Lodha Elanza RERA Details - PRM/KA/RERA/1251/308/PR/191225/008353 Bangalore

View the RERA registration, promoter, approval, building, inventory, document and construction-progress disclosures for Lodha Elanza under registration PRM/KA/RERA/1251/308/PR/191225/008353 in Bangalore, Karnataka. Data is sourced from rera.ka.

RERA

RERA Snapshot

The most important statutory project disclosures, generated dynamically from available RERA fields.

  • RERA Number PRM/KA/RERA/1251/308/PR/191225/008353
  • Project Name Elanza
  • Project Type Residential/Group Housing
  • Project Status New Launch
  • District Bengaluru Urban
  • Taluka Anekal
  • Original Completion 30 September 2031
  • Documents 84 Verified
Timeline

Project Timeline & Completion Details

Key statutory dates from registration through proposed completion and permit validity.

Proposed Start 01 February 2026 Expected commencement of civil works and foundation on site.
Original Completion 30 September 2031 Mandated date for project handover to the allottees and final compliance filing.
Promoter

Promoter, Organisation & Member Details

Declared promoter entity, address and corporate identifiers on file with the authority.

Primary Promoter

Lodha Developers Limited
Registered Address SKAV 909, 7th Floor, No. 9/1, Lavelle Road,Richmond Circle, Shanthala Nagar ,Bengaluru South ,Bengaluru Urban-560001
Experience Details
Location

Land, Address & Location Details

Land parcel, zoning and geo-coordinates as recorded in the project filing.

Address Sy. Nos. 137/1, 139/1, 139/2, 140, 149/2 (old No. 149), 150, 151, 153/2 (old No. 153), 154/4, 155/1, 155/3, 155/4, 156/1, 156/2, 157, 158 , 159/1, 159/2, 160/1, 160/2, 162/1, 162/2, 163, 174/1, 174/2, 174/3, 174/5 and 174/6 of Yamare Village, Sarjapura Hobli , Anekal , Bengaluru Urban, Karnataka - 562125

RERA Coordinates

Latitude, Longitude 12.8747086, 77.7588306
Plans

Plans & Approvals

Statutory approvals obtained or pending against the project site.

Plan Approval No. APA/CC/1199/2025-26
Authority Anekal Planning Authority
Approved Date 12 December 2025

Understand this Project's RERA details

Get clear answers and additional support from our RERA experts.

RERA Banner
Buildings

Buildings, Towers & Building-Level Details

Statutory building-level disclosures including tower height, sanctioned floors, structural counts and parking areas.

Building Detail
Name No. of Basements No. of Slab No. of Slits No. of Open Parking Building Type Height of Tower No. of Floors No. of Units
A 0 34 0 119 Residential 104.15 33 119
B 0 34 0 119 Residential 104.15 33 119
C 0 34 0 111 Residential 104.15 33 111
D 0 34 0 111 Residential 104.15 33 111
E 0 34 0 119 Residential 104.15 33 119
F 0 34 0 119 Residential 104.15 33 119

Scroll horizontally to view all building-level fields. Values marked "-" were not disclosed in the source RERA record.

Inventory

Unit Inventory & Configuration Details

Configuration mix and floor-level disclosures with both grouped and raw RERA views.

