Squareyards Logo
Blogs
Sell or Rent Property
Login
Rera Banner
residential Under Construction Source: rera.ka

Lodha Mirabelle RERA Details - PRM/KA/RERA/1251/309/PR/131023/006321 Bangalore

View the RERA registration, promoter, approval, building, inventory, document and construction-progress disclosures for Lodha Mirabelle under registration PRM/KA/RERA/1251/309/PR/131023/006321 in Bangalore, Karnataka. Data is sourced from rera.ka.

RERA

RERA Snapshot

The most important statutory project disclosures, generated dynamically from available RERA fields.

  • RERA Number PRM/KA/RERA/1251/309/PR/131023/006321
  • Project Name Mirabelle
  • Project Type Residential/Group Housing
  • Project Status Under Construction
  • District Bengaluru Urban
  • Taluka Bengaluru North
  • Original Completion 30 June 2028
  • Documents 79 Verified
Timeline

Project Timeline & Completion Details

Key statutory dates from registration through proposed completion and permit validity.

Proposed Start 01 November 2023 Expected commencement of civil works and foundation on site.
Original Completion 30 June 2028 Mandated date for project handover to the allottees and final compliance filing.
Promoter

Promoter, Organisation & Member Details

Declared promoter entity, address and corporate identifiers on file with the authority.

Primary Promoter

G Corp Homes Private Limited
Registered Address SKAV 909, 7th Floor, No. 9/1, Lavelle Road,Richmond Circle, Bengaluru - 560 001 ,Bengaluru South ,Bengaluru Urban-560001
Location

Land, Address & Location Details

Land parcel, zoning and geo-coordinates as recorded in the project filing.

Address Khata no.13/2, Ward no.06, Sy.Nos 47/1(P), 47/2(P), 48/1(P), 48/2(P), 48/4, 48/5, 48/6(P), 48/7, 48/8(P), 50/2, 51(P), 52/1, 52/2, 52/7, 52/8, 53, , 54/1, 54/2, 54/3, 54/4, 55/2, 55/3, 55/4, 55/5(P), 56/6(P), 55/7(P), 55/9(P), 56/1, 56/2(P), 56/3(P), 56/4(P), 58/2, 59/2, 60/1(P), Thanisandra village, KR Puram Hobli, Bangalore North Taluk , Bengaluru North , Bengaluru Urban, Karnataka - 560077

RERA Coordinates

Latitude, Longitude 13.04960, 77.62581
Plans

Plans & Approvals

Statutory approvals obtained or pending against the project site.

Plan Approval No. BDA/TPM/TPM/DLP-65/10-11/331/2023-23
Authority BDA - Bangalore Development Authority
Approved Date 11 May 2023

Understand this Project's RERA details

Get clear answers and additional support from our RERA experts.

RERA Banner
Buildings

Buildings, Towers & Building-Level Details

Statutory building-level disclosures including tower height, sanctioned floors, structural counts and parking areas.

Building Detail
Name No. of Basements No. of Slab No. of Slits No. of Open Parking Building Type Height of Tower No. of Floors No. of Units
Tower 5 0 30 0 115 Residential 89.2 28 116
Tower 6 2 30 0 117 Residential 89.2 28 118
Tower 7 2 30 0 159 Residential 89.2 28 203

Scroll horizontally to view all building-level fields. Values marked "-" were not disclosed in the source RERA record.

Inventory

Unit Inventory & Configuration Details

Configuration mix and floor-level disclosures with both grouped and raw RERA views.

