Squareyards Logo
Blogs
Sell or Rent Property
Login
Rera Banner
residential Under Construction Source: rera.ka

Casagrand Vivacity RERA Details - PRM/KA/RERA/1251/308/PR/220424/006830 Bangalore

View the RERA registration, promoter, approval, building, inventory, document and construction-progress disclosures for Casagrand Vivacity under registration PRM/KA/RERA/1251/308/PR/220424/006830 in Bangalore, Karnataka. Data is sourced from rera.ka.

RERA

RERA Snapshot

The most important statutory project disclosures, generated dynamically from available RERA fields.

  • RERA Number PRM/KA/RERA/1251/308/PR/220424/006830
  • Project Name CASAGRAND VIVACITY
  • Project Type Residential/Group Housing
  • Project Status Under Construction
  • District Bengaluru Urban
  • Taluka Anekal
  • Original Completion 04 April 2029
  • Documents 127 Verified
Timeline

Project Timeline & Completion Details

Key statutory dates from registration through proposed completion and permit validity.

Proposed Start 30 April 2024 Expected commencement of civil works and foundation on site.
Original Completion 04 April 2029 Mandated date for project handover to the allottees and final compliance filing.
Promoter

Promoter, Organisation & Member Details

Declared promoter entity, address and corporate identifiers on file with the authority.

Primary Promoter

CASA GRANDE GARDEN CITY BUILDERS PVT LTD
Registered Address Salma Bizhouse, No.34/1, 4th Floor, Meanee Avenue Road,,Opp to Lakeside Hospital, Ulsoor Road, Near Ulsoor Lake ,Bengaluru South ,Bengaluru Urban-560042
Location

Land, Address & Location Details

Land parcel, zoning and geo-coordinates as recorded in the project filing.

Address Sy.Nos. 93 & 99 , Chikkanagamangala Village Sarajapura Hobli, Anekal Taluk , Anekal , Bengaluru Urban, Karnataka - 560099

RERA Coordinates

Latitude, Longitude 12.85161, 77.693274
Plans

Plans & Approvals

Statutory approvals obtained or pending against the project site.

Plan Approval No. BDA/BL/E.S/T.A-1/H.S-2/E/04/2024-25
Authority BDA - Bangalore Development Authority
Approved Date 18 April 2024

Understand this Project's RERA details

Get clear answers and additional support from our RERA experts.

RERA Banner
Buildings

Buildings, Towers & Building-Level Details

Statutory building-level disclosures including tower height, sanctioned floors, structural counts and parking areas.

Building Detail
Name No. of Basements No. of Slab No. of Slits No. of Open Parking Building Type Height of Tower No. of Floors No. of Units
Tower 1 1 10 0 349 Residential 29.95 9 381
Tower 2 1 10 0 431 Residential 29.95 9 336

Scroll horizontally to view all building-level fields. Values marked "-" were not disclosed in the source RERA record.

Inventory

Unit Inventory & Configuration Details

Configuration mix and floor-level disclosures with both grouped and raw RERA views.

