Squareyards Logo
Blogs
Sell or Rent Property
Login
Rera Banner
residential Under Construction Source: rera.ka

Mista Sri City RERA Details - PRM/KA/RERA/1251/446/PR/080125/007360 Bangalore

View the RERA registration, promoter, approval, building, inventory, document and construction-progress disclosures for Mista Sri City under registration PRM/KA/RERA/1251/446/PR/080125/007360 in Bangalore, Karnataka. Data is sourced from rera.ka.

RERA

RERA Snapshot

The most important statutory project disclosures, generated dynamically from available RERA fields.

  • RERA Number PRM/KA/RERA/1251/446/PR/080125/007360
  • Project Name MISTA SRI CITY- BUDIGERE CROSS
  • Project Type Residential/Group Housing
  • Project Status Under Construction
  • District Bengaluru Urban
  • Taluka Bengaluru East
  • Original Completion 30 June 2029
  • Documents 96 Verified
Timeline

Project Timeline & Completion Details

Key statutory dates from registration through proposed completion and permit validity.

Proposed Start 28 August 2023 Expected commencement of civil works and foundation on site.
Original Completion 30 June 2029 Mandated date for project handover to the allottees and final compliance filing.
Promoter

Promoter, Organisation & Member Details

Declared promoter entity, address and corporate identifiers on file with the authority.

Primary Promoter

MISTA INFRA PRIVATE LIMITED
Registered Address NO 1109 ,11TH FLOOR , TOWER B , BRIGADE SIGNATURE TOWERS , KATTAMANNALLUR , OLD MADRAS ROAD ,Bengaluru East ,Bengaluru Urban-562129
Location

Land, Address & Location Details

Land parcel, zoning and geo-coordinates as recorded in the project filing.

Address SY NO 2/6, KONADASAPURA VILLAGE , BIDARAHALLI HOBLI , Bengaluru East , Bengaluru Urban, Karnataka - 560049

RERA Coordinates

Latitude, Longitude 13.048926, 77.755014
Plans

Plans & Approvals

Statutory approvals obtained or pending against the project site.

Plan Approval No. 22/2023-24
Authority BDA - Bangalore Development Authority
Approved Date 24 August 2023

Understand this Project's RERA details

Get clear answers and additional support from our RERA experts.

RERA Banner
Buildings

Buildings, Towers & Building-Level Details

Statutory building-level disclosures including tower height, sanctioned floors, structural counts and parking areas.

Building Detail
Name No. of Basements No. of Slab No. of Slits No. of Open Parking Building Type Height of Tower No. of Floors No. of Units
Residential Apartment block -01 5 52 0 275 Residential 155.8 51 250

Scroll horizontally to view all building-level fields. Values marked "-" were not disclosed in the source RERA record.

Inventory

Unit Inventory & Configuration Details

Configuration mix and floor-level disclosures with both grouped and raw RERA views.