Total Units -
Configurations 5
Inventory Type RESIDENTIAL
Configuration Distribution
1 BHK 0 units
3 BHK 0 units
4 BHK 0 units
5 BHK 0 units
STUDIO 0 units
  • Tower 5
  • Tower 6
  • Tower 7
Floor-Wise Inventory Explorer
Floor Apartment Type Carpet Area No. of Unit
-1 2.5 BHK 95.90 0001
-1 1.5 BHK 63.66 0002
-1 1.5 BHK 63.66 0003
-1 3.5 BHK 113.70 0004
GF 3.5 BHK 113.67 0101
GF 2.5 BHK 81.39 0102
GF 2.5 BHK 81.46 0103
GF 3.5 BHK 113.70 0104
1 3.5 BHK 113.67 0201
1 2.5 BHK 81.39 0202
1 2.5 BHK 81.46 0203
1 3.5 BHK 113.70 0204
2 3.5 BHK 113.67 0301
2 2.5 BHK 81.39 0302
2 2.5 BHK 81.46 0303
2 3.5 BHK 113.70 0304
3 3.5 BHK 113.67 0401
3 2.5 BHK 81.39 0402
3 2.5 BHK 81.46 0403
3 3.5 BHK 113.70 0404
4 3.5 BHK 113.67 0501
4 2.5 BHK 81.39 0502
4 2.5 BHK 81.46 0503
4 3.5 BHK 113.70 0504
5 3.5 BHK 113.67 0601
5 2.5 BHK 81.39 0602
5 2.5 BHK 81.46 0603
5 3.5 BHK 113.70 0604
6 3.5 BHK 113.67 0701
6 2.5 BHK 81.39 0702
6 2.5 BHK 81.46 0703
6 3.5 BHK 113.70 0704
7 3.5 BHK 113.67 0801
7 2.5 BHK 81.39 0802
7 2.5 BHK 81.46 0803
7 3.5 BHK 113.70 0804
8 3.5 BHK 113.67 0901
8 2.5 BHK 81.39 0902
8 2.5 BHK 81.46 0903
8 3.5 BHK 113.70 0904
9 3.5 BHK 113.67 1001
9 2.5 BHK 81.39 1002
9 2.5 BHK 81.46 1003
9 3.5 BHK 113.70 1004
10 3.5 BHK 113.67 1101
10 2.5 BHK 81.39 1102
10 2.5 BHK 81.46 1103
10 3.5 BHK 113.70 1104
11 3.5 BHK 113.67 1201
11 2.5 BHK 81.39 1202
11 2.5 BHK 81.46 1203
11 3.5 BHK 113.70 1204
12 3.5 BHK 113.67 1401
12 2.5 BHK 81.39 1402
12 2.5 BHK 81.46 1403
12 3.5 BHK 113.70 1404
13 3.5 BHK 113.67 1501
13 2.5 BHK 81.39 1502
13 2.5 BHK 81.46 1503
13 3.5 BHK 113.70 1504
14 3.5 BHK 113.67 1601
14 2.5 BHK 81.39 1602
14 2.5 BHK 81.46 1603
14 3.5 BHK 113.70 1604
15 3.5 BHK 113.67 1701
15 2.5 BHK 81.39 1702
15 2.5 BHK 81.46 1703
15 3.5 BHK 113.70 1704
16 3.5 BHK 113.67 1801
16 2.5 BHK 81.39 1802
16 2.5 BHK 81.46 1803
16 3.5 BHK 113.70 1804
17 3.5 BHK 113.67 1901
17 2.5 BHK 81.39 1902
17 2.5 BHK 81.46 1903
17 3.5 BHK 113.70 1904
18 2.5 BHK 95.91 2001
18 1.5 BHK 63.66 2002
18 2.5 BHK 81.46 2003
18 3.5 BHK 113.70 2004
19 3.5 BHK 113.67 2101
19 2.5 BHK 81.39 2102
19 2.5 BHK 81.46 2103
19 3.5 BHK 113.70 2104
20 3.5 BHK 113.67 2201
20 2.5 BHK 81.39 2202
20 2.5 BHK 81.46 2203
20 3.5 BHK 113.70 2204
21 3.5 BHK 113.67 2301
21 2.5 BHK 81.39 2302
21 2.5 BHK 81.46 2303
21 3.5 BHK 113.70 2304
22 3.5 BHK 113.67 2401
22 2.5 BHK 81.39 2402
22 2.5 BHK 81.46 2403
22 3.5 BHK 113.70 2404
23 3.5 BHK 113.67 2501
23 2.5 BHK 81.39 2502
23 2.5 BHK 81.46 2503
23 3.5 BHK 113.70 2504
24 3.5 BHK 113.67 2601
24 2.5 BHK 81.39 2602
24 2.5 BHK 81.46 2603
24 3.5 BHK 113.70 2604
25 3.5 BHK 113.67 2701
25 2.5 BHK 81.39 2702
25 2.5 BHK 81.46 2703
25 3.5 BHK 113.70 2704
26 3.5 BHK 113.67 2801
26 2.5 BHK 81.39 2802
26 2.5 BHK 81.46 2803
26 3.5 BHK 113.70 2804
27 3.5 BHK 113.67 2901
27 2.5 BHK 81.39 2902
27 2.5 BHK 81.46 2903
27 3.5 BHK 113.70 2904
Parking

Parking, Garage & Area Details

Parking provision declared in the sanctioned plan.

Type Proposed Booked Work Done
Garage - - -
Covered Parking - - -
Open Parking - - -
Development

Development Works & Common Area Disclosures

Project-level common infrastructure disclosures as reported by the developer to the RERA authority.

