Squareyards Logo
Blogs
Sell or Rent Property
Login
Rera Banner
residential Under Construction Source: rera.ka

Allure Avani RERA Details - PRM/KA/RERA/1251/446/PR/200626/008729 Bangalore

View the RERA registration, promoter, approval, building, inventory, document and construction-progress disclosures for Allure Avani under registration PRM/KA/RERA/1251/446/PR/200626/008729 in Bangalore, Karnataka. Data is sourced from rera.ka.

RERA

RERA Snapshot

The most important statutory project disclosures, generated dynamically from available RERA fields.

  • RERA Number PRM/KA/RERA/1251/446/PR/200626/008729
  • Project Name Allure Avani Phase 2
  • Project Type Residential/Group Housing
  • Project Status Under Construction
  • District Bengaluru Urban
  • Taluka Bengaluru East
  • Original Completion 31 December 2029
  • Documents 108 Verified
Timeline

Project Timeline & Completion Details

Key statutory dates from registration through proposed completion and permit validity.

Proposed Start 01 June 2026 Expected commencement of civil works and foundation on site.
Original Completion 31 December 2029 Mandated date for project handover to the allottees and final compliance filing.
Promoter

Promoter, Organisation & Member Details

Declared promoter entity, address and corporate identifiers on file with the authority.

Primary Promoter

Allure Awani Private Limited
Registered Address Sy No. 74/4,,Horamavu Agara Main Road ,Bengaluru North ,Bengaluru Urban-560049
Experience Details
Location

Land, Address & Location Details

Land parcel, zoning and geo-coordinates as recorded in the project filing.

Address Sy. 77 & 78, Kammasandra Village, , Bidarahalli Hobli , Bengaluru East , Bengaluru Urban, Karnataka - 560049

RERA Coordinates

Latitude, Longitude 13.075847, 77.704984
Plans

Plans & Approvals

Statutory approvals obtained or pending against the project site.

Plan Approval No. CC/451/2025-26
Authority Local Planing Authority
Approved Date 14 November 2025

Understand this Project's RERA details

Get clear answers and additional support from our RERA experts.

RERA Banner
Buildings

Buildings, Towers & Building-Level Details

Statutory building-level disclosures including tower height, sanctioned floors, structural counts and parking areas.

Building Detail
Name No. of Basements No. of Slab No. of Slits No. of Open Parking Building Type Height of Tower No. of Floors No. of Units
Allure Avani Ph 2 0 3 0 176 Residential 10.65 0 79

Scroll horizontally to view all building-level fields. Values marked "-" were not disclosed in the source RERA record.

Inventory

Unit Inventory & Configuration Details

Configuration mix and floor-level disclosures with both grouped and raw RERA views.

