Squareyards Logo
Blogs
Sell or Rent Property
Login
Rera Banner
residential Under Construction Source: rera.ka

SDMV Elite RERA Details - PRM/KA/RERA/1251/308/PR/180723/006073 Bangalore

View the RERA registration, promoter, approval, building, inventory, document and construction-progress disclosures for SDMV Elite under registration PRM/KA/RERA/1251/308/PR/180723/006073 in Bangalore, Karnataka. Data is sourced from rera.ka.

RERA

RERA Snapshot

The most important statutory project disclosures, generated dynamically from available RERA fields.

  • RERA Number PRM/KA/RERA/1251/308/PR/180723/006073
  • Project Name SDMV ELITE
  • Project Type Residential/Group Housing
  • Project Status Under Construction
  • District Bengaluru Urban
  • Taluka Anekal
  • Original Completion 31 December 2026
  • Documents 116 Verified
Timeline

Project Timeline & Completion Details

Key statutory dates from registration through proposed completion and permit validity.

Proposed Start 30 January 2023 Expected commencement of civil works and foundation on site.
Original Completion 31 December 2026 Mandated date for project handover to the allottees and final compliance filing.
Promoter

Promoter, Organisation & Member Details

Declared promoter entity, address and corporate identifiers on file with the authority.

Primary Promoter

M/s SDMV INFRA
Registered Address No.48, Third Floor, Third Cabin, ,S Kariyappa Road, Yediyur Circe, Basavanagudi ,Bengaluru South ,Bengaluru Urban-560004
Location

Land, Address & Location Details

Land parcel, zoning and geo-coordinates as recorded in the project filing.

Address Project situated in Sy.no.15/8, 15/15, 18/1, 18/4, 18/8, 18/9 of Kammasandra Village , Attibele Hobli, Anekal Taluk , Anekal , Bengaluru Urban, Karnataka - 560100

RERA Coordinates

Latitude, Longitude 12.834766708678963, 77.6996687243215
Plans

Plans & Approvals

Statutory approvals obtained or pending against the project site.

Plan Approval No. 508/2022-23
Authority Local Planing Authority
Approved Date 30 January 2023

Understand this Project's RERA details

Get clear answers and additional support from our RERA experts.

RERA Banner
Buildings

Buildings, Towers & Building-Level Details

Statutory building-level disclosures including tower height, sanctioned floors, structural counts and parking areas.

Building Detail
Name No. of Basements No. of Slab No. of Slits No. of Open Parking Building Type Height of Tower No. of Floors No. of Units
SDMV ELITE 0 5 1 181 Residential 14.95 4 168

Scroll horizontally to view all building-level fields. Values marked "-" were not disclosed in the source RERA record.

Inventory

Unit Inventory & Configuration Details

Configuration mix and floor-level disclosures with both grouped and raw RERA views.

