Bricks The Earthscape RERA Details - PRM/KA/RERA/1251/446/PR/020925/008044 Bangalore

View the RERA registration, promoter, approval, building, inventory, document and construction-progress disclosures for Bricks The Earthscape under registration PRM/KA/RERA/1251/446/PR/020925/008044 in Bangalore, Karnataka. Data is sourced from rera.ka.

RERA

RERA Snapshot

The most important statutory project disclosures, generated dynamically from available RERA fields.

  • RERA Number PRM/KA/RERA/1251/446/PR/020925/008044
  • Project Name THE EARTHSCAPE PHASE-1
  • Project Type Residential/Group Housing
  • Project Status New Launch
  • District Bengaluru Urban
  • Taluka Bengaluru East
  • Original Completion 31 August 2030
  • Documents 80 Verified
Timeline

Project Timeline & Completion Details

Key statutory dates from registration through proposed completion and permit validity.

Proposed Start 01 September 2025 Expected commencement of civil works and foundation on site.
Original Completion 31 August 2030 Mandated date for project handover to the allottees and final compliance filing.
Promoter

Promoter, Organisation & Member Details

Declared promoter entity, address and corporate identifiers on file with the authority.

Primary Promoter

M/s Bricks and Milestones Projects LLP
Registered Address NO 1140, 4TH FLOOR, 17TH CROSS, 5TH MAIN, ,7TH SECTOR,,HSR LAYOUT - BENGALURU ,Bengaluru South ,Bengaluru Urban-560102 ,Bengaluru South ,Bengaluru Urban-560102
Experience Details
Location

Land, Address & Location Details

Land parcel, zoning and geo-coordinates as recorded in the project filing.

Address Khatha No.2382155512, Sy No 55/1, 55/2,55/3,55/4 (P), 56/2(P), 56/3(P), 62/1(P), 62/2(P), 62/3(P), 62/4, 62/5, 62/6 , 62/7, 63/2, 63/3, 63/4(P), 63/5, 63/6 of GUNJUR Village, Varthur Hobli, Ward No: 149 , Bengaluru East , Bengaluru Urban, Karnataka - 560087

RERA Coordinates

Latitude, Longitude 12.9170587, 77.730999
Plans

Plans & Approvals

Statutory approvals obtained or pending against the project site.

Plan Approval No. LP.No:BBMP/Addl.Dir/JDNORTH/0028/25-26
Authority BBMP - Bruhat Bengaluru Mahanagara Palike
Approved Date 30 August 2025

Understand this Project's RERA details

Get clear answers and additional support from our RERA experts.

RERA Banner
Buildings

Buildings, Towers & Building-Level Details

Statutory building-level disclosures including tower height, sanctioned floors, structural counts and parking areas.

Building Detail
Name No. of Basements No. of Slab No. of Slits No. of Open Parking Building Type Height of Tower No. of Floors No. of Units
WING A 1 27 0 108 Residential 81.3 26 108
WING B 1 27 0 108 Residential 81.3 26 108
WING C 2 27 0 108 Residential 81.3 26 108
WING D 2 27 0 108 Residential 81.3 26 108
WING E 2 27 0 211 Residential 81.3 26 108
WING F 2 27 0 211 Residential 81.3 26 108

Scroll horizontally to view all building-level fields. Values marked "-" were not disclosed in the source RERA record.

Inventory

Unit Inventory & Configuration Details

Configuration mix and floor-level disclosures with both grouped and raw RERA views.

