Squareyards Logo
Blogs
Sell or Rent Property
Login
Rera Banner
residential New Launch Source: rera.ka

Puravankara Northern Lights RERA Details - PRM/KA/RERA/1251/309/PR/120326/008524 Bangalore

View the RERA registration, promoter, approval, building, inventory, document and construction-progress disclosures for Puravankara Northern Lights under registration PRM/KA/RERA/1251/309/PR/120326/008524 in Bangalore, Karnataka. Data is sourced from rera.ka.

RERA

RERA Snapshot

The most important statutory project disclosures, generated dynamically from available RERA fields.

  • RERA Number PRM/KA/RERA/1251/309/PR/120326/008524
  • Project Name Northern Lights by Puravankara KVN Phase 2
  • Project Type Mixed Development
  • Project Status New Launch
  • District Bengaluru Urban
  • Taluka Bengaluru North
  • Original Completion 31 December 2030
  • Documents 76 Verified
Timeline

Project Timeline & Completion Details

Key statutory dates from registration through proposed completion and permit validity.

Proposed Start 05 October 2026 Expected commencement of civil works and foundation on site.
Original Completion 31 December 2030 Mandated date for project handover to the allottees and final compliance filing.
Promoter

Promoter, Organisation & Member Details

Declared promoter entity, address and corporate identifiers on file with the authority.

Primary Promoter

KVN Property Holdings LLP
Registered Address No.2011, Embassy Habitat, Palace Cross Road,Seshadripuram, High Grounds Police Station, Bangalore ,Bengaluru North ,Bengaluru Urban-560020
Location

Land, Address & Location Details

Land parcel, zoning and geo-coordinates as recorded in the project filing.

Address Plot No. R-12 of Hitech, Defense and Aerospace Park, Bengaluru Comprised in Sy No. Part of 417,418,419,423,389,390,391,392,393 & 117 , Bagalur Village Jala Hobli, Bengaluru North Yelahanka Taluk, Bengaluru Urban District , Bengaluru North , Bengaluru Urban, Karnataka - 562149

RERA Coordinates

Latitude, Longitude 13.14633609832597, 77.65804585054664
Plans

Plans & Approvals

Statutory approvals obtained or pending against the project site.

Plan Approval No. DO3-KIADB-00190/25-26/BP
Authority KIADB - Karnataka Industrial Areas Development Board
Approved Date 07 March 2026

Understand this Project's RERA details

Get clear answers and additional support from our RERA experts.

RERA Banner
Buildings

Buildings, Towers & Building-Level Details

Statutory building-level disclosures including tower height, sanctioned floors, structural counts and parking areas.

Building Detail
Name No. of Basements No. of Slab No. of Slits No. of Open Parking Building Type Height of Tower No. of Floors No. of Units
Wing 4 1 32 0 220 Residential 98.95 30 270
Wing 5 1 32 0 220 Residential 98.95 30 270
Tower 8 1 32 0 480 Residential 94.25 30 668

Scroll horizontally to view all building-level fields. Values marked "-" were not disclosed in the source RERA record.

Inventory

Unit Inventory & Configuration Details

Configuration mix and floor-level disclosures with both grouped and raw RERA views.