Total Units -
Configurations 2
Inventory Type RESIDENTIAL
Configuration Distribution
2 BHK 0 units
3 BHK 0 units
  • SDMV ELITE
Floor-Wise Inventory Explorer
Floor Apartment Type Carpet Area No. of Unit
GF 2 BHK 53 1
GF 2 BHK 58 2
GF 2 BHK 63 3
GF 2 BHK 58 4
GF 2 BHK 58 5
GF 2 BHK 58 6
GF 2 BHK 58 7
GF 2 BHK 60 8
GF 2 BHK 58 9
GF 2 BHK 58 10
GF 2 BHK 64 11
GF 2 BHK 57 12
GF 2 BHK 54 13
GF 2 BHK 63 14
GF 2 BHK 52 15
GF 2 BHK 52 16
GF 2 BHK 52 17
GF 2 BHK 52 18
GF 2 BHK 52 19
GF 2 BHK 52 20
GF 3 BHK 82 21
GF 2 BHK 64 22
GF 2 BHK 63 23
GF 2 BHK 73 24
GF 2 BHK 72 25
GF 3 BHK 82 26
GF 3 BHK 85 27
GF 3 BHK 85 28
GF 3 BHK 85 29
GF 3 BHK 85 30
GF 2 BHK 71 31
GF 3 BHK 80 32
GF 3 BHK 82 33
GF 2 BHK 67 34
GF 2 BHK 71 35
GF 3 BHK 91 36
GF 2 BHK 73 37
GF 3 BHK 83 38
GF 3 BHK 85 39
GF 3 BHK 85 40
GF 3 BHK 78 41
GF 3 BHK 83 42
1 2 BHK 53 101
1 2 BHK 58 102
1 2 BHK 63 103
1 2 BHK 58 104
1 2 BHK 58 105
1 2 BHK 58 106
1 2 BHK 58 107
1 2 BHK 60 108
1 2 BHK 58 109
1 2 BHK 58 110
1 2 BHK 64 111
1 2 BHK 57 112
1 2 BHK 54 113
1 2 BHK 63 114
1 2 BHK 52 115
1 2 BHK 52 116
1 2 BHK 52 117
1 2 BHK 52 118
1 2 BHK 52 119
1 2 BHK 52 120
1 3 BHK 82 121
1 2 BHK 64 122
1 2 BHK 63 123
1 2 BHK 73 124
1 2 BHK 72 125
1 3 BHK 82 126
1 3 BHK 85 127
1 3 BHK 85 128
1 3 BHK 85 129
1 3 BHK 85 130
1 2 BHK 71 131
1 3 BHK 80 132
1 3 BHK 82 133
1 2 BHK 67 134
1 2 BHK 71 135
1 3 BHK 91 136
1 2 BHK 73 137
1 3 BHK 83 138
1 3 BHK 85 139
1 3 BHK 85 140
1 3 BHK 78 141
1 3 BHK 83 142
2 2 BHK 53 201
2 2 BHK 58 202
2 2 BHK 63 203
2 2 BHK 58 204
2 2 BHK 58 205
2 2 BHK 58 206
2 2 BHK 58 207
2 2 BHK 60 208
2 2 BHK 58 209
2 2 BHK 58 210
2 2 BHK 64 211
2 2 BHK 57 212
2 2 BHK 54 213
2 2 BHK 63 214
2 2 BHK 52 215
2 2 BHK 52 216
2 2 BHK 52 217
2 2 BHK 52 218
2 2 BHK 52 219
2 2 BHK 52 220
2 3 BHK 82 221
2 2 BHK 64 222
2 2 BHK 63 223
2 2 BHK 73 224
2 2 BHK 72 225
2 3 BHK 82 226
2 3 BHK 85 227
2 3 BHK 85 228
2 3 BHK 85 229
2 3 BHK 85 230
2 2 BHK 71 231
2 3 BHK 80 232
2 3 BHK 82 233
2 2 BHK 67 234
2 2 BHK 71 235
2 3 BHK 91 236
2 2 BHK 73 237
2 3 BHK 83 238
2 3 BHK 85 239
2 3 BHK 85 240
2 3 BHK 78 241
2 3 BHK 83 242
3 2 BHK 53 301
3 2 BHK 58 302
3 2 BHK 63 303
3 2 BHK 58 304
3 2 BHK 58 305
3 2 BHK 58 306
3 2 BHK 58 307
3 2 BHK 60 308
3 2 BHK 58 309
3 2 BHK 58 310
3 2 BHK 64 311
3 2 BHK 57 312
3 2 BHK 54 313
3 2 BHK 63 314
3 2 BHK 52 315
3 2 BHK 52 316
3 2 BHK 52 317
3 2 BHK 52 318
3 2 BHK 52 319
3 2 BHK 52 320
3 3 BHK 82 321
3 2 BHK 64 322
3 2 BHK 63 323
3 2 BHK 73 324
3 2 BHK 72 325
3 3 BHK 82 326
3 3 BHK 85 327
3 3 BHK 85 328
3 3 BHK 85 329
3 3 BHK 85 330
3 2 BHK 71 331
3 3 BHK 80 332
3 3 BHK 82 333
3 2 BHK 67 334
3 2 BHK 71 335
3 3 BHK 91 336
3 2 BHK 73 337
3 3 BHK 83 338
3 3 BHK 85 339
3 3 BHK 85 340
3 3 BHK 78 341
3 3 BHK 83 342
Parking

Parking, Garage & Area Details

Parking provision declared in the sanctioned plan.

Type Proposed Booked Work Done
Garage - - -
Covered Parking - - -
Open Parking - - -
Development

Development Works & Common Area Disclosures

Project-level common infrastructure disclosures as reported by the developer to the RERA authority.

