LnT Elara Celestia RERA Details - PRM/KA/RERA/1251/472/PR/100325/007564 Bangalore

View the RERA registration, promoter, approval, building, inventory, document and construction-progress disclosures for LnT Elara Celestia under registration PRM/KA/RERA/1251/472/PR/100325/007564 in Bangalore, Karnataka. Data is sourced from rera.ka.

RERA

RERA Snapshot

The most important statutory project disclosures, generated dynamically from available RERA fields.

  • RERA Number PRM/KA/RERA/1251/472/PR/100325/007564
  • Project Name Elara Celestia
  • Project Type Residential/Group Housing
  • Project Status Under Construction
  • District Bengaluru Urban
  • Taluka Yelahanka
  • Original Completion 31 March 2030
  • Documents 83 Verified
Timeline

Project Timeline & Completion Details

Key statutory dates from registration through proposed completion and permit validity.

Proposed Start 15 February 2025 Expected commencement of civil works and foundation on site.
Original Completion 31 March 2030 Mandated date for project handover to the allottees and final compliance filing.
Promoter

Promoter, Organisation & Member Details

Declared promoter entity, address and corporate identifiers on file with the authority.

Primary Promoter

L&T Realty Developers Limited
Registered Address L&T Realty Developers Limited, Project Office, Shabari Nagar,Bellary Road, Byatarayanapura, BEngaluru (Bangalore) Urban ,Yelahanka ,Bengaluru Urban-560092
Location

Land, Address & Location Details

Land parcel, zoning and geo-coordinates as recorded in the project filing.

Address Khata No. 239/240/275/88/1 and 240/276/89/1 of ward No. 07, Sy No. 88/1(P),89/1,89/2,90, 1,92/1,93/1,93/2A,93/2B,93/3,93/4,93/5,94/1,/2,94/3.94/4,95/1 , 95/2,96/1,96/2,97/1,97/2,97/3,98/1P,98/2,98/3,98/4,99,100/1P,101/1AP,101/1B1,101/2P,101/3P,102/1P,102/2P,102/3P,103,104/1P,104/2,104/3,104/4 of Byatarayanapura Village , Yelahanka , Bengaluru Urban, Karnataka - 560092

RERA Coordinates

Latitude, Longitude 13.072395241469358, 77.59049368982697
Plans

Plans & Approvals

Statutory approvals obtained or pending against the project site.

Plan Approval No. BBMP/Addl.Dir/JDNORTH/0105/24-25
Authority BBMP - Bruhat Bengaluru Mahanagara Palike
Approved Date 04 March 2025

Understand this Project's RERA details

Get clear answers and additional support from our RERA experts.

RERA Banner
Buildings

Buildings, Towers & Building-Level Details

Statutory building-level disclosures including tower height, sanctioned floors, structural counts and parking areas.

Building Detail
Name No. of Basements No. of Slab No. of Slits No. of Open Parking Building Type Height of Tower No. of Floors No. of Units
Tower 1 2 14 0 241 Residential 43.65 13 208
Tower 2 2 14 0 244 Residential 43.65 13 222
Tower 3 2 14 0 235 Residential 43.65 13 204

Scroll horizontally to view all building-level fields. Values marked "-" were not disclosed in the source RERA record.

Inventory

Unit Inventory & Configuration Details

Configuration mix and floor-level disclosures with both grouped and raw RERA views.