Total Units -
Configurations 5
Inventory Type RESIDENTIAL
Configuration Distribution
1 BHK 0 units
2 BHK 0 units
3 BHK 0 units
4 BHK 0 units
EWS 0 units
  • Wing 4
  • Wing 5
  • Tower 8
Floor-Wise Inventory Explorer
Floor Apartment Type Carpet Area No. of Unit
1 3 BHK 98.62 W4-0201
1 2 BHK 62.23 W4-0202
1 2 BHK 62.23 W4-0203
1 3 BHK 109.96 W4-0204
1 3 BHK 95.95 W4-0205
1 EWS 7.01 W4-0206
1 2 BHK 68.84 W4-0207
1 3 BHK 104.5 W4-0209
1 EWS 7.89 W4-0210
2 3 BHK 98.62 W4-0301
2 2 BHK 62.23 W4-0302
2 2 BHK 62.23 W4-0303
2 3 BHK 109.96 W4-0304
2 3 BHK 95.95 W4-0305
2 EWS 7.01 W4-0306
2 2 BHK 68.84 W4-0307
2 3 BHK 104.5 W4-0309
2 EWS 7.89 W4-0310
3 3 BHK 98.62 W4-0401
3 2 BHK 62.23 W4-0402
3 2 BHK 62.23 W4-0403
3 3 BHK 109.96 W4-0404
3 3 BHK 95.95 W4-0405
3 EWS 7.01 W4-0406
3 2 BHK 68.84 W4-0407
3 2 BHK 68.84 W4-0408
3 3 BHK 104.5 W4-0409
3 EWS 7.89 W4-0410
4 3 BHK 98.62 W4-0501
4 2 BHK 62.23 W4-0502
4 2 BHK 62.23 W4-0503
4 3 BHK 109.96 W4-0504
4 3 BHK 95.95 W4-0505
4 EWS 7.01 W4-0506
4 2 BHK 68.84 W4-0507
4 2 BHK 68.84 W4-0508
4 3 BHK 104.5 W4-0509
4 EWS 7.89 W4-0510
5 3 BHK 98.62 W4-0601
5 2 BHK 62.23 W4-0602
5 2 BHK 62.23 W4-0603
5 3 BHK 109.96 W4-0604
5 3 BHK 95.95 W4-0605
5 EWS 7.01 W4-0606
5 2 BHK 68.84 W4-0607
5 2 BHK 68.84 W4-0608
5 3 BHK 104.5 W4-0609
5 EWS 7.89 W4-0610
6 3 BHK 98.62 W4-0701
6 2 BHK 62.23 W4-0702
6 2 BHK 62.23 W4-0703
6 3 BHK 109.96 W4-0704
6 3 BHK 95.95 W4-0705
6 EWS 7.01 W4-0706
6 2 BHK 68.84 W4-0707
6 2 BHK 68.84 W4-0708
6 3 BHK 104.5 W4-0709
6 EWS 7.89 W4-0710
7 3 BHK 98.62 W4-0801
7 2 BHK 62.23 W4-0802
7 2 BHK 62.23 W4-0803
7 3 BHK 109.96 W4-0804
7 3 BHK 95.95 W4-0805
7 EWS 7.01 W4-0806
7 2 BHK 68.84 W4-0807
7 2 BHK 68.84 W4-0808
7 3 BHK 104.5 W4-0809
7 EWS 7.89 W4-0810
8 3 BHK 98.62 W4-0901
8 2 BHK 62.23 W4-0902
8 2 BHK 62.23 W4-0903
8 3 BHK 109.96 W4-0904
8 3 BHK 95.95 W4-0905
8 EWS 7.01 W4-0906
8 2 BHK 68.84 W4-0907
8 2 BHK 68.84 W4-0908
8 3 BHK 104.5 W4-0909
8 EWS 7.89 W4-0910
9 3 BHK 98.62 W4-1001
9 2 BHK 62.23 W4-1002
9 2 BHK 62.23 W4-1003
9 3 BHK 109.96 W4-1004
9 3 BHK 95.95 W4-1005
9 EWS 7.01 W4-1006
9 2 BHK 68.84 W4-1007
