Squareyards Logo
Blogs
Sell or Rent Property
Login
Rera Banner
residential Under Construction Source: rera.ka

Assetz Trees And Tandem RERA Details - PRM/KA/RERA/1251/308/PR/160426/008586 Bangalore

View the RERA registration, promoter, approval, building, inventory, document and construction-progress disclosures for Assetz Trees And Tandem under registration PRM/KA/RERA/1251/308/PR/160426/008586 in Bangalore, Karnataka. Data is sourced from rera.ka.

RERA

RERA Snapshot

The most important statutory project disclosures, generated dynamically from available RERA fields.

  • RERA Number PRM/KA/RERA/1251/308/PR/160426/008586
  • Project Name Assetz Trees & Tandem -Tower A
  • Project Type Residential/Group Housing
  • Project Status Under Construction
  • District Bengaluru Urban
  • Taluka Anekal
  • Original Completion 31 May 2030
  • Documents 69 Verified
Timeline

Project Timeline & Completion Details

Key statutory dates from registration through proposed completion and permit validity.

Proposed Start 01 March 2025 Expected commencement of civil works and foundation on site.
Original Completion 31 May 2030 Mandated date for project handover to the allottees and final compliance filing.
Promoter

Promoter, Organisation & Member Details

Declared promoter entity, address and corporate identifiers on file with the authority.

Primary Promoter

Infraedge Management Services Pvt Ltd
Registered Address Assetz House No.30 ,Crescent Road Bangalore ,Bengaluru North ,Bengaluru Urban-560001
Location

Land, Address & Location Details

Land parcel, zoning and geo-coordinates as recorded in the project filing.

Address SURVEY NOS. 29/3, 31/1, 31/2, , 32/1 & 32/2 , AVALAHALLI VILLAGE, ON HUSKUR MAIN ROAD, SARJAPURA-2 HOBLI, ANEKAL TALUK, , Anekal , Bengaluru Urban, Karnataka - 560099

RERA Coordinates

Latitude, Longitude 12.8741, 77.71585
Plans

Plans & Approvals

Statutory approvals obtained or pending against the project site.

Plan Approval No. BAMP/MM/AS/AA-5/TAS-2/PU/80/2025-26
Authority BDA - Bangalore Development Authority
Approved Date 18 March 2026

Understand this Project's RERA details

Get clear answers and additional support from our RERA experts.

RERA Banner
Buildings

Buildings, Towers & Building-Level Details

Statutory building-level disclosures including tower height, sanctioned floors, structural counts and parking areas.

Building Detail
Name No. of Basements No. of Slab No. of Slits No. of Open Parking Building Type Height of Tower No. of Floors No. of Units
Tower A 1 23 0 233 Residential 69.95 22 220

Scroll horizontally to view all building-level fields. Values marked "-" were not disclosed in the source RERA record.

Inventory

Unit Inventory & Configuration Details

Configuration mix and floor-level disclosures with both grouped and raw RERA views.