Common Areas Lifts % not reported Sub Structure Earth Work And Other Leveling Preparation Work % not reported Sub Structure Foundation Footing Work % not reported
Sub Structure Upto Plinth Level % not reported Sub Structure Sub-structure Flooring (Parking Floor, More Than One Floor Below General Ground Level) % not reported Sub Structure Retaining Wall (All Types) % not reported
Sup Structure Rcc Or Ms Framed Structure % not reported Sup Structure Masonry Construction % not reported Sup Structure Plastering Inside , Outside & Ceiling % not reported
Sup Structure Joinery: Doors, Windows, Ventilators Etc % not reported Sup Structure Basic Work Of Water Supply, Sanitary And Electrification % not reported Sup Structure Dadoing, Skirting, Flooring, Tiles Work (All Types) % not reported
Sup Structure Railing And Grill Fixing % not reported Finishing Works Electrification, Water Supply And Sanitary Finishing % not reported Finishing Works Painting % not reported
Finishing Works Fire Prevention And Fire Fighting Fitting And Fixture With Network % not reported Finishing Works Weather Proof Work(tile,concrete) % not reported Finishing Works Wardrobe, Showcase, Kitchen Cabinet, Puja Work % not reported
Finishing Works Elevation Work % not reported Finishing Works Internal And External Work Including Landscapes As Per Sanctioned Drawings % not reported Internal Infrastructure Water Supply % not reported
Internal Infrastructure Sewage And Drainage System % not reported Internal Infrastructure Water Conservation/rain Water Harvesting/recharge Of Ground Water % not reported Internal Infrastructure Energy Management % not reported
Internal Infrastructure Fire Protection And Fire Safety Requirements % not reported Internal Infrastructure Solid Waste Management And Disposal % not reported Internal Infrastructure Emergency Evacuation Services % not reported
External Infrastructure Water Supply % not reported External Infrastructure Internal Roads & Footpaths % not reported External Infrastructure Sewage And Drainage System % not reported
External Infrastructure Electricity Supply Transformer And Substation % not reported External Infrastructure Solid Waste Management And Disposal % not reported External Infrastructure Emergency Evacuation Services % not reported
External Infrastructure Storm Water Drains % not reported External Infrastructure Use Of Renewable Energy % not reported External Infrastructure Water Conservation/rain Water Harvesting/recharge Of Ground Water % not reported
External Infrastructure Fire Protection And Fire Safety Requirements % not reported External Infrastructure Sewage Treatment Plant (Stp) % not reported External Infrastructure Parks & Tree Planting % not reported
External Infrastructure Street Lighting % not reported Amenities Electricity % not reported Amenities Smart Home Automation % not reported
Amenities Cctv Surveillance % not reported Amenities Club House % not reported Amenities Community Hall % not reported
Amenities Outdoor Sports Facility % not reported Amenities Indoor Sports Facility % not reported Amenities Swimming Pool % not reported
Amenities Gym % not reported Amenities Parks % not reported Amenities Power Backup % not reported
Amenities Piped Gas % not reported Amenities Water And Sanitation % not reported Amenities Air Conditioning % not reported
Common Areas Staircases % not reported Common Areas Corridor/lobbies % not reported Common Areas Fire Escapes % not reported
Common Areas Common Entrance And Exit For The Building/common Portico/foyer/verandah % not reported Common Areas Basement % not reported Common Areas Terrace % not reported
Common Areas Outer Wall % not reported Common Areas Open Parking Areas % not reported Common Areas Provision For Lodging Of Management Staff And Security Staff % not reported
Common Areas Water Conservation And Renewable Energy % not reported Common Areas Common Storage Spaces % not reported
Documents

RERA Documents & Filings

All statutory documents uploaded by the promoter to the authority portal.