9 2 BHK 68.84 W4-1008
9 3 BHK 104.5 W4-1009
9 EWS 7.89 W4-1010
10 3 BHK 98.62 W4-1101
10 2 BHK 62.23 W4-1102
10 2 BHK 62.23 W4-1103
10 3 BHK 109.96 W4-1104
10 3 BHK 95.95 W4-1105
10 EWS 7.01 W4-1106
10 2 BHK 68.84 W4-1107
10 2 BHK 68.84 W4-1108
10 3 BHK 104.5 W4-1109
10 EWS 7.89 W4-1110
11 3 BHK 98.62 W4-1201
11 2 BHK 62.23 W4-1202
11 2 BHK 62.23 W4-1203
11 3 BHK 109.96 W4-1204
11 3 BHK 95.95 W4-1205
11 EWS 7.01 W4-1206
11 2 BHK 68.84 W4-1207
11 2 BHK 68.84 W4-1208
11 3 BHK 104.5 W4-1209
11 EWS 7.89 W4-1210
12 3 BHK 98.62 W4-1301
12 2 BHK 62.23 W4-1302
12 2 BHK 62.23 W4-1303
12 3 BHK 109.96 W4-1304
12 3 BHK 95.95 W4-1305
12 EWS 7.01 W4-1306
12 2 BHK 68.84 W4-1307
12 2 BHK 68.84 W4-1308
12 3 BHK 104.5 W4-1309
12 EWS 7.89 W4-1310
13 3 BHK 98.62 W4-1401
13 2 BHK 62.23 W4-1402
13 2 BHK 62.23 W4-1403
13 3 BHK 109.96 W4-1404
13 3 BHK 95.95 W4-1405
13 EWS 7.01 W4-1406
13 2 BHK 68.84 W4-1407
13 2 BHK 68.84 W4-1408
13 3 BHK 104.5 W4-1409
13 EWS 7.89 W4-1410
14 3 BHK 98.62 W4-1501
14 2 BHK 62.23 W4-1502
14 2 BHK 62.23 W4-1503
14 3 BHK 109.96 W4-1504
14 3 BHK 95.95 W4-1505
14 EWS 7.01 W4-1506
14 2 BHK 68.84 W4-1507
14 2 BHK 68.84 W4-1508
14 3 BHK 104.5 W4-1509
14 EWS 7.89 W4-1510
15 3 BHK 98.62 W4-1601
15 2 BHK 62.23 W4-1602
15 2 BHK 62.23 W4-1603
15 3 BHK 109.96 W4-1604
15 3 BHK 95.95 W4-1605
15 EWS 7.01 W4-1606
15 2 BHK 68.84 W4-1607
15 2 BHK 68.84 W4-1608
15 3 BHK 104.5 W4-1609
15 EWS 7.89 W4-1610
16 3 BHK 98.62 W4-1701
16 2 BHK 62.23 W4-1702
16 2 BHK 62.23 W4-1703
16 3 BHK 109.96 W4-1704
16 3 BHK 95.95 W4-1705
16 EWS 7.01 W4-1706
16 2 BHK 68.84 W4-1707
16 3 BHK 104.5 W4-1709
16 EWS 7.89 W4-1710
17 3 BHK 98.62 W4-1801
17 2 BHK 62.23 W4-1802
17 2 BHK 62.23 W4-1803
17 3 BHK 109.96 W4-1804
17 3 BHK 95.95 W4-1805
17 EWS 7.01 W4-1806
17 2 BHK 68.84 W4-1807
17 2 BHK 68.84 W4-1808
17 3 BHK 104.5 W4-1809
17 EWS 7.89 W4-1810
18 3 BHK 98.62 W4-1901
18 2 BHK 62.23 W4-1902
18 2 BHK 62.23 W4-1903
18 3 BHK 109.96 W4-1904
18 3 BHK 95.95 W4-1905
18 EWS 7.01 W4-1906
18 2 BHK 68.84 W4-1907
18 2 BHK 68.84 W4-1908
18 3 BHK 104.5 W4-1909
18 EWS 7.89 W4-1910
19 3 BHK 98.62 W4-2001