Total Units -
Configurations 3
Inventory Type RESIDENTIAL
Configuration Distribution
2 BHK 0 units
3 BHK 0 units
STUDIO 0 units
  • Tower A
Floor-Wise Inventory Explorer
Floor Apartment Type Carpet Area No. of Unit
-1 3 BHK 132.54 A-001
-1 STUDIO 19.4 A-002
-1 2 BHK 101.8 A-003
-1 2 BHK 101.8 A-004
-1 STUDIO 19.4 A-005
-1 3 BHK 132.54 A-006
-1 3 BHK 132.54 A-007
-1 3 BHK 121.2 A-008
-1 3 BHK 121.2 A-009
GF 3 BHK 132.54 A-011
GF STUDIO 19.4 A-012
GF 2 BHK 101.8 A-013
GF 2 BHK 101.8 A-014
GF STUDIO 19.4 A-015
GF 3 BHK 132.54 A-016
GF 3 BHK 132.54 A-017
GF 3 BHK 121.2 A-018
GF 3 BHK 121.2 A-019
1 3 BHK 132.54 A-021
1 STUDIO 19.4 A-022
1 2 BHK 101.8 A-023
1 2 BHK 101.8 A-024
1 STUDIO 19.4 A-025
1 3 BHK 132.54 A-026
1 3 BHK 132.54 A-027
1 3 BHK 121.2 A-028
1 3 BHK 121.2 A-029
1 3 BHK 132.54 A-0210
2 3 BHK 132.54 A-031
2 STUDIO 19.4 A-032
2 2 BHK 101.8 A-033
2 2 BHK 101.8 A-034
2 STUDIO 19.4 A-035
2 3 BHK 132.54 A-036
2 3 BHK 132.54 A-037
2 3 BHK 121.2 A-038
2 3 BHK 121.2 A-039
2 3 BHK 132.54 A-0310
3 3 BHK 132.54 A-041
3 STUDIO 19.4 A-042
3 2 BHK 101.8 A-043
3 2 BHK 101.8 A-044
3 STUDIO 19.4 A-045
3 3 BHK 132.54 A-046
3 3 BHK 132.54 A-047
3 3 BHK 121.2 A-048
3 3 BHK 121.2 A-049
3 3 BHK 132.54 A-0410
4 3 BHK 132.54 A-051
4 STUDIO 19.4 A-052
4 2 BHK 101.8 A-053
4 2 BHK 101.8 A-054
4 STUDIO 19.4 A-055
4 3 BHK 132.54 A-056
4 3 BHK 132.54 A-057
4 3 BHK 121.2 A-058
4 3 BHK 121.2 A-059
4 3 BHK 132.54 A-0510
5 3 BHK 132.54 A-061
5 STUDIO 19.4 A-062
5 2 BHK 101.8 A-063
5 2 BHK 101.8 A-064
5 STUDIO 19.4 A-065
5 3 BHK 132.54 A-066
5 3 BHK 132.54 A-067
5 3 BHK 121.2 A-068
5 3 BHK 121.2 A-069
5 3 BHK 132.54 A-0610
6 3 BHK 132.54 A-071
6 STUDIO 19.4 A-072
6 2 BHK 101.8 A-073
6 2 BHK 101.8 A-074
6 STUDIO 19.4 A-075
6 3 BHK 132.54 A-076
6 3 BHK 132.54 A-077
6 3 BHK 121.2 A-078
6 3 BHK 121.2 A-079
6 3 BHK 132.54 A-0710
7 3 BHK 132.54 A-081
7 STUDIO 19.4 A-082
7 2 BHK 101.8 A-083
7 2 BHK 101.8 A-084
7 STUDIO 19.4 A-085
7 3 BHK 132.54 A-086
7 3 BHK 132.54 A-087
7 3 BHK 121.2 A-088
7 3 BHK 121.2 A-089
7 3 BHK 132.54 A-0810
8 3 BHK 132.54 A-091
8 STUDIO 19.4 A-092
8 2 BHK 101.8 A-093
8 2 BHK 101.8 A-094
8 STUDIO 19.4 A-095
8 3 BHK 132.54 A-096
8 3 BHK 132.54 A-097
8 3 BHK 121.2 A-098
8 3 BHK 121.2 A-099
8 3 BHK 132.54 A-0910
9 3 BHK 132.54 A-101
9 STUDIO 19.4 A-102
9 2 BHK 101.8 A-103
9 2 BHK 101.8 A-104
9 STUDIO 19.4 A-105
9 3 BHK 132.54 A-106
9 3 BHK 132.54 A-107
9 3 BHK 121.2 A-108
9 3 BHK 121.2 A-109