Total Units -
Configurations 5
Inventory Type RESIDENTIAL
Configuration Distribution
1 BHK 0 units
2 BHK 0 units
3 BHK 0 units
4 BHK 0 units
5 BHK 0 units
  • Tower 1
  • Tower 2
  • Tower 3
Floor-Wise Inventory Explorer
Floor Apartment Type Carpet Area No. of Unit
-1 4BHK L1A 195.81 EC01F0002
-1 4BHK S2 170.78 EC01F0003
-1 3BHK XS1 94.47 EC01F0004
-1 SPECIAL 1BHK 59.92 EC01F0006
-1 3BHK S1B 129.71 EC01F0007
-1 3BHK L2C 135.23 EC01F0008
-1 3BHK L2A 131.37 EC01F0009
-1 3BHK S1A 129.95 EC01F0010
-1 SPECIAL 2BHK S2 82.75 EC01F0012
-1 3BHK XS1 94.47 EC01F0013
-1 3BHK L2A 131.37 EC01F0014
-1 4BHK L1B 196.26 EC01F0015
GF SPECIAL 3BHK 143.81 EC01F0101
GF 4BHK L1A 195.81 EC01F0102
GF 4BHK S2 170.78 EC01F0103
GF 3BHK XS1 94.47 EC01F0104
GF SPECIAL 2BHK L1 104.56 EC01F0105
GF SPECIAL 1BHK 59.92 EC01F0106
GF 3BHK S1B 129.71 EC01F0107
GF 3BHK L2C 135.23 EC01F0108
GF 3BHK L2A 131.37 EC01F0109
GF 3BHK S1A 129.95 EC01F0110
GF SPECIAL 2BHK S2 82.75 EC01F0112
GF 3BHK XS1 94.47 EC01F0113
GF 3BHK L2A 131.37 EC01F0114
GF 4BHK L1B 196.26 EC01F0115
GF SPECIAL 3BHK 143.81 EC01F0116
1 4BHK S1 176.48 EC01F0201
1 4BHK L1A 195.81 EC01F0202
1 4BHK S2 170.78 EC01F0203
1 3BHK XS1 94.47 EC01F0204
1 3BHK L1A 136.35 EC01F0205
1 3BHK S1D 131.45 EC01F0206
1 3BHK S1B 129.71 EC01F0207
1 3BHK L2C 135.23 EC01F0208
1 3BHK L2A 131.37 EC01F0209
1 3BHK S1A 129.95 EC01F0210
1 3BHK XS1 94.47 EC01F0211
1 3BHK XS1 94.47 EC01F0212
1 3BHK XS1 94.47 EC01F0213
1 3BHK L2A 131.37 EC01F0214
1 4BHK L1B 196.26 EC01F0215
1 4BHK S1 176.48 EC01F0216
2 4BHK S1 176.48 EC01F0301
2 4BHK L1A 195.81 EC01F0302
2 4BHK S2 170.78 EC01F0303
2 3BHK XS1 94.47 EC01F0304
2 3BHK L1A 136.35 EC01F0305
2 3BHK S1D 131.45 EC01F0306
2 3BHK S1B 129.71 EC01F0307
2 3BHK L2C 135.23 EC01F0308
2 3BHK L2A 131.37 EC01F0309
2 3BHK S1A 129.95 EC01F0310
2 3BHK XS1 94.47 EC01F0311
2 3BHK XS1 94.47 EC01F0312
2 3BHK XS1 94.47 EC01F0313
2 3BHK L2A 131.37 EC01F0314
2 4BHK L1B 196.26 EC01F0315
2 4BHK S1 176.48 EC01F0316
3 4BHK S1 176.48 EC01F0401
3 4BHK L1A 195.81 EC01F0402
3 4BHK S2 170.78 EC01F0403
3 3BHK XS1 94.47 EC01F0404
3 3BHK L1A 136.35 EC01F0405
3 3BHK S1D 131.45 EC01F0406
3 3BHK S1B 129.71 EC01F0407
3 3BHK L2C 135.23 EC01F0408
3 3BHK L2A 131.37 EC01F0409
3 3BHK S1A 129.95 EC01F0410
3 3BHK XS1 94.47 EC01F0411
3 3BHK XS1 94.47 EC01F0412
3 3BHK XS1 94.47 EC01F0413
3 3BHK L2A 131.37 EC01F0414
3 4BHK L1B 196.26 EC01F0415
3 4BHK S1 176.48 EC01F0416
4 4BHK S1 176.48 EC01F0501
4 4BHK L1A 195.81 EC01F0502
4 4BHK S2 170.78 EC01F0503
4 3BHK XS1 94.47 EC01F0504
4 3BHK L1A 136.35 EC01F0505
4 3BHK S1D 131.45 EC01F0506
4 3BHK S1B 129.71 EC01F0507
4 3BHK L2C 135.23 EC01F0508
4 3BHK L2A 131.37 EC01F0509
4 3BHK S1A 129.95 EC01F0510
4 3BHK XS1 94.47 EC01F0511
4 3BHK XS1 94.47 EC01F0512
4 3BHK XS1 94.47 EC01F0513
4 3BHK L2A 131.37 EC01F0514
4 4BHK L1B 196.26 EC01F0515
4 4BHK S1 176.48 EC01F0516
5 4BHK S1 176.48 EC01F0601
5 4BHK L1A 195.81 EC01F0602
5 4BHK S2 170.78 EC01F0603
5 3BHK XS1 94.47 EC01F0604
5 3BHK L1A 136.35 EC01F0605
5 3BHK S1D 131.45 EC01F0606
5 3BHK S1B 129.71 EC01F0607
5 3BHK L2C 135.23 EC01F0608