Total Units -
Configurations 4
Inventory Type RESIDENTIAL
Configuration Distribution
1 BHK 0 units
2 BHK 0 units
3 BHK 0 units
4 BHK 0 units
  • A
  • B
  • C
  • D
  • E
  • F
Floor-Wise Inventory Explorer
Floor Apartment Type Carpet Area No. of Unit
GF 3 BHK+STUDY_C 131.58 0103
1 3 BHK_B 114.83 0203
1 3 BHK_B 114.83 0204
2 1 BHK+STUDY+GARDEN 82.89 0301
2 3 BHK+GARDEN_A 107.46 0302
2 3 BHK_B 114.83 0303
2 3 BHK_B 114.83 0304
3 3 BHK OPTIMA 90.99 0401
3 3 BHK OPTIMA 90.99 0402
3 3 BHK_B 114.83 0403
3 3 BHK_B 114.83 0404
4 3 BHK OPTIMA 90.99 0501
4 3 BHK OPTIMA 90.99 0502
4 3 BHK_B 114.83 0503
4 3 BHK_B 114.83 0504
5 3 BHK OPTIMA 90.99 0601
5 3 BHK OPTIMA 90.99 0602
5 3 BHK_B 114.83 0603
5 3 BHK_B 114.83 0604
6 3 BHK OPTIMA 90.99 0701
6 3 BHK OPTIMA 90.99 0702
6 3 BHK_B 114.83 0703
6 3 BHK_B 114.83 0704
7 3 BHK OPTIMA 90.99 0801
7 3 BHK OPTIMA 90.99 0802
7 3 BHK_B 114.83 0803
7 3 BHK_B 114.83 0804
8 3 BHK OPTIMA 90.99 0901
8 3 BHK OPTIMA 90.99 0902
8 3 BHK_B 114.83 0903
8 3 BHK_B 114.83 0904
9 3 BHK OPTIMA 90.99 1001
9 3 BHK OPTIMA 90.99 1002
9 3 BHK_B 114.83 1003
9 3 BHK_B 114.83 1004
10 3 BHK OPTIMA 90.99 1101
10 3 BHK OPTIMA 90.99 1102
10 3 BHK_B 114.83 1103
10 3 BHK_B 114.83 1104
11 3 BHK OPTIMA 90.99 1201
11 3 BHK OPTIMA 90.99 1202
11 3 BHK_B 114.83 1203
11 3 BHK_B 114.83 1204
12 3 BHK OPTIMA 90.99 1401
12 3 BHK OPTIMA 90.99 1402
12 3 BHK_B 114.83 1403
12 3 BHK_B 114.83 1404
13 3 BHK OPTIMA 90.99 1501
13 3 BHK OPTIMA 90.99 1502
13 3 BHK_B 114.83 1503
13 3 BHK_B 114.83 1504
14 3 BHK OPTIMA 90.99 1601
14 3 BHK OPTIMA 90.99 1602
14 3 BHK_B 114.83 1603
14 3 BHK_B 114.83 1604
15 3 BHK OPTIMA 90.99 1701
15 3 BHK OPTIMA 90.99 1702
15 3 BHK_B 114.83 1703
15 3 BHK_B 114.83 1704
16 3 BHK OPTIMA 90.99 1801
16 3 BHK OPTIMA 90.99 1802
16 3 BHK_B 114.83 1803
16 3 BHK_B 114.83 1804
17 3 BHK OPTIMA 90.99 1901
17 3 BHK OPTIMA 90.99 1902
17 3 BHK_B 114.83 1903
17 3 BHK_B 114.83 1904
18 3 BHK OPTIMA 90.99 2001
18 3 BHK OPTIMA 90.99 2002
18 4 BHK_A 184.12 2003
19 3 BHK OPTIMA 90.99 2101
19 3 BHK OPTIMA 90.99 2102
19 3 BHK_B 114.83 2103
19 3 BHK_B 114.83 2104
20 3 BHK OPTIMA 90.99 2201
20 3 BHK OPTIMA 90.99 2202
20 3 BHK_B 114.83 2203
20 3 BHK_B 114.83 2204
21 3 BHK OPTIMA 90.99 2301
21 3 BHK OPTIMA 90.99 2302
21 3 BHK_B 114.83 2303
21 3 BHK_B 114.83 2304
22 3 BHK OPTIMA 90.99 2401
22 3 BHK OPTIMA 90.99 2402
22 3 BHK_B 114.83 2403
22 3 BHK_B 114.83 2404
23 3 BHK OPTIMA 90.99 2501
23 3 BHK OPTIMA 90.99 2502
23 3 BHK_B 114.83 2503
23 3 BHK_B 114.83 2504
24 3 BHK OPTIMA 90.99 2601
24 3 BHK OPTIMA 90.99 2602
24 3 BHK_B 114.83 2603
24 3 BHK_B 114.83 2604
25 3 BHK OPTIMA 90.99 2701
25 3 BHK OPTIMA 90.99 2702
25 3 BHK_B 114.83 2703
25 3 BHK_B 114.83 2704
26 3 BHK OPTIMA 90.99 2801
26 3 BHK OPTIMA 90.99 2802
26 3 BHK_B 114.83 2803
26 3 BHK_B 114.83 2804
27 3 BHK OPTIMA 90.99 2901
27 3 BHK OPTIMA 90.99 2902
27 3 BHK_B 114.83 2903
27 3 BHK_B 114.83 2904
28 3 BHK OPTIMA 90.99 3001
28 3 BHK OPTIMA 90.99 3002
28 4 BHK_A 184.12 3003
29 3 BHK OPTIMA 90.99 3101
29 3 BHK OPTIMA 90.99 3102
29 3 BHK_B 114.83 3103
29 3 BHK_B 114.83 3104
30 3 BHK OPTIMA 90.99 3201
30 3 BHK OPTIMA 90.99 3202
31 3 BHK OPTIMA 90.99 3301
31 3 BHK OPTIMA 90.99 3302
31 4 BHK+STUDY+TERRACE_PH_A 320.83 3303
31 4 BHK+STUDY+TERRACE_PH_A 320.83 3304
Parking

Parking, Garage & Area Details

Parking provision declared in the sanctioned plan.

