Squareyards Logo
Blogs
Sell or Rent Property
Login
Rera Banner
residential Under Construction Source: rera.ka

Brigade Sanctuary RERA Details - PRM/KA/RERA/1251/446/PR/041123/006372 Bangalore

View the RERA registration, promoter, approval, building, inventory, document and construction-progress disclosures for Brigade Sanctuary under registration PRM/KA/RERA/1251/446/PR/041123/006372 in Bangalore, Karnataka. Data is sourced from rera.ka.

RERA

RERA Snapshot

The most important statutory project disclosures, generated dynamically from available RERA fields.

  • RERA Number PRM/KA/RERA/1251/446/PR/041123/006372
  • Project Name Brigade Sanctuary
  • Project Type Residential/Group Housing
  • Project Status Under Construction
  • District Bengaluru Urban
  • Taluka Bengaluru East
  • Original Completion 31 December 2028
  • Documents 81 Verified
Timeline

Project Timeline & Completion Details

Key statutory dates from registration through proposed completion and permit validity.

Proposed Start 01 December 2023 Expected commencement of civil works and foundation on site.
Original Completion 31 December 2028 Mandated date for project handover to the allottees and final compliance filing.
Promoter

Promoter, Organisation & Member Details

Declared promoter entity, address and corporate identifiers on file with the authority.

Primary Promoter

Brigade Enterprises Ltd
Registered Address 29th Floor, World Trade Center, Brigade Gateway Campus,26/1, Dr. Rajkumar Road, Malleswaram-Rajajinagar ,Bengaluru North ,Bengaluru Urban-560055
Location

Land, Address & Location Details

Land parcel, zoning and geo-coordinates as recorded in the project filing.

Address Sy. No. 27, 33/1, 34/1, 34/2 & 35 , Chikkavaderapura Village, Sarjapura Hobli, Anekal Taluk, Bangalore Urban District , Bengaluru East , Bengaluru Urban, Karnataka - 560087

RERA Coordinates

Latitude, Longitude 12.8950625, 77.7490625
Plans

Plans & Approvals

Statutory approvals obtained or pending against the project site.

Plan Approval No. BDA/PS/EM/E.O-1/T.A-4/E/29/2023-24
Authority BDA - Bangalore Development Authority
Approved Date 09 October 2023

Understand this Project's RERA details

Get clear answers and additional support from our RERA experts.

RERA Banner
Buildings

Buildings, Towers & Building-Level Details

Statutory building-level disclosures including tower height, sanctioned floors, structural counts and parking areas.

Building Detail
Name No. of Basements No. of Slab No. of Slits No. of Open Parking Building Type Height of Tower No. of Floors No. of Units
A 2 28 0 218 Residential 83.7 27 109
B 2 28 0 177 Residential 83.7 27 164
C 2 28 0 179 Residential 83.7 27 164
D 2 28 0 217 Residential 83.7 27 109
E 2 28 0 175 Residential 83.7 27 163
F 2 28 1 196 Residential 83.7 27 161
G 2 28 1 169 Residential 83.7 27 214
H 2 28 0 227 Residential 83.7 27 191

Scroll horizontally to view all building-level fields. Values marked "-" were not disclosed in the source RERA record.

Inventory

Unit Inventory & Configuration Details

Configuration mix and floor-level disclosures with both grouped and raw RERA views.