Sub Structure Earth Work And Other Leveling Preparation Work % not reported Sub Structure Foundation Footing Work % not reported Sub Structure Upto Plinth Level % not reported
Sub Structure Sub-structure Flooring (Parking Floor, More Than One Floor Below General Ground Level) % not reported Sub Structure Retaining Wall (All Types) % not reported Sup Structure Rcc Or Ms Framed Structure % not reported
Sup Structure Masonry Construction % not reported Sup Structure Plastering Inside , Outside & Ceiling % not reported Sup Structure Joinery: Doors, Windows, Ventilators Etc % not reported
Sup Structure Basic Work Of Water Supply, Sanitary And Electrification % not reported Sup Structure Dadoing, Skirting, Flooring, Tiles Work (All Types) % not reported Sup Structure Railing And Grill Fixing % not reported
Finishing Works Electrification, Water Supply And Sanitary Finishing % not reported Finishing Works Painting % not reported Finishing Works Fire Prevention And Fire Fighting Fitting And Fixture With Network % not reported
Finishing Works Weather Proof Work(tile,concrete) % not reported Finishing Works Wardrobe, Showcase, Kitchen Cabinet, Puja Work % not reported Finishing Works Elevation Work % not reported
Finishing Works Internal And External Work Including Landscapes As Per Sanctioned Drawings % not reported Internal Infrastructure Water Supply % not reported Internal Infrastructure Sewage And Drainage System % not reported
Internal Infrastructure Water Conservation/rain Water Harvesting/recharge Of Ground Water % not reported Internal Infrastructure Energy Management % not reported Internal Infrastructure Fire Protection And Fire Safety Requirements % not reported
Internal Infrastructure Solid Waste Management And Disposal % not reported Internal Infrastructure Emergency Evacuation Services % not reported External Infrastructure Water Supply % not reported
External Infrastructure Internal Roads & Footpaths % not reported External Infrastructure Sewage And Drainage System % not reported External Infrastructure Electricity Supply Transformer And Substation % not reported
External Infrastructure Solid Waste Management And Disposal % not reported External Infrastructure Emergency Evacuation Services % not reported External Infrastructure Storm Water Drains % not reported
External Infrastructure Use Of Renewable Energy % not reported External Infrastructure Water Conservation/rain Water Harvesting/recharge Of Ground Water % not reported External Infrastructure Fire Protection And Fire Safety Requirements % not reported
External Infrastructure Sewage Treatment Plant (Stp) % not reported External Infrastructure Parks & Tree Planting % not reported External Infrastructure Street Lighting % not reported
Amenities Electricity % not reported Amenities Smart Home Automation % not reported Amenities Cctv Surveillance % not reported
Amenities Club House % not reported Amenities Community Hall % not reported Amenities Outdoor Sports Facility % not reported
Amenities Indoor Sports Facility % not reported Amenities Swimming Pool % not reported Amenities Gym % not reported
Amenities Parks % not reported Amenities Power Backup % not reported Amenities Piped Gas % not reported
Amenities Water And Sanitation % not reported Amenities Air Conditioning % not reported Common Areas Staircases % not reported
Common Areas Lifts % not reported Common Areas Corridor/lobbies % not reported Common Areas Fire Escapes % not reported
Common Areas Common Entrance And Exit For The Building/common Portico/foyer/verandah % not reported Common Areas Basement % not reported Common Areas Terrace % not reported
Common Areas Outer Wall % not reported Common Areas Open Parking Areas % not reported Common Areas Provision For Lodging Of Management Staff And Security Staff % not reported
Common Areas Water Conservation And Renewable Energy % not reported Common Areas Common Storage Spaces % not reported
Documents

RERA Documents & Filings

All statutory documents uploaded by the promoter to the authority portal.

