Lodha Haven RERA Details - PRM/KA/RERA/1251/308/PR/280525/007785 Bangalore

View the RERA registration, promoter, approval, building, inventory, document and construction-progress disclosures for Lodha Haven under registration PRM/KA/RERA/1251/308/PR/280525/007785 in Bangalore, Karnataka. Data is sourced from rera.ka.

RERA

RERA Snapshot

The most important statutory project disclosures, generated dynamically from available RERA fields.

  • RERA Number PRM/KA/RERA/1251/308/PR/280525/007785
  • Project Name Haven
  • Project Type Residential/Group Housing
  • Project Status Under Construction
  • District Bengaluru Urban
  • Taluka Anekal
  • Original Completion 30 June 2030
  • Documents 63 Verified
Timeline

Project Timeline & Completion Details

Key statutory dates from registration through proposed completion and permit validity.

Proposed Start 14 June 2025 Expected commencement of civil works and foundation on site.
Original Completion 30 June 2030 Mandated date for project handover to the allottees and final compliance filing.
Promoter

Promoter, Organisation & Member Details

Declared promoter entity, address and corporate identifiers on file with the authority.

Primary Promoter

Lodha Developers Limited
Registered Address No. 9/1, 7th Floor, SKAV 909, Lavelle Road, Richmond Circle ,Bengaluru South ,Bengaluru Urban-560001
Experience Details
Location

Land, Address & Location Details

Land parcel, zoning and geo-coordinates as recorded in the project filing.

Address Sy Nos. 60/1, 60/2 & 61/2 , Choodasandra Village, Sarjapura Hobli , Anekal , Bengaluru Urban, Karnataka - 560035

RERA Coordinates

Latitude, Longitude 12.8903946, 77.6733393
Plans

Plans & Approvals

Statutory approvals obtained or pending against the project site.

Plan Approval No. BDA/PS/EM/EO-1/TA-2/E/10/2025-26
Authority BDA - Bangalore Development Authority
Approved Date 23 May 2025

Understand this Project's RERA details

Get clear answers and additional support from our RERA experts.

RERA Banner
Buildings

Buildings, Towers & Building-Level Details

Statutory building-level disclosures including tower height, sanctioned floors, structural counts and parking areas.

Building Detail
Name No. of Basements No. of Slab No. of Slits No. of Open Parking Building Type Height of Tower No. of Floors No. of Units
Tower A 0 20 0 76 Residential 62.0 19 76
Tower B 0 20 0 76 Residential 62.0 19 76
Tower C 0 20 0 76 Residential 62.0 19 76
Tower F 0 20 0 76 Residential 62.0 19 76

Scroll horizontally to view all building-level fields. Values marked "-" were not disclosed in the source RERA record.

Inventory

Unit Inventory & Configuration Details

Configuration mix and floor-level disclosures with both grouped and raw RERA views.

Total Units -
Configurations 3
Inventory Type RESIDENTIAL
Configuration Distribution
2 BHK 0 units
3 BHK 0 units
4 BHK 0 units
  • Tower A
  • Tower B
  • Tower C
  • Tower F
Floor-Wise Inventory Explorer
Floor Apartment Type Carpet Area No. of Unit
-1 4BHK DUPLEX TYPE A 251 0001
-1 4BHK DUPLEX TYPE A 251 0002
GF 4 BHK + STUDY 182 0103
GF 4 BHK + STUDY 182 0104
1 3 BHK + STUDY LUXE 124 0201
1 3 BHK + STUDY LUXE 124 0202
1 4 BHK + STUDY 182 0203
1 4 BHK + STUDY 182 0204
2 3 BHK + STUDY LUXE 124 0301
2 3 BHK + STUDY LUXE 124 0302
2 4 BHK + STUDY 182 0303
2 4 BHK + STUDY 182 0304
3 3 BHK + STUDY LUXE 124 0401
3 3 BHK + STUDY LUXE 124 0402
3 4 BHK + STUDY 182 0403
3 4 BHK + STUDY 182 0404
4 3 BHK + STUDY LUXE 124 0501
4 3 BHK + STUDY LUXE 124 0502
4 4 BHK + STUDY 182 0503
4 4 BHK + STUDY 182 0504
5 3 BHK + STUDY LUXE 124 0601
5 3 BHK + STUDY LUXE 124 0602
5 4 BHK + STUDY 182 0603
5 4 BHK + STUDY 182 0604
6 3 BHK + STUDY LUXE 124 0701
6 3 BHK + STUDY LUXE 124 0702
6 4 BHK + STUDY 182 0703
6 4 BHK + STUDY 182 0704
7 3 BHK + STUDY LUXE 124 0801
7 3 BHK + STUDY LUXE 124 0802
7 4 BHK + STUDY 182 0803
7 4 BHK + STUDY 182 0804
8 3 BHK + STUDY LUXE 124 0901
8 3 BHK + STUDY LUXE 124 0902
8 4 BHK + STUDY 182 0903
8 4 BHK + STUDY 182 0904
9 3 BHK + STUDY LUXE 124 1001
9 3 BHK + STUDY LUXE 124 1002
9 4 BHK + STUDY 182 1003
9 4 BHK + STUDY 182 1004
10 3 BHK + STUDY LUXE 124 1101
10 3 BHK + STUDY LUXE 124 1102
10 4 BHK + STUDY 182 1103
10 4 BHK + STUDY 182 1104
11 3 BHK + STUDY LUXE 124 1201
11 3 BHK + STUDY LUXE 124 1202
11 4 BHK + STUDY 182 1203
11 4 BHK + STUDY 182 1204
12 3 BHK + STUDY LUXE 124 1401
12 3 BHK + STUDY LUXE 124 1402
12 4 BHK + STUDY 182 1403
12 4 BHK + STUDY 182 1404
13 3 BHK + STUDY LUXE 124 1501
13 3 BHK + STUDY LUXE 124 1502
13 4 BHK + STUDY 182 1503
13 4 BHK + STUDY 182 1504
14 3 BHK + STUDY LUXE 124 1601
14 3 BHK + STUDY LUXE 124 1602
14 4 BHK + STUDY 182 1603
14 4 BHK + STUDY 182 1604
15 3 BHK + STUDY LUXE 124 1701
15 3 BHK + STUDY LUXE 124 1702
15 4 BHK + STUDY 182 1703
15 4 BHK + STUDY 182 1704
16 3 BHK + STUDY LUXE 124 1801
16 3 BHK + STUDY LUXE 124 1802
16 4 BHK + STUDY 182 1803
16 4 BHK + STUDY 182 1804
17 3 BHK + STUDY LUXE 124 1901
17 3 BHK + STUDY LUXE 124 1902
17 4 BHK + STUDY 182 1903
17 4 BHK + STUDY 182 1904
18 3 BHK + STUDY LUXE 124 2001
18 2BHK+ STUDY 87 2002
18 4 BHK + STUDY 182 2003
18 4 BHK + STUDY 182 2004
Parking

