Squareyards Logo
Blogs
Sell or Rent Property
Login
Rera Banner
commercial Ready to Move Source: rera.ka

Sumadhura Z Hub RERA Details - PRM/KA/RERA/1251/446/PR/151223/006486 Bangalore

View the RERA registration, promoter, approval, building, inventory, document and construction-progress disclosures for Sumadhura Z Hub under registration PRM/KA/RERA/1251/446/PR/151223/006486 in Bangalore, Karnataka. Data is sourced from rera.ka.

RERA

RERA Snapshot

The most important statutory project disclosures, generated dynamically from available RERA fields.

  • RERA Number PRM/KA/RERA/1251/446/PR/151223/006486
  • Project Name Z-HUB BY SUMADHURA
  • Project Type Mixed Development
  • Project Status Ready to Move
  • District Bengaluru Urban
  • Taluka Bengaluru East
  • Original Completion 31 March 2026
  • Documents 77 Verified
Timeline

Project Timeline & Completion Details

Key statutory dates from registration through proposed completion and permit validity.

Proposed Start 20 September 2023 Expected commencement of civil works and foundation on site.
Original Completion 31 March 2026 Mandated date for project handover to the allottees and final compliance filing.
Promoter

Promoter, Organisation & Member Details

Declared promoter entity, address and corporate identifiers on file with the authority.

Primary Promoter

SUMADHURA MTB DEVELOPERS LLP
Registered Address NO 108/2 3rd FLOOR MILLENIA BUILDING 1st MAIN MSR LAYOUT,MUNNEKOLLALA VILLAGE MARATHAHALLI RING ROAD ,Bengaluru East ,Bengaluru Urban-560037
Location

Land, Address & Location Details

Land parcel, zoning and geo-coordinates as recorded in the project filing.

Address KATHA NO 417 PLOT NO 10 PATTANDUR AGRAHARA SADARAMANGALA VILLAGE , KR PURAM HOBLI , Bengaluru East , Bengaluru Urban, Karnataka - 560066

RERA Coordinates

Latitude, Longitude 12.984865344766511, 77.73344726023706
Plans

Plans & Approvals

Statutory approvals obtained or pending against the project site.

Plan Approval No. BBMP/Addl.Dir/JDNORTH/0037/22-23 and Project No: PRJ/4575/22-23
Authority BBMP - Bruhat Bengaluru Mahanagara Palike
Approved Date 20 September 2023

Understand this Project's RERA details

Get clear answers and additional support from our RERA experts.

RERA Banner
Buildings

Buildings, Towers & Building-Level Details

Statutory building-level disclosures including tower height, sanctioned floors, structural counts and parking areas.

Building Detail
Name No. of Basements No. of Slab No. of Slits No. of Open Parking Building Type Height of Tower No. of Floors No. of Units
BLOCK-A 1 8 0 38 Mixed 24.0 7 269
BLOCK-B 1 6 0 93 Mixed 24.0 5 49

Scroll horizontally to view all building-level fields. Values marked "-" were not disclosed in the source RERA record.

Inventory

Unit Inventory & Configuration Details

Configuration mix and floor-level disclosures with both grouped and raw RERA views.

