Purva Blubelle RERA Details - PRM/KA/RERA/1251/310/PR/290323/005829 Bangalore

View the RERA registration, promoter, approval, building, inventory, document and construction-progress disclosures for Purva Blubelle under registration PRM/KA/RERA/1251/310/PR/290323/005829 in Bangalore, Karnataka. Data is sourced from rera.ka.

RERA

RERA Snapshot

The most important statutory project disclosures, generated dynamically from available RERA fields.

  • RERA Number PRM/KA/RERA/1251/310/PR/290323/005829
  • Project Name Purva Blubelle
  • Project Type Residential/Group Housing
  • Project Status Under Construction
  • District Bengaluru Urban
  • Taluka Bengaluru South
  • Original Completion 30 June 2029
  • Documents 84 Verified
Timeline

Project Timeline & Completion Details

Key statutory dates from registration through proposed completion and permit validity.

Proposed Start 01 April 2023 Expected commencement of civil works and foundation on site.
Original Completion 30 June 2029 Mandated date for project handover to the allottees and final compliance filing.
Promoter

Promoter, Organisation & Member Details

Declared promoter entity, address and corporate identifiers on file with the authority.

Primary Promoter

Puravankara Limited
Registered Address 130/1 Ulsoor Road,Ulsoor Road ,Bengaluru North ,Bengaluru Urban-560042
Experience Details
Location

Land, Address & Location Details

Land parcel, zoning and geo-coordinates as recorded in the project filing.

Address Municipal No. 74 PID No. 32-1-74 Magadi Road Main Road , Ward No. 32 (New Ward No. 122), Kempapura Agrahara Bangalore , Bengaluru South , Bengaluru Urban, Karnataka - 560023

RERA Coordinates

Latitude, Longitude 12.97492635724679, 77.55532566931151
Plans

Plans & Approvals

Statutory approvals obtained or pending against the project site.

Plan Approval No. PRJ/8553/22-23IN
Authority BBMP - Bruhat Bengaluru Mahanagara Palike
Approved Date 17 March 2023

Understand this Project's RERA details

Get clear answers and additional support from our RERA experts.

RERA Banner
Buildings

Buildings, Towers & Building-Level Details

Statutory building-level disclosures including tower height, sanctioned floors, structural counts and parking areas.

Building Detail
Name No. of Basements No. of Slab No. of Slits No. of Open Parking Building Type Height of Tower No. of Floors No. of Units
Tower A 1 31 1 186 Residential 96.7 31 186
Tower B 2 33 1 192 Residential 99.7 32 192

Scroll horizontally to view all building-level fields. Values marked "-" were not disclosed in the source RERA record.

Inventory

Unit Inventory & Configuration Details

Configuration mix and floor-level disclosures with both grouped and raw RERA views.