5 3BHK L2A 131.37 EC01F0609
5 3BHK S1A 129.95 EC01F0610
5 3BHK XS1 94.47 EC01F0611
5 3BHK XS1 94.47 EC01F0612
5 3BHK XS1 94.47 EC01F0613
5 3BHK L2A 131.37 EC01F0614
5 4BHK L1B 196.26 EC01F0615
5 4BHK S1 176.48 EC01F0616
6 4BHK S1 176.48 EC01F0701
6 4BHK L1A 195.81 EC01F0702
6 4BHK S2 170.78 EC01F0703
6 3BHK XS1 94.47 EC01F0704
6 3BHK L1A 136.35 EC01F0705
6 3BHK S1D 131.45 EC01F0706
6 3BHK S1B 129.71 EC01F0707
6 3BHK L2C 135.23 EC01F0708
6 3BHK L2A 131.37 EC01F0709
6 3BHK S1A 129.95 EC01F0710
6 3BHK XS1 94.47 EC01F0711
6 3BHK XS1 94.47 EC01F0712
6 3BHK XS1 94.47 EC01F0713
6 3BHK L2A 131.37 EC01F0714
6 4BHK L1B 196.26 EC01F0715
6 4BHK S1 176.48 EC01F0716
7 4BHK S1 176.48 EC01F0801
7 4BHK L1A 195.81 EC01F0802
7 4BHK S2 170.78 EC01F0803
7 3BHK XS1 94.47 EC01F0804
7 3BHK L1A 136.35 EC01F0805
7 3BHK S1D 131.45 EC01F0806
7 3BHK S1B 129.71 EC01F0807
7 3BHK L2C 135.23 EC01F0808
7 3BHK L2A 131.37 EC01F0809
7 3BHK S1A 129.95 EC01F0810
7 3BHK XS1 94.47 EC01F0811
7 3BHK XS1 94.47 EC01F0812
7 3BHK XS1 94.47 EC01F0813
7 3BHK L2A 131.37 EC01F0814
7 4BHK L1B 196.26 EC01F0815
7 4BHK S1 176.48 EC01F0816
8 4BHK S1 176.48 EC01F0901
8 4BHK L1A 195.81 EC01F0902
8 4BHK S2 170.78 EC01F0903
8 3BHK XS1 94.47 EC01F0904
8 3BHK L1A 136.35 EC01F0905
8 3BHK S1D 131.45 EC01F0906
8 3BHK S1B 129.71 EC01F0907
8 3BHK L2C 135.23 EC01F0908
8 3BHK L2A 131.37 EC01F0909
8 3BHK S1A 129.95 EC01F0910
8 3BHK XS1 94.47 EC01F0911
8 3BHK XS1 94.47 EC01F0912
8 3BHK XS1 94.47 EC01F0913
8 3BHK L2A 131.37 EC01F0914
8 4BHK L1B 196.26 EC01F0915
8 4BHK S1 176.48 EC01F0916
9 4BHK S1 176.48 EC01F1001
9 4BHK L1A 195.81 EC01F1002
9 4BHK S2 170.78 EC01F1003
9 3BHK XS1 94.47 EC01F1004
9 3BHK L1A 136.35 EC01F1005
9 3BHK S1D 131.45 EC01F1006
9 3BHK S1B 129.71 EC01F1007
9 3BHK L2C 135.23 EC01F1008
9 3BHK L2A 131.37 EC01F1009
9 3BHK S1A 129.95 EC01F1010
9 3BHK XS1 94.47 EC01F1011
9 3BHK XS1 94.47 EC01F1012
9 3BHK XS1 94.47 EC01F1013
9 3BHK L2A 131.37 EC01F1014
9 4BHK L1B 196.26 EC01F1015
9 4BHK S1 176.48 EC01F1016
10 4BHK S1 176.48 EC01F1101
10 4BHK L1A 195.81 EC01F1102
10 4BHK S2 170.78 EC01F1103
10 3BHK XS1 94.47 EC01F1104
10 3BHK L1A 136.35 EC01F1105
10 3BHK S1D 131.45 EC01F1106
10 3BHK S1B 129.71 EC01F1107
10 3BHK L2C 135.23 EC01F1108
10 3BHK L2A 131.37 EC01F1109
10 3BHK S1A 129.95 EC01F1110
10 3BHK XS1 94.47 EC01F1111
10 3BHK XS1 94.47 EC01F1112
10 3BHK XS1 94.47 EC01F1113
10 3BHK L2A 131.37 EC01F1114
10 4BHK L1B 196.26 EC01F1115
10 4BHK S1 176.48 EC01F1116
11 5BHK S1 DU 305.4 EC01F1201
11 5BHK L1A DU 346.28 EC01F1202
11 3BHK S1D 131.45 EC01F1206
11 3BHK S1B 129.71 EC01F1207
11 3BHK L2C 135.23 EC01F1208
11 3BHK L2A 131.37 EC01F1209
11 3BHK S1A 129.95 EC01F1210
11 3BHK XS1 94.47 EC01F1211
11 3BHK XS1 94.47 EC01F1212
11 3BHK XS1 94.47 EC01F1213
11 4BHK S2 DU 235.41 EC01F1214
11 5BHK L1B DU 344.73 EC01F1215
11 5BHK S1 DU 305.4 EC01F1216
12 3BHK S1D 131.45 EC01F1306
12 3BHK S1B 129.71 EC01F1307
12 3BHK L2C 135.23 EC01F1308
12 3BHK L2A 131.37 EC01F1309
12 3BHK S1A 129.95 EC01F1310
12 3BHK XS1 94.47 EC01F1311
12 3BHK XS1 94.47 EC01F1312
12 3BHK XS1 94.47 EC01F1313
Parking

