Assetz Sora And Saki RERA Details - PRM/KA/RERA/1251/309/PR/060324/006692 Bangalore

View the RERA registration, promoter, approval, building, inventory, document and construction-progress disclosures for Assetz Sora And Saki under registration PRM/KA/RERA/1251/309/PR/060324/006692 in Bangalore, Karnataka. Data is sourced from rera.ka.

RERA

RERA Snapshot

The most important statutory project disclosures, generated dynamically from available RERA fields.

  • RERA Number PRM/KA/RERA/1251/309/PR/060324/006692
  • Project Name ASSETZ SORA & SAKI Phase 1
  • Project Type Residential/Group Housing
  • Project Status Under Construction
  • District Bengaluru Urban
  • Taluka Bengaluru North
  • Original Completion 30 September 2028
  • Documents 74 Verified
Timeline

Project Timeline & Completion Details

Key statutory dates from registration through proposed completion and permit validity.

Proposed Start 01 April 2024 Expected commencement of civil works and foundation on site.
Original Completion 30 September 2028 Mandated date for project handover to the allottees and final compliance filing.
Promoter

Promoter, Organisation & Member Details

Declared promoter entity, address and corporate identifiers on file with the authority.

Primary Promoter

NETRA SOFTWARE TECHNOLOGIES PRIVATE LIMITED
Registered Address # 216, 5th Cross, 3rd Main,Defence Colony, Indiranagar ,Bengaluru North ,Bengaluru Urban-560038
Location

Land, Address & Location Details

Land parcel, zoning and geo-coordinates as recorded in the project filing.

Address PLOT Nos. R-9-D1, R-9-D2, R-9-D1-P & R-9-D2-P OF HITECH, DEFENCE & AEROSPACE PARK, (HARDWARE SECTOR) COMPRISED IN SURVEY Nos. 176, 177, 470, 471 OF , BAGALUR VILLAGE AND SURVEY NO. 176 & 82 OF HOOVINAYAKANAHALLI VILLAGE, JALA HOBLI , Bengaluru North , Bengaluru Urban, Karnataka - 562149

RERA Coordinates

Latitude, Longitude 13.14778, 77.6808
Plans

Plans & Approvals

Statutory approvals obtained or pending against the project site.

Plan Approval No. DO3-KIADB-00018/23-24/BP
Authority KIADB - Karnataka Industrial Areas Development Board
Approved Date 15 February 2024

Understand this Project's RERA details

Get clear answers and additional support from our RERA experts.

RERA Banner
Buildings

Buildings, Towers & Building-Level Details

Statutory building-level disclosures including tower height, sanctioned floors, structural counts and parking areas.

Building Detail
Name No. of Basements No. of Slab No. of Slits No. of Open Parking Building Type Height of Tower No. of Floors No. of Units
WING A-1 1 19 0 178 Residential 57.84 18 179
WING A-2 1 19 0 177 Residential 57.84 18 179

Scroll horizontally to view all building-level fields. Values marked "-" were not disclosed in the source RERA record.

Inventory

Unit Inventory & Configuration Details

Configuration mix and floor-level disclosures with both grouped and raw RERA views.