Total Units -
Configurations 3
Inventory Type RESIDENTIAL
Configuration Distribution
2 BHK 0 units
3 BHK 0 units
5 BHK 0 units
  • WING A
  • WING B
  • WING C
  • WING D
  • WING E
  • WING F
Floor-Wise Inventory Explorer
Floor Apartment Type Carpet Area No. of Unit
-1 2 BHK 79 001
-1 3 BHK 101 002
-1 3 BHK 101 003
-1 2 BHK 85 004
GF 2 BHK 81 101
GF 3 BHK 104 102
GF 3 BHK 105 103
GF 2 BHK 85 104
1 3 BHK 106 201
1 3 BHK 104 202
1 3 BHK 105 203
1 3 BHK 107 204
2 3 BHK 106 301
2 3 BHK 104 302
2 3 BHK 105 303
2 3 BHK 107 304
3 3 BHK 106 401
3 3 BHK 104 402
3 3 BHK 105 403
3 3 BHK 107 404
4 3 BHK 106 501
4 3 BHK 104 502
4 3 BHK 105 503
4 3 BHK 107 504
5 3 BHK 106 601
5 3 BHK 104 602
5 3 BHK 105 603
5 3 BHK 107 604
6 3 BHK 106 701
6 3 BHK 104 702
6 3 BHK 105 703
6 3 BHK 107 704
7 3 BHK 106 801
7 3 BHK 104 802
7 3 BHK 105 803
7 3 BHK 107 804
8 3 BHK 106 901
8 3 BHK 104 902
8 3 BHK 105 903
8 3 BHK 107 904
9 3 BHK 106 1001
9 3 BHK 104 1002
9 3 BHK 105 1003
9 3 BHK 107 1004
10 3 BHK 106 1101
10 3 BHK 104 1102
10 3 BHK 105 1103
10 3 BHK 107 1104
11 3 BHK 106 1201
11 3 BHK 104 1202
11 3 BHK 105 1203
11 3 BHK 107 1204
12 3 BHK 106 1301
12 3 BHK 104 1302
12 3 BHK 105 1303
12 3 BHK 107 1304
13 3 BHK 106 1401
13 3 BHK 104 1402
13 3 BHK 105 1403
13 3 BHK 107 1404
14 3 BHK 106 1501
14 3 BHK 104 1502
14 3 BHK 105 1503
14 3 BHK 107 1504
15 3 BHK 106 1601
15 3 BHK 104 1602
15 3 BHK 105 1603
15 3 BHK 107 1604
16 3 BHK 106 1701
16 3 BHK 104 1702
16 3 BHK 105 1703
16 3 BHK 107 1704
17 3 BHK 106 1801
17 3 BHK 104 1802
17 3 BHK 105 1803
17 3 BHK 107 1804
18 3 BHK 106 1901
18 3 BHK 104 1902
18 3 BHK 105 1903
18 2 BHK 83 1904
19 3 BHK 106 2001
19 3 BHK 104 2002
19 3 BHK 105 2003
19 3 BHK 107 2004
20 3 BHK 106 2101
20 3 BHK 104 2102
20 3 BHK 105 2103
20 3 BHK 107 2104
21 3 BHK 106 2201
21 3 BHK 104 2202
21 3 BHK 105 2203
21 3 BHK 107 2204
22 3 BHK 106 2301
22 3 BHK 104 2302
22 3 BHK 105 2303
22 3 BHK 107 2304
23 3 BHK 106 2401
23 3 BHK 104 2402
23 3 BHK 105 2403
23 3 BHK 107 2404
24 3 BHK 106 2501
24 3 BHK 104 2502
24 3 BHK 105 2503
24 3 BHK 107 2504
25 3 BHK 106 2601
25 3 BHK 104 2602
25 3 BHK 105 2603
25 3 BHK 107 2604
Parking

Parking, Garage & Area Details

Parking provision declared in the sanctioned plan.

Type Proposed Booked Work Done
Garage - - -
Covered Parking - - -
Open Parking - - -
Development

Development Works & Common Area Disclosures

Project-level common infrastructure disclosures as reported by the developer to the RERA authority.