Type Proposed Booked Work Done
Garage - - -
Covered Parking - - -
Open Parking - - -
Development

Development Works & Common Area Disclosures

Project-level common infrastructure disclosures as reported by the developer to the RERA authority.

Sub Structure Earth Work And Other Leveling Preparation Work % not reported Sub Structure Foundation Footing Work % not reported Sub Structure Upto Plinth Level % not reported
Sub Structure Sub-structure Flooring (Parking Floor, More Than One Floor Below General Ground Level) % not reported Sub Structure Retaining Wall (All Types) % not reported Sup Structure Rcc Or Ms Framed Structure % not reported
Sup Structure Masonry Construction % not reported Sup Structure Plastering Inside , Outside & Ceiling % not reported Sup Structure Joinery: Doors, Windows, Ventilators Etc % not reported
Sup Structure Basic Work Of Water Supply, Sanitary And Electrification % not reported Sup Structure Dadoing, Skirting, Flooring, Tiles Work (All Types) % not reported Sup Structure Railing And Grill Fixing % not reported
Finishing Works Electrification, Water Supply And Sanitary Finishing % not reported Finishing Works Painting % not reported Finishing Works Fire Prevention And Fire Fighting Fitting And Fixture With Network % not reported
Finishing Works Weather Proof Work(tile,concrete) % not reported Finishing Works Wardrobe, Showcase, Kitchen Cabinet, Puja Work % not reported Finishing Works Elevation Work % not reported
Finishing Works Internal And External Work Including Landscapes As Per Sanctioned Drawings % not reported Internal Infrastructure Water Supply % not reported Internal Infrastructure Sewage And Drainage System % not reported
Internal Infrastructure Water Conservation/rain Water Harvesting/recharge Of Ground Water % not reported Internal Infrastructure Energy Management % not reported Internal Infrastructure Fire Protection And Fire Safety Requirements % not reported
Internal Infrastructure Solid Waste Management And Disposal % not reported Internal Infrastructure Emergency Evacuation Services % not reported External Infrastructure Water Supply % not reported
External Infrastructure Internal Roads & Footpaths % not reported External Infrastructure Sewage And Drainage System % not reported External Infrastructure Electricity Supply Transformer And Substation % not reported
External Infrastructure Solid Waste Management And Disposal % not reported External Infrastructure Emergency Evacuation Services % not reported External Infrastructure Storm Water Drains % not reported
External Infrastructure Use Of Renewable Energy % not reported External Infrastructure Water Conservation/rain Water Harvesting/recharge Of Ground Water % not reported External Infrastructure Fire Protection And Fire Safety Requirements % not reported
External Infrastructure Sewage Treatment Plant (Stp) % not reported External Infrastructure Parks & Tree Planting % not reported External Infrastructure Street Lighting % not reported
Amenities Electricity % not reported Amenities Smart Home Automation % not reported Amenities Cctv Surveillance % not reported
Amenities Club House % not reported Amenities Community Hall % not reported Amenities Outdoor Sports Facility % not reported
Amenities Indoor Sports Facility % not reported Amenities Swimming Pool % not reported Amenities Gym % not reported
Amenities Parks % not reported Amenities Power Backup % not reported Amenities Piped Gas % not reported
Amenities Water And Sanitation % not reported Amenities Air Conditioning % not reported Common Areas Staircases % not reported
Common Areas Lifts % not reported Common Areas Corridor/lobbies % not reported Common Areas Fire Escapes % not reported
Common Areas Common Entrance And Exit For The Building/common Portico/foyer/verandah % not reported Common Areas Basement % not reported Common Areas Terrace % not reported
Common Areas Outer Wall % not reported Common Areas Open Parking Areas % not reported Common Areas Provision For Lodging Of Management Staff And Security Staff % not reported
Common Areas Water Conservation And Renewable Energy % not reported Common Areas Common Storage Spaces % not reported
Documents

RERA Documents & Filings

All statutory documents uploaded by the promoter to the authority portal.