Total Units -
Configurations 3
Inventory Type RESIDENTIAL
Configuration Distribution
2 BHK 0 units
3 BHK 0 units
5 BHK 0 units
  • Residential Apartment block -01
Floor-Wise Inventory Explorer
Floor Apartment Type Carpet Area No. of Unit
GF 3 BHK 80.01 A-101
GF 2 BHK 52.17 A-102
GF 3.5 BHK 97.03 A-103
GF 2.5 BHK 80.72 A-104
GF 2 BHK 73.37 A-105
1 3 BHK 81.07 A-201
1 2 BHK 52.59 A-202
1 3.5 BHK 98.91 A-203
1 2.5 BHK 80.72 A-204
1 2 BHK 73.39 A-205
2 3 BHK 81.07 A-301
2 2 BHK 52.59 A-302
2 3.5 BHK 98.91 A-303
2 2.5 BHK 80.72 A-304
2 2 BHK 73.39 A-305
3 3 BHK 81.07 A-401
3 2 BHK 52.59 A-402
3 3.5 BHK 98.91 A-403
3 2.5 BHK 80.72 A-404
3 2 BHK 73.39 A-405
4 3 BHK 81.07 A-501
4 2 BHK 52.59 A-502
4 3.5 BHK 98.91 A-503
4 2.5 BHK 80.72 A-504
4 2 BHK 73.39 A-505
5 3 BHK 81.07 A-601
5 2 BHK 52.59 A-602
5 3.5 BHK 98.91 A-603
5 2.5 BHK 80.72 A-604
5 2 BHK 73.39 A-605
6 3 BHK 81.07 A-701
6 2 BHK 52.59 A-702
6 3.5 BHK 98.91 A-703
6 2.5 BHK 80.72 A-704
6 2 BHK 73.39 A-705
7 3 BHK 81.07 A-801
7 2 BHK 52.59 A-802
7 3.5 BHK 98.91 A-803
7 2.5 BHK 80.72 A-804
7 2 BHK 73.39 A-805
8 3 BHK 81.07 A-901
8 2 BHK 52.59 A-902
8 3.5 BHK 98.91 A-903
8 2.5 BHK 80.72 A-904
8 2 BHK 73.39 A-905
9 3 BHK 81.07 A-1001
9 2 BHK 52.59 A-1002
9 3.5 BHK 98.91 A-1003
9 2.5 BHK 80.72 A-1004
9 2 BHK 73.39 A-1005
10 3 BHK 81.07 A-1101
10 2 BHK 52.59 A-1102
10 3.5 BHK 98.91 A-1103
10 2.5 BHK 80.72 A-1104
10 2 BHK 73.39 A-1105
11 3 BHK 81.07 A-1201
11 2 BHK 52.59 A-1202
11 3.5 BHK 98.91 A-1203
11 2.5 BHK 80.72 A-1204
11 2 BHK 73.39 A-1205
12 3 BHK 81.07 A-1301
12 2 BHK 52.59 A-1302
12 3.5 BHK 98.91 A-1303
12 2.5 BHK 80.72 A-1304
12 2 BHK 73.39 A-1305
13 3 BHK 81.07 A-1401
13 2 BHK 52.59 A-1402
13 3.5 BHK 98.91 A-1403
13 2.5 BHK 80.72 A-1404
13 2 BHK 73.39 A-1405
14 3 BHK 81.07 A-1501
14 2 BHK 52.59 A-1502
14 3.5 BHK 98.91 A-1503
14 2.5 BHK 80.72 A-1504
14 2 BHK 73.39 A-1505
15 3 BHK 81.07 A-1601
15 2 BHK 52.59 A-1602
15 3.5 BHK 98.91 A-1603
15 2.5 BHK 80.72 A-1604
15 2 BHK 73.39 A-1605