Total Units -
Configurations 6
Inventory Type RESIDENTIAL
Configuration Distribution
1 BHK 0 units
2 BHK 0 units
3 BHK 0 units
4 BHK 0 units
STUDIO 0 units
PENTHOUSE 0 units
  • Tower 1
  • Tower 2
Floor-Wise Inventory Explorer
Floor Apartment Type Carpet Area No. of Unit
-1 3BHK+3T 104.90 A-G01
-1 3BHK+3T 104.90 A-G02
-1 3BHK+3T 104.90 A-G03
-1 3BHK+3T 104.90 A-G04
-1 3BHK+3T 104.90 A-G05
-1 1BHK+1T 63.66 A-G06
-1 STUDIO 37.39 A-G06A
-1 1BHK+1T 63.66 A-G07
-1 STUDIO 37.39 A-G07A
-1 1BHK+1T 63.66 A-G08
-1 STUDIO 37.39 A-G08A
-1 1BHK+1T 63.66 A-G09
-1 STUDIO 37.39 A-G09A
-1 1BHK+1T 63.66 A-G10
-1 STUDIO 37.39 A-G10A
-1 3BHK+3T 101.94 A-G11
-1 3BHK+3T 101.94 A-G12
-1 2BHK+2T 75.56 A-G13
-1 2BHK+2T 75.56 A-G14
-1 3BHK+3T 104.90 B-G01
-1 3BHK+3T 104.90 B-G02
-1 3BHK+3T 101.94 B-G03
-1 3BHK+3T 101.94 B-G04
-1 2BHK+2T 73.60 B-G05
-1 2BHK+2T 73.60 B-G06
-1 2BHK+2T 73.60 B-G07
-1 2BHK+2T 73.60 B-G08
-1 2BHK+2T 73.60 B-G09
-1 2BHK+2T 73.60 B-G10
-1 2BHK+2T 75.56 B-G11
-1 2BHK+2T 75.56 B-G12
-1 2BHK+2T 75.56 B-G13
-1 2BHK+2T 73.60 C-G01
-1 2BHK+2T 73.60 C-G02
-1 2BHK+2T 73.60 C-G03
-1 3BHK+3T 115.67 C-G04
-1 3BHK+3T 115.67 C-G05
-1 3BHK+3T 104.90 C-G06
GF 3BHK+3T 104.90 A-101
GF 3BHK+3T 104.90 A-102
GF 3BHK+3T 104.90 A-103
GF 3BHK+3T 104.90 A-104
GF 3BHK+3T 104.90 A-105
GF 1BHK+1T 63.66 A-106
GF STUDIO 37.39 A-106A
GF 1BHK+1T 63.66 A-107
GF STUDIO 37.39 A-107A
GF 1BHK+1T 63.66 A-108
GF STUDIO 37.39 A-108A
GF 1BHK+1T 63.66 A-109
GF STUDIO 37.39 A-109A
GF 1BHK+1T 63.66 A-110
GF STUDIO 37.39 A-110A
GF 3BHK+3T 101.94 A-111
GF 3BHK+3T 101.94 A-112
GF 2BHK+2T 75.56 A-113
GF 2BHK+2T 75.56 A-114
GF 2BHK+2T 75.56 A-115
GF 3BHK+3T 104.90 B-101
GF 3BHK+3T 104.90 B-102
GF 3BHK+3T 101.94 B-103
GF 3BHK+3T 101.94 B-104
GF 2BHK+2T 73.60 B-105
GF 2BHK+2T 73.60 B-106
GF 2BHK+2T 73.60 B-107
GF 2BHK+2T 73.60 B-108
GF 2BHK+2T 73.60 B-109
GF 2BHK+2T 73.60 B-110
GF 2BHK+2T 75.56 B-111
GF 2BHK+2T 75.56 B-112
GF 2BHK+2T 75.56 B-113
GF 2BHK+2T 73.60 C-101
GF 2BHK+2T 73.60 C-102
GF 2BHK+2T 73.60 C-103
GF 3BHK+3T 115.67 C-104
GF 3BHK+3T 115.67 C-105
GF 3BHK+3T 104.90 C-106
1 3BHK+3T 104.90 A-201
1 3BHK+3T 104.90 A-202
1 3BHK+3T 104.90 A-203
1 3BHK+3T 104.90 A-204
1 3BHK+3T 104.90 A-205
1 1BHK+1T 63.66 A-206
1 STUDIO 37.39 A-206A