Total Units -
Configurations 2
Inventory Type RESIDENTIAL
Configuration Distribution
2 BHK 0 units
3 BHK 0 units
  • Tower A
  • Tower B
Floor-Wise Inventory Explorer
Floor Apartment Type Carpet Area No. of Unit
GF 3 BHK 98.32 101
GF 3 BHK 88.57 102
GF 3 BHK 88.57 103
GF 3 BHK 98.32 104
GF 3 BHK 88.57 105
GF 3 BHK 88.57 106
1 3 BHK 98.33 201
1 3 BHK 88.57 202
1 3 BHK 88.57 203
1 3 BHK 98.33 204
1 3 BHK 88.57 205
1 3 BHK 88.57 206
2 3 BHK 98.33 301
2 3 BHK 88.57 302
2 3 BHK 88.57 303
2 3 BHK 98.33 304
2 3 BHK 88.57 305
2 3 BHK 88.57 306
3 3 BHK 98.33 401
3 3 BHK 88.57 402
3 3 BHK 88.57 403
3 3 BHK 98.33 404
3 3 BHK 88.57 405
3 3 BHK 88.57 406
4 3 BHK 98.33 501
4 3 BHK 88.57 502
4 3 BHK 88.57 503
4 3 BHK 98.33 504
4 3 BHK 88.57 505
4 3 BHK 88.57 506
5 3 BHK 98.33 601
5 3 BHK 88.57 602
5 3 BHK 88.57 603
5 3 BHK 98.33 604
5 3 BHK 88.57 605
5 3 BHK 88.57 606
6 3 BHK 98.33 701
6 3 BHK 88.57 702
6 3 BHK 88.57 703
6 3 BHK 98.33 704
6 3 BHK 88.57 705
6 3 BHK 88.57 706
7 3 BHK 98.33 801
7 3 BHK 88.57 802
7 3 BHK 88.57 803
7 3 BHK 98.33 804
7 3 BHK 88.57 805
7 3 BHK 88.57 806
8 3 BHK 98.33 901
8 3 BHK 88.57 902
8 3 BHK 88.57 903
8 3 BHK 98.33 904
8 3 BHK 88.57 905
8 3 BHK 88.57 906
9 3 BHK 98.33 1001
9 3 BHK 88.57 1002
9 3 BHK 88.57 1003
9 3 BHK 98.33 1004
9 3 BHK 88.57 1005
9 3 BHK 88.57 1006
10 3 BHK 98.33 1101
10 3 BHK 88.57 1102
10 3 BHK 88.57 1103
10 3 BHK 98.33 1104
10 3 BHK 88.57 1105
10 3 BHK 88.57 1106
11 3 BHK 98.33 1201
11 3 BHK 88.57 1202
11 3 BHK 88.57 1203
11 3 BHK 98.33 1204
11 3 BHK 88.57 1205
11 3 BHK 88.57 1206
12 3 BHK 98.33 1301
12 3 BHK 88.57 1302
12 3 BHK 88.57 1303
12 3 BHK 98.33 1304
12 3 BHK 88.57 1305
12 3 BHK 88.57 1306
13 3 BHK 98.33 1401
13 3 BHK 88.57 1402
13 3 BHK 88.57 1403
13 3 BHK 98.33 1404
13 3 BHK 88.57 1405
13 3 BHK 88.57 1406
14 3 BHK 98.33 1501
14 3 BHK 88.57 1502
14 3 BHK 88.57 1503
14 3 BHK 98.33 1504
14 3 BHK 88.57 1505
14 3 BHK 88.57 1506
15 3 BHK 98.33 1601