16 3 BHK 81.07 A-1701
16 2 BHK 52.59 A-1702
16 3.5 BHK 98.91 A-1703
16 2.5 BHK 80.72 A-1704
16 2 BHK 73.39 A-1705
17 3 BHK 81.07 A-1801
17 2 BHK 52.59 A-1802
17 3.5 BHK 98.91 A-1803
17 2.5 BHK 80.72 A-1804
17 2 BHK 73.39 A-1805
18 3 BHK 82.24 A-1901
18 2 BHK 53.64 A-1902
18 3.5 BHK 100.47 A-1903
18 2.5 BHK 81.87 A-1904
18 2 BHK 74.05 A-1905
19 3 BHK 82.24 A-2001
19 2 BHK 53.64 A-2002
19 3.5 BHK 100.47 A-2003
19 2.5 BHK 81.87 A-2004
19 2 BHK 74.05 A-2005
20 3 BHK 82.24 A-2101
20 2 BHK 53.64 A-2102
20 3.5 BHK 100.47 A-2103
20 2.5 BHK 81.87 A-2104
20 2 BHK 74.05 A-2105
21 3 BHK 82.24 A-2201
21 2 BHK 53.64 A-2202
21 3.5 BHK 100.47 A-2203
21 2.5 BHK 81.87 A-2204
21 2 BHK 74.05 A-2205
22 3 BHK 82.24 A-2301
22 2 BHK 53.64 A-2302
22 3.5 BHK 100.47 A-2303
22 2.5 BHK 81.87 A-2304
22 2 BHK 74.05 A-2305
23 3 BHK 82.24 A-2401
23 2 BHK 53.64 A-2402
23 3.5 BHK 100.47 A-2403
23 2.5 BHK 81.87 A-2404
23 2 BHK 74.05 A-2405
24 3 BHK 82.24 A-2501
24 2 BHK 53.64 A-2502
24 3.5 BHK 100.47 A-2503
24 2.5 BHK 81.87 A-2504
24 2 BHK 74.05 A-2505
25 3 BHK 82.24 A-2601
25 2 BHK 53.64 A-2602
25 3.5 BHK 100.47 A-2603
25 2.5 BHK 81.87 A-2604
25 2 BHK 74.05 A-2605
26 3 BHK 82.24 A-2701
26 2 BHK 53.64 A-2702
26 3.5 BHK 100.47 A-2703
26 2.5 BHK 81.87 A-2704
26 2 BHK 74.05 A-2705
27 3 BHK 82.24 A-2801
27 2 BHK 53.64 A-2802
27 3.5 BHK 100.47 A-2803
27 2.5 BHK 81.87 A-2804
27 2 BHK 74.05 A-2805
28 3 BHK 82.24 A-2901
28 2 BHK 53.64 A-2902
28 3.5 BHK 100.47 A-2903
28 2.5 BHK 81.87 A-2904
28 2 BHK 74.05 A-2905
29 3 BHK 82.24 A-3001
29 2 BHK 53.64 A-3002
29 3.5 BHK 100.47 A-3003
29 2.5 BHK 81.87 A-3004
29 2 BHK 74.05 A-3005
30 3 BHK 82.24 A-3101
30 2 BHK 53.64 A-3102
30 3.5 BHK 100.47 A-3103
30 2.5 BHK 81.87 A-3104
30 2 BHK 74.05 A-3105
31 3 BHK 82.24 A-3201
31 2 BHK 53.64 A-3202
31 3.5 BHK 100.47 A-3203
31 2.5 BHK 81.87 A-3204
31 2 BHK 74.05 A-3205
32 3 BHK 82.24 A-3301
32 2 BHK 53.64 A-3302
32 3.5 BHK 100.47 A-3303
32 2.5 BHK 81.87 A-3304
32 2 BHK 74.05 A-3305