Sub Structure Earth Work And Other Leveling Preparation Work % not reported Sub Structure Foundation Footing Work % not reported Sub Structure Upto Plinth Level % not reported
Sub Structure Sub-structure Flooring (Parking Floor, More Than One Floor Below General Ground Level) % not reported Sub Structure Retaining Wall (All Types) % not reported Sup Structure Rcc Or Ms Framed Structure % not reported
Sup Structure Masonry Construction % not reported Sup Structure Plastering Inside , Outside & Ceiling % not reported Sup Structure Joinery: Doors, Windows, Ventilators Etc % not reported
Sup Structure Basic Work Of Water Supply, Sanitary And Electrification % not reported Sup Structure Dadoing, Skirting, Flooring, Tiles Work (All Types) % not reported Sup Structure Railing And Grill Fixing % not reported
Finishing Works Electrification, Water Supply And Sanitary Finishing % not reported Finishing Works Painting % not reported Finishing Works Fire Prevention And Fire Fighting Fitting And Fixture With Network % not reported
Finishing Works Weather Proof Work(tile,concrete) % not reported Finishing Works Wardrobe, Showcase, Kitchen Cabinet, Puja Work % not reported Finishing Works Elevation Work % not reported
Finishing Works Internal And External Work Including Landscapes As Per Sanctioned Drawings % not reported Internal Infrastructure Water Supply % not reported Internal Infrastructure Sewage And Drainage System % not reported
Internal Infrastructure Water Conservation/rain Water Harvesting/recharge Of Ground Water % not reported Internal Infrastructure Energy Management % not reported Internal Infrastructure Fire Protection And Fire Safety Requirements % not reported
Internal Infrastructure Solid Waste Management And Disposal % not reported Internal Infrastructure Emergency Evacuation Services % not reported External Infrastructure Water Supply % not reported
External Infrastructure Internal Roads & Footpaths % not reported External Infrastructure Sewage And Drainage System % not reported External Infrastructure Electricity Supply Transformer And Substation % not reported
External Infrastructure Solid Waste Management And Disposal % not reported External Infrastructure Emergency Evacuation Services % not reported External Infrastructure Storm Water Drains % not reported
External Infrastructure Use Of Renewable Energy % not reported External Infrastructure Water Conservation/rain Water Harvesting/recharge Of Ground Water % not reported External Infrastructure Fire Protection And Fire Safety Requirements % not reported
External Infrastructure Sewage Treatment Plant (Stp) % not reported External Infrastructure Parks & Tree Planting % not reported External Infrastructure Street Lighting % not reported
Amenities Electricity % not reported Amenities Smart Home Automation % not reported Amenities Cctv Surveillance % not reported
Amenities Club House % not reported Amenities Community Hall % not reported Amenities Outdoor Sports Facility % not reported
Amenities Indoor Sports Facility % not reported Amenities Swimming Pool % not reported Amenities Gym % not reported
Amenities Parks % not reported Amenities Power Backup % not reported Amenities Piped Gas % not reported
Amenities Water And Sanitation % not reported Amenities Air Conditioning % not reported Common Areas Staircases % not reported
Common Areas Lifts % not reported Common Areas Corridor/lobbies % not reported Common Areas Fire Escapes % not reported
Common Areas Common Entrance And Exit For The Building/common Portico/foyer/verandah % not reported Common Areas Basement % not reported Common Areas Terrace % not reported
Common Areas Outer Wall % not reported Common Areas Open Parking Areas % not reported Common Areas Provision For Lodging Of Management Staff And Security Staff % not reported
Common Areas Water Conservation And Renewable Energy % not reported Common Areas Common Storage Spaces % not reported
Documents

RERA Documents & Filings

All statutory documents uploaded by the promoter to the authority portal.