19 2 BHK 62.23 W4-2002
19 2 BHK 62.23 W4-2003
19 3 BHK 109.96 W4-2004
19 3 BHK 95.95 W4-2005
19 EWS 7.01 W4-2006
19 2 BHK 68.84 W4-2007
19 2 BHK 68.84 W4-2008
19 3 BHK 104.5 W4-2009
19 EWS 7.89 W4-2010
20 3 BHK 98.62 W4-2101
20 2 BHK 62.23 W4-2102
20 2 BHK 62.23 W4-2103
20 3 BHK 109.96 W4-2104
20 3 BHK 95.95 W4-2105
20 EWS 7.01 W4-2106
20 2 BHK 68.84 W4-2107
20 2 BHK 68.84 W4-2108
20 3 BHK 104.5 W4-2109
20 EWS 7.89 W4-2110
21 3 BHK 98.62 W4-2201
21 2 BHK 62.23 W4-2202
21 2 BHK 62.23 W4-2203
21 3 BHK 109.96 W4-2204
21 3 BHK 95.95 W4-2205
21 EWS 7.01 W4-2206
21 2 BHK 68.84 W4-2207
21 2 BHK 68.84 W4-2208
21 3 BHK 104.5 W4-2209
21 EWS 7.89 W4-2210
22 3 BHK 98.62 W4-2301
22 2 BHK 62.23 W4-2302
22 2 BHK 62.23 W4-2303
22 3 BHK 109.96 W4-2304
22 3 BHK 95.95 W4-2305
22 EWS 7.01 W4-2306
22 2 BHK 68.84 W4-2307
22 2 BHK 68.84 W4-2308
22 3 BHK 104.5 W4-2309
22 EWS 7.89 W4-2310
23 3 BHK 98.62 W4-2401
23 2 BHK 62.23 W4-2402
23 2 BHK 62.23 W4-2403
23 3 BHK 109.96 W4-2404
23 3 BHK 95.95 W4-2405
23 EWS 7.01 W4-2406
23 2 BHK 68.84 W4-2407
23 2 BHK 68.84 W4-2408
23 3 BHK 104.5 W4-2409
23 EWS 7.89 W4-2410
24 3 BHK 98.62 W4-2501
24 2 BHK 62.23 W4-2502
24 2 BHK 62.23 W4-2503
24 3 BHK 109.96 W4-2504
24 3 BHK 95.95 W4-2505
24 EWS 7.01 W4-2506
24 2 BHK 68.84 W4-2507
24 2 BHK 68.84 W4-2508
24 3 BHK 104.5 W4-2509
24 EWS 7.89 W4-2510
25 3 BHK 98.62 W4-2601
25 2 BHK 62.23 W4-2602
25 2 BHK 62.23 W4-2603
25 3 BHK 109.96 W4-2604
25 3 BHK 95.95 W4-2605
25 EWS 7.01 W4-2606
25 2 BHK 68.84 W4-2607
25 2 BHK 68.84 W4-2608
25 3 BHK 104.5 W4-2609
25 EWS 7.89 W4-2610
26 4 BHK 207.73 W4-2701
26 2 BHK 62.23 W4-2702
26 2 BHK 62.23 W4-2703
26 4 BHK 215.68 W4-2704
26 4 BHK 216.65 W4-2705
26 2 BHK 68.84 W4-2707
26 4 BHK 209.66 W4-2709
27 2 BHK 62.23 W4-2802
27 2 BHK 62.23 W4-2803
27 2 BHK 68.84 W4-2807
27 2 BHK 68.84 W4-2808
28 4 BHK 207.73 W4-2901
28 2 BHK 62.23 W4-2902
28 2 BHK 62.23 W4-2903
28 4 BHK 215.68 W4-2904
28 4 BHK 216.65 W4-2905
28 2 BHK 68.84 W4-2907
28 2 BHK 68.84 W4-2908
28 4 BHK 209.66 W4-2909
29 2 BHK 62.23 W4-3002
29 2 BHK 62.23 W4-3003
29 2 BHK 68.84 W4-3007
29 2 BHK 68.84 W4-3008
Parking