Total Units -
Configurations 5
Inventory Type COMMERCIAL
Configuration Distribution
SHOP 0 units
ROOM 0 units
COUPLE ROOM 0 units
STUDIO ROOM 0 units
OFFICE 0 units
  • BLOCK-A
  • BLOCK-B
Floor-Wise Inventory Explorer
Floor Apartment Type Carpet Area No. of Unit
-1 SHOP 64.47 DS-1
-1 SHOP 75.72 DS-2
-1 SHOP 75.72 DS-3
-1 SHOP 75.25 DS-4
-1 SHOP 64.85 DS-5
-1 SHOP 63.82 DS-6
-1 SHOP 41.81 DS-7
-1 SHOP 31.96 DS-8
-1 SHOP 31.96 DS-9
-1 SHOP 31.96 DS-10
GF ROOM 14.03 101
GF ROOM 14.03 102
GF ROOM 14.03 103
GF ROOM 14.03 104
GF ROOM 14.03 105
GF ROOM 14.03 106
GF ROOM 14.03 107
GF ROOM 14.03 108
GF ROOM 14.03 109
GF ROOM 14.03 110
GF ROOM 14.03 111
GF ROOM 14.03 112
GF ROOM 14.03 113
GF ROOM 14.03 114
GF ROOM 14.03 115
GF ROOM 14.03 116
GF ROOM 14.03 117
GF ROOM 14.03 118
GF ROOM 14.03 119
GF ROOM 14.03 120
GF ROOM 14.03 121
GF ROOM 14.03 122
GF ROOM 14.03 123
GF ROOM 14.03 124
GF ROOM 14.03 125
GF ROOM 14.03 126
GF ROOM 14.03 127
GF ROOM 14.03 128
GF ROOM 14.03 129
GF ROOM 14.03 130
GF ROOM 14.03 131
GF ROOM 14.03 132
GF ROOM 14.03 133
GF COUPLE ROOM 20.90 134
GF COUPLE ROOM 20.25 135
GF STUDIO ROOM 27.22 136
GF STUDIO ROOM 27.22 137
1 ROOM 14.03 201
1 ROOM 14.03 202
1 ROOM 14.03 203
1 ROOM 14.03 204
1 ROOM 14.03 205
1 ROOM 14.03 206
1 ROOM 14.03 207
1 ROOM 14.03 208
1 ROOM 14.03 209
1 ROOM 14.03 210
1 ROOM 14.03 211
1 ROOM 14.03 212
1 ROOM 14.03 213
1 ROOM 14.03 214
1 ROOM 14.03 215
1 ROOM 14.03 216
1 ROOM 14.03 217
1 ROOM 14.03 218
1 ROOM 14.03 219
1 ROOM 14.03 220
1 ROOM 14.03 221
1 ROOM 14.03 222
1 ROOM 14.03 223
1 ROOM 14.03 224
1 ROOM 14.03 225
1 ROOM 14.03 226
1 ROOM 14.03 227
1 ROOM 14.03 228
1 ROOM 14.03 229
1 ROOM 14.03 230
1 ROOM 14.03 231
1 ROOM 14.03 232
1 ROOM 14.03 233
1 COUPLE ROOM 20.90 234
1 COUPLE ROOM 20.25 235
1 STUDIO ROOM 27.22 236
1 STUDIO ROOM 27.22 237
2 ROOM 14.03 301
2 ROOM 14.03 302
2 ROOM 14.03 303
2 ROOM 14.03 304
2 ROOM 14.03 305
2 ROOM 14.03 306
2 ROOM 14.03 307
2 ROOM 14.03 308
2 ROOM 14.03 309
2 ROOM 14.03 310
2 ROOM 14.03 311
2 ROOM 14.03 312
2 ROOM 14.03 313
2 ROOM 14.03 314
2 ROOM 14.03 315
2 ROOM 14.03 316
2 ROOM 14.03 317
2 ROOM 14.03 318
2 ROOM 14.03 319
2 ROOM 14.03 320
2 ROOM 14.03 321
2 ROOM 14.03 322
2 ROOM 14.03 323
2 ROOM 14.03 324
2 ROOM 14.03 325
2 ROOM 14.03 326
2 ROOM 14.03 327
2 ROOM 14.03 328
2 ROOM 14.03 329
2 ROOM 14.03 330
2 ROOM 14.03 331
2 ROOM 14.03 332
2 ROOM 14.03 333
2 COUPLE ROOM 20.90 334
2 COUPLE ROOM 20.25 335
2 STUDIO ROOM 27.22 336
2 STUDIO ROOM 27.22 337
3 ROOM 14.03 401
3 ROOM 14.03 402
3 ROOM 14.03 403
3 ROOM 14.03 404
3 ROOM 14.03 405
