Squareyards Logo
Blogs
Sell or Rent Property
Login
Rera Banner
residential New Launch Source: rera.ka

Puravankara Purva Silver Sky RERA Details - PRM/KA/RERA/1251/310/PR/151225/008338 Bangalore

View the RERA registration, promoter, approval, building, inventory, document and construction-progress disclosures for Puravankara Purva Silver Sky under registration PRM/KA/RERA/1251/310/PR/151225/008338 in Bangalore, Karnataka. Data is sourced from rera.ka.

RERA

RERA Snapshot

The most important statutory project disclosures, generated dynamically from available RERA fields.

  • RERA Number PRM/KA/RERA/1251/310/PR/151225/008338
  • Project Name Purva Silversky
  • Project Type Residential/Group Housing
  • Project Status New Launch
  • District Bengaluru Urban
  • Taluka Bengaluru South
  • Original Completion 30 July 2030
  • Documents 114 Verified
Timeline

Project Timeline & Completion Details

Key statutory dates from registration through proposed completion and permit validity.

Proposed Start 02 January 2026 Expected commencement of civil works and foundation on site.
Original Completion 30 July 2030 Mandated date for project handover to the allottees and final compliance filing.
Promoter

Promoter, Organisation & Member Details

Declared promoter entity, address and corporate identifiers on file with the authority.

Primary Promoter

Puravankara Limited
Registered Address 130/1 Yellappa chetty Layout, Ulsoor Road Bangalore ,Bengaluru East ,Bengaluru Urban-560042
Experience Details
Location

Land, Address & Location Details

Land parcel, zoning and geo-coordinates as recorded in the project filing.

Address Sy no. 58/1,59/3,60/16P,of Hebbagodi Village , Attibele Hobli, Anekal Taluk Bangalore Urban , Bengaluru South , Bengaluru Urban, Karnataka - 560099

RERA Coordinates

Latitude, Longitude 12.84250000, 77.67138889
Plans

Plans & Approvals

Statutory approvals obtained or pending against the project site.

Plan Approval No. BDA/NM/AS/AA-3/TSA-2/D/21/2025-26
Authority BDA - Bangalore Development Authority
Approved Date 18 November 2025

Understand this Project's RERA details

Get clear answers and additional support from our RERA experts.

RERA Banner
Buildings

Buildings, Towers & Building-Level Details

Statutory building-level disclosures including tower height, sanctioned floors, structural counts and parking areas.

Building Detail
Name No. of Basements No. of Slab No. of Slits No. of Open Parking Building Type Height of Tower No. of Floors No. of Units
Tower A 1 32 1 118 Residential 107.75 32 118
Tower B 1 32 1 118 Residential 107.75 32 118
Tower C 1 32 1 120 Residential 107.75 32 120

Scroll horizontally to view all building-level fields. Values marked "-" were not disclosed in the source RERA record.

Inventory

Unit Inventory & Configuration Details

Configuration mix and floor-level disclosures with both grouped and raw RERA views.