Total Units -
Configurations 4
Inventory Type RESIDENTIAL
Configuration Distribution
1 BHK 0 units
2 BHK 0 units
3 BHK 0 units
4 BHK 0 units
  • A
  • B
  • C
  • D
  • E
  • F
  • G
  • H
Floor-Wise Inventory Explorer
Floor Apartment Type Carpet Area No. of Unit
-1 4 BHK 146.63 A 0001
-1 4 BHK 146.63 A 0004
GF 4 BHK 146.63 A 0101
GF 4 BHK 146.63 A 0103
GF 4 BHK 146.63 A 0104
1 4 BHK 146.63 A 0201
1 4 BHK 146.63 A 0202
1 4 BHK 146.63 A 0203
1 4 BHK 146.63 A 0204
2 4 BHK 146.63 A 0301
2 4 BHK 146.63 A 0302
2 4 BHK 146.63 A 0303
2 4 BHK 146.63 A 0304
3 4 BHK 146.63 A 0401
3 4 BHK 146.63 A 0402
3 4 BHK 146.63 A 0403
3 4 BHK 146.63 A 0404
4 4 BHK 146.63 A 0501
4 4 BHK 146.63 A 0502
4 4 BHK 146.63 A 0503
4 4 BHK 146.63 A 0504
5 4 BHK 146.63 A 0601
5 4 BHK 146.63 A 0602
5 4 BHK 146.63 A 0603
5 4 BHK 146.63 A 0604
6 4 BHK 146.63 A 0701
6 4 BHK 146.63 A 0702
6 4 BHK 146.63 A 0703
6 4 BHK 146.63 A 0704
7 4 BHK 146.63 A 0801
7 4 BHK 146.63 A 0802
7 4 BHK 146.63 A 0803
7 4 BHK 146.63 A 0804
8 4 BHK 146.63 A 0901
8 4 BHK 146.63 A 0902
8 4 BHK 146.63 A 0903
8 4 BHK 146.63 A 0904
9 4 BHK 146.63 A 1001
9 4 BHK 146.63 A 1002
9 4 BHK 146.63 A 1003
9 4 BHK 146.63 A 1004
10 4 BHK 146.63 A 1101
10 4 BHK 146.63 A 1102
10 4 BHK 146.63 A 1103
10 4 BHK 146.63 A 1104
11 4 BHK 146.63 A 1201
11 4 BHK 146.63 A 1202
11 4 BHK 146.63 A 1203
11 4 BHK 146.63 A 1204
12 4 BHK 146.63 A 1301
12 4 BHK 146.63 A 1302
12 4 BHK 146.63 A 1303
12 4 BHK 146.63 A 1304
13 4 BHK 146.63 A 1401
13 4 BHK 146.63 A 1402
13 4 BHK 146.63 A 1403
13 4 BHK 146.63 A 1404
14 4 BHK 146.63 A 1501
14 4 BHK 146.63 A 1502
14 4 BHK 146.63 A 1503
14 4 BHK 146.63 A 1504
15 4 BHK 146.63 A 1601
15 4 BHK 146.63 A 1602
15 4 BHK 146.63 A 1603
15 4 BHK 146.63 A 1604
16 4 BHK 146.63 A 1701
16 4 BHK 146.63 A 1702
16 4 BHK 146.63 A 1703
16 4 BHK 146.63 A 1704
17 4 BHK 146.63 A 1801
17 4 BHK 146.63 A 1802
17 4 BHK 146.63 A 1803
17 4 BHK 146.63 A 1804
18 4 BHK 146.63 A 1901
18 4 BHK 146.63 A 1902
18 4 BHK 146.63 A 1903
18 4 BHK 146.63 A 1904
19 4 BHK 146.63 A 2001
19 3 BHK 119.05 A 2002
19 4 BHK 146.63 A 2003
19 4 BHK 146.63 A 2004
20 4 BHK 146.63 A 2101
20 4 BHK 146.63 A 2102
20 4 BHK 146.63 A 2103
20 4 BHK 146.63 A 2104
21 4 BHK 146.63 A 2201
21 4 BHK 146.63 A 2202
21 4 BHK 146.63 A 2203
21 4 BHK 146.63 A 2204
22 4 BHK 146.63 A 2301
22 4 BHK 146.63 A 2302
22 4 BHK 146.63 A 2303
22 4 BHK 146.63 A 2304
23 4 BHK 146.63 A 2401
23 4 BHK 146.63 A 2402
23 4 BHK 146.63 A 2403
23 4 BHK 146.63 A 2404
24 4 BHK 146.63 A 2501
24 4 BHK 146.63 A 2502
24 4 BHK 146.63 A 2503
24 4 BHK 146.63 A 2504
25 4 BHK 146.63 A 2601
25 4 BHK 146.63 A 2602
25 4 BHK 146.63 A 2603
25 4 BHK 146.63 A 2604
26 4 BHK 146.63 A 2701
26 4 BHK 146.63 A 2702
26 4 BHK 146.63 A 2703
26 4 BHK 146.63 A 2704
Parking

Parking, Garage & Area Details

Parking provision declared in the sanctioned plan.

Type Proposed Booked Work Done
Garage - - -
Covered Parking - - -
Open Parking - - -
Development

Development Works & Common Area Disclosures

Project-level common infrastructure disclosures as reported by the developer to the RERA authority.