Parking, Garage & Area Details

Parking provision declared in the sanctioned plan.

Type Proposed Booked Work Done
Garage - - -
Covered Parking - - -
Open Parking - - -
Development

Development Works & Common Area Disclosures

Project-level common infrastructure disclosures as reported by the developer to the RERA authority.

Sub Structure Earth Work And Other Leveling Preparation Work % not reported Sub Structure Foundation Footing Work % not reported Sub Structure Upto Plinth Level % not reported
Sub Structure Sub-structure Flooring (Parking Floor, More Than One Floor Below General Ground Level) % not reported Sub Structure Retaining Wall (All Types) % not reported Sup Structure Rcc Or Ms Framed Structure % not reported
Sup Structure Masonry Construction % not reported Sup Structure Plastering Inside , Outside & Ceiling % not reported Sup Structure Joinery: Doors, Windows, Ventilators Etc % not reported
Sup Structure Basic Work Of Water Supply, Sanitary And Electrification % not reported Sup Structure Dadoing, Skirting, Flooring, Tiles Work (All Types) % not reported Sup Structure Railing And Grill Fixing % not reported
Finishing Works Electrification, Water Supply And Sanitary Finishing % not reported Finishing Works Painting % not reported Finishing Works Fire Prevention And Fire Fighting Fitting And Fixture With Network % not reported
Finishing Works Weather Proof Work(tile,concrete) % not reported Finishing Works Wardrobe, Showcase, Kitchen Cabinet, Puja Work % not reported Finishing Works Elevation Work % not reported
Finishing Works Internal And External Work Including Landscapes As Per Sanctioned Drawings % not reported Internal Infrastructure Water Supply % not reported Internal Infrastructure Sewage And Drainage System % not reported
Internal Infrastructure Water Conservation/rain Water Harvesting/recharge Of Ground Water % not reported Internal Infrastructure Energy Management % not reported Internal Infrastructure Fire Protection And Fire Safety Requirements % not reported
Internal Infrastructure Solid Waste Management And Disposal % not reported Internal Infrastructure Emergency Evacuation Services % not reported External Infrastructure Water Supply % not reported
External Infrastructure Internal Roads & Footpaths % not reported External Infrastructure Sewage And Drainage System % not reported External Infrastructure Electricity Supply Transformer And Substation % not reported
External Infrastructure Solid Waste Management And Disposal % not reported External Infrastructure Emergency Evacuation Services % not reported External Infrastructure Storm Water Drains % not reported
External Infrastructure Use Of Renewable Energy % not reported External Infrastructure Water Conservation/rain Water Harvesting/recharge Of Ground Water % not reported External Infrastructure Fire Protection And Fire Safety Requirements % not reported
External Infrastructure Sewage Treatment Plant (Stp) % not reported External Infrastructure Parks & Tree Planting % not reported External Infrastructure Street Lighting % not reported
Amenities Electricity % not reported Amenities Smart Home Automation % not reported Amenities Cctv Surveillance % not reported
Amenities Club House % not reported Amenities Community Hall % not reported Amenities Outdoor Sports Facility % not reported
Amenities Indoor Sports Facility % not reported Amenities Swimming Pool % not reported Amenities Gym % not reported
Amenities Parks % not reported Amenities Power Backup % not reported Amenities Piped Gas % not reported
Amenities Water And Sanitation % not reported Amenities Air Conditioning % not reported Common Areas Staircases % not reported
Common Areas Lifts % not reported Common Areas Corridor/lobbies % not reported Common Areas Fire Escapes % not reported
Common Areas Common Entrance And Exit For The Building/common Portico/foyer/verandah % not reported Common Areas Basement % not reported Common Areas Terrace % not reported
Common Areas Outer Wall % not reported Common Areas Open Parking Areas % not reported Common Areas Provision For Lodging Of Management Staff And Security Staff % not reported
Common Areas Water Conservation And Renewable Energy % not reported Common Areas Common Storage Spaces % not reported
Documents

