Squareyards Logo
Blogs
Sell or Rent Property
Login
Rera Banner
residential Ready to Move Source: rera.ka

Casagrand Galileo RERA Details - PRM/KA/RERA/1251/309/PR/070222/004675 Bangalore

View the RERA registration, promoter, approval, building, inventory, document and construction-progress disclosures for Casagrand Galileo under registration PRM/KA/RERA/1251/309/PR/070222/004675 in Bangalore, Karnataka. Data is sourced from rera.ka.

RERA

RERA Snapshot

The most important statutory project disclosures, generated dynamically from available RERA fields.

  • RERA Number PRM/KA/RERA/1251/309/PR/070222/004675
  • Project Name CASAGRAND GALILEO
  • Project Type Residential/Group Housing
  • Project Status Ready to Move
  • District Bengaluru Urban
  • Taluka Bengaluru North
  • Original Completion 07 February 2025
  • Documents 76 Verified
Timeline

Project Timeline & Completion Details

Key statutory dates from registration through proposed completion and permit validity.

Proposed Start 20 March 2022 Expected commencement of civil works and foundation on site.
Original Completion 07 February 2025 Mandated date for project handover to the allottees and final compliance filing.
Promoter

Promoter, Organisation & Member Details

Declared promoter entity, address and corporate identifiers on file with the authority.

Primary Promoter

CASA GRANDE GARDEN CITY BUILDERS PVT LTD
Registered Address Salma Bizhouse, No.34/1, 4th Floor, Meanee Avenue Road,Opp to Lakeside Hospital, Ulsoor Road, Near Ulsoor Lake ,Bengaluru North ,Bengaluru Urban-560042
Experience Details
Location

Land, Address & Location Details

Land parcel, zoning and geo-coordinates as recorded in the project filing.

Address SY.NO.61/2, KATHA NO.422/61/2, K.R.PURAM VILLAGE , K R PURAM HOBLI,BANGALORE.WARD NO.52 , Bengaluru North , Bengaluru Urban, Karnataka - 560036

RERA Coordinates

Latitude, Longitude 13.007045, 77.692838
Plans

Plans & Approvals

Statutory approvals obtained or pending against the project site.

Plan Approval No. PRJ/5767/21-22
Authority BBMP - Bruhat Bengaluru Mahanagara Palike
Approved Date 20 January 2022

Understand this Project's RERA details

Get clear answers and additional support from our RERA experts.

RERA Banner
Buildings

Buildings, Towers & Building-Level Details

Statutory building-level disclosures including tower height, sanctioned floors, structural counts and parking areas.

Building Detail
Name No. of Basements No. of Slab No. of Slits No. of Open Parking Building Type Height of Tower No. of Floors No. of Units
CASAGRAND GALILEO 1 120 18 133 Residential 60.4 18 104

Scroll horizontally to view all building-level fields. Values marked "-" were not disclosed in the source RERA record.

Inventory

Unit Inventory & Configuration Details

Configuration mix and floor-level disclosures with both grouped and raw RERA views.