Affidavit
Photo 1 Project Photo
Promoter Registration Certificate
Promoter Pan Card
Promoter Address Proof
Fd 1 Certificate From CA For Not Showing Any Accounts.Pdf
Fd 2 Certificate From CA For Not Showing Any Accounts.Pdf
Fd 3 Certificate From CA For Not Showing Any Accounts.Pdf
Fd 4 Certificate From CA For Not Showing Any Accounts.Pdf
Fd 5 Certificate From CA For Not Showing Any Accounts.Pdf
Fd 6 Certificate From CA For Not Showing Any Accounts.Pdf
Fd 7 ELITE NOT APPLICABLE YET.Pdf
Fd 8 ELITE NOT APPLICABLE YET.Pdf
Fd 9 ELITE NOT APPLICABLE YET.Pdf
Fd 10 Certificate From CA For Not Showing Any Accounts.Pdf
Fd 11 Certificate From CA For Not Showing Any Accounts.Pdf
Fd 12 Certificate From CA For Not Showing Any Accounts.Pdf
Fd 13 Certificate From CA For Not Showing Any Accounts.Pdf
Fd 14 Certificate From CA For Not Showing Any Accounts.Pdf
Fd 15 Certificate From CA For Not Showing Any Accounts.Pdf
Fd 16 Certificate From CA For Not Showing Any Accounts.Pdf
Fd 17 Certificate From CA For Not Showing Any Accounts.Pdf
Fd 18 Certificate From CA For Not Showing Any Accounts.Pdf
Pd 1 Self Attested PAN Card*( Annexure - 66 )
Pd 2 Commencement Certificate*( Annexure - 67 )
Pd 3 Electricity Permission Letter*( Annexure - 68 )
Pd 4 Water Permission Letter*( Annexure - 69 )
Pd 5 Approved Layout Plan*( Annexure - 70 )
Pd 6 Approved Building Plotting Plan*( Annexure - 71 )
Pd 7 Existing Layout Plan( Annexure - 72 )
Pd 8 Existing Section Plan And Specification( Annexure - 73 )
Pd 9 Sectional Drawing Of The Apartments*( Annexure - 74 )
Pd 10 Project Specifications*( Annexure - 75 )
Pd 12 Area Development Plan Of Project Area*( Annexure - 77 )
Pd 13 Certificate From Registered Engineer Indicating The Structural Safety Of The Building*( Annexure - 78 )
Pd 14 Advocate Search Report*( Annexure - 79 )
Pd 16 Collaboration Agreement Development Agreement Joint Development Agreement Other Agreement*( Annexure - 81 )
Pd 19 Conversion Certificate Under Section 95 Of The KLR Act 1964*( Annexure - 84 )
Pd 20 Any Other Document (Rights Title Interest Name)*( Annexure - 85 )
Pd 21 Proforma Of Agreement For Sale*( Annexure - 86 )
Pd 22 Proforma Of Allotment Letter*( Annexure - 87 )
Pd 24 Brochure*( Annexure - 89 )
Dc 1 Declaration (Form B)*( Annexure - 90 )
Dc 2 Section 3(1) Notarized Affidavit*( Annexure - 91 )
Dc 3 JD AFFIDAVIT CUM DECLARATION*( Annexure - 92 )
Noc 1 ESCOM Electricity*( Annexure - 93 )
Noc 2 KWSSB Water*( Annexure - 94 )
Noc 7 KSPCB( Annexure - 99 )
Od 1 AuthorizationLetter.Pdf
Od 2 SRValue-Document.Pdf
Od 3 DETAILED FEASIBILTY REPORT 115KLD SDMV Elite.Pdf
Od 4 Kammasandra Village Map (1).Pdf
Od 5 Exact CDP Location.Pdf
Od 6 SDMV ELITE STP -Model.Pdf
Od 7 Conversion All.Pdf
Ed 1 19-05-2023
Ed 2 19-05-2023
Ed 3 19-05-2023
Ed 4 19-05-2023
Ed 5 19-05-2023
Ed 6 19-05-2023
Ed 7 19-05-2023
Ed 8 19-05-2023
Ed 9 19-05-2023
Ed 10 09-06-2023
Ed 11 09-06-2023
Ed 12 09-06-2023
Ed 13 09-06-2023
Ed 14 09-06-2023
Ed 15 09-06-2023
Ed 16 09-06-2023
Ed 17 09-06-2023
Ed 18 03-07-2023
Ed 19 03-07-2023
Ed 20 03-07-2023
Ed 21 03-07-2023
Ed 22 03-07-2023
Ed 23 03-07-2023
Ed 24 03-07-2023
Ed 25 03-07-2023
Ed 26 03-07-2023
Ed 27 03-07-2023
Ed 28 03-07-2023
Ed 29 03-07-2023
Ed 30 03-07-2023
Ed 31 03-07-2023
Ed 32 03-07-2023
Ed 33 03-07-2023
Ed 34 03-07-2023
Ed 35 03-07-2023
Ed 36 03-07-2023
Ed 37 03-07-2023
Ed 38 03-07-2023
Ed 39 03-07-2023
Ed 40 03-07-2023
Ed 41 03-07-2023
Ed 42 03-07-2023
Ed 43 03-07-2023
Ed 44 03-07-2023
Ed 45 03-07-2023
Ed 46 03-07-2023
Ed 47 03-07-2023
Ed 48 03-07-2023
Ed 49 03-07-2023
Ed 50 03-07-2023
Ed 51 03-07-2023
Ed 52 03-07-2023
Ed 53 03-07-2023
Ed 54 03-07-2023
Ed 55 03-07-2023
Ld Rtc
Ld Mutation
Ld Encumbrance Certificate
Ld Conversion Order
Ld Sale Deed
Ld Khatha
Bank

Bank & Cost Disclosure

Declared project cost and the designated escrow account on file.

Project Account Bank Union Bank of India
Account Number (RERA) 257011010000045
IFSC UBIN0825701
Branch Address Ananth Nagar Branch, Bangalore
Country/City