Parking, Garage & Area Details

Parking provision declared in the sanctioned plan.

Type Proposed Booked Work Done
Garage - - -
Covered Parking - - -
Open Parking - - -
Development

Development Works & Common Area Disclosures

Project-level common infrastructure disclosures as reported by the developer to the RERA authority.

Sub Structure Earth Work And Other Leveling Preparation Work % not reported Sub Structure Foundation Footing Work % not reported Sub Structure Upto Plinth Level % not reported
Sub Structure Sub-structure Flooring (Parking Floor, More Than One Floor Below General Ground Level) % not reported Sub Structure Retaining Wall (All Types) % not reported Sup Structure Rcc Or Ms Framed Structure % not reported
Sup Structure Masonry Construction % not reported Sup Structure Plastering Inside , Outside & Ceiling % not reported Sup Structure Joinery: Doors, Windows, Ventilators Etc % not reported
Sup Structure Basic Work Of Water Supply, Sanitary And Electrification % not reported Sup Structure Dadoing, Skirting, Flooring, Tiles Work (All Types) % not reported Sup Structure Railing And Grill Fixing % not reported
Finishing Works Electrification, Water Supply And Sanitary Finishing % not reported Finishing Works Painting % not reported Finishing Works Fire Prevention And Fire Fighting Fitting And Fixture With Network % not reported
Finishing Works Weather Proof Work(tile,concrete) % not reported Finishing Works Wardrobe, Showcase, Kitchen Cabinet, Puja Work % not reported Finishing Works Elevation Work % not reported
Finishing Works Internal And External Work Including Landscapes As Per Sanctioned Drawings % not reported Internal Infrastructure Water Supply % not reported Internal Infrastructure Sewage And Drainage System % not reported
Internal Infrastructure Water Conservation/rain Water Harvesting/recharge Of Ground Water % not reported Internal Infrastructure Energy Management % not reported Internal Infrastructure Fire Protection And Fire Safety Requirements % not reported
Internal Infrastructure Solid Waste Management And Disposal % not reported Internal Infrastructure Emergency Evacuation Services % not reported External Infrastructure Water Supply % not reported
External Infrastructure Internal Roads & Footpaths % not reported External Infrastructure Sewage And Drainage System % not reported External Infrastructure Electricity Supply Transformer And Substation % not reported
External Infrastructure Solid Waste Management And Disposal % not reported External Infrastructure Emergency Evacuation Services % not reported External Infrastructure Storm Water Drains % not reported
External Infrastructure Use Of Renewable Energy % not reported External Infrastructure Water Conservation/rain Water Harvesting/recharge Of Ground Water % not reported External Infrastructure Fire Protection And Fire Safety Requirements % not reported
External Infrastructure Sewage Treatment Plant (Stp) % not reported External Infrastructure Parks & Tree Planting % not reported External Infrastructure Street Lighting % not reported
Amenities Electricity % not reported Amenities Smart Home Automation % not reported Amenities Cctv Surveillance % not reported
Amenities Club House % not reported Amenities Community Hall % not reported Amenities Outdoor Sports Facility % not reported
Amenities Indoor Sports Facility % not reported Amenities Swimming Pool % not reported Amenities Gym % not reported
Amenities Parks % not reported Amenities Power Backup % not reported Amenities Piped Gas % not reported
Amenities Water And Sanitation % not reported Amenities Air Conditioning % not reported Common Areas Staircases % not reported
Common Areas Lifts % not reported Common Areas Corridor/lobbies % not reported Common Areas Fire Escapes % not reported
Common Areas Common Entrance And Exit For The Building/common Portico/foyer/verandah % not reported Common Areas Basement % not reported Common Areas Terrace % not reported
Common Areas Outer Wall % not reported Common Areas Open Parking Areas % not reported Common Areas Provision For Lodging Of Management Staff And Security Staff % not reported
Common Areas Water Conservation And Renewable Energy % not reported Common Areas Common Storage Spaces % not reported
Documents

RERA Documents & Filings

All statutory documents uploaded by the promoter to the authority portal.