33 3 BHK 82.24 A-3401
33 2 BHK 53.64 A-3402
33 3.5 BHK 100.47 A-3403
33 2.5 BHK 81.87 A-3404
33 2 BHK 74.05 A-3405
34 3 BHK 82.24 A-3501
34 2 BHK 53.64 A-3502
34 3.5 BHK 100.47 A-3503
34 2.5 BHK 81.87 A-3504
34 2 BHK 74.05 A-3505
35 3 BHK 82.24 A-3601
35 2 BHK 53.64 A-3602
35 3.5 BHK 100.47 A-3603
35 2.5 BHK 81.87 A-3604
35 2 BHK 74.05 A-3605
36 3 BHK 82.24 A-3701
36 2 BHK 53.64 A-3702
36 3.5 BHK 100.47 A-3703
36 2.5 BHK 81.87 A-3704
36 2 BHK 74.05 A-3705
37 3 BHK 82.24 A-3801
37 2 BHK 53.64 A-3802
37 3.5 BHK 100.47 A-3803
37 2.5 BHK 81.87 A-3804
37 2 BHK 74.05 A-3805
38 3 BHK 82.24 A-3901
38 2 BHK 53.64 A-3902
38 3.5 BHK 100.47 A-3903
38 2.5 BHK 81.87 A-3904
38 2 BHK 74.05 A-3905
39 3 BHK 82.24 A-4001
39 2 BHK 53.64 A-4002
39 3.5 BHK 100.47 A-4003
39 2.5 BHK 81.87 A-4004
39 2 BHK 74.05 A-4005
40 3 BHK 82.24 A-4101
40 2 BHK 53.64 A-4102
40 3.5 BHK 100.47 A-4103
40 2.5 BHK 81.87 A-4104
40 2 BHK 74.05 A-4105
41 3 BHK 82.24 A-4201
41 2 BHK 53.64 A-4202
41 3.5 BHK 100.47 A-4203
41 2.5 BHK 81.87 A-4204
41 2 BHK 74.05 A-4205
42 3 BHK 82.24 A-4301
42 2 BHK 53.64 A-4302
42 3.5 BHK 100.47 A-4303
42 2.5 BHK 81.87 A-4304
42 2 BHK 74.05 A-4305
43 3 BHK 82.24 A-4401
43 2 BHK 53.64 A-4402
43 3.5 BHK 100.47 A-4403
43 2.5 BHK 81.87 A-4404
43 2 BHK 74.05 A-4405
44 3 BHK 82.24 A-4501
44 2 BHK 53.64 A-4502
44 3.5 BHK 100.47 A-4503
44 2.5 BHK 81.87 A-4504
44 2 BHK 74.05 A-4505
45 3 BHK 82.24 A-4601
45 2 BHK 53.64 A-4602
45 3.5 BHK 100.47 A-4603
45 2.5 BHK 81.87 A-4604
45 2 BHK 74.05 A-4605
46 3 BHK 82.24 A-4701
46 2 BHK 53.64 A-4702
46 3.5 BHK 100.47 A-4703
46 2.5 BHK 81.87 A-4704
46 2 BHK 74.05 A-4705
47 3 BHK 82.24 A-4801
47 2 BHK 53.64 A-4802
47 3.5 BHK 100.47 A-4803
47 2.5 BHK 81.87 A-4804
47 2 BHK 74.05 A-4805
48 3 BHK 82.24 A-4901
48 2 BHK 53.64 A-4902
48 3.5 BHK 100.47 A-4903
48 2.5 BHK 81.87 A-4904
48 2 BHK 74.05 A-4905
49 3 BHK 82.24 A-5001
49 2 BHK 53.64 A-5002
49 3.5 BHK 100.47 A-5003
49 2.5 BHK 81.87 A-5004
49 2 BHK 74.05 A-5005
Parking