15 3 BHK 88.57 1602
15 3 BHK 88.57 1603
15 3 BHK 98.33 1604
15 3 BHK 88.57 1605
15 3 BHK 88.57 1606
16 3 BHK 98.33 1701
16 3 BHK 88.57 1702
16 3 BHK 88.57 1703
16 3 BHK 98.33 1704
16 3 BHK 88.57 1705
16 3 BHK 88.57 1706
17 3 BHK 98.33 1801
17 3 BHK 88.57 1802
17 3 BHK 88.57 1803
17 3 BHK 98.33 1804
17 3 BHK 88.57 1805
17 3 BHK 88.57 1806
18 3 BHK 98.33 1901
18 3 BHK 88.57 1902
18 3 BHK 88.57 1903
18 3 BHK 98.33 1904
18 3 BHK 88.57 1905
18 3 BHK 88.57 1906
19 3 BHK 98.33 2001
19 3 BHK 88.57 2002
19 3 BHK 69.44 2003
19 3 BHK 98.33 2004
19 3 BHK 88.57 2005
19 3 BHK 88.57 2006
20 3 BHK 98.33 2101
20 3 BHK 88.57 2102
20 3 BHK 88.57 2103
20 3 BHK 98.33 2104
20 3 BHK 88.57 2105
20 3 BHK 88.57 2106
21 3 BHK 98.33 2201
21 3 BHK 88.57 2202
21 3 BHK 88.57 2203
21 3 BHK 98.33 2204
21 3 BHK 88.57 2205
21 3 BHK 88.57 2206
22 3 BHK 98.33 2301
22 3 BHK 88.57 2302
22 3 BHK 88.57 2303
22 3 BHK 98.33 2304
22 3 BHK 88.57 2305
22 3 BHK 88.57 2306
23 3 BHK 98.33 2401
23 3 BHK 88.57 2402
23 3 BHK 88.57 2403
23 3 BHK 98.33 2404
23 3 BHK 88.57 2405
23 3 BHK 88.57 2406
24 3 BHK 98.33 2501
24 3 BHK 88.57 2502
24 3 BHK 88.57 2503
24 3 BHK 98.33 2504
24 3 BHK 88.57 2505
24 3 BHK 88.57 2506
25 3 BHK 98.33 2601
25 3 BHK 88.57 2602
25 3 BHK 88.57 2603
25 3 BHK 98.33 2604
25 3 BHK 88.57 2605
25 3 BHK 88.57 2606
26 3 BHK 98.33 2701
26 3 BHK 88.57 2702
26 3 BHK 88.57 2703
26 3 BHK 98.33 2704
26 3 BHK 88.57 2705
26 3 BHK 88.57 2706
27 3 BHK 98.33 2801
27 3 BHK 88.57 2802
27 3 BHK 69.44 2803
27 3 BHK 98.33 2804
27 3 BHK 88.57 2805
27 3 BHK 88.57 2806
28 3 BHK 98.33 2901
28 3 BHK 88.57 2902
28 3 BHK 88.57 2903
28 3 BHK 98.33 2904
28 3 BHK 88.57 2905
28 3 BHK 88.57 2906
29 3 BHK 98.33 3001
29 3 BHK 88.57 3002
29 3 BHK 88.57 3003
29 3 BHK 98.33 3004
29 3 BHK 88.57 3005
29 3 BHK 88.57 3006
30 3 BHK 98.33 3101
30 3 BHK 88.57 3102
30 3 BHK 88.57 3103
30 3 BHK 98.33 3104
30 3 BHK 88.57 3105
30 3 BHK 88.57 3106
Parking