Total Units -
Configurations 3
Inventory Type RESIDENTIAL
Configuration Distribution
2 BHK 0 units
3 BHK 0 units
4 BHK 0 units
  • CASAGRAND GALILEO
Floor-Wise Inventory Explorer
Floor Apartment Type Carpet Area No. of Unit
GF 3 BHK 103.47 101
GF 2 BHK 70.48 102
GF 2 BHK 83.38 103
GF 3 BHK 111.52 104
GF 4 BHK 135.23 105
GF 3 BHK 96.97 106
1 3 BHK 103.47 201
1 2 BHK 73.42 202
1 3 BHK 101.58 203
1 3 BHK 111.52 204
1 4 BHK 135.23 205
1 3 BHK 100.17 206
2 3 BHK 103.47 301
2 2 BHK 73.42 302
2 3 BHK 101.58 303
2 3 BHK 111.52 304
2 4 BHK 135.23 305
2 3 BHK 100.17 306
3 3 BHK 103.47 401
3 2 BHK 73.42 402
3 3 BHK 101.58 403
3 3 BHK 111.52 404
3 4 BHK 135.23 405
3 3 BHK 100.17 406
4 3 BHK 103.47 501
4 2 BHK 73.42 502
4 3 BHK 101.58 503
4 3 BHK 111.52 504
4 4 BHK 135.23 505
4 3 BHK 100.17 506
5 3 BHK 103.47 601
5 2 BHK 73.42 602
5 3 BHK 101.58 603
5 3 BHK 111.52 604
5 4 BHK 135.23 605
5 3 BHK 100.17 606
6 3 BHK 103.47 701
6 2 BHK 73.42 702
6 3 BHK 101.58 703
6 3 BHK 111.52 704
6 4 BHK 135.23 705
6 3 BHK 100.17 706
7 3 BHK 103.47 801
7 2 BHK 73.42 802
7 3 BHK 101.58 803
7 3 BHK 111.52 804
7 4 BHK 135.23 805
7 3 BHK 100.17 806
8 3 BHK 103.47 901
8 2 BHK 73.42 902
8 3 BHK 101.58 903
8 3 BHK 111.52 904
8 4 BHK 135.23 905
8 3 BHK 100.17 906
9 3 BHK 103.47 1001
9 2 BHK 73.42 1002
9 3 BHK 101.58 1003
9 3 BHK 111.52 1004
9 4 BHK 135.23 1005
9 3 BHK 100.17 1006
10 3 BHK 103.47 1101
10 2 BHK 73.42 1102
10 3 BHK 101.58 1103
10 3 BHK 111.52 1104
10 4 BHK 135.23 1105
10 3 BHK 100.17 1106
11 3 BHK 103.47 1201
11 2 BHK 73.42 1202
11 3 BHK 101.58 1203
11 3 BHK 111.52 1204
11 4 BHK 135.23 1205
11 3 BHK 100.17 1206
12 3 BHK 103.47 1301
12 2 BHK 73.42 1302
12 3 BHK 101.58 1303
12 3 BHK 111.52 1304
12 4 BHK 135.23 1305
12 3 BHK 100.17 1306
13 3 BHK 103.47 1401
13 2 BHK 73.42 1402
13 3 BHK 101.58 1403
13 3 BHK 111.52 1404
13 4 BHK 135.23 1405
13 3 BHK 100.17 1406
14 3 BHK 103.47 1501
14 2 BHK 73.42 1502
14 3 BHK 101.58 1503
14 3 BHK 111.52 1504
14 4 BHK 135.23 1505
14 3 BHK 100.17 1506
15 3 BHK 103.47 1601
15 2 BHK 73.42 1602
15 3 BHK 101.58 1603
15 3 BHK 111.52 1604
15 4 BHK 135.23 1605
15 3 BHK 100.17 1606
16 3 BHK 103.47 1701
16 2 BHK 73.42 1702
16 3 BHK 101.58 1703
16 3 BHK 111.52 1704
16 4 BHK 135.23 1705
16 3 BHK 100.17 1706
17 3 BHK 103.47 1801
17 3 BHK 100.17 1806
Parking

Parking, Garage & Area Details

Parking provision declared in the sanctioned plan.

Type Proposed Booked Work Done
Garage - - -
Covered Parking - - -
Open Parking - - -
Development

Development Works & Common Area Disclosures

Project-level common infrastructure disclosures as reported by the developer to the RERA authority.