Parking, Garage & Area Details

Parking provision declared in the sanctioned plan.

Type Proposed Booked Work Done
Garage - - -
Covered Parking - - -
Open Parking - - -
Development

Development Works & Common Area Disclosures

Project-level common infrastructure disclosures as reported by the developer to the RERA authority.

Finishing Works Weather Proof Work(tile,concrete) % not reported Sub Structure Earth Work And Other Leveling Preparation Work % not reported Sub Structure Foundation Footing Work % not reported
Sub Structure Upto Plinth Level % not reported Sub Structure Sub-structure Flooring (Parking Floor, More Than One Floor Below General Ground Level) % not reported Sub Structure Retaining Wall (All Types) % not reported
Sup Structure Rcc Or Ms Framed Structure % not reported Sup Structure Masonry Construction % not reported Sup Structure Plastering Inside , Outside & Ceiling % not reported
Sup Structure Joinery: Doors, Windows, Ventilators Etc % not reported Sup Structure Basic Work Of Water Supply, Sanitary And Electrification % not reported Sup Structure Dadoing, Skirting, Flooring, Tiles Work (All Types) % not reported
Sup Structure Railing And Grill Fixing % not reported Finishing Works Electrification, Water Supply And Sanitary Finishing % not reported Finishing Works Painting % not reported
Finishing Works Fire Prevention And Fire Fighting Fitting And Fixture With Network % not reported Finishing Works Wardrobe, Showcase, Kitchen Cabinet, Puja Work % not reported Finishing Works Elevation Work % not reported
Finishing Works Internal And External Work Including Landscapes As Per Sanctioned Drawings % not reported Internal Infrastructure Water Supply % not reported Internal Infrastructure Sewage And Drainage System % not reported
Internal Infrastructure Water Conservation/rain Water Harvesting/recharge Of Ground Water % not reported Internal Infrastructure Energy Management % not reported Internal Infrastructure Fire Protection And Fire Safety Requirements % not reported
Internal Infrastructure Solid Waste Management And Disposal % not reported Internal Infrastructure Emergency Evacuation Services % not reported External Infrastructure Water Supply % not reported
External Infrastructure Internal Roads & Footpaths % not reported External Infrastructure Sewage And Drainage System % not reported External Infrastructure Electricity Supply Transformer And Substation % not reported
External Infrastructure Solid Waste Management And Disposal % not reported External Infrastructure Emergency Evacuation Services % not reported External Infrastructure Storm Water Drains % not reported
External Infrastructure Use Of Renewable Energy % not reported External Infrastructure Water Conservation/rain Water Harvesting/recharge Of Ground Water % not reported External Infrastructure Fire Protection And Fire Safety Requirements % not reported
External Infrastructure Sewage Treatment Plant (Stp) % not reported External Infrastructure Parks & Tree Planting % not reported External Infrastructure Street Lighting % not reported
Amenities Electricity % not reported Amenities Smart Home Automation % not reported Amenities Cctv Surveillance % not reported
Amenities Club House % not reported Amenities Community Hall % not reported Amenities Outdoor Sports Facility % not reported
Amenities Indoor Sports Facility % not reported Amenities Swimming Pool % not reported Amenities Gym % not reported
Amenities Parks % not reported Amenities Power Backup % not reported Amenities Piped Gas % not reported
Amenities Water And Sanitation % not reported Amenities Air Conditioning % not reported Common Areas Staircases % not reported
Common Areas Lifts % not reported Common Areas Corridor/lobbies % not reported Common Areas Fire Escapes % not reported
Common Areas Common Entrance And Exit For The Building/common Portico/foyer/verandah % not reported Common Areas Basement % not reported Common Areas Terrace % not reported
Common Areas Outer Wall % not reported Common Areas Open Parking Areas % not reported Common Areas Provision For Lodging Of Management Staff And Security Staff % not reported
Common Areas Water Conservation And Renewable Energy % not reported Common Areas Common Storage Spaces % not reported
Documents

RERA Documents & Filings

All statutory documents uploaded by the promoter to the authority portal.