Promoter Registration Certificate
Promoter Pan Card
Promoter Address Proof
Affidavit
Fd 1 Balance Sheet.Pdf
Fd 2 Balance Sheet R1.Pdf
Fd 3 Balance Sheet R1.Pdf
Fd 4 P&L.Pdf
Fd 5 Profit & Loss.Pdf
Fd 6 Profit & Loss.Pdf
Fd 7 ITR Ack FY 23-24.Pdf
Fd 8 ITR Ack FY 22-23.Pdf
Fd 9 ITR Ack FY 21-22.Pdf
Fd 10 Board Report.Pdf
Fd 11 Board Report .Pdf
Fd 12 Board Report R1.Pdf
Fd 13 Cash Flow Statement.Pdf
Fd 14 Cash Flow Statement.Pdf
Fd 15 Cash Flow Statement.Pdf
Fd 16 Audit Report.Pdf
Fd 17 Audit Report .Pdf
Fd 18 Audit Report.Pdf
Pd 1 Commencement Certificate( Annexure - 80 )
Pd 2 Approved Building Plan( Annexure - 81 )
Pd 3 Sectional Drawing Of The Apartments( Annexure - 82 )
Pd 4 Certificate From Registered Engineer Indicating The Structural Safety Of The Building( Annexure - 83 )
Pd 5 Project Specifications( Annexure - 84 )
Pd 6 Brochure( Annexure - 85 )
Pd 7 Relinquishment Deed( Annexure - 86 )
Pd 8 Proforma Of Agreement For Sale( Annexure - 87 )
Pd 9 Proforma Of Allotment Letter( Annexure - 88 )
Dc 1 Declaration (Form B)( Annexure - 89 )
Dc 2 Section 3(1) Notarized Affidavit( Annexure - 90 )
Dc 4 Advocate Search Report( Annexure - 92 )
Noc 1 ESCOM Electricity( Annexure - 95 )
Noc 2 KWSSB Water( Annexure - 96 )
Noc 3 KSPCB( Annexure - 97 )
Noc 4 SEIAA( Annexure - 98 )
Noc 5 Fire Force Department( Annexure - 99 )
Noc 6 Airport Authority Of India( Annexure - 100 )
Noc 7 BSNL( Annexure - 101 )
Noc 8 Lift Authorities( Annexure - 102 )
Noc 9 BMRCL( Annexure - 103 )
Noc 10 NOC In Case Of Building Proposals Abutting To Neighbouring Properties( Annexure - 104 )
Noc 11 Bangalore Urban Arts Commission( Annexure - 105 )
Noc 12 Inspector Of Factories Controller Of Explosives Railways( Annexure - 106 )
Noc 13 Coastal Regulation Zone Authority( Annexure - 107 )
Photo 1 Project Photo
Photo 2 Project Photo
Photo 3 Project Photo
Photo 4 Project Photo
Od 1 CDP MARK UP.Pdf
Od 2 VILLAGE MARK UP.Pdf
Od 3 INDICATIVE STP Layout.Pdf
Od 4 Mutation.Pdf
Od 5 Conversion Order Copy.Pdf
Od 6 5036879205.Pdf
Od 7 DP MARK UP.Pdf
Od 8 BDA Plan & Order.Pdf
Od 9 Area Statement.Pdf
Od 10 Amenities And Common Areas.Pdf
Ed 1 27-02-2025
Ed 2 27-02-2025
Ed 3 27-02-2025
Ed 4 27-02-2025
Ed 5 27-02-2025
Ed 6 27-02-2025
Ed 7 27-02-2025
Ed 8 27-02-2025
Ed 9 27-02-2025
Ed 10 27-02-2025
Ed 11 27-02-2025
Ed 12 27-02-2025
Ed 13 06-03-2025
Ed 14 06-03-2025
Ed 15 07-03-2025
Ed 16 07-03-2025
Ld Rtc
Ld Mutation
Ld Encumbrance Certificate
Ld Conversion Order
Ld Sale Deed
Ld Khatha
Bank

Bank & Cost Disclosure

Declared project cost and the designated escrow account on file.

Project Account Bank KOTAK MAHINDRA BANK
Account Number (RERA) 4311660717
IFSC KKBK0008045
Branch Address Sahakara Nagar
Country/City