Promoter Registration Certificate
Promoter Pan Card
Promoter Address Proof
Fd 1 G Corp FY 23 F.Pdf
Fd 2 F Y 21- 22 FINAL F.Pdf
Fd 3 FY 2020-21 FINAL.Pdf
Fd 4 G Corp FY 23 F.Pdf
Fd 5 F Y 21- 22 FINAL F.Pdf
Fd 6 FY 2020-21 FINAL.Pdf
Fd 7 Annexure 62 - Director Report 2023.Pdf
Fd 8 Annexure 62 - Director Report 2022.Pdf
Fd 9 Annexure 62 - Director Report 2021.Pdf
Fd 10 Annexure 63 Cash Flow 2023.Pdf
Fd 11 Annexure 63 Cash Flow 2022.Pdf
Fd 12 Annexure 63 Cash Flow 2021.Pdf
Fd 13 Annexure 64 - Auditors Report 23.Pdf
Fd 14 Annexure 64 - Auditors Report 22.Pdf
Fd 15 Annexure 64 - Auditors Report 21.Pdf
Fd 16 Annexure 65 - ITR-V ACK 2023.Pdf
Fd 17 Annexure 65 - ITR-V ACK 2022.Pdf
Fd 18 Annexure 65 - ITR-V ACK 2021.Pdf
Pd 1 Self Attested PAN Card*( Annexure - 66 )
Pd 2 Commencement Certificate*( Annexure - 67 )
Pd 3 Electricity Permission Letter*( Annexure - 68 )
Pd 4 Water Permission Letter*( Annexure - 69 )
Pd 5 Approved Layout Plan*( Annexure - 70 )
Pd 6 Approved Building Plotting Plan*( Annexure - 71 )
Pd 7 Existing Layout Plan( Annexure - 72 )
Pd 8 Existing Section Plan And Specification( Annexure - 73 )
Pd 9 Sectional Drawing Of The Apartments*( Annexure - 74 )
Pd 10 Project Specifications*( Annexure - 75 )
Pd 11 Approved Section Of Building Infrastructure Plan Of Plotting*( Annexure - 76 )
Pd 12 Area Development Plan Of Project Area*( Annexure - 77 )
Pd 13 Certificate From Registered Engineer Indicating The Structural Safety Of The Building*( Annexure - 78 )
Pd 14 Advocate Search Report*( Annexure - 79 )
Pd 15 Urban Land Ceiling*( Annexure - 80 )
Pd 16 Collaboration Agreement Development Agreement Joint Development Agreement Other Agreement*( Annexure - 81 )
Pd 17 Change Of Land Use*( Annexure - 82 )
Pd 18 District Magistrate*( Annexure - 83 )
Pd 19 Conversion Certificate Under Section 95 Of The KLR Act 1964*( Annexure - 84 )
Pd 20 Any Other Document (Rights Title Interest Name)*( Annexure - 85 )
Pd 21 Proforma Of Agreement For Sale*( Annexure - 86 )
Pd 22 Proforma Of Allotment Letter*( Annexure - 87 )
Pd 24 Brochure*( Annexure - 89 )
Dc 1 Declaration (Form B)*( Annexure - 90 )
Dc 2 Section 3(1) Notarized Affidavit*( Annexure - 91 )
Dc 3 JD AFFIDAVIT CUM DECLARATION*( Annexure - 92 )
Noc 1 ESCOM Electricity*( Annexure - 93 )
Noc 2 KWSSB Water*( Annexure - 94 )
Noc 3 Approval NOC Under Section 109 Of KLR Act 1961( Annexure - 95 )
Noc 4 Approval NOC Under Section 14 Of The KTCP Act( Annexure - 96 )
Noc 5 Fire Force Department( Annexure - 97 )
Noc 6 Airport Authority Of India( Annexure - 98 )
Noc 7 KSPCB( Annexure - 99 )
Noc 8 SEIAA( Annexure - 100 )
Noc 9 BSNL( Annexure - 101 )
Noc 10 Lift Authorities( Annexure - 102 )
Noc 11 BMRCL( Annexure - 103 )
Noc 12 NOC In Case Of Building Proposals Abutting To Neighbouring Properties( Annexure - 104 )
Noc 13 Bangalore Urban Arts Commission( Annexure - 105 )
Noc 14 Inspector Of Factories Controller Of Explosives Railways( Annexure - 106 )
Noc 15 Coastal Regulation Zone Authority( Annexure - 107 )
Dr 1 Utilisation Certificate( Annexure - 108 )
Dr 2 Transfer Of Development Rights Certificate( Annexure - 109 )
Dr 3 Relinquishment Deed( Annexure - 110 )
Photo 1 Project Photo
Od 1 Tanisandra Village Map.Pdf
Od 2 BDA CDP.Pdf
Od 3 RERA Registration Applied For T5T6T7.Pdf
Ed 1 12-10-2023
Ed 2 12-10-2023
Ed 3 12-10-2023
Ed 4 12-10-2023
Ld Rtc
Ld Mutation
Ld Encumbrance Certificate
Ld Conversion Order
Ld Sale Deed
Ld Khatha
Bank

Bank & Cost Disclosure

Declared project cost and the designated escrow account on file.

Project Account Bank ICICI Bank
Account Number (RERA) 777705250085
IFSC icici000166
Branch Address 17/1, Khata Dae 61,Vittal Mallya Road ,Civil Station , Bangalore, Karnataka-560001
Country/City