1 1BHK+1T 63.66 A-207
1 STUDIO 37.39 A-207A
1 1BHK+1T 63.66 A-208
1 STUDIO 37.39 A-208A
1 1BHK+1T 63.66 A-209
1 STUDIO 37.39 A-209A
1 1BHK+1T 63.66 A-210
1 STUDIO 37.39 A-210A
1 3BHK+3T 101.94 A-211
1 3BHK+3T 101.94 A-212
1 2BHK+2T 75.56 A-213
1 2BHK+2T 75.56 A-214
1 2BHK+2T 75.56 A-215
1 3BHK+3T 104.90 B-201
1 3BHK+3T 104.90 B-202
1 3BHK+3T 101.94 B-203
1 3BHK+3T 101.94 B-204
1 2BHK+2T 73.60 B-205
1 2BHK+2T 73.60 B-206
1 2BHK+2T 73.60 B-207
1 2BHK+2T 73.60 B-208
1 2BHK+2T 73.60 B-209
1 2BHK+2T 73.60 B-210
1 2BHK+2T 75.56 B-211
1 2BHK+2T 75.56 B-212
1 2BHK+2T 75.56 B-213
1 2BHK+2T 73.60 C-201
1 2BHK+2T 73.60 C-202
1 2BHK+2T 73.60 C-203
1 3BHK+3T 115.67 C-204
1 3BHK+3T 115.67 C-205
1 3BHK+3T 104.90 C-206
2 3BHK+3T 104.90 A-301
2 3BHK+3T 104.90 A-302
2 3BHK+3T 104.90 A-303
2 3BHK+3T 104.90 A-304
2 3BHK+3T 104.90 A-305
2 1BHK+1T 63.66 A-306
2 STUDIO 37.39 A-306A
2 1BHK+1T 63.66 A-307
2 STUDIO 37.39 A-307A
2 1BHK+1T 63.66 A-308
2 STUDIO 37.39 A-308A
2 1BHK+1T 63.66 A-309
2 STUDIO 37.39 A-309A
2 1BHK+1T 63.66 A-310
2 STUDIO 37.39 A-310A
2 3BHK+3T 101.94 A-311
2 3BHK+3T 101.94 A-312
2 2BHK+2T 75.56 A-313
2 2BHK+2T 75.56 A-314
2 2BHK+2T 75.56 A-315
2 3BHK+3T 104.90 B-301
2 3BHK+3T 104.90 B-302
2 3BHK+3T 101.94 B-303
2 3BHK+3T 101.94 B-304
2 2BHK+2T 73.60 B-305
2 2BHK+2T 73.60 B-306
2 2BHK+2T 73.60 B-307
2 2BHK+2T 73.60 B-308
2 2BHK+2T 73.60 B-309
2 2BHK+2T 73.60 B-310
2 2BHK+2T 75.56 B-311
2 2BHK+2T 75.56 B-312
2 2BHK+2T 75.56 B-313
2 2BHK+2T 73.60 C-301
2 2BHK+2T 73.60 C-302
2 2BHK+2T 73.60 C-303
2 3BHK+3T 115.67 C-304
2 3BHK+3T 115.67 C-305
2 3BHK+3T 104.90 C-306
3 3BHK+3T 104.90 A-401
3 3BHK+3T 104.90 A-402
3 3BHK+3T 104.90 A-403
3 3BHK+3T 104.90 A-404
3 3BHK+3T 104.90 A-405
3 1BHK+1T 63.66 A-406
3 STUDIO 37.39 A-406A
3 1BHK+1T 63.66 A-407
3 STUDIO 37.39 A-407A
3 1BHK+1T 63.66 A-408
3 STUDIO 37.39 A-408A
3 1BHK+1T 63.66 A-409
3 STUDIO 37.39 A-409A
3 1BHK+1T 63.66 A-410
3 STUDIO 37.39 A-410A
3 3BHK+3T 101.94 A-411
3 3BHK+3T 101.94 A-412
3 2BHK+2T 75.56 A-413
3 2BHK+2T 75.56 A-414
3 2BHK+2T 75.56 A-415
3 3BHK+3T 104.90 B-401
3 3BHK+3T 104.90 B-402
3 3BHK+3T 101.94 B-403
3 3BHK+3T 101.94 B-404
3 2BHK+2T 73.60 B-405
3 2BHK+2T 73.60 B-406
3 2BHK+2T 73.60 B-407
3 2BHK+2T 73.60 B-408