Total Units -
Configurations 1
Inventory Type RESIDENTIAL
Configuration Distribution
4 BHK 0 units
  • Allure Avani Ph 2
Floor-Wise Inventory Explorer
Floor Apartment Type Carpet Area No. of Unit
-1 4 BHK 245.84 V6
-1 4 BHK 246.02 P1
-1 4 BHK 273.44 P2
-1 4 BHK 341.09 Q1
-1 4 BHK 295.75 Q2
-1 4 BHK 284.05 Q3
-1 4 BHK 284.05 Q4
-1 4 BHK 284.05 Q5
-1 4 BHK 296.55 Q6
-1 4 BHK 342.52 Q7
-1 4 BHK 345.86 R1
-1 4 BHK 287.66 R2
-1 4 BHK 284.13 R3
-1 4 BHK 284.13 R4
-1 4 BHK 284.13 R5
-1 4 BHK 296.59 R6
-1 4 BHK 346.18 R7
-1 4 BHK 355.26 S1
-1 4 BHK 295.8 S2
-1 4 BHK 283.87 S3
-1 4 BHK 283.87 S4
-1 4 BHK 283.87 S5
-1 4 BHK 294.51 S6
-1 4 BHK 351 S7
-1 4 BHK 355.26 T1
-1 4 BHK 295.8 T2
-1 4 BHK 283.87 T3
-1 4 BHK 283.87 T4
-1 4 BHK 283.87 T5
-1 4 BHK 294.51 T6
-1 4 BHK 351 T7
-1 4 BHK 304.35 U1
-1 4 BHK 259.49 U2
-1 4 BHK 252.19 U3
-1 4 BHK 252.19 U4
-1 4 BHK 252.19 U5
-1 4 BHK 245.84 U6
-1 4 BHK 292.85 U7
-1 4 BHK 304.35 V1
-1 4 BHK 259.49 V2
-1 4 BHK 252.19 V3
-1 4 BHK 252.19 V4
-1 4 BHK 252.19 V5
-1 4 BHK 292.85 V7
-1 4 BHK 297.32 W1
-1 4 BHK 256.8 W2
-1 4 BHK 252.44 W3
-1 4 BHK 252.44 W4
-1 4 BHK 252.44 W5
-1 4 BHK 245.53 W6
-1 4 BHK 286.2 W7
-1 4 BHK 296.19 X1
-1 4 BHK 256.44 X2
-1 4 BHK 253.07 X3
-1 4 BHK 253.07 X4
-1 4 BHK 253.07 X5
-1 4 BHK 242.68 X6
-1 4 BHK 284.02 X7
-1 4 BHK 296.19 Y1
-1 4 BHK 256.44 Y2
-1 4 BHK 253.07 Y3
-1 4 BHK 253.07 Y4
-1 4 BHK 253.07 Y5
-1 4 BHK 242.68 Y6
-1 4 BHK 284.02 Y7
-1 4 BHK 297.32 Z1
-1 4 BHK 256.8 Z2
-1 4 BHK 252.44 Z3
-1 4 BHK 252.44 Z4
-1 4 BHK 252.44 Z5
-1 4 BHK 245.53 Z6
-1 4 BHK 286.2 Z7
-1 4 BHK 304.98 AA1
-1 4 BHK 257.41 AA2
-1 4 BHK 252.19 AA3
-1 4 BHK 252.19 AA4
-1 4 BHK 252.19 AA5
-1 4 BHK 243.02 AA6
-1 4 BHK 298.96 AA7
Parking

Parking, Garage & Area Details

Parking provision declared in the sanctioned plan.

Type Proposed Booked Work Done
Garage - - -
Covered Parking - - -
Open Parking - - -
Development

Development Works & Common Area Disclosures

Project-level common infrastructure disclosures as reported by the developer to the RERA authority.