3 ROOM 14.03 406
3 ROOM 14.03 407
3 ROOM 14.03 408
3 ROOM 14.03 409
3 ROOM 14.03 410
3 ROOM 14.03 411
3 ROOM 14.03 412
3 ROOM 14.03 413
3 ROOM 14.03 414
3 ROOM 14.03 415
3 ROOM 14.03 416
3 ROOM 14.03 417
3 ROOM 14.03 418
3 ROOM 14.03 419
3 ROOM 14.03 420
3 ROOM 14.03 421
3 ROOM 14.03 422
3 ROOM 14.03 423
3 ROOM 14.03 424
3 ROOM 14.03 425
3 ROOM 14.03 426
3 ROOM 14.03 427
3 ROOM 14.03 428
3 ROOM 14.03 429
3 ROOM 14.03 430
3 ROOM 14.03 431
3 ROOM 14.03 432
3 ROOM 14.03 433
3 COUPLE ROOM 20.90 434
3 COUPLE ROOM 20.25 435
3 STUDIO ROOM 27.22 436
3 STUDIO ROOM 27.22 437
4 ROOM 14.03 501
4 ROOM 14.03 502
4 ROOM 14.03 503
4 ROOM 14.03 504
4 ROOM 14.03 505
4 ROOM 14.03 506
4 ROOM 14.03 507
4 ROOM 14.03 508
4 ROOM 14.03 509
4 ROOM 14.03 510
4 ROOM 14.03 511
4 ROOM 14.03 512
4 ROOM 14.03 513
4 ROOM 14.03 514
4 ROOM 14.03 515
4 ROOM 14.03 516
4 ROOM 14.03 517
4 ROOM 14.03 518
4 ROOM 14.03 519
4 ROOM 14.03 520
4 ROOM 14.03 521
4 ROOM 14.03 522
4 ROOM 14.03 523
4 ROOM 14.03 524
4 ROOM 14.03 525
4 ROOM 14.03 526
4 ROOM 14.03 527
4 ROOM 14.03 528
4 ROOM 14.03 529
4 ROOM 14.03 530
4 ROOM 14.03 531
4 ROOM 14.03 532
4 ROOM 14.03 533
4 COUPLE ROOM 20.90 534
4 COUPLE ROOM 20.25 535
4 STUDIO ROOM 27.22 536
4 STUDIO ROOM 27.22 537
5 ROOM 14.03 601
5 ROOM 14.03 602
5 ROOM 14.03 603
5 ROOM 14.03 604
5 ROOM 14.03 605
5 ROOM 14.03 606
5 ROOM 14.03 607
5 ROOM 14.03 608
5 ROOM 14.03 609
5 ROOM 14.03 610
5 ROOM 14.03 611
5 ROOM 14.03 612
5 ROOM 14.03 613
5 ROOM 14.03 614
5 ROOM 14.03 615
5 ROOM 14.03 616
5 ROOM 14.03 617
5 ROOM 14.03 618
5 ROOM 14.03 619
5 ROOM 14.03 620
5 ROOM 14.03 621
5 ROOM 14.03 622
5 ROOM 14.03 623
5 ROOM 14.03 624
5 ROOM 14.03 625
5 ROOM 14.03 626
5 ROOM 14.03 627
5 ROOM 14.03 628
5 ROOM 14.03 629
5 ROOM 14.03 630
5 ROOM 14.03 631
5 ROOM 14.03 632
5 ROOM 14.03 633
5 COUPLE ROOM 20.90 634
5 COUPLE ROOM 20.25 635
5 STUDIO ROOM 27.22 636
5 STUDIO ROOM 27.22 637
6 ROOM 14.03 701
6 ROOM 14.03 702
6 ROOM 14.03 703
6 ROOM 14.03 704
6 ROOM 14.03 705
6 ROOM 14.03 706
6 ROOM 14.03 707
6 ROOM 14.03 708
6 ROOM 14.03 709
6 ROOM 14.03 710
6 ROOM 14.03 711
6 ROOM 14.03 712
6 ROOM 14.03 713
6 ROOM 14.03 714
6 ROOM 14.03 715
6 ROOM 14.03 716
6 ROOM 14.03 717
6 ROOM 14.03 718
6 ROOM 14.03 719
6 ROOM 14.03 720
6 ROOM 14.03 721
6 ROOM 14.03 722
6 ROOM 14.03 723
6 ROOM 14.03 724
6 ROOM 14.03 725
6 ROOM 14.03 726
6 ROOM 14.03 727
6 ROOM 14.03 728
6 ROOM 14.03 729
6 ROOM 14.03 730
6 ROOM 14.03 731
6 ROOM 14.03 732
6 ROOM 14.03 733
6 COUPLE ROOM 20.90 734
6 COUPLE ROOM 20.25 735
6 STUDIO ROOM 27.22 736
6 STUDIO ROOM 27.22 737
Parking