Total Units -
Configurations 3
Inventory Type RESIDENTIAL
Configuration Distribution
3 BHK 0 units
4 BHK 0 units
5 BHK 0 units
  • Tower A
  • Tower B
  • Tower C
Floor-Wise Inventory Explorer
Floor Apartment Type Carpet Area No. of Unit
1 3 BHK 105.25 A-0201
1 3 BHK 104.49 A-0202
1 3 BHK 104.49 A-0203
1 3 BHK 105.25 A-0204
2 3 BHK 105.25 A-0301
2 3 BHK 104.49 A-0302
2 3 BHK 104.49 A-0303
2 3 BHK 105.25 A-0304
3 3 BHK 105.25 A-0401
3 3 BHK 104.49 A-0402
3 3 BHK 104.49 A-0403
3 3 BHK 105.25 A-0404
4 3 BHK 105.25 A-0501
4 3 BHK 104.49 A-0502
4 3 BHK 104.49 A-0503
4 3 BHK 105.25 A-0504
5 3 BHK 105.25 A-0601
5 3 BHK 104.49 A-0602
5 3 BHK 104.49 A-0603
5 3 BHK 105.25 A-0604
6 3 BHK 105.25 A-0701
6 3 BHK 104.49 A-0702
6 3 BHK 104.49 A-0703
6 3 BHK 105.25 A-0704
7 3 BHK 105.25 A-0801
7 3 BHK 104.49 A-0802
7 3 BHK 104.49 A-0803
7 3 BHK 105.25 A-0804
8 3 BHK 105.25 A-0901
8 3 BHK 104.49 A-0902
8 3 BHK 104.49 A-0903
8 3 BHK 105.25 A-0904
9 3 BHK 105.25 A-1001
9 3 BHK 104.49 A-1002
9 3 BHK 104.49 A-1003
9 3 BHK 105.25 A-1004
10 3 BHK 105.25 A-1101
10 3 BHK 104.49 A-1102
10 3 BHK 104.49 A-1103
10 3 BHK 105.25 A-1104
11 3 BHK 105.25 A-1201
11 3 BHK 104.49 A-1202
11 3 BHK 104.49 A-1203
11 3 BHK 105.25 A-1204
12 3 BHK 105.25 A-1301
12 3 BHK 104.49 A-1302
12 3 BHK 104.49 A-1303
12 3 BHK 105.25 A-1304
13 3 BHK 105.25 A-1401
13 3 BHK 104.49 A-1402
13 3 BHK 104.49 A-1403
13 3 BHK 105.25 A-1404
14 3 BHK 105.25 A-1501
14 3 BHK 104.49 A-1502
14 3 BHK 104.49 A-1503
14 3 BHK 105.25 A-1504
15 3 BHK 105.25 A-1601
15 3 BHK 104.49 A-1602
15 3 BHK 104.49 A-1603
15 3 BHK 105.25 A-1604
16 3 BHK 105.25 A-1701
16 3 BHK 104.49 A-1702
16 3 BHK 104.49 A-1703
16 3 BHK 105.25 A-1704
17 3 BHK 105.25 A-1801
17 3 BHK 104.49 A-1802
17 3 BHK 105.25 A-1804
18 3 BHK 105.25 A-1901
18 3 BHK 104.49 A-1902
18 3 BHK 104.49 A-1903
18 3 BHK 105.25 A-1904
19 3 BHK 105.25 A-2001
19 3 BHK 104.49 A-2002
19 3 BHK 104.49 A-2003
19 3 BHK 105.25 A-2004
20 3 BHK 105.25 A-2101
20 3 BHK 104.49 A-2102
20 3 BHK 104.49 A-2103
20 3 BHK 105.25 A-2104
21 3 BHK 105.25 A-2201
21 3 BHK 104.49 A-2202
21 3 BHK 104.49 A-2203
21 3 BHK 105.25 A-2204
22 3 BHK 105.25 A-2301
22 3 BHK 104.49 A-2302
22 3 BHK 104.49 A-2303
22 3 BHK 105.25 A-2304
23 3 BHK 105.25 A-2401
23 3 BHK 104.49 A-2402
23 3 BHK 104.49 A-2403
23 3 BHK 105.25 A-2404
24 3 BHK 105.25 A-2501
24 3 BHK 104.49 A-2502
24 3 BHK 104.49 A-2503
24 3 BHK 105.25 A-2504
25 3 BHK 105.25 A-2601
25 3 BHK 104.49 A-2602
25 3 BHK 104.49 A-2603
25 3 BHK 105.25 A-2604
26 3 BHK 105.25 A-2701
26 3 BHK 104.49 A-2702
26 3 BHK 105.25 A-2704
27 3 BHK 105.25 A-2801
27 3 BHK 104.49 A-2802
27 3 BHK 104.49 A-2803
27 3 BHK 105.25 A-2804
28 3 BHK 105.25 A-2901
28 3 BHK 104.49 A-2902
28 3 BHK 104.49 A-2903
28 3 BHK 105.25 A-2904
29 3 BHK 105.25 A-3001
29 3 BHK 104.49 A-3002
29 3 BHK 104.49 A-3003
29 3 BHK 105.25 A-3004
30 4 BHK 190.18 A-3101
30 4 BHK 188.66 A-3102
30 4 BHK 188.66 A-3103
30 4 BHK 190.18 A-3104
Parking

Parking, Garage & Area Details

Parking provision declared in the sanctioned plan.

Type Proposed Booked Work Done
Garage - - -
Covered Parking - - -
Open Parking - - -
Development

Development Works & Common Area Disclosures

Project-level common infrastructure disclosures as reported by the developer to the RERA authority.

