank FEDERAL BANK OF INDIA
Account Number (RERA) 11040200034174
IFSC FDRL0001104
Branch Address ST MARKS ROAD
Country/City