Parking, Garage & Area Details

Parking provision declared in the sanctioned plan.

Type Proposed Booked Work Done
Garage - - -
Covered Parking - - -
Open Parking - - -
Development

Development Works & Common Area Disclosures

Project-level common infrastructure disclosures as reported by the developer to the RERA authority.

Sub Structure Earth Work And Other Leveling Preparation Work % not reported Sub Structure Foundation Footing Work % not reported Sub Structure Upto Plinth Level % not reported
Sub Structure Sub-structure Flooring (Parking Floor, More Than One Floor Below General Ground Level) % not reported Sub Structure Retaining Wall (All Types) % not reported Sup Structure Rcc Or Ms Framed Structure % not reported
Sup Structure Masonry Construction % not reported Sup Structure Plastering Inside , Outside & Ceiling % not reported Sup Structure Joinery: Doors, Windows, Ventilators Etc % not reported
Sup Structure Basic Work Of Water Supply, Sanitary And Electrification % not reported Sup Structure Dadoing, Skirting, Flooring, Tiles Work (All Types) % not reported Sup Structure Railing And Grill Fixing % not reported
Finishing Works Electrification, Water Supply And Sanitary Finishing % not reported Finishing Works Painting % not reported Finishing Works Fire Prevention And Fire Fighting Fitting And Fixture With Network % not reported
Finishing Works Weather Proof Work(tile,concrete) % not reported Finishing Works Wardrobe, Showcase, Kitchen Cabinet, Puja Work % not reported Finishing Works Elevation Work % not reported
Finishing Works Internal And External Work Including Landscapes As Per Sanctioned Drawings % not reported Internal Infrastructure Water Supply % not reported Internal Infrastructure Sewage And Drainage System % not reported
Internal Infrastructure Water Conservation/rain Water Harvesting/recharge Of Ground Water % not reported Internal Infrastructure Energy Management % not reported Internal Infrastructure Fire Protection And Fire Safety Requirements % not reported
Internal Infrastructure Solid Waste Management And Disposal % not reported Internal Infrastructure Emergency Evacuation Services % not reported External Infrastructure Water Supply % not reported
External Infrastructure Internal Roads & Footpaths % not reported External Infrastructure Sewage And Drainage System % not reported External Infrastructure Electricity Supply Transformer And Substation % not reported
External Infrastructure Solid Waste Management And Disposal % not reported External Infrastructure Emergency Evacuation Services % not reported External Infrastructure Storm Water Drains % not reported
External Infrastructure Use Of Renewable Energy % not reported External Infrastructure Water Conservation/rain Water Harvesting/recharge Of Ground Water % not reported External Infrastructure Fire Protection And Fire Safety Requirements % not reported
External Infrastructure Sewage Treatment Plant (Stp) % not reported External Infrastructure Parks & Tree Planting % not reported External Infrastructure Street Lighting % not reported
Amenities Electricity % not reported Amenities Smart Home Automation % not reported Amenities Cctv Surveillance % not reported
Amenities Club House % not reported Amenities Community Hall % not reported Amenities Outdoor Sports Facility % not reported
Amenities Indoor Sports Facility % not reported Amenities Swimming Pool % not reported Amenities Gym % not reported
Amenities Parks % not reported Amenities Power Backup % not reported Amenities Piped Gas % not reported
Amenities Water And Sanitation % not reported Amenities Air Conditioning % not reported Common Areas Staircases % not reported
Common Areas Lifts % not reported Common Areas Fire Escape % not reported Common Areas Basement % not reported
Common Areas Terrace % not reported Common Areas Outerwall % not reported Common Areas Water Convesation % not reported
Documents

RERA Documents & Filings

All statutory documents uploaded by the promoter to the authority portal.