3 2BHK+2T 73.60 B-409
3 2BHK+2T 73.60 B-410
3 2BHK+2T 75.56 B-411
3 2BHK+2T 75.56 B-412
3 2BHK+2T 75.56 B-413
3 2BHK+2T 73.60 C-401
3 2BHK+2T 73.60 C-402
3 2BHK+2T 73.60 C-403
3 3BHK+3T 115.67 C-404
3 3BHK+3T 115.67 C-405
3 3BHK+3T 104.90 C-406
4 3BHK+3T 104.90 A-501
4 3BHK+3T 104.90 A-502
4 3BHK+3T 104.90 A-503
4 3BHK+3T 104.90 A-504
4 3BHK+3T 104.90 A-505
4 1BHK+1T 63.66 A-506
4 STUDIO 37.39 A-506A
4 1BHK+1T 63.66 A-507
4 STUDIO 37.39 A-507A
4 1BHK+1T 63.66 A-508
4 STUDIO 37.39 A-508A
4 1BHK+1T 63.66 A-509
4 STUDIO 37.39 A-509A
4 1BHK+1T 63.66 A-510
4 STUDIO 37.39 A-510A
4 3BHK+3T 101.94 A-511
4 3BHK+3T 101.94 A-512
4 2BHK+2T 75.56 A-513
4 2BHK+2T 75.56 A-514
4 2BHK+2T 75.56 A-515
4 3BHK+3T 104.90 B-501
4 3BHK+3T 104.90 B-502
4 3BHK+3T 101.94 B-503
4 3BHK+3T 101.94 B-504
4 2BHK+2T 73.60 B-505
4 2BHK+2T 73.60 B-506
4 2BHK+2T 73.60 B-507
4 2BHK+2T 73.60 B-508
4 2BHK+2T 73.60 B-509
4 2BHK+2T 73.60 B-510
4 2BHK+2T 75.56 B-511
4 2BHK+2T 75.56 B-512
4 2BHK+2T 75.56 B-513
4 2BHK+2T 73.60 C-501
4 2BHK+2T 73.60 C-502
4 2BHK+2T 73.60 C-503
4 3BHK+3T 115.67 C-504
4 3BHK+3T 115.67 C-505
4 3BHK+3T 104.90 C-506
5 3BHK+3T 104.90 A-601
5 3BHK+3T 104.90 A-602
5 3BHK+3T 104.90 A-603
5 3BHK+3T 104.90 A-604
5 3BHK+3T 104.90 A-605
5 1BHK+1T 63.66 A-606
5 STUDIO 37.39 A-606A
5 1BHK+1T 63.66 A-607
5 STUDIO 37.39 A-607A
5 1BHK+1T 63.66 A-608
5 STUDIO 37.39 A-608A
5 1BHK+1T 63.66 A-609
5 STUDIO 37.39 A-609A
5 1BHK+1T 63.66 A-610
5 STUDIO 37.39 A-610A
5 3BHK+3T 101.94 A-611
5 3BHK+3T 101.94 A-612
5 2BHK+2T 75.56 A-613
5 2BHK+2T 75.56 A-614
5 2BHK+2T 75.56 A-615
5 3BHK+3T 104.90 B-601
5 3BHK+3T 104.90 B-602
5 3BHK+3T 101.94 B-603
5 3BHK+3T 101.94 B-604
5 2BHK+2T 73.60 B-605
5 2BHK+2T 73.60 B-606
5 2BHK+2T 73.60 B-607
5 2BHK+2T 73.60 B-608
5 2BHK+2T 73.60 B-609
5 2BHK+2T 73.60 B-610
5 2BHK+2T 75.56 B-611
5 2BHK+2T 75.56 B-612
5 2BHK+2T 75.56 B-613
5 2BHK+2T 73.60 C-601
5 2BHK+2T 73.60 C-602
5 2BHK+2T 73.60 C-603
5 3BHK+3T 115.67 C-604
5 3BHK+3T 115.67 C-605
5 3BHK+3T 104.90 C-606
6 3BHK+3T 104.90 A-701
6 3BHK+3T 104.90 A-702
6 3BHK+3T 104.90 A-703
6 3BHK+3T 104.90 A-704
6 3BHK+3T 104.90 A-705
6 1BHK+1T 63.66 A-706
6 STUDIO 37.39 A-706A
6 1BHK+1T 63.66 A-707
6 STUDIO 37.39 A-707A
6 1BHK+1T 63.66 A-708