9 3 BHK 132.54 A-1010
10 3 BHK 132.54 A-111
10 STUDIO 19.4 A-112
10 2 BHK 101.8 A-113
10 2 BHK 101.8 A-114
10 STUDIO 19.4 A-115
10 3 BHK 132.54 A-116
10 3 BHK 132.54 A-117
10 3 BHK 121.2 A-118
10 3 BHK 121.2 A-119
10 3 BHK 132.54 A-1110
11 3 BHK 132.54 A-121
11 STUDIO 19.4 A-122
11 2 BHK 101.8 A-123
11 2 BHK 101.8 A-124
11 STUDIO 19.4 A-125
11 3 BHK 132.54 A-126
11 3 BHK 132.54 A-127
11 3 BHK 121.2 A-128
11 3 BHK 121.2 A-129
11 3 BHK 132.54 A-1210
12 3 BHK 132.54 A-131
12 STUDIO 19.4 A-132
12 2 BHK 101.8 A-133
12 2 BHK 101.8 A-134
12 STUDIO 19.4 A-135
12 3 BHK 132.54 A-136
12 3 BHK 132.54 A-137
12 3 BHK 121.2 A-138
12 3 BHK 121.2 A-139
12 3 BHK 132.54 A-1310
13 3 BHK 132.54 A-141
13 STUDIO 19.4 A-142
13 2 BHK 101.8 A-143
13 2 BHK 101.8 A-144
13 STUDIO 19.4 A-145
13 3 BHK 132.54 A-146
13 3 BHK 132.54 A-147
13 3 BHK 121.2 A-148
13 3 BHK 121.2 A-149
13 3 BHK 132.54 A-1410
14 3 BHK 132.54 A-151
14 STUDIO 19.4 A-152
14 2 BHK 101.8 A-153
14 2 BHK 101.8 A-154
14 STUDIO 19.4 A-155
14 3 BHK 132.54 A-156
14 3 BHK 132.54 A-157
14 3 BHK 121.2 A-158
14 3 BHK 121.2 A-159
14 3 BHK 132.54 A-1510
15 3 BHK 132.54 A-161
15 STUDIO 19.4 A-162
15 2 BHK 101.8 A-163
15 2 BHK 101.8 A-164
15 STUDIO 19.4 A-165
15 3 BHK 132.54 A-166
15 3 BHK 132.54 A-167
15 3 BHK 121.2 A-168
15 3 BHK 121.2 A-169
15 3 BHK 132.54 A-1610
16 3 BHK 132.54 A-171
16 STUDIO 19.4 A-172
16 2 BHK 101.8 A-173
16 2 BHK 101.8 A-174
16 STUDIO 19.4 A-175
16 3 BHK 132.54 A-176
16 3 BHK 132.54 A-177
16 3 BHK 121.2 A-178
16 3 BHK 121.2 A-179
16 3 BHK 132.54 A-1710
17 3 BHK 132.54 A-181
17 STUDIO 19.4 A-182
17 2 BHK 101.8 A-183
17 2 BHK 101.8 A-184
17 STUDIO 19.4 A-185
17 3 BHK 132.54 A-186
17 3 BHK 132.54 A-187
17 3 BHK 121.2 A-188
17 3 BHK 121.2 A-189
17 3 BHK 132.54 A-1810
18 3 BHK 132.54 A-191
18 3 BHK 121.2 A-193
18 3 BHK 121.2 A-194
18 3 BHK 132.54 A-196
18 3 BHK 132.54 A-197
18 2 BHK 89.74 A-198
18 2 BHK 89.74 A-199
18 3 BHK 132.54 A-1910
19 3 BHK 132.54 A-201
19 3 BHK 121.2 A-203
19 3 BHK 121.2 A-204
19 3 BHK 132.54 A-206
19 3 BHK 132.54 A-207
19 3 BHK 121.2 A-208
19 3 BHK 121.2 A-209
19 3 BHK 132.54 A-2010
20 3 BHK 132.54 A-211
20 3 BHK 121.2 A-213
20 3 BHK 121.2 A-214
20 3 BHK 132.54 A-216
20 3 BHK 132.54 A-217
20 3 BHK 121.2 A-218
20 3 BHK 121.2 A-219
20 3 BHK 132.54 A-2110
21 3 BHK 132.54 A-221
21 3 BHK 121.2 A-223
21 3 BHK 121.2 A-224
21 3 BHK 132.54 A-226
21 3 BHK 132.54 A-227
21 3 BHK 121.2 A-228
21 3 BHK 121.2 A-229
21 3 BHK 132.54 A-2210
Parking