Fd 5 Financials FY 21-22.Pdf
Promoter Registration Certificate
Promoter Pan Card
Promoter Address Proof
Affidavit
Fd 1 Financials FY 22-23.Pdf
Fd 2 Financials FY 21-22.Pdf
Fd 3 Financials FY 20-21.Pdf
Fd 4 Financials FY 22-23.Pdf
Fd 6 Financials FY 20-21.Pdf
Fd 7 NOT APPLICABLE.Pdf
Fd 8 NOT APPLICABLE.Pdf
Fd 9 NOT APPLICABLE.Pdf
Fd 10 NOT APPLICABLE.Pdf
Fd 11 NOT APPLICABLE.Pdf
Fd 12 NOT APPLICABLE.Pdf
Fd 13 Audit Report FY 22-23.Pdf
Fd 14 Audit Report FY 21-22.Pdf
Fd 15 Audit Report FY 20-21.Pdf
Fd 16 ACK492701381311023.Pdf
Fd 17 NOT APPLICABLE.Pdf
Fd 18 NOT APPLICABLE.Pdf
Pd 1 Self Attested PAN Card*( Annexure - 66 )
Pd 2 Commencement Certificate*( Annexure - 67 )
Pd 3 Electricity Permission Letter*( Annexure - 68 )
Pd 4 Water Permission Letter*( Annexure - 69 )
Pd 5 Approved Layout Plan*( Annexure - 70 )
Pd 6 Approved Building Plotting Plan*( Annexure - 71 )
Pd 7 Existing Layout Plan( Annexure - 72 )
Pd 8 Existing Section Plan And Specification( Annexure - 73 )
Pd 9 Sectional Drawing Of The Apartments*( Annexure - 74 )
Pd 10 Project Specifications*( Annexure - 75 )
Pd 11 Approved Section Of Building Infrastructure Plan Of Plotting*( Annexure - 76 )
Pd 12 Area Development Plan Of Project Area*( Annexure - 77 )
Pd 13 Certificate From Registered Engineer Indicating The Structural Safety Of The Building*( Annexure - 78 )
Pd 14 Advocate Search Report*( Annexure - 79 )
Pd 15 Urban Land Ceiling*( Annexure - 80 )
Pd 16 Collaboration Agreement Development Agreement Joint Development Agreement Other Agreement*( Annexure - 81 )
Pd 17 Change Of Land Use*( Annexure - 82 )
Pd 18 District Magistrate*( Annexure - 83 )
Pd 19 Conversion Certificate Under Section 95 Of The KLR Act 1964*( Annexure - 84 )
Pd 20 Any Other Document (Rights Title Interest Name)*( Annexure - 85 )
Pd 21 Proforma Of Agreement For Sale*( Annexure - 86 )
Pd 22 Proforma Of Allotment Letter*( Annexure - 87 )
Pd 24 Brochure*( Annexure - 89 )
Dc 1 Declaration (Form B)*( Annexure - 90 )
Dc 2 Section 3(1) Notarized Affidavit*( Annexure - 91 )
Dc 3 JD AFFIDAVIT CUM DECLARATION*( Annexure - 92 )
Noc 1 ESCOM Electricity*( Annexure - 93 )
Noc 2 KWSSB Water*( Annexure - 94 )
Noc 3 Approval NOC Under Section 109 Of KLR Act 1961( Annexure - 95 )
Noc 4 Approval NOC Under Section 14 Of The KTCP Act( Annexure - 96 )
Noc 5 Fire Force Department( Annexure - 97 )
Noc 6 Airport Authority Of India( Annexure - 98 )
Noc 7 KSPCB( Annexure - 99 )
Noc 9 BSNL( Annexure - 101 )
Photo 1 Project Photo
Photo 2 Project Photo
Photo 3 Project Photo
Photo 4 Project Photo
Photo 5 Project Photo
Od 1 Project Schedule.Pdf
Od 2 Approved Sanction Plans.Pdf
Od 3 Amalgamation Deed.Pdf
Od 4 Sale Deed Abdul Rahman.Pdf
Ed 1 11-12-2023
Ed 2 11-12-2023
Ed 3 11-12-2023
Ed 4 11-12-2023
Ed 5 11-12-2023
Ed 6 11-12-2023
Ld Rtc
Ld Mutation
Ld Encumbrance Certificate
Ld Conversion Order
Ld Sale Deed
Ld Khatha
Bank

Bank & Cost Disclosure

Declared project cost and the designated escrow account on file.

Project Account Bank HDFC
Account Number (RERA) 57500000515547
IFSC HDFC0000523
Branch Address RICHMOND ROAD BANGALORE
Country/City