Parking, Garage & Area Details

Parking provision declared in the sanctioned plan.

Type Proposed Booked Work Done
Garage - - -
Covered Parking - - -
Open Parking - - -
Development

Development Works & Common Area Disclosures

Project-level common infrastructure disclosures as reported by the developer to the RERA authority.

Sub Structure Earth Work And Other Leveling Preparation Work % not reported Sub Structure Foundation Footing Work % not reported Sub Structure Upto Plinth Level % not reported
Sub Structure Sub-structure Flooring (Parking Floor, More Than One Floor Below General Ground Level) % not reported Sub Structure Retaining Wall (All Types) % not reported Sup Structure Rcc Or Ms Framed Structure % not reported
Sup Structure Masonry Construction % not reported Sup Structure Plastering Inside , Outside & Ceiling % not reported Sup Structure Joinery: Doors, Windows, Ventilators Etc % not reported
Sup Structure Basic Work Of Water Supply, Sanitary And Electrification % not reported Sup Structure Dadoing, Skirting, Flooring, Tiles Work (All Types) % not reported Sup Structure Railing And Grill Fixing % not reported
Finishing Works Electrification, Water Supply And Sanitary Finishing % not reported Finishing Works Painting % not reported Finishing Works Fire Prevention And Fire Fighting Fitting And Fixture With Network % not reported
Finishing Works Weather Proof Work(tile,concrete) % not reported Finishing Works Wardrobe, Showcase, Kitchen Cabinet, Puja Work % not reported Finishing Works Elevation Work % not reported
Finishing Works Internal And External Work Including Landscapes As Per Sanctioned Drawings % not reported Internal Infrastructure Water Supply % not reported Internal Infrastructure Sewage And Drainage System % not reported
Internal Infrastructure Water Conservation/rain Water Harvesting/recharge Of Ground Water % not reported Internal Infrastructure Energy Management % not reported Internal Infrastructure Fire Protection And Fire Safety Requirements % not reported
Internal Infrastructure Solid Waste Management And Disposal % not reported Internal Infrastructure Emergency Evacuation Services % not reported External Infrastructure Water Supply % not reported
External Infrastructure Internal Roads & Footpaths % not reported External Infrastructure Sewage And Drainage System % not reported External Infrastructure Electricity Supply Transformer And Substation % not reported
External Infrastructure Solid Waste Management And Disposal % not reported External Infrastructure Emergency Evacuation Services % not reported External Infrastructure Storm Water Drains % not reported
External Infrastructure Use Of Renewable Energy % not reported External Infrastructure Water Conservation/rain Water Harvesting/recharge Of Ground Water % not reported External Infrastructure Fire Protection And Fire Safety Requirements % not reported
External Infrastructure Sewage Treatment Plant (Stp) % not reported External Infrastructure Parks & Tree Planting % not reported External Infrastructure Street Lighting % not reported
Amenities Electricity % not reported Amenities Smart Home Automation % not reported Amenities Cctv Surveillance % not reported
Amenities Club House % not reported Amenities Community Hall % not reported Amenities Outdoor Sports Facility % not reported
Amenities Indoor Sports Facility % not reported Amenities Swimming Pool % not reported Amenities Gym % not reported
Amenities Parks % not reported Amenities Power Backup % not reported Amenities Piped Gas % not reported
Amenities Water And Sanitation % not reported Amenities Air Conditioning % not reported Common Areas Staircases % not reported
Common Areas Lifts % not reported Common Areas Corridor/lobbies % not reported Common Areas Fire Escapes % not reported
Common Areas Common Entrance And Exit For The Building/common Portico/foyer/verandah % not reported Common Areas Basement % not reported Common Areas Terrace % not reported
Common Areas Outer Wall % not reported Common Areas Open Parking Areas % not reported Common Areas Provision For Lodging Of Management Staff And Security Staff % not reported
Common Areas Water Conservation And Renewable Energy % not reported Common Areas Common Storage Spaces % not reported
Documents

RERA Documents & Filings

All statutory documents uploaded by the promoter to the authority portal.