Sub Structure Earth Work And Other Leveling Preparation Work % not reported Sub Structure Foundation Footing Work % not reported Sub Structure Upto Plinth Level % not reported
Sub Structure Sub-structure Flooring (Parking Floor, More Than One Floor Below General Ground Level) % not reported Sub Structure Retaining Wall (All Types) % not reported Sup Structure Rcc Or Ms Framed Structure % not reported
Sup Structure Masonry Construction % not reported Sup Structure Plastering Inside , Outside & Ceiling % not reported Sup Structure Joinery: Doors, Windows, Ventilators Etc % not reported
Sup Structure Basic Work Of Water Supply, Sanitary And Electrification % not reported Sup Structure Dadoing, Skirting, Flooring, Tiles Work (All Types) % not reported Sup Structure Railing And Grill Fixing % not reported
Finishing Works Electrification, Water Supply And Sanitary Finishing % not reported Finishing Works Painting % not reported Finishing Works Fire Prevention And Fire Fighting Fitting And Fixture With Network % not reported
Finishing Works Weather Proof Work(tile,concrete) % not reported Finishing Works Wardrobe, Showcase, Kitchen Cabinet, Puja Work % not reported Finishing Works Elevation Work % not reported
Finishing Works Internal And External Work Including Landscapes As Per Sanctioned Drawings % not reported Internal Infrastructure Water Supply % not reported Internal Infrastructure Sewage And Drainage System % not reported
Internal Infrastructure Water Conservation/rain Water Harvesting/recharge Of Ground Water % not reported Internal Infrastructure Energy Management % not reported Internal Infrastructure Fire Protection And Fire Safety Requirements % not reported
Internal Infrastructure Solid Waste Management And Disposal % not reported Internal Infrastructure Emergency Evacuation Services % not reported External Infrastructure Water Supply % not reported
External Infrastructure Internal Roads & Footpaths % not reported External Infrastructure Sewage And Drainage System % not reported External Infrastructure Electricity Supply Transformer And Substation % not reported
External Infrastructure Solid Waste Management And Disposal % not reported External Infrastructure Emergency Evacuation Services % not reported External Infrastructure Storm Water Drains % not reported
External Infrastructure Use Of Renewable Energy % not reported External Infrastructure Water Conservation/rain Water Harvesting/recharge Of Ground Water % not reported External Infrastructure Fire Protection And Fire Safety Requirements % not reported
External Infrastructure Sewage Treatment Plant (Stp) % not reported External Infrastructure Parks & Tree Planting % not reported External Infrastructure Street Lighting % not reported
Amenities Electricity % not reported Amenities Smart Home Automation % not reported Amenities Cctv Surveillance % not reported
Amenities Club House % not reported Amenities Community Hall % not reported Amenities Outdoor Sports Facility % not reported
Amenities Indoor Sports Facility % not reported Amenities Swimming Pool % not reported Amenities Gym % not reported
Amenities Parks % not reported Amenities Power Backup % not reported Amenities Piped Gas % not reported
Amenities Water And Sanitation % not reported Amenities Air Conditioning % not reported Common Areas Staircases % not reported
Common Areas Lifts % not reported Common Areas Corridor/lobbies % not reported Common Areas Fire Escapes % not reported
Common Areas Common Entrance And Exit For The Building/common Portico/foyer/verandah % not reported Common Areas Basement % not reported Common Areas Terrace % not reported
Common Areas Outer Wall % not reported Common Areas Open Parking Areas % not reported Common Areas Provision For Lodging Of Management Staff And Security Staff % not reported
Common Areas Water Conservation And Renewable Energy % not reported Common Areas Common Storage Spaces % not reported
Documents

RERA Documents & Filings

All statutory documents uploaded by the promoter to the authority portal.