6 STUDIO 37.39 A-708A
6 1BHK+1T 63.66 A-709
6 STUDIO 37.39 A-709A
6 1BHK+1T 63.66 A-710
6 STUDIO 37.39 A-710A
6 3BHK+3T 101.94 A-711
6 3BHK+3T 101.94 A-712
6 2BHK+2T 75.56 A-713
6 2BHK+2T 75.56 A-714
6 2BHK+2T 75.56 A-715
6 3BHK+3T 104.90 B-701
6 3BHK+3T 104.90 B-702
6 3BHK+3T 101.94 B-703
6 3BHK+3T 101.94 B-704
6 2BHK+2T 73.60 B-705
6 2BHK+2T 73.60 B-706
6 2BHK+2T 73.60 B-707
6 2BHK+2T 73.60 B-708
6 2BHK+2T 73.60 B-709
6 2BHK+2T 73.60 B-710
6 2BHK+2T 75.56 B-711
6 2BHK+2T 75.56 B-712
6 2BHK+2T 75.56 B-713
6 2BHK+2T 73.60 C-701
6 2BHK+2T 73.60 C-702
6 2BHK+2T 73.60 C-703
6 3BHK+3T 115.67 C-704
6 3BHK+3T 115.67 C-705
6 3BHK+3T 104.90 C-706
7 3BHK+3T 104.90 A-801
7 3BHK+3T 104.90 A-802
7 3BHK+3T 104.90 A-803
7 3BHK+3T 104.90 A-804
7 3BHK+3T 104.90 A-805
7 1BHK+1T 63.66 A-806
7 STUDIO 37.39 A-806A
7 1BHK+1T 63.66 A-807
7 STUDIO 37.39 A-807A
7 1BHK+1T 63.66 A-808
7 STUDIO 37.39 A-808A
7 1BHK+1T 63.66 A-809
7 STUDIO 37.39 A-809A
7 1BHK+1T 63.66 A-810
7 STUDIO 37.39 A-810A
7 3BHK+3T 101.94 A-811
7 3BHK+3T 101.94 A-812
7 2BHK+2T 75.56 A-813
7 2BHK+2T 75.56 A-814
7 2BHK+2T 75.56 A-815
7 3BHK+3T 104.90 B-801
7 3BHK+3T 104.90 B-802
7 3BHK+3T 101.94 B-803
7 3BHK+3T 101.94 B-804
7 2BHK+2T 73.60 B-805
7 2BHK+2T 73.60 B-806
7 2BHK+2T 73.60 B-807
7 2BHK+2T 73.60 B-808
7 2BHK+2T 73.60 B-809
7 2BHK+2T 73.60 B-810
7 2BHK+2T 75.56 B-811
7 2BHK+2T 75.56 B-812
7 2BHK+2T 75.56 B-813
7 2BHK+2T 73.60 C-801
7 2BHK+2T 73.60 C-802
7 2BHK+2T 73.60 C-803
7 PENTHOUSE 217.59 C-804
7 PENTHOUSE 217.59 C-805
7 3BHK+3T 104.90 C-806
8 3BHK+3T 104.90 A-901
8 3BHK+3T 104.90 A-902
8 3BHK+3T 104.90 A-903
8 3BHK+3T 104.90 A-904
8 3BHK+3T 104.90 A-905
8 1BHK+1T 63.66 A-906
8 STUDIO 37.39 A-906A
8 1BHK+1T 63.66 A-907
8 STUDIO 37.39 A-907A
8 1BHK+1T 63.66 A-908
8 STUDIO 37.39 A-908A
8 1BHK+1T 63.66 A-909
8 STUDIO 37.39 A-909A
8 1BHK+1T 63.66 A-910
8 STUDIO 37.39 A-910A
8 3BHK+3T 101.94 A-911
8 3BHK+3T 101.94 A-912
8 2BHK+2T 75.56 A-913
8 2BHK+2T 75.56 A-914
8 2BHK+2T 75.56 A-915
8 3BHK+3T 104.90 B-901
8 3BHK+3T 104.90 B-902
8 3BHK+3T 101.94 B-903
8 3BHK+3T 101.94 B-904
8 2BHK+2T 73.60 B-905
8 2BHK+2T 73.60 B-906
8 2BHK+2T 75.56 B-913
8 2BHK+2T 73.60 C-901
8 2BHK+2T 73.60 C-902
8 2BHK+2T 73.60 C-903
8 3BHK+3T 104.90 C-906
Parking