Sub Structure Earth Work And Other Leveling Preparation Work % not reported Sub Structure Foundation Footing Work % not reported Sub Structure Upto Plinth Level % not reported
Sub Structure Sub-structure Flooring (Parking Floor, More Than One Floor Below General Ground Level) % not reported Sub Structure Retaining Wall (All Types) % not reported Sup Structure Rcc Or Ms Framed Structure % not reported
Sup Structure Masonry Construction % not reported Sup Structure Plastering Inside , Outside & Ceiling % not reported Sup Structure Joinery: Doors, Windows, Ventilators Etc % not reported
Sup Structure Basic Work Of Water Supply, Sanitary And Electrification % not reported Sup Structure Dadoing, Skirting, Flooring, Tiles Work (All Types) % not reported Sup Structure Railing And Grill Fixing % not reported
Finishing Works Electrification, Water Supply And Sanitary Finishing % not reported Finishing Works Painting % not reported Finishing Works Fire Prevention And Fire Fighting Fitting And Fixture With Network % not reported
Finishing Works Weather Proof Work(tile,concrete) % not reported Finishing Works Wardrobe, Showcase, Kitchen Cabinet, Puja Work % not reported Finishing Works Elevation Work % not reported
Finishing Works Internal And External Work Including Landscapes As Per Sanctioned Drawings % not reported Internal Infrastructure Water Supply % not reported Internal Infrastructure Sewage And Drainage System % not reported
Internal Infrastructure Water Conservation/rain Water Harvesting/recharge Of Ground Water % not reported Internal Infrastructure Energy Management % not reported Internal Infrastructure Fire Protection And Fire Safety Requirements % not reported
Internal Infrastructure Solid Waste Management And Disposal % not reported Internal Infrastructure Emergency Evacuation Services % not reported External Infrastructure Water Supply % not reported
External Infrastructure Internal Roads & Footpaths % not reported External Infrastructure Sewage And Drainage System % not reported External Infrastructure Electricity Supply Transformer And Substation % not reported
External Infrastructure Solid Waste Management And Disposal % not reported External Infrastructure Emergency Evacuation Services % not reported External Infrastructure Storm Water Drains % not reported
External Infrastructure Use Of Renewable Energy % not reported External Infrastructure Water Conservation/rain Water Harvesting/recharge Of Ground Water % not reported External Infrastructure Fire Protection And Fire Safety Requirements % not reported
External Infrastructure Sewage Treatment Plant (Stp) % not reported External Infrastructure Parks & Tree Planting % not reported External Infrastructure Street Lighting % not reported
Amenities Electricity % not reported Amenities Smart Home Automation % not reported Amenities Cctv Surveillance % not reported
Amenities Club House % not reported Amenities Community Hall % not reported Amenities Outdoor Sports Facility % not reported
Amenities Indoor Sports Facility % not reported Amenities Swimming Pool % not reported Amenities Gym % not reported
Amenities Parks % not reported Amenities Power Backup % not reported Amenities Piped Gas % not reported
Amenities Water And Sanitation % not reported Amenities Air Conditioning % not reported Common Areas Staircases % not reported
Common Areas Lifts % not reported Common Areas Corridor/lobbies % not reported Common Areas Fire Escapes % not reported
Common Areas Common Entrance And Exit For The Building/common Portico/foyer/verandah % not reported Common Areas Basement % not reported Common Areas Terrace % not reported
Common Areas Outer Wall % not reported Common Areas Open Parking Areas % not reported Common Areas Provision For Lodging Of Management Staff And Security Staff % not reported
Common Areas Water Conservation And Renewable Energy % not reported Common Areas Common Storage Spaces % not reported
Documents

RERA Documents & Filings

All statutory documents uploaded by the promoter to the authority portal.