Parking, Garage & Area Details

Parking provision declared in the sanctioned plan.

Type Proposed Booked Work Done
Garage - - -
Covered Parking - - -
Open Parking - - -
Development

Development Works & Common Area Disclosures

Project-level common infrastructure disclosures as reported by the developer to the RERA authority.

Sub Structure Earth Work And Other Leveling Preparation Work % not reported Sub Structure Foundation Footing Work % not reported Sub Structure Upto Plinth Level % not reported
Sub Structure Sub-structure Flooring (Parking Floor, More Than One Floor Below General Ground Level) % not reported Sub Structure Retaining Wall (All Types) % not reported Sup Structure Rcc Or Ms Framed Structure % not reported
Sup Structure Masonry Construction % not reported Sup Structure Plastering Inside , Outside & Ceiling % not reported Sup Structure Joinery: Doors, Windows, Ventilators Etc % not reported
Sup Structure Basic Work Of Water Supply, Sanitary And Electrification % not reported Sup Structure Dadoing, Skirting, Flooring, Tiles Work (All Types) % not reported Sup Structure Railing And Grill Fixing % not reported
Finishing Works Electrification, Water Supply And Sanitary Finishing % not reported Finishing Works Painting % not reported Finishing Works Fire Prevention And Fire Fighting Fitting And Fixture With Network % not reported
Finishing Works Weather Proof Work(tile,concrete) % not reported Finishing Works Wardrobe, Showcase, Kitchen Cabinet, Puja Work % not reported Finishing Works Elevation Work % not reported
Finishing Works Internal And External Work Including Landscapes As Per Sanctioned Drawings % not reported Internal Infrastructure Water Supply % not reported Internal Infrastructure Sewage And Drainage System % not reported
Internal Infrastructure Water Conservation/rain Water Harvesting/recharge Of Ground Water % not reported Internal Infrastructure Energy Management % not reported Internal Infrastructure Fire Protection And Fire Safety Requirements % not reported
Internal Infrastructure Solid Waste Management And Disposal % not reported Internal Infrastructure Emergency Evacuation Services % not reported External Infrastructure Water Supply % not reported
External Infrastructure Internal Roads & Footpaths % not reported External Infrastructure Sewage And Drainage System % not reported External Infrastructure Electricity Supply Transformer And Substation % not reported
External Infrastructure Solid Waste Management And Disposal % not reported External Infrastructure Emergency Evacuation Services % not reported External Infrastructure Storm Water Drains % not reported
External Infrastructure Use Of Renewable Energy % not reported External Infrastructure Water Conservation/rain Water Harvesting/recharge Of Ground Water % not reported External Infrastructure Fire Protection And Fire Safety Requirements % not reported
External Infrastructure Sewage Treatment Plant (Stp) % not reported External Infrastructure Parks & Tree Planting % not reported External Infrastructure Street Lighting % not reported
Amenities Electricity % not reported Amenities Smart Home Automation % not reported Amenities Cctv Surveillance % not reported
Amenities Club House % not reported Amenities Community Hall % not reported Amenities Outdoor Sports Facility % not reported
Amenities Indoor Sports Facility % not reported Amenities Swimming Pool % not reported Amenities Gym % not reported
Amenities Parks % not reported Amenities Power Backup % not reported Amenities Piped Gas % not reported
Amenities Water And Sanitation % not reported Amenities Air Conditioning % not reported Common Areas Staircases % not reported
Common Areas Lifts % not reported Common Areas Corridor/lobbies % not reported Common Areas Fire Escapes % not reported
Common Areas Common Entrance And Exit For The Building/common Portico/foyer/verandah % not reported Common Areas Basement % not reported Common Areas Terrace % not reported
Common Areas Outer Wall % not reported Common Areas Open Parking Areas % not reported Common Areas Provision For Lodging Of Management Staff And Security Staff % not reported
Common Areas Water Conservation And Renewable Energy % not reported Common Areas Common Storage Spaces % not reported
Documents

RERA Documents & Filings

All statutory documents uploaded by the promoter to the authority portal.