Parking, Garage & Area Details

Parking provision declared in the sanctioned plan.

Type Proposed Booked Work Done
Garage - - -
Covered Parking - - -
Open Parking - - -
Development

Development Works & Common Area Disclosures

Project-level common infrastructure disclosures as reported by the developer to the RERA authority.

Sub Structure Earth Work And Other Leveling Preparation Work % not reported Sub Structure Foundation Footing Work % not reported Sub Structure Upto Plinth Level % not reported
Sub Structure Sub-structure Flooring (Parking Floor, More Than One Floor Below General Ground Level) % not reported Sub Structure Retaining Wall (All Types) % not reported Sup Structure Rcc Or Ms Framed Structure % not reported
Sup Structure Masonry Construction % not reported Sup Structure Plastering Inside , Outside & Ceiling % not reported Sup Structure Joinery: Doors, Windows, Ventilators Etc % not reported
Sup Structure Basic Work Of Water Supply, Sanitary And Electrification % not reported Sup Structure Dadoing, Skirting, Flooring, Tiles Work (All Types) % not reported Sup Structure Railing And Grill Fixing % not reported
Finishing Works Electrification, Water Supply And Sanitary Finishing % not reported Finishing Works Painting % not reported Finishing Works Fire Prevention And Fire Fighting Fitting And Fixture With Network % not reported
Finishing Works Weather Proof Work(tile,concrete) % not reported Finishing Works Wardrobe, Showcase, Kitchen Cabinet, Puja Work % not reported Finishing Works Elevation Work % not reported
Finishing Works Internal And External Work Including Landscapes As Per Sanctioned Drawings % not reported Internal Infrastructure Water Supply % not reported Internal Infrastructure Sewage And Drainage System % not reported
Internal Infrastructure Water Conservation/rain Water Harvesting/recharge Of Ground Water % not reported Internal Infrastructure Energy Management % not reported Internal Infrastructure Fire Protection And Fire Safety Requirements % not reported
Internal Infrastructure Solid Waste Management And Disposal % not reported Internal Infrastructure Emergency Evacuation Services % not reported External Infrastructure Water Supply % not reported
External Infrastructure Internal Roads & Footpaths % not reported External Infrastructure Sewage And Drainage System % not reported External Infrastructure Electricity Supply Transformer And Substation % not reported
External Infrastructure Solid Waste Management And Disposal % not reported External Infrastructure Emergency Evacuation Services % not reported External Infrastructure Storm Water Drains % not reported
External Infrastructure Use Of Renewable Energy % not reported External Infrastructure Water Conservation/rain Water Harvesting/recharge Of Ground Water % not reported External Infrastructure Fire Protection And Fire Safety Requirements % not reported
External Infrastructure Sewage Treatment Plant (Stp) % not reported External Infrastructure Parks & Tree Planting % not reported External Infrastructure Street Lighting % not reported
Amenities Electricity % not reported Amenities Smart Home Automation % not reported Amenities Cctv Surveillance % not reported
Amenities Club House % not reported Amenities Community Hall % not reported Amenities Outdoor Sports Facility % not reported
Amenities Indoor Sports Facility % not reported Amenities Swimming Pool % not reported Amenities Gym % not reported
Amenities Parks % not reported Amenities Power Backup % not reported Amenities Piped Gas % not reported
Amenities Water And Sanitation % not reported Amenities Air Conditioning % not reported Common Areas Staircases % not reported
Common Areas Lifts % not reported Common Areas Corridor/lobbies % not reported Common Areas Fire Escapes % not reported
Common Areas Common Entrance And Exit For The Building/common Portico/foyer/verandah % not reported Common Areas Basement % not reported Common Areas Terrace % not reported
Common Areas Outer Wall % not reported Common Areas Open Parking Areas % not reported Common Areas Provision For Lodging Of Management Staff And Security Staff % not reported
Common Areas Water Conservation And Renewable Energy % not reported Common Areas Common Storage Spaces % not reported
Documents

RERA Documents & Filings

All statutory documents uploaded by the promoter to the authority portal.