Sub Structure Earth Work And Other Leveling Preparation Work % not reported Sub Structure Foundation Footing Work % not reported Sub Structure Upto Plinth Level % not reported
Sub Structure Sub-structure Flooring (Parking Floor, More Than One Floor Below General Ground Level) % not reported Sub Structure Retaining Wall (All Types) % not reported Sup Structure Rcc Or Ms Framed Structure % not reported
Sup Structure Masonry Construction % not reported Sup Structure Plastering Inside , Outside & Ceiling % not reported Sup Structure Joinery: Doors, Windows, Ventilators Etc % not reported
Sup Structure Basic Work Of Water Supply, Sanitary And Electrification % not reported Sup Structure Dadoing, Skirting, Flooring, Tiles Work (All Types) % not reported Sup Structure Railing And Grill Fixing % not reported
Finishing Works Electrification, Water Supply And Sanitary Finishing % not reported Finishing Works Painting % not reported Finishing Works Fire Prevention And Fire Fighting Fitting And Fixture With Network % not reported
Finishing Works Weather Proof Work(tile,concrete) % not reported Finishing Works Wardrobe, Showcase, Kitchen Cabinet, Puja Work % not reported Finishing Works Elevation Work % not reported
Finishing Works Internal And External Work Including Landscapes As Per Sanctioned Drawings % not reported Internal Infrastructure Water Supply % not reported Internal Infrastructure Sewage And Drainage System % not reported
Internal Infrastructure Water Conservation/rain Water Harvesting/recharge Of Ground Water % not reported Internal Infrastructure Energy Management % not reported Internal Infrastructure Fire Protection And Fire Safety Requirements % not reported
Internal Infrastructure Solid Waste Management And Disposal % not reported Internal Infrastructure Emergency Evacuation Services % not reported External Infrastructure Water Supply % not reported
External Infrastructure Internal Roads & Footpaths % not reported External Infrastructure Sewage And Drainage System % not reported External Infrastructure Electricity Supply Transformer And Substation % not reported
External Infrastructure Solid Waste Management And Disposal % not reported External Infrastructure Emergency Evacuation Services % not reported External Infrastructure Storm Water Drains % not reported
External Infrastructure Use Of Renewable Energy % not reported External Infrastructure Water Conservation/rain Water Harvesting/recharge Of Ground Water % not reported External Infrastructure Fire Protection And Fire Safety Requirements % not reported
External Infrastructure Sewage Treatment Plant (Stp) % not reported External Infrastructure Parks & Tree Planting % not reported External Infrastructure Street Lighting % not reported
Amenities Electricity % not reported Amenities Smart Home Automation % not reported Amenities Cctv Surveillance % not reported
Amenities Club House % not reported Amenities Community Hall % not reported Amenities Outdoor Sports Facility % not reported
Amenities Indoor Sports Facility % not reported Amenities Swimming Pool % not reported Amenities Gym % not reported
Amenities Parks % not reported Amenities Power Backup % not reported Amenities Piped Gas % not reported
Amenities Water And Sanitation % not reported Amenities Air Conditioning % not reported Common Areas Staircases % not reported
Common Areas Lifts % not reported Common Areas Corridor/lobbies % not reported Common Areas Fire Escapes % not reported
Common Areas Common Entrance And Exit For The Building/common Portico/foyer/verandah % not reported Common Areas Basement % not reported Common Areas Terrace % not reported
Common Areas Outer Wall % not reported Common Areas Open Parking Areas % not reported Common Areas Provision For Lodging Of Management Staff And Security Staff % not reported
Common Areas Water Conservation And Renewable Energy % not reported Common Areas Common Storage Spaces % not reported
Documents

RERA Documents & Filings

All statutory documents uploaded by the promoter to the authority portal.