Promoter Registration Certificate
Promoter Pan Card
Promoter Address Proof
Affidavit
Fd 1 Balance Sheet - 2022-23 With CA UDIN.Pdf
Fd 2 Balance Sheet - 2021-22 With CA UDIN.Pdf
Fd 3 Balance Sheet - 2020-21 With CA UDIN.Pdf
Fd 4 Profit And Loss - 2022-23.Pdf
Fd 5 Profti And Loss - 2021-22.Pdf
Fd 6 Profti And Loss - 2020-21.Pdf
Fd 7 Board Report - 2022-23.Pdf
Fd 8 Board Report - 2021-22.Pdf
Fd 9 Board Report - 2020-21.Pdf
Fd 10 Cash Flow Statement - 2022-23.Pdf
Fd 11 Cash Flow Statement - 2021-22.Pdf
Fd 12 Cash Flow Statement - 2020-21.Pdf
Fd 13 Auditors Report - 2022-23.Pdf
Fd 14 Auditors Report - 2021-22.Pdf
Fd 15 Auditors Report - 2020-21.Pdf
Fd 16 ITRV - 2021-22.Pdf
Fd 17 ITRV - 2020-21.Pdf
Fd 18 ITRV - 2019-20.Pdf
Pd 1 Self Attested PAN Card*( Annexure - 66 )
Pd 2 Commencement Certificate*( Annexure - 67 )
Pd 3 Electricity Permission Letter*( Annexure - 68 )
Pd 4 Water Permission Letter*( Annexure - 69 )
Pd 5 Approved Layout Plan*( Annexure - 70 )
Pd 6 Approved Building Plotting Plan*( Annexure - 71 )
Pd 7 Existing Layout Plan( Annexure - 72 )
Pd 8 Existing Section Plan And Specification( Annexure - 73 )
Pd 9 Sectional Drawing Of The Apartments*( Annexure - 74 )
Pd 10 Project Specifications*( Annexure - 75 )
Pd 11 Approved Section Of Building Infrastructure Plan Of Plotting*( Annexure - 76 )
Pd 12 Area Development Plan Of Project Area*( Annexure - 77 )
Pd 13 Certificate From Registered Engineer Indicating The Structural Safety Of The Building*( Annexure - 78 )
Pd 14 Advocate Search Report*( Annexure - 79 )
Pd 16 Collaboration Agreement Development Agreement Joint Development Agreement Other Agreement*( Annexure - 81 )
Pd 17 Change Of Land Use*( Annexure - 82 )
Pd 19 Conversion Certificate Under Section 95 Of The KLR Act 1964*( Annexure - 84 )
Pd 20 Any Other Document (Rights Title Interest Name)*( Annexure - 85 )
Pd 21 Proforma Of Agreement For Sale*( Annexure - 86 )
Pd 22 Proforma Of Allotment Letter*( Annexure - 87 )
Pd 24 Brochure*( Annexure - 89 )
Dc 1 Declaration (Form B)*( Annexure - 90 )
Dc 2 Section 3(1) Notarized Affidavit*( Annexure - 91 )
Dc 3 JD AFFIDAVIT CUM DECLARATION*( Annexure - 92 )
Noc 1 ESCOM Electricity*( Annexure - 93 )
Noc 2 KWSSB Water*( Annexure - 94 )
Noc 5 Fire Force Department( Annexure - 97 )
Noc 6 Airport Authority Of India( Annexure - 98 )
Noc 7 KSPCB( Annexure - 99 )
Noc 8 SEIAA( Annexure - 100 )
Dr 3 Relinquishment Deed( Annexure - 110 )
Photo 1 Project Photo
Od 1 Village Map.Pdf
Od 2 CDP Plan1.Pdf
Od 3 Brigade Sanctuary - BDA Work Order.Pdf
Od 4 STP Plan.Pdf
Od 5 STP Report.Pdf
Od 6 Brigade Sanctuary - Typical Floor Plan.Pdf
Od 7 Brigade Sanctuary - Estimated Cost.Pdf
Ed 1 28-10-2023
Ed 2 28-10-2023
Ed 3 28-10-2023
Ed 4 28-10-2023
Ed 5 28-10-2023
Ed 6 28-10-2023
Ed 7 28-10-2023
Ed 8 28-10-2023
Ed 9 28-10-2023
Ed 10 28-10-2023
Ed 11 28-10-2023
Ed 12 28-10-2023
Ed 13 28-10-2023
Ed 14 28-10-2023
Ld Rtc
Ld Mutation
Ld Encumbrance Certificate
Ld Conversion Order
Ld Sale Deed
Ld Khatha
Bank

Bank & Cost Disclosure

Declared project cost and the designated escrow account on file.

Project Account Bank KOTAK MAHINDRA BANK
Account Number (RERA) 5211759792
IFSC KKBK0000422
Branch Address Lavelle Road
Country/City