Parking, Garage & Area Details

Parking provision declared in the sanctioned plan.

Type Proposed Booked Work Done
Garage - - -
Covered Parking - - -
Open Parking - - -
Development

Development Works & Common Area Disclosures

Project-level common infrastructure disclosures as reported by the developer to the RERA authority.

Sub Structure Earth Work And Other Leveling Preparation Work % not reported Sub Structure Foundation Footing Work % not reported Sub Structure Upto Plinth Level % not reported
Sub Structure Sub-structure Flooring (Parking Floor, More Than One Floor Below General Ground Level) % not reported Sub Structure Retaining Wall (All Types) % not reported Sup Structure Rcc Or Ms Framed Structure % not reported
Sup Structure Masonry Construction % not reported Sup Structure Plastering Inside , Outside & Ceiling % not reported Sup Structure Joinery: Doors, Windows, Ventilators Etc % not reported
Sup Structure Basic Work Of Water Supply, Sanitary And Electrification % not reported Sup Structure Dadoing, Skirting, Flooring, Tiles Work (All Types) % not reported Sup Structure Railing And Grill Fixing % not reported
Finishing Works Electrification, Water Supply And Sanitary Finishing % not reported Finishing Works Painting % not reported Finishing Works Fire Prevention And Fire Fighting Fitting And Fixture With Network % not reported
Finishing Works Weather Proof Work(tile,concrete) % not reported Finishing Works Wardrobe, Showcase, Kitchen Cabinet, Puja Work % not reported Finishing Works Elevation Work % not reported
Finishing Works Internal And External Work Including Landscapes As Per Sanctioned Drawings % not reported Internal Infrastructure Water Supply % not reported Internal Infrastructure Sewage And Drainage System % not reported
Internal Infrastructure Water Conservation/rain Water Harvesting/recharge Of Ground Water % not reported Internal Infrastructure Energy Management % not reported Internal Infrastructure Fire Protection And Fire Safety Requirements % not reported
Internal Infrastructure Solid Waste Management And Disposal % not reported Internal Infrastructure Emergency Evacuation Services % not reported External Infrastructure Water Supply % not reported
External Infrastructure Internal Roads & Footpaths % not reported External Infrastructure Sewage And Drainage System % not reported External Infrastructure Electricity Supply Transformer And Substation % not reported
External Infrastructure Solid Waste Management And Disposal % not reported External Infrastructure Emergency Evacuation Services % not reported External Infrastructure Storm Water Drains % not reported
External Infrastructure Use Of Renewable Energy % not reported External Infrastructure Water Conservation/rain Water Harvesting/recharge Of Ground Water % not reported External Infrastructure Fire Protection And Fire Safety Requirements % not reported
External Infrastructure Sewage Treatment Plant (Stp) % not reported External Infrastructure Parks & Tree Planting % not reported External Infrastructure Street Lighting % not reported
Amenities Electricity % not reported Amenities Smart Home Automation % not reported Amenities Cctv Surveillance % not reported
Amenities Club House % not reported Amenities Community Hall % not reported Amenities Outdoor Sports Facility % not reported
Amenities Indoor Sports Facility % not reported Amenities Swimming Pool % not reported Amenities Gym % not reported
Amenities Parks % not reported Amenities Power Backup % not reported Amenities Piped Gas % not reported
Amenities Water And Sanitation % not reported Amenities Air Conditioning % not reported Common Areas Staircases % not reported
Common Areas Lifts % not reported Common Areas Corridor/lobbies % not reported Common Areas Fire Escapes % not reported
Common Areas Common Entrance And Exit For The Building/common Portico/foyer/verandah % not reported Common Areas Basement % not reported Common Areas Terrace % not reported
Common Areas Outer Wall % not reported Common Areas Open Parking Areas % not reported Common Areas Provision For Lodging Of Management Staff And Security Staff % not reported
Common Areas Water Conservation And Renewable Energy % not reported Common Areas Common Storage Spaces % not reported
Documents

RERA Documents & Filings

All statutory documents uploaded by the promoter to the authority portal.