Ld Conversion Order
Promoter Registration Certificate
Promoter Pan Card
Promoter Address Proof
Affidavit
Fd 1 Annexure 70c BS 2024-2025.Pdf
Fd 2 Annexure 70b BS 2023-2024.Pdf
Fd 3 Annexure 70a BS 2022-2023.Pdf
Fd 4 Annexure 71c PL 2024-2025.Pdf
Fd 5 Annexure 71b PL 2023-2024.Pdf
Fd 6 Annexure 71a PL 2022-2023.Pdf
Fd 7 Annexure 72c-ITR 2024-2025.Pdf
Fd 8 Annexure 72b-ITR 2023-2024.Pdf
Fd 9 Annexure 72a-ITR 2022-2023.Pdf
Fd 10 Annexure 73c DR 2024-2025.Pdf
Fd 11 Annexure 73b DR 2023-2024.Pdf
Fd 12 Annexure 73a DR 2022-2023.Pdf
Fd 13 Annexure 74c CF 2024-2025.Pdf
Fd 14 Annexure 74b CF 2023-2024.Pdf
Fd 15 Annexure 74a CF 2022-2023.Pdf
Fd 16 Annexure 75c AR 2024-2025.Pdf
Fd 17 Annexure 75b AR 2023-2024.Pdf
Fd 18 Annexure 75a AR 2022-2023.Pdf
Pd 1 Commencement Certificate( Annexure - 80 )
Pd 2 Approved Building Plan( Annexure - 81 )
Pd 3 Sectional Drawing Of The Apartments( Annexure - 82 )
Pd 4 Certificate From Registered Engineer Indicating The Structural Safety Of The Building( Annexure - 83 )
Pd 5 Project Specifications( Annexure - 84 )
Pd 6 Brochure( Annexure - 85 )
Pd 7 Relinquishment Deed( Annexure - 86 )
Pd 8 Proforma Of Agreement For Sale( Annexure - 87 )
Pd 9 Proforma Of Allotment Letter( Annexure - 88 )
Dc 1 Declaration (Form B)( Annexure - 89 )
Dc 2 Section 3(1) Notarized Affidavit( Annexure - 90 )
Dc 3 JD AFFIDAVIT CUM DECLARATION( Annexure - 91 )
Dc 4 Advocate Search Report( Annexure - 92 )
Noc 1 ESCOM Electricity( Annexure - 95 )
Noc 2 KWSSB Water( Annexure - 96 )
Noc 3 KSPCB( Annexure - 97 )
Noc 4 SEIAA( Annexure - 98 )
Noc 5 Fire Force Department( Annexure - 99 )
Noc 6 Airport Authority Of India( Annexure - 100 )
Noc 7 BSNL( Annexure - 101 )
Photo 1 Project Photo
Od 1 Annexure 113-Search Report Sy No 29-3.Pdf
Od 2 Annexure 113-Search Report Sy No 31-1 And 31-2.Pdf
Od 3 Annexure 113-Search Report Sy No 32-1 And 32-2.Pdf
Od 4 Annexure 113-STP Details.Pdf
Od 5 Annexure 113-Demarcation Drawing.Pdf
Ed 1 31-03-2026
Ed 2 31-03-2026
Ed 3 31-03-2026
Ed 4 31-03-2026
Ed 5 31-03-2026
Ed 6 31-03-2026
Ed 7 31-03-2026
Ed 8 31-03-2026
Ed 9 31-03-2026
Ed 10 31-03-2026
Ed 11 31-03-2026
Ed 12 31-03-2026
Ed 13 31-03-2026
Ed 14 31-03-2026
Ed 15 07-04-2026
Ld Rtc
Ld Mutation
Ld Encumbrance Certificate
Ld Sale Deed
Ld Khatha
Bank

Bank & Cost Disclosure

Declared project cost and the designated escrow account on file.

Project Account Bank HDFC
Account Number (RERA) 99999923122013
IFSC HDFC0000009
Branch Address Kasturba Gandhi Marg Bengaluru
Country/City