Promoter Registration Certificate
Promoter Pan Card
Promoter Address Proof
Affidavit
1 Completion Certificate
2 Completion Certificate
3 Completion Certificate
4 Completion Certificate
Fd 1 B&M LLP FY 23-24 Financials.Pdf
Fd 2 Bricks & Milestones Projects LLP - Financial Statements FY 22-23.Pdf
Fd 3 Bricks & Milestones Projects LLP - Financial Statements FY 21-22.Pdf
Fd 4 B&M LLP FY 23-24 Financials.Pdf
Fd 5 Bricks & Milestones Projects LLP - Financial Statements FY 22-23.Pdf
Fd 6 Bricks & Milestones Projects LLP - Financial Statements FY 21-22.Pdf
Fd 7 ITR FY 2023-24.Pdf
Fd 8 ITR -V-2022-23.Pdf
Fd 9 ITR -V-2021-22.Pdf
Pd 1 Commencement Certificate( Annexure - 80 )
Pd 2 Approved Building Plan( Annexure - 81 )
Pd 3 Sectional Drawing Of The Apartments( Annexure - 82 )
Pd 4 Certificate From Registered Engineer Indicating The Structural Safety Of The Building( Annexure - 83 )
Pd 5 Project Specifications( Annexure - 84 )
Pd 6 Brochure( Annexure - 85 )
Pd 7 Relinquishment Deed( Annexure - 86 )
Pd 8 Proforma Of Agreement For Sale( Annexure - 87 )
Pd 9 Proforma Of Allotment Letter( Annexure - 88 )
Dc 1 Declaration (Form B)( Annexure - 89 )
Dc 2 Section 3(1) Notarized Affidavit( Annexure - 90 )
Dc 3 JD AFFIDAVIT CUM DECLARATION( Annexure - 91 )
Dc 4 Advocate Search Report( Annexure - 92 )
Noc 1 ESCOM Electricity( Annexure - 95 )
Noc 2 KWSSB Water( Annexure - 96 )
Noc 3 KSPCB( Annexure - 97 )
Noc 4 SEIAA( Annexure - 98 )
Noc 5 Fire Force Department( Annexure - 99 )
Noc 6 Airport Authority Of India( Annexure - 100 )
Noc 7 BSNL( Annexure - 101 )
Photo 1 Project Photo
Photo 2 Project Photo
Photo 3 Project Photo
Photo 4 Project Photo
Od 1 Gunjuru CLU Order Copies.Pdf
Od 2 HAL NOC.PDF
Od 3 B And M PHASE-01 STP DESIGN.Pdf
Od 4 ADLR SKETCH GUNJUR.Pdf
Od 5 CDP Demarcation.Pdf
Od 6 Village Map Demarcation.Pdf
Od 7 Location Demarcation.Pdf
Od 8 Patha Badalavane Order Copies.Pdf
Od 9 Estimated Construction Cost Breakup.Pdf
Od 10 GPA Sy No 55-1.Pdf
Od 11 GPA Sy No 55-2.Pdf
Od 12 GPA Sy No 55-3 & 55-4.Pdf
Od 13 GPA Sy No 63-5 & 63-6.Pdf
Od 14 Title Docs Sy No 55-1.Pdf
Od 15 Title Docs Sy No 56-2.Pdf
Od 16 Title Docs Sy Nos 62-1, 5.Pdf
Od 17 Title Docs Sy No 62-2.Pdf
Od 18 Title Docs Sy Nos 62-3,6,7.Pdf
Od 19 Title Docs Sy No 62-4.Pdf
Od 20 Title Docs 63-2,3,4,5,6.Pdf
Od 21 Carpet Area Statement.Pdf
Od 22 Area Bifurcation For Phase-1.Pdf
Od 23 Common Areas & Amenities Signed By Engineer.Pdf
Ed 1 01-09-2025
Ed 2 01-09-2025
Ed 3 01-09-2025
Ed 4 01-09-2025
Ed 5 01-09-2025
Ed 6 01-09-2025
Ed 7 01-09-2025
Ed 8 01-09-2025
Ed 9 01-09-2025
Ed 10 01-09-2025
Ed 11 01-09-2025
Ld Rtc
Ld Mutation
Ld Encumbrance Certificate
Ld Conversion Order
Ld Khatha
Bank

Bank & Cost Disclosure

Declared project cost and the designated escrow account on file.

Project Account Bank HDFC
Account Number (RERA) 57500000576115
IFSC HDFC0001993
Branch Address HSR layout
Country/City