Sub Structure Earth Work And Other Leveling Preparation Work % not reported Sub Structure Foundation Footing Work % not reported Sub Structure Upto Plinth Level % not reported
Sub Structure Sub-structure Flooring (Parking Floor, More Than One Floor Below General Ground Level) % not reported Sub Structure Retaining Wall (All Types) % not reported Sup Structure Rcc Or Ms Framed Structure % not reported
Sup Structure Masonry Construction % not reported Sup Structure Plastering Inside , Outside & Ceiling % not reported Sup Structure Joinery: Doors, Windows, Ventilators Etc % not reported
Sup Structure Basic Work Of Water Supply, Sanitary And Electrification % not reported Sup Structure Dadoing, Skirting, Flooring, Tiles Work (All Types) % not reported Sup Structure Railing And Grill Fixing % not reported
Finishing Works Electrification, Water Supply And Sanitary Finishing % not reported Finishing Works Painting % not reported Finishing Works Fire Prevention And Fire Fighting Fitting And Fixture With Network % not reported
Finishing Works Weather Proof Work(tile,concrete) % not reported Finishing Works Wardrobe, Showcase, Kitchen Cabinet, Puja Work % not reported Finishing Works Elevation Work % not reported
Finishing Works Internal And External Work Including Landscapes As Per Sanctioned Drawings % not reported Internal Infrastructure Water Supply % not reported Internal Infrastructure Sewage And Drainage System % not reported
Internal Infrastructure Water Conservation/rain Water Harvesting/recharge Of Ground Water % not reported Internal Infrastructure Energy Management % not reported Internal Infrastructure Fire Protection And Fire Safety Requirements % not reported
Internal Infrastructure Solid Waste Management And Disposal % not reported Internal Infrastructure Emergency Evacuation Services % not reported External Infrastructure Water Supply % not reported
External Infrastructure Internal Roads & Footpaths % not reported External Infrastructure Sewage And Drainage System % not reported External Infrastructure Electricity Supply Transformer And Substation % not reported
External Infrastructure Solid Waste Management And Disposal % not reported External Infrastructure Emergency Evacuation Services % not reported External Infrastructure Storm Water Drains % not reported
External Infrastructure Use Of Renewable Energy % not reported External Infrastructure Water Conservation/rain Water Harvesting/recharge Of Ground Water % not reported External Infrastructure Fire Protection And Fire Safety Requirements % not reported
External Infrastructure Sewage Treatment Plant (Stp) % not reported External Infrastructure Parks & Tree Planting % not reported External Infrastructure Street Lighting % not reported
Amenities Electricity % not reported Amenities Smart Home Automation % not reported Amenities Cctv Surveillance % not reported
Amenities Club House % not reported Amenities Community Hall % not reported Amenities Outdoor Sports Facility % not reported
Amenities Indoor Sports Facility % not reported Amenities Swimming Pool % not reported Amenities Gym % not reported
Amenities Parks % not reported Amenities Power Backup % not reported Amenities Piped Gas % not reported
Amenities Water And Sanitation % not reported Amenities Air Conditioning % not reported Common Areas Staircases % not reported
Common Areas Lifts % not reported Common Areas Corridor/lobbies % not reported Common Areas Fire Escapes % not reported
Common Areas Common Entrance And Exit For The Building/common Portico/foyer/verandah % not reported Common Areas Basement % not reported Common Areas Terrace % not reported
Common Areas Outer Wall % not reported Common Areas Open Parking Areas % not reported Common Areas Provision For Lodging Of Management Staff And Security Staff % not reported
Common Areas Water Conservation And Renewable Energy % not reported Common Areas Common Storage Spaces % not reported
Documents

RERA Documents & Filings

All statutory documents uploaded by the promoter to the authority portal.