Promoter Registration Certificate
Promoter Pan Card
Promoter Address Proof
Affidavit
Fd 1 Balance Sheet 20-21.Pdf
Fd 2 Balance Sheet 2019-20.Pdf
Fd 3 Balance Sheet 2018-19.Pdf
Fd 4 Profit And Loss 20-21.Pdf
Fd 5 Profit And Loss 2019-20.Pdf
Fd 6 Profit And Loss 2018-19.Pdf
Fd 7 Not Available.Pdf
Fd 8 Director'S Report 2019-20.Pdf
Fd 9 Director'S Report 2018-19.Pdf
Fd 10 Cashflow Statement 20-21.Pdf
Fd 11 Cash Flow 2019-20.Pdf
Fd 12 Cash Flow 2018-19.Pdf
Fd 13 Auditors Report 20-21.Pdf
Fd 14 Auditor'S Report 2019-20.Pdf
Fd 15 Audit Report 2018-19.Pdf
Fd 16 Not Available.Pdf
Fd 17 ITR For 2019-20.Pdf
Fd 18 ITR For 2018-19.Pdf
Pd 1 Self Attested PAN Card*( Annexure - 66 )
Pd 2 Commencement Certificate*( Annexure - 67 )
Pd 3 Electricity Permission Letter*( Annexure - 68 )
Pd 4 Water Permission Letter*( Annexure - 69 )
Pd 5 Approved Layout Plan*( Annexure - 70 )
Pd 6 Approved Building Plotting Plan*( Annexure - 71 )
Pd 7 Existing Layout Plan( Annexure - 72 )
Pd 8 Existing Section Plan And Specification( Annexure - 73 )
Pd 9 Sectional Drawing Of The Apartments*( Annexure - 74 )
Pd 10 Project Specifications*( Annexure - 75 )
Pd 11 Approved Section Of Building Infrastructure Plan Of Plotting*( Annexure - 76 )
Pd 12 Area Development Plan Of Project Area*( Annexure - 77 )
Pd 13 Certificate From Registered Engineer Indicating The Structural Safety Of The Building*( Annexure - 78 )
Pd 14 Advocate Search Report*( Annexure - 79 )
Pd 15 Urban Land Ceiling*( Annexure - 80 )
Pd 16 Collaboration Agreement Development Agreement Joint Development Agreement Other Agreement*( Annexure - 81 )
Pd 17 Change Of Land Use*( Annexure - 82 )
Pd 18 District Magistrate*( Annexure - 83 )
Pd 19 Conversion Certificate Under Section 95 Of The KLR Act 1964*( Annexure - 84 )
Pd 20 Any Other Document (Rights Title Interest Name)*( Annexure - 85 )
Pd 21 Proforma Of Agreement For Sale*( Annexure - 86 )
Pd 22 Proforma Of Allotment Letter*( Annexure - 87 )
Pd 24 Brochure*( Annexure - 89 )
Dc 1 Declaration (Form B)*( Annexure - 90 )
Dc 2 Section 3(1) Notarized Affidavit*( Annexure - 91 )
Dc 3 JD AFFIDAVIT CUM DECLARATION*( Annexure - 92 )
Noc 1 ESCOM Electricity*( Annexure - 93 )
Noc 2 KWSSB Water*( Annexure - 94 )
Noc 5 Fire Force Department( Annexure - 97 )
Noc 6 Airport Authority Of India( Annexure - 98 )
Noc 7 KSPCB( Annexure - 99 )
Noc 9 BSNL( Annexure - 101 )
Photo 1 Project Photo
Od 1 Project Photos.Pdf
Od 2 STP Demarcation.Jpeg
Od 3 KR Puram -Site Plan.Pdf
Od 4 KR Puram -Basement Plan.Pdf
Od 5 KR Puram Ground Floor Plan.Pdf
Od 6 KR Puram Typical 2nd To 17th Floor Plan.Pdf
Od 7 KR Puram 18th Floor Plan.Pdf
Od 8 KR Puram Elevation Plan.Pdf
Od 9 Guidance Value.Jpeg
Od 10 MoDT.Pdf
Od 11 Clarification On STP.Pdf
Od 12 Clarification On Sold And Unsold Units.Pdf
Od 13 Clarification On Non-Production Of Brochures.Pdf
Ed 1 04-02-2022
Ed 2 04-02-2022
Ld Rtc
Ld Mutation
Ld Encumbrance Certificate
Ld Conversion Order
Ld Sale Deed
Ld Khatha
Bank

Bank & Cost Disclosure

Declared project cost and the designated escrow account on file.

Project Account Bank ICICI Bank
Account Number (RERA) 777705999054
IFSC ICICI000390
Branch Address ULSOOR ROAD
Country/City