Promoter Registration Certificate
Promoter Pan Card
Promoter Address Proof
Affidavit
1 Completion Certificate
Fd 1 22 Balance Sheet.Pdf
Fd 2 21 Balance Sheet.Pdf
Fd 3 20 Balance Sheet.Pdf
Fd 4 22 Statment Of P& L Account.Pdf
Fd 5 21 Statement Of P & L.Pdf
Fd 6 20 Statement Of P & L Account.Pdf
Fd 7 Director'S Report 22.Pdf
Fd 8 Director'S Report 21.Pdf
Fd 9 Director'S Report 20.Pdf
Fd 10 22 Cash Flow.Pdf
Fd 11 21 Cash Flow Statment.Pdf
Fd 12 20 Cash Flow Statement.Pdf
Fd 13 22 Independent Auditors Report Compressed (1).Pdf
Fd 14 21 Independent Auditors Report.Pdf
Fd 15 20 Independent Audiors Report 31-Mar-20.Pdf
Fd 16 AY 22 ITR.Pdf
Fd 17 AY 21 ITR.Pdf
Fd 18 AY 20 ITR.Pdf
Pd 1 Self Attested PAN Card*( Annexure - 66 )
Pd 2 Commencement Certificate*( Annexure - 67 )
Pd 3 Electricity Permission Letter*( Annexure - 68 )
Pd 4 Water Permission Letter*( Annexure - 69 )
Pd 5 Approved Layout Plan*( Annexure - 70 )
Pd 6 Approved Building Plotting Plan*( Annexure - 71 )
Pd 7 Existing Layout Plan( Annexure - 72 )
Pd 8 Existing Section Plan And Specification( Annexure - 73 )
Pd 9 Sectional Drawing Of The Apartments*( Annexure - 74 )
Pd 10 Project Specifications*( Annexure - 75 )
Pd 11 Approved Section Of Building Infrastructure Plan Of Plotting*( Annexure - 76 )
Pd 12 Area Development Plan Of Project Area*( Annexure - 77 )
Pd 13 Certificate From Registered Engineer Indicating The Structural Safety Of The Building*( Annexure - 78 )
Pd 14 Advocate Search Report*( Annexure - 79 )
Pd 15 Urban Land Ceiling*( Annexure - 80 )
Pd 16 Collaboration Agreement Development Agreement Joint Development Agreement Other Agreement*( Annexure - 81 )
Pd 17 Change Of Land Use*( Annexure - 82 )
Pd 18 District Magistrate*( Annexure - 83 )
Pd 19 Conversion Certificate Under Section 95 Of The KLR Act 1964*( Annexure - 84 )
Pd 20 Any Other Document (Rights Title Interest Name)*( Annexure - 85 )
Pd 21 Proforma Of Agreement For Sale*( Annexure - 86 )
Pd 22 Proforma Of Allotment Letter*( Annexure - 87 )
Pd 24 Brochure*( Annexure - 89 )
Dc 1 Declaration (Form B)*( Annexure - 90 )
Dc 2 Section 3(1) Notarized Affidavit*( Annexure - 91 )
Dc 3 JD AFFIDAVIT CUM DECLARATION*( Annexure - 92 )
Noc 1 ESCOM Electricity*( Annexure - 93 )
Noc 2 KWSSB Water*( Annexure - 94 )
Noc 3 Approval NOC Under Section 109 Of KLR Act 1961( Annexure - 95 )
Noc 4 Approval NOC Under Section 14 Of The KTCP Act( Annexure - 96 )
Noc 5 Fire Force Department( Annexure - 97 )
Noc 6 Airport Authority Of India( Annexure - 98 )
Noc 7 KSPCB( Annexure - 99 )
Noc 8 SEIAA( Annexure - 100 )
Noc 9 BSNL( Annexure - 101 )
Noc 10 Lift Authorities( Annexure - 102 )
Noc 11 BMRCL( Annexure - 103 )
Noc 12 NOC In Case Of Building Proposals Abutting To Neighbouring Properties( Annexure - 104 )
Noc 13 Bangalore Urban Arts Commission( Annexure - 105 )
Noc 14 Inspector Of Factories Controller Of Explosives Railways( Annexure - 106 )
Noc 15 Coastal Regulation Zone Authority( Annexure - 107 )
Dr 1 Utilisation Certificate( Annexure - 108 )
Dr 2 Transfer Of Development Rights Certificate( Annexure - 109 )
Dr 3 Relinquishment Deed( Annexure - 110 )
Photo 1 Project Photo
Od 1 HAL NOC.Pdf
Od 2 CDP Magadi.Pdf
Od 3 City Survey Sketch Compressed.Pdf
Od 4 Grant Certificate.Pdf
Od 5 PT Sheet.Pdf
Od 6 Field Book.Pdf
Od 7 PR Card.Pdf
Od 8 GuideLine Value.Pdf
Od 9 Upper Floor Plans.Pdf
Od 10 1 Basement Floor Plan.Pdf
Od 11 2 Basement Floor Plan.Pdf
Ld Rtc
Ld Mutation
Ld Encumbrance Certificate
Ld Conversion Order
Ld Khatha
Bank

Bank & Cost Disclosure

Declared project cost and the designated escrow account on file.

Project Account Bank HDFC
Account Number (RERA) 57500001279206
IFSC HDFC0000523
Branch Address RICHMOND ROAD
Country/City