Promoter Registration Certificate
Promoter Pan Card
Promoter Address Proof
Affidavit
Fd 1 BS FY 24-25.Pdf
Fd 2 BS FY 23-24.Pdf
Fd 3 Balance Sheet FY 2022-23 V1.Pdf
Fd 4 PL FY 24-25.Pdf
Fd 5 PL FY 23-24.Pdf
Fd 6 P & L FY 2022-23.Pdf
Fd 7 ACK825085161101225 FY 24-25.Pdf
Fd 8 ACK663294371291024 FY 23-24.Pdf
Fd 9 ITR ACK-FY 2022-23 - Allure Awami Pvt Ltd.Pdf
Fd 10 DR FY 24-25.Pdf
Fd 11 DR FY 23-24.Pdf
Fd 12 Driector FY 2022-23 Compressed.Pdf
Fd 13 CF FY 24-25.Pdf
Fd 14 NA.Pdf
Fd 15 NA.Pdf
Fd 16 Audit Report FY 24-25.Pdf
Fd 17 Audit Report FY 23-24.Pdf
Fd 18 Audit Report FY 2022-23.Pdf
Pd 1 Commencement Certificate( Annexure - 80 )
Pd 2 Approved Building Plan( Annexure - 81 )
Pd 3 Sectional Drawing Of The Apartments( Annexure - 82 )
Pd 4 Certificate From Registered Engineer Indicating The Structural Safety Of The Building( Annexure - 83 )
Pd 5 Project Specifications( Annexure - 84 )
Pd 6 Brochure( Annexure - 85 )
Pd 7 Relinquishment Deed( Annexure - 86 )
Pd 8 Proforma Of Agreement For Sale( Annexure - 87 )
Pd 9 Proforma Of Allotment Letter( Annexure - 88 )
Dc 1 Declaration (Form B)( Annexure - 89 )
Dc 2 Section 3(1) Notarized Affidavit( Annexure - 90 )
Dc 3 JD AFFIDAVIT CUM DECLARATION( Annexure - 91 )
Dc 4 Advocate Search Report( Annexure - 92 )
Noc 1 ESCOM Electricity( Annexure - 95 )
Noc 2 KWSSB Water( Annexure - 96 )
Noc 3 KSPCB( Annexure - 97 )
Noc 4 SEIAA( Annexure - 98 )
Photo 1 Project Photo
Od 1 Allure Awani Annual Report Compressed.Pdf
Od 2 Annual Report 23-24.Pdf
Od 3 Annual Report 24-25.Pdf
Od 4 Structural Stability Cert & License.Pdf
Od 5 Floor & Elevation Plan 1.Pdf
Od 6 Floor & Elevation Plan 2.Pdf
Od 7 Floor & Elevation Plan 3.Pdf
Od 8 Floor & Elevation Plan 4.Pdf
Od 9 Floor & Elevation Plan 5.Pdf
Od 10 Google Coordinates.Pdf
Od 11 MOEF Phase 2 Challan Paid Receipt.Pdf
Od 12 Plan Approval Fee.Pdf
Od 13 Plan Approval.Pdf
Od 14 Village Map.Pdf
Od 15 Work Order Clear.Pdf
Od 16 POA 10 Acres Compressed.Pdf
Od 17 Amalgamation Khata PH-1 And PH-2.Pdf
Od 18 Road Cornirmation - Panchayat.Pdf
Od 19 Water Source (1).Jpeg
Od 20 Water Source (2).Jpeg
Od 21 Water Source (4).Jpeg
Od 22 Alure Avani Ph-2-Budget.Pdf
Od 23 Akar Band - 77.Pdf
Od 24 Certified Copy - 77.Pdf
Od 25 Re Survey Tippani - 77.Pdf
Od 26 Transfer Of Rights - 77 - Consl.Pdf
Od 27 Certified Copy - 78.Pdf
Od 28 Re Survey Tippani - 78.Pdf
Od 29 Clarification On Area Bifurcation.Pdf
Od 30 Land Guidance Value Clarification.Pdf
Od 31 Affidivit For Approvals.Pdf
Od 32 AOA.Pdf
Od 33 MOA.Pdf
Ed 1 04-06-2026
Ed 2 04-06-2026
Ed 3 04-06-2026
Ed 4 04-06-2026
Ed 5 04-06-2026
Ed 6 04-06-2026
Ed 7 04-06-2026
Ed 8 04-06-2026
Ed 9 04-06-2026
Ed 10 04-06-2026
Ed 11 04-06-2026
Ed 12 04-06-2026
Ed 13 04-06-2026
Ed 14 04-06-2026
Ed 15 04-06-2026
Ed 16 04-06-2026
Ed 17 04-06-2026
Ed 18 04-06-2026
Ed 19 04-06-2026
Ed 20 04-06-2026
Ed 21 04-06-2026
Ed 22 04-06-2026
Ed 23 04-06-2026
Ed 24 04-06-2026
Ed 25 04-06-2026
Ed 26 16-06-2026
Ed 27 16-06-2026
Ed 28 16-06-2026
Ed 29 16-06-2026
Ed 30 16-06-2026
Ld Rtc
Ld Mutation
Ld Encumbrance Certificate
Ld Conversion Order
Ld Khatha
Bank

Bank & Cost Disclosure

Declared project cost and the designated escrow account on file.

Project Account Bank STATE BANK OF INDIA
Account Number (RERA) 45059966834
IFSC SBIN0040007
Branch Address Avenue Road, Bangalore
Country/City