Promoter Registration Certificate
Promoter Pan Card
Promoter Address Proof
Affidavit
Fd 1 Balance Sheet With Schedules.Pdf
Fd 2 Balance Sheet With Schedules.Pdf
Fd 3 Balance Sheet With Schedules.Pdf
Fd 4 Profit & Loss.Pdf
Fd 5 Audit Report.Pdf
Fd 6 Profit & Loss.Pdf
Fd 7 Financials 202223 (2).Pdf
Fd 8 Financials 202122 (1).Pdf
Fd 9 Financials 202021.Pdf
Fd 10 Cashflow Statement.Pdf
Fd 11 Cashflow Statement.Pdf
Fd 12 Cashflow Statement.Pdf
Fd 13 Audit Report.Pdf
Fd 14 Audit Report.Pdf
Fd 15 NA.Pdf
Fd 16 ITR Acknowledgement For FY 202324 (2).Pdf
Fd 17 ITR Acknowledgement For FY 202324.Pdf
Fd 18 ITR ACK 202122.Pdf
Pd 1 Self Attested PAN Card*( Annexure - 66 )
Pd 2 Commencement Certificate*( Annexure - 67 )
Pd 3 Electricity Permission Letter*( Annexure - 68 )
Pd 4 Water Permission Letter*( Annexure - 69 )
Pd 5 Approved Layout Plan*( Annexure - 70 )
Pd 6 Approved Building Plotting Plan*( Annexure - 71 )
Pd 7 Existing Layout Plan( Annexure - 72 )
Pd 8 Existing Section Plan And Specification( Annexure - 73 )
Pd 9 Sectional Drawing Of The Apartments*( Annexure - 74 )
Pd 10 Project Specifications*( Annexure - 75 )
Pd 11 Approved Section Of Building Infrastructure Plan Of Plotting*( Annexure - 76 )
Pd 12 Area Development Plan Of Project Area*( Annexure - 77 )
Pd 13 Certificate From Registered Engineer Indicating The Structural Safety Of The Building*( Annexure - 78 )
Pd 14 Advocate Search Report*( Annexure - 79 )
Pd 15 Urban Land Ceiling*( Annexure - 80 )
Pd 16 Collaboration Agreement Development Agreement Joint Development Agreement Other Agreement*( Annexure - 81 )
Pd 17 Change Of Land Use*( Annexure - 82 )
Pd 18 District Magistrate*( Annexure - 83 )
Pd 19 Conversion Certificate Under Section 95 Of The KLR Act 1964*( Annexure - 84 )
Pd 20 Any Other Document (Rights Title Interest Name)*( Annexure - 85 )
Pd 21 Proforma Of Agreement For Sale*( Annexure - 86 )
Pd 22 Proforma Of Allotment Letter*( Annexure - 87 )
Pd 24 Brochure*( Annexure - 89 )
Dc 1 Declaration (Form B)*( Annexure - 90 )
Dc 2 Section 3(1) Notarized Affidavit*( Annexure - 91 )
Dc 3 JD AFFIDAVIT CUM DECLARATION*( Annexure - 92 )
Noc 1 ESCOM Electricity*( Annexure - 93 )
Noc 2 KWSSB Water*( Annexure - 94 )
Noc 5 Fire Force Department( Annexure - 97 )
Noc 6 Airport Authority Of India( Annexure - 98 )
Noc 7 KSPCB( Annexure - 99 )
Noc 8 SEIAA( Annexure - 100 )
Noc 9 BSNL( Annexure - 101 )
Dr 3 Relinquishment Deed( Annexure - 110 )
Photo 1 Project Photo
Od 1 Village Map.Pdf
Od 2 Survey Sketch.Pdf
Od 3 Chikkanagamangala Guideline Certificate.Pdf
Od 4 Confirmation Deed Dated 7-2-23 Doc No 9829-2022-23.Pdf