Promoter Registration Certificate
Promoter Pan Card
Promoter Address Proof
Affidavit
Fd 1 BALANCE SHEET 22-23.Pdf
Fd 2 BALANCE SHEET 21-22.Pdf
Fd 3 BALANCE SHEET 20-21.Pdf
Fd 4 P AND L 22-23.Pdf
Fd 5 P AND L 21-22.Pdf
Fd 6 P AND L 20-21.Pdf
Fd 7 DIRECTORS REPORT 22-23.Pdf
Fd 8 DIRECTORS REPORT 21-22.Pdf
Fd 9 DIRECTORS 20-21.Pdf
Fd 10 CASH FLOW STATEMENT 22-23.Pdf
Fd 11 CASH FLOW STATEMENT 21-22.Pdf
Fd 12 CASH FLOW STATEMENT 20-21.Pdf
Fd 13 AUDIT REPORT 22-23.Pdf
Fd 14 AUDIT REPORT 21-22.Pdf
Fd 15 AUDIT REPORT 20-21.Pdf
Fd 16 ITR ACK 23-24.Pdf
Fd 17 IRT ACK 22-23.Pdf
Fd 18 ITR ACK 21-22.Pdf
Pd 1 Self Attested PAN Card*( Annexure - 66 )
Pd 2 Commencement Certificate*( Annexure - 67 )
Pd 3 Electricity Permission Letter*( Annexure - 68 )
Pd 4 Water Permission Letter*( Annexure - 69 )
Pd 5 Approved Layout Plan*( Annexure - 70 )
Pd 6 Approved Building Plotting Plan*( Annexure - 71 )
Pd 7 Existing Layout Plan( Annexure - 72 )
Pd 8 Existing Section Plan And Specification( Annexure - 73 )
Pd 9 Sectional Drawing Of The Apartments*( Annexure - 74 )
Pd 10 Project Specifications*( Annexure - 75 )
Pd 12 Area Development Plan Of Project Area*( Annexure - 77 )
Pd 13 Certificate From Registered Engineer Indicating The Structural Safety Of The Building*( Annexure - 78 )
Pd 14 Advocate Search Report*( Annexure - 79 )
Pd 16 Collaboration Agreement Development Agreement Joint Development Agreement Other Agreement*( Annexure - 81 )
Pd 20 Any Other Document (Rights Title Interest Name)*( Annexure - 85 )
Dc 1 Declaration (Form B)*( Annexure - 90 )
Dc 2 Section 3(1) Notarized Affidavit*( Annexure - 91 )
Dc 3 JD AFFIDAVIT CUM DECLARATION*( Annexure - 92 )
Noc 1 ESCOM Electricity*( Annexure - 93 )
Noc 2 KWSSB Water*( Annexure - 94 )
Noc 5 Fire Force Department( Annexure - 97 )
Noc 6 Airport Authority Of India( Annexure - 98 )
Noc 7 KSPCB( Annexure - 99 )
Noc 8 SEIAA( Annexure - 100 )
Noc 9 BSNL( Annexure - 101 )
Photo 1 Project Photo
Od 1 EC 2021-2024.Pdf
Od 2 GIFT DEED 1.Pdf
Od 3 GIFT DEED 2.Pdf
Od 4 GIFT DEED 3.Pdf
Od 5 GIFT DEED 4.Pdf
Od 6 RECTIFICATION DEED 1.Pdf
Od 7 RECTIFICATION DEED 2.Pdf
Od 8 RECTIFICATION DEED 3.Pdf
Od 9 RECTIFICATION DEED 4.Pdf
Od 10 RECTIFICATION DEED 5.Pdf
Od 11 KATHA.Pdf
Od 12 RTC 2022.Pdf
Od 13 VILLAGE MAP.Pdf
Od 14 STP COMMERCIAL FOR RERA.Pdf
Od 15 SURVEY SKETCH.Pdf
Od 16 MR 4 A 23 GU.Pdf
Od 17 MR 2011-2012.Pdf
Od 18 MR 2021-2022.Pdf
Od 19 MR SY 2006-2007.Pdf
Od 20 MR.Pdf
Od 21 SOURCE OF FUNDS CLARIFICATION.Pdf
Od 22 LOCATON MAP.Pdf
Od 23 GOOGLE IMAGE.Pdf
Od 24 TOPOGRAPHICAL MAP.Pdf
Od 25 HISSA PODI.Pdf
Od 26 AAKARBAND.Pdf
Od 27 ADDRESS PROOF.Pdf
Od 28 Guidance Value Certificate.Pdf
Od 29 ZR COPY.Pdf
Od 30 GWA.Pdf
Ed 1 22-10-2024
Ed 2 22-10-2024
Ed 3 22-10-2024
Ed 4 22-10-2024
Ed 5 22-10-2024
Ed 6 22-10-2024
Ed 7 22-10-2024
Ed 8 22-10-2024
Ed 9 22-10-2024
Ed 10 22-10-2024
Ed 11 22-10-2024
Ed 12 22-10-2024
Ed 13 31-12-2024
Ld Rtc
Ld Mutation
Ld Encumbrance Certificate
Ld Conversion Order
Ld Khatha
Bank

Bank & Cost Disclosure

Declared project cost and the designated escrow account on file.

Project Account Bank IDFC FIRST BANK
Account Number (RERA) 10191115087
IFSC IDFB0080184
Branch Address JEEVAN BIMA NAGAR
Country/City