Promoter Registration Certificate
Promoter Pan Card
Promoter Address Proof
Affidavit
1 Completion Certificate
Fd 1 24 Balance Sheet.Pdf
Fd 2 23 Balance Sheet.Pdf
Fd 3 22 Balance Sheet.Pdf
Fd 4 24 Statement Of P&L.Pdf
Fd 5 23 Statement Of P & L.Pdf
Fd 6 22 Statement Of P & L.Pdf
Fd 7 AY 25-26 ITR.Pdf
Fd 8 AY 24-25 ITR.Pdf
Fd 9 AY 23-24 ITR.Pdf
Fd 10 Directors Report 24-25.Pdf
Fd 11 Diretors Report 23-24.Pdf
Fd 12 Director'S Report 22-23 Upload.Pdf
Fd 13 24 Cash Flow Statement.Pdf
Fd 14 23 Cash Flow Statement.Pdf
Fd 15 22 Cash Flow Statement.Pdf
Fd 16 24 Independent Auditors Report.Pdf
Fd 17 23 Independent Auditors Report.Pdf
Fd 18 22 Independent Auditors Report.Pdf
Pd 1 Commencement Certificate( Annexure - 80 )
Pd 2 Approved Building Plan( Annexure - 81 )
Pd 3 Sectional Drawing Of The Apartments( Annexure - 82 )
Pd 4 Certificate From Registered Engineer Indicating The Structural Safety Of The Building( Annexure - 83 )
Pd 5 Project Specifications( Annexure - 84 )
Pd 6 Brochure( Annexure - 85 )
Pd 7 Relinquishment Deed( Annexure - 86 )
Pd 8 Proforma Of Agreement For Sale( Annexure - 87 )
Pd 9 Proforma Of Allotment Letter( Annexure - 88 )
Dc 1 Declaration (Form B)( Annexure - 89 )
Dc 2 Section 3(1) Notarized Affidavit( Annexure - 90 )
Dc 3 JD AFFIDAVIT CUM DECLARATION( Annexure - 91 )
Dc 4 Advocate Search Report( Annexure - 92 )
Noc 1 ESCOM Electricity( Annexure - 95 )
Noc 2 KWSSB Water( Annexure - 96 )
Noc 3 KSPCB( Annexure - 97 )
Noc 4 SEIAA( Annexure - 98 )
Noc 5 Fire Force Department( Annexure - 99 )
Noc 6 Airport Authority Of India( Annexure - 100 )
Noc 7 BSNL( Annexure - 101 )
Noc 8 Lift Authorities( Annexure - 102 )
Noc 9 BMRCL( Annexure - 103 )
Ed 14 12-12-2025
Noc 10 NOC In Case Of Building Proposals Abutting To Neighbouring Properties( Annexure - 104 )
Noc 11 Bangalore Urban Arts Commission( Annexure - 105 )
Noc 12 Inspector Of Factories Controller Of Explosives Railways( Annexure - 106 )
Noc 13 Coastal Regulation Zone Authority( Annexure - 107 )
Photo 1 Project Photo
Od 1 Hebbagodi-Village.Pdf
Od 2 Hebbagodi-CDP.Pdf
Od 3 Guideline Value Declaration Land Cost.Pdf
Od 4 1st Floor Plan Tower C.Pdf
Od 5 2nd Floor Plan Tower B.Pdf
Od 6 2nd Floor Plan Tower C.Pdf
Od 7 26th Floor Plan Tower B.Pdf
Od 8 27th Floor Plan Tower B.Pdf
Od 9 31 Floor Plan Tower A.Pdf
Od 10 31 St Floor Plan Tower C.Pdf
Od 11 31st Floor Plan Tower B.Pdf
Od 12 32 Nd Floor Plan Tower A.Pdf
Od 13 32nd Floor Plan Tower B.Pdf
Od 14 32nd Floor Plan Tower C.Pdf
Od 15 Basement Floor Plan.Pdf
Od 16 First Floor Plan.Pdf
Od 17 Ground Floor Plan.Pdf
Od 18 Pump Room Floor Plan Tower B.Pdf
Od 19 Pump Room Floor Plan.Pdf
Od 20 Refugee Floor Plan Tower A.Pdf
Od 21 Refugee Floor Plan Tower B.Pdf
Od 22 Refugee Floor Plan Tower C.Pdf
Od 23 Roof Slab Floor Plan Tower A.Pdf
Od 24 Roof Slan Floor Plan Tower B.Pdf
Od 25 Section And Elevation Tower A.Pdf
Od 26 Section And Elevation Tower C.Pdf
Od 27 Section Elevation Plan Tower B.Pdf
Od 28 Terrace Floor Plan Tower B.Pdf
Od 29 Terrace Floor Plan Tower C.Pdf
Od 30 Terrace Floor Plan.Pdf
Od 31 Typal Flooor Plan Tower A.Pdf
Od 32 Typical Floor Plan Tower B.Pdf
Od 33 Typical Floor Plan Tower C.Pdf
Od 34 PHE MOEF SANCTION-R2-28-10-2024-SITE PLAN (1) Compressed.Pdf
Od 35 Hebbagodi Budget R0.Pdf
Od 36 Development Plan Sanction Plan Compressed.Pdf
Od 37 Development Plan Sanction Letter- Hebbagodi.Pdf
Ed 1 11-12-2025
Ed 2 11-12-2025
Ed 3 11-12-2025
Ed 4 11-12-2025
Ed 5 11-12-2025
Ed 6 11-12-2025
Ed 7 11-12-2025
Ed 8 11-12-2025
Ed 9 11-12-2025
Ed 10 11-12-2025
Ed 11 11-12-2025
Ed 12 11-12-2025
Ed 13 12-12-2025
Ed 15 12-12-2025
Ed 16 12-12-2025
Ed 17 12-12-2025
Ed 18 12-12-2025
Ed 19 12-12-2025
Ed 20 12-12-2025
Ed 21 12-12-2025
Ld Rtc
Ld Mutation
Ld Encumbrance Certificate
Ld Conversion Order
Ld Sale Deed
Ld Khatha
Bank

Bank & Cost Disclosure

Declared project cost and the designated escrow account on file.

Project Account Bank ICICI Bank
Account Number (RERA) 777705409332
IFSC ICIC0003904
Branch Address Ulsoor Road
Country/City