Affidavit
Promoter Registration Certificate
Promoter Pan Card
Promoter Address Proof
Fd 1 Balance Sheet - FY 24-25.Pdf
Fd 2 Anne -70 Balance Sheet - 23-24.Pdf
Fd 3 Annex- 70 Balance Sheet FY 22-23.Pdf
Fd 4 Profit And Loss - FY 24-25.Pdf
Fd 5 Anne - 71 P & L -23-24.Pdf
Fd 6 Annex- 71 P & L FY 22-23.Pdf
Fd 7 ITR Ack FY-24-25.Pdf
Fd 8 ITR Ack FY 2023-24.Pdf
Fd 9 Annex - 72 ITR Ack FY 2022-23.Pdf
Fd 10 LDL Directors Report FY 24-25.Pdf
Fd 11 Annex 73 Directors Report 23-24-Compressed.Pdf
Fd 12 Annex 73 Directors Report FY 22-23.Pdf
Fd 13 Cash Flow - FY 24-25.Pdf
Fd 14 Anne 74 Cash Flow - 23-24.Pdf
Fd 15 Annex- 74 Cash Flow FY 22-23.Pdf
Fd 16 Auditor Report- FY 24-25.Pdf
Fd 17 Anne - 75 Auditor Report 23-24.Pdf
Fd 18 Annex- 75 Auditors Report FY 22-23.Pdf
Pd 1 Commencement Certificate( Annexure - 80 )
Pd 2 Approved Building Plan( Annexure - 81 )
Pd 3 Sectional Drawing Of The Apartments( Annexure - 82 )
Pd 4 Certificate From Registered Engineer Indicating The Structural Safety Of The Building( Annexure - 83 )
Pd 5 Project Specifications( Annexure - 84 )
Pd 6 Brochure( Annexure - 85 )
Pd 7 Relinquishment Deed( Annexure - 86 )
Pd 8 Proforma Of Agreement For Sale( Annexure - 87 )
Pd 9 Proforma Of Allotment Letter( Annexure - 88 )
Dc 1 Declaration (Form B)( Annexure - 89 )
Dc 2 Section 3(1) Notarized Affidavit( Annexure - 90 )
Dc 3 JD AFFIDAVIT CUM DECLARATION( Annexure - 91 )
Dc 4 Advocate Search Report( Annexure - 92 )
Noc 1 ESCOM Electricity( Annexure - 95 )
Noc 2 KWSSB Water( Annexure - 96 )
Noc 3 KSPCB( Annexure - 97 )
Noc 4 SEIAA( Annexure - 98 )
Noc 5 Fire Force Department( Annexure - 99 )
Noc 6 Airport Authority Of India( Annexure - 100 )
Noc 7 BSNL( Annexure - 101 )
Photo 1 Project Photo
Photo 2 Project Photo
Photo 3 Project Photo
Photo 4 Project Photo
Od 1 HAL NOC Dt 20-11-2025.PDF
Od 2 APA Development Plan.Pdf
Od 3 APA DP Work Order.Pdf
Od 4 Yamare Village Map With Demarcations.Pdf
Od 5 CDP BO.Pdf
Od 6 RERA Registration Applied For Towers A, B, C, D, E, F.Pdf
Od 7 Area Statement Signed By Architect (1).Pdf
Od 8 STP Design - Sarjapur.Pdf
Od 9 Land Cost Calculation Sheet Signed.Pdf
Od 10 Project Cost Estimation Certified By Chartered Engineer.Pdf
Od 11 Source Of Funding - Declaration Letter (1).Pdf
Od 12 Consent Letter - Sarjapur.Pdf
Od 13 ADLR SKETCH- Yamare Village.Pdf
Od 14 Self-Attested Aadhaar Of Chartered Engineer.Pdf
Od 15 Phase-Wise Bifurcation Of Area.Pdf
Od 16 Chartered Engineer'S Registration Certificate.Pdf
Ed 1 18-12-2025
Ed 2 18-12-2025
Ed 3 18-12-2025
Ed 4 18-12-2025
Ed 5 18-12-2025
Ed 6 18-12-2025
Ed 7 18-12-2025
Ed 8 18-12-2025
Ed 9 18-12-2025
Ed 10 18-12-2025
Ed 11 18-12-2025
Ed 12 18-12-2025
Ed 13 18-12-2025
Ed 14 18-12-2025
Ed 15 18-12-2025
Ed 16 18-12-2025
Ld Rtc
Ld Mutation
Ld Encumbrance Certificate
Ld Conversion Order
Ld Sale Deed
Ld Khatha
Bank

Bank & Cost Disclosure

Declared project cost and the designated escrow account on file.

Project Account Bank ICICI Bank
Account Number (RERA) 777705880103
IFSC ICIC0001663
Branch Address 1-7/1, Khata Dae 61, Vittal Mallya Road, Civil Station
Country/City