Promoter Registration Certificate
Promoter Pan Card
Promoter Address Proof
Affidavit
Fd 1 KVN Property Holdings LLP- Balance Sheet - 2024-25.Pdf
Fd 2 Purva Blue Home Ventures FS FY 24-25 Compressed.Pdf
Fd 3 NA.Pdf
Fd 4 NA.Pdf
Fd 5 NA.Pdf
Fd 6 NA.Pdf
Fd 7 KVN ITR Ack.Pdf
Fd 8 NA.Pdf
Fd 9 NA.Pdf
Pd 1 Commencement Certificate( Annexure - 80 )
Pd 2 Approved Building Plan( Annexure - 81 )
Pd 3 Sectional Drawing Of The Apartments( Annexure - 82 )
Pd 4 Certificate From Registered Engineer Indicating The Structural Safety Of The Building( Annexure - 83 )
Pd 5 Project Specifications( Annexure - 84 )
Pd 6 Brochure( Annexure - 85 )
Pd 7 Relinquishment Deed( Annexure - 86 )
Pd 8 Proforma Of Agreement For Sale( Annexure - 87 )
Pd 9 Proforma Of Allotment Letter( Annexure - 88 )
Dc 1 Declaration (Form B)( Annexure - 89 )
Dc 2 Section 3(1) Notarized Affidavit( Annexure - 90 )
Dc 3 JD AFFIDAVIT CUM DECLARATION( Annexure - 91 )
Dc 4 Advocate Search Report( Annexure - 92 )
Noc 1 ESCOM Electricity( Annexure - 95 )
Noc 2 KWSSB Water( Annexure - 96 )
Noc 3 KSPCB( Annexure - 97 )
Noc 4 SEIAA( Annexure - 98 )
Noc 5 Fire Force Department( Annexure - 99 )
Noc 6 Airport Authority Of India( Annexure - 100 )
Noc 7 BSNL( Annexure - 101 )
Noc 8 Lift Authorities( Annexure - 102 )
Noc 9 BMRCL( Annexure - 103 )
Noc 10 NOC In Case Of Building Proposals Abutting To Neighbouring Properties( Annexure - 104 )
Noc 11 Bangalore Urban Arts Commission( Annexure - 105 )
Noc 12 Inspector Of Factories Controller Of Explosives Railways( Annexure - 106 )
Noc 13 Coastal Regulation Zone Authority( Annexure - 107 )
Photo 1 Project Photo
Od 1 Village Map Combined.Pdf
Od 2 Land Cost Calculation.Pdf
Od 3 Phase Wise Signed Certificate.Pdf
Od 4 CDP Demarcated Map.Pdf
Od 5 Common Area Statement.Pdf
Od 6 PHASE WISE DEMARCATION KVN.Pdf
Od 7 16 WINGS 2 3 4 2ND FLOOR PLAN.Pdf
Od 8 17 WINGS 2 3 4 3RD FLOOR PLAN.Pdf
Od 9 18 WINGS 2 3 4 4TH FLOOR PLAN.Pdf
Od 10 19 WINGS 2 3 4 TYPICAL 5TH TO 16 18 TO 26TH FLOOR PLAN.Pdf
Od 11 20 WINGS 2 3 4 17TH (REFUGE) FLOOR PLAN.Pdf
Od 12 31 W8 2ND FLOOR PLAN.Pdf
Od 13 32 W8 3RD FLOOR PLAN.Pdf
Od 14 33 W8 4TH FLOOR PLAN.Pdf
Od 15 34 W8 TYPICAL 5TH TO 16TH & 18TH TO 26TH FLOOR PLAN.Pdf
Od 16 35 W8 17TH (REFUGE) FLOOR PLAN.Pdf
Od 17 36 W8 27TH (REFUGE) FLOOR PLAN.Pdf
Od 18 37 W8 28TH FLOOR PLAN.Pdf
Od 19 38 W8 29TH FLOOR PLAN.Pdf
Od 20 39 W8 30TH FLOOR PLAN.Pdf
Od 21 40 W8 TERRACE FLOOR PLAN.Pdf
Od 22 42 SECTION AT 3 AND 4.Pdf
Od 23 2 BASEMENT FLOOR PLAN.Pdf
Od 24 3 GROUND FLOOR PLAN.Pdf
Od 25 4 FIRST FLOOR PLAN.Pdf
Od 26 SRP FEASIBILITY REPORT- 2000 KLD.Pdf
Od 27 KVN 2000KLD-MBR STP PLAN.Pdf
Od 28 Budget KVN Updated.Pdf
Od 29 Declaration Of Amenities.Pdf
Od 30 KIADB STR LICENcompressed.Pdf
Od 31 Structural Stability Certificate.PDF
Ed 1 12-03-2026
Ld Rtc
Ld Mutation
Ld Encumbrance Certificate
Ld Khatha
Bank

Bank & Cost Disclosure

Declared project cost and the designated escrow account on file.

Project Account Bank HDFC
Account Number (RERA) 99954153626743
IFSC HDFC0003689
Branch Address Ulsoor Road Bangalore
Country/City