Od 5 Family Tree -Bodappa And Venkamma.Pdf
Od 6 Family Tree Chikkabodappa.Pdf
Od 7 Inheritence Certificate.Pdf
Od 8 MR-55-2004-05.Pdf
Od 9 MR-68,69,70 -1997-98.Pdf
Od 10 MR-68,69,70-1997-98.Pdf
Od 11 Order Sheet No OS-486-2020.Pdf
Od 12 Sale Deed @ Casa Chikkanagmangala.Pdf
Od 13 Sale Deed Dated 13-8-51 Doc No 1198-51-52.Pdf
Od 14 Sale Deed-Dated 10-04-1972 Doc No 122-1972-73.Pdf
Od 15 Unregistered Gift Agreement Dated 10-08-1965.Pdf
Od 16 Sale Deed Dated 24-2-1996 Doc No 8242-1995-96.Pdf
Od 17 Sale Deed Dated 24-2-1996 Doc No 8276-1995-96.Pdf
Od 18 Sale Deed Dated 6-3-2003 Doc No 9463-2002-03.Pdf
Od 19 VIVACITY SOLD Vs UNSOLD.Pdf
Od 20 STP.Pdf
Od 21 WTP.Pdf
Od 22 Estimated Cost Details Certified By Engineer.Pdf
Od 23 APPROVED BDA DP WORK ORDER.Pdf
Od 24 Basement Plan.Pdf
Od 25 Ground Floor Plan.Pdf
Od 26 Terrace Floor Plan.Pdf
Od 27 Tower 1 2nd To 7th Floor Part 1.Pdf
Od 28 Tower 1 2nd To 7th Floor Part 2.Pdf
Od 29 Tower 1 8th Floor Part 1.Pdf
Od 30 Tower 1 8th Floor Part 2.Pdf
Od 31 Tower 1 9th Floor Part 1.Pdf
Od 32 Tower 1 9th Floor Part 2.Pdf
Od 33 Tower 1 Elevation A.Pdf
Od 34 TOWER 1 Elevation B & Section Drawing.Pdf
Od 35 Tower 1 First Floor Part 2.Pdf
Od 36 Tower 1 First Floor Plan Part 1.Pdf
Od 37 Tower 1 Ground Floor Plan Part 1.Pdf
Od 38 Tower 1 Ground Floor Plan Part 2.Pdf
Od 39 Tower 1 Terrace Floor Part 1.Pdf
Od 40 Tower 1 Terrace Floor Part 2.Pdf
Od 41 Tower 2 2nd Floor Part 1.Pdf
Od 42 Tower 2 3rd To 4th Floor Part 1.Pdf
Od 43 Tower 2 5th Floor To 7th Floor Part 1.Pdf
Od 44 Tower 2 8thfloor Part 1.Pdf
Od 45 Tower 2 First Floor Part 1.Pdf
Od 46 Tower 2 Ground Floor Part 1.Pdf
Od 47 Tower 2 9th Floor Part 1.Pdf
Od 48 Tower 2 Terrace Floor Part 1.Pdf
Od 49 Tower 2 Ground & First Floor Part 2.Pdf
Od 50 Tower 2 2nd To 4th Floor Part 2.Pdf
Od 51 Tower 2 5TH TO 8TH FLOOR PART 2.Pdf
Od 52 Tower 2 9TH & Terrace Floor Part 2.Pdf
Od 53 Tower 2 9th Floor Part 3.Pdf
Od 54 Tower 2 Ground To 2nd Floor Part 4.Pdf
Od 55 Tower 2 3rd To 8th Floor Part 4.Pdf
Od 56 Tower 2 9th Floor & Terrace Floor Part 4.Pdf
Od 57 Tower 2 Section & Elevaton.Pdf
Od 58 Tower 1&2 Elevation.Pdf
Od 59 Amentity Block Ground 1st 2nd 3rd Floor.Pdf
Od 60 Amenity Block Terrace And Mumty Plan.Pdf
Od 61 Amenity Block Elevation 1 & Section.Pdf
Ed 1 22-04-2024
Ed 2 22-04-2024
Ed 3 22-04-2024
Ld Rtc
Ld Mutation
Ld Encumbrance Certificate
Ld Conversion Order
Ld Sale Deed
Ld Khatha
Bank

Bank & Cost Disclosure

Declared project cost and the designated escrow account on file.

Project Account Bank KOTAK MAHINDRA BANK
Account Number (RERA) 9811750203
IFSC KKBK0008049
Branch Address ULSOOR
Country/City