RERA Documents & Filings

All statutory documents uploaded by the promoter to the authority portal.

Promoter Registration Certificate
Promoter Pan Card
Promoter Address Proof
Affidavit
Fd 1 Anne -70 Balance Sheet - 23-24.Pdf
Fd 2 Annex- 70 Balance Sheet FY 22-23.Pdf
Fd 3 Annex- 70 Balance Sheet FY 21-22.Pdf
Fd 4 Anne - 71 P & L -23-24.Pdf
Fd 5 Annex- 71 P & L FY 22-23.Pdf
Fd 6 Annex- 71 P & L FY 21-22.Pdf
Fd 7 ITR Ack AY 2024-25.Pdf
Fd 8 Annex - 72 ITR Ack FY 2022-23.Pdf
Fd 9 Annex - 72 ITR Ack FY 2021-22.Pdf
Fd 10 Annex 73 Directors Report 23-24 Compressed.Pdf
Fd 11 Annex 73 Directors Report FY 22-23.Pdf
Fd 12 Annex 73 Directors Report FY 21-22.Pdf
Fd 13 Anne 74 Cash Flow - 23-24.Pdf
Fd 14 Annex- 74 Cash Flow FY 22-23.Pdf
Fd 15 Annex- 74 Cash Flow FY -21-22.Pdf
Fd 16 Anne - 75 Auditor Report 23-24.Pdf
Fd 17 Annex- 75 Auditors Report FY 22-23.Pdf
Fd 18 Annex- 75 Auditors Report FY 21-22.Pdf
Pd 1 Commencement Certificate( Annexure - 80 )
Pd 2 Approved Building Plan( Annexure - 81 )
Pd 3 Sectional Drawing Of The Apartments( Annexure - 82 )
Pd 4 Certificate From Registered Engineer Indicating The Structural Safety Of The Building( Annexure - 83 )
Pd 5 Project Specifications( Annexure - 84 )
Pd 6 Brochure( Annexure - 85 )
Pd 7 Relinquishment Deed( Annexure - 86 )
Pd 8 Proforma Of Agreement For Sale( Annexure - 87 )
Pd 9 Proforma Of Allotment Letter( Annexure - 88 )
Dc 1 Declaration (Form B)( Annexure - 89 )
Dc 2 Section 3(1) Notarized Affidavit( Annexure - 90 )
Dc 3 JD AFFIDAVIT CUM DECLARATION( Annexure - 91 )
Dc 4 Advocate Search Report( Annexure - 92 )
Noc 1 ESCOM Electricity( Annexure - 95 )
Noc 2 KWSSB Water( Annexure - 96 )
Noc 3 KSPCB( Annexure - 97 )
Noc 4 SEIAA( Annexure - 98 )
Noc 5 Fire Force Department( Annexure - 99 )
Noc 6 Airport Authority Of India( Annexure - 100 )
Noc 7 BSNL( Annexure - 101 )
Noc 8 Lift Authorities( Annexure - 102 )
Noc 9 BMRCL( Annexure - 103 )
Noc 10 NOC In Case Of Building Proposals Abutting To Neighbouring Properties( Annexure - 104 )
Noc 11 Bangalore Urban Arts Commission( Annexure - 105 )
Noc 12 Inspector Of Factories Controller Of Explosives Railways( Annexure - 106 )
Noc 13 Coastal Regulation Zone Authority( Annexure - 107 )
Photo 1 Project Photo
Photo 2 Project Photo
Od 1 Consent Letter - Modification In Towers.Pdf
Od 2 RERA Registration Applied For Towers A, B, C & F.Pdf
Od 3 BDA Work Order Dt 29-03-2025 - Hosa Road.Pdf
Od 4 BDA DP Dt 29-3-2025-Hosa Road.Pdf
Od 5 Area Statment Under Architect'S Letterhead.Pdf
Od 6 Land Calculation Sheet.Pdf
Od 7 Village Map Of Choodasandra.Pdf
Ld Rtc
Ld Mutation
Ld Encumbrance Certificate
Ld Conversion Order
Ld Sale Deed
Ld Khatha
Bank

Bank & Cost Disclosure

Declared project cost and the designated escrow account on file.

Project Account Bank ICICI Bank
Account Number (RERA) 777705559903
IFSC ICIC0001663
Branch Address 1-7/1, Khata Dae 61, Vittal Mallya Road, Civil Station
Country/City