Total Units -
Configurations 3
Inventory Type RESIDENTIAL
Configuration Distribution
2 BHK 0 units
3 BHK 0 units
Studio 0 units
  • WING A-1
  • WING A-2
Floor-Wise Inventory Explorer
Floor Apartment Type Carpet Area No. of Unit
GF 3 BHK 109.81 A-1011
GF 3 BHK 109.81 A-1012
GF 3 BHK 105.82 A-1014
GF Studio 16.16 A-1015
GF 2 BHK 92.53 A-1016
GF 2 BHK 92.53 A-1017
GF Studio 16.16 A-1018
GF 3 BHK 105.91 A-1019
GF 3 BHK 105.91 A-10110
1 3 BHK 109.81 A-1021
1 3 BHK 109.81 A-1022
1 3 BHK 105.82 A-1023
1 3 BHK 105.82 A-1024
1 Studio 16.16 A-1025
1 2 BHK 92.53 A-1026
1 2 BHK 92.53 A-1027
1 Studio 16.16 A-1028
1 3 BHK 105.91 A-1029
1 3 BHK 105.91 A-10210
2 3 BHK 109.81 A-1031
2 3 BHK 109.81 A-1032
2 3 BHK 105.82 A-1033
2 3 BHK 105.82 A-1034
2 Studio 16.16 A-1035
2 2 BHK 92.53 A-1036
2 2 BHK 92.53 A-1037
2 Studio 16.16 A-1038
2 3 BHK 105.91 A-1039
2 3 BHK 105.91 A-10310
3 3 BHK 109.81 A-1041
3 3 BHK 109.81 A-1042
3 3 BHK 105.82 A-1043
3 3 BHK 105.82 A-1044
3 Studio 16.16 A-1045
3 2 BHK 92.53 A-1046
3 2 BHK 92.53 A-1047
3 Studio 16.16 A-1048
3 3 BHK 105.91 A-1049
3 3 BHK 105.91 A-10410
4 3 BHK 109.81 A-1051
4 3 BHK 109.81 A-1052
4 3 BHK 105.82 A-1053
4 3 BHK 105.82 A-1054
4 Studio 16.16 A-1055
4 2 BHK 92.53 A-1056
4 2 BHK 92.53 A-1057
4 Studio 16.16 A-1058
4 3 BHK 105.91 A-1059
4 3 BHK 105.91 A-10510
5 3 BHK 109.81 A-1061
5 3 BHK 109.81 A-1062
5 3 BHK 105.82 A-1063
5 3 BHK 105.82 A-1064
5 Studio 16.16 A-1065
5 2 BHK 92.53 A-1066
5 2 BHK 92.53 A-1067
5 Studio 16.16 A-1068
5 3 BHK 105.91 A-1069
5 3 BHK 105.91 A-10610
6 3 BHK 109.81 A-1071
6 3 BHK 109.81 A-1072
6 3 BHK 105.82 A-1073
6 3 BHK 105.82 A-1074
6 Studio 16.16 A-1075
6 2 BHK 92.53 A-1076
6 2 BHK 92.53 A-1077
6 Studio 16.16 A-1078
6 3 BHK 105.91 A-1079
6 3 BHK 105.91 A-10710
7 3 BHK 109.81 A-1081
7 3 BHK 109.81 A-1082
7 3 BHK 105.82 A-1083
7 3 BHK 105.82 A-1084
7 Studio 16.16 A-1085
7 2 BHK 92.53 A-1086
7 2 BHK 92.53 A-1087
7 Studio 16.16 A-1088
7 3 BHK 105.91 A-1089
7 3 BHK 105.91 A-10810
8 3 BHK 109.81 A-1091
8 3 BHK 109.81 A-1092
8 3 BHK 105.82 A-1093
8 3 BHK 105.82 A-1094
8 Studio 16.16 A-1095
8 2 BHK 92.53 A-1096
8 2 BHK 92.53 A-1097
8 Studio 16.16 A-1098
8 3 BHK 105.91 A-1099
8 3 BHK 105.91 A-10910
9 3 BHK 109.81 A-1101
9 3 BHK 109.81 A-1102
9 3 BHK 105.82 A-1103
9 3 BHK 105.82 A-1104
9 Studio 16.16 A-1105
9 2 BHK 92.53 A-1106
9 2 BHK 92.53 A-1107
9 Studio 16.16 A-1108
9 3 BHK 105.91 A-1109
9 3 BHK 105.91 A-11010
10 3 BHK 109.81 A-1111
10 3 BHK 109.81 A-1112
10 3 BHK 105.82 A-1113
10 3 BHK 105.82 A-1114
10 Studio 16.16 A-1115
10 2 BHK 92.53 A-1116
10 2 BHK 92.53 A-1117
10 Studio 16.16 A-1118
10 3 BHK 105.91 A-1119
10 3 BHK 105.91 A-11110
11 3 BHK 109.81 A-1121
11 3 BHK 109.81 A-1122
11 3 BHK 105.82 A-1123
11 3 BHK 105.82 A-1124
11 Studio 16.16 A-1125
11 2 BHK 92.53 A-1126
11 2 BHK 92.53 A-1127
11 Studio 16.16 A-1128
11 3 BHK 105.91 A-1129
11 3 BHK 105.91 A-11210
12 3 BHK 109.81 A-1131
12 3 BHK 109.81 A-1132
12 3 BHK 105.82 A-1133
12 3 BHK 105.82 A-1134
12 Studio 16.16 A-1135
12 2 BHK 92.53 A-1136
12 2 BHK 92.53 A-1137
12 Studio 16.16 A-1138
12 3 BHK 105.91 A-1139
12 3 BHK 105.91 A-11310
13 3 BHK 109.81 A-1141
13 3 BHK 109.81 A-1142
13 3 BHK 105.82 A-1143
13 3 BHK 105.82 A-1144
13 Studio 16.16 A-1145
13 2 BHK 92.53 A-1146
13 2 BHK 92.53 A-1147
13 Studio 16.16 A-1148
13 3 BHK 105.91 A-1149
13 3 BHK 105.91 A-11410
14 3 BHK 109.81 A-1151
14 3 BHK 109.81 A-1152
14 3 BHK 105.82 A-1153
14 3 BHK 105.82 A-1154
14 Studio 16.16 A-1155
14 2 BHK 92.53 A-1156
14 2 BHK 92.53 A-1157
14 Studio 16.16 A-1158
14 3 BHK 105.91 A-1159
14 3 BHK 105.91 A-11510
15 3 BHK 109.81 A-1161
15 3 BHK 109.81 A-1162
15 3 BHK 105.82 A-1163
15 3 BHK 105.82 A-1164
15 Studio 16.16 A-1165
15 2 BHK 92.53 A-1166
15 2 BHK 92.53 A-1167
15 Studio 16.16 A-1168
15 3 BHK 105.91 A-1169
15 3 BHK 105.91 A-11610
16 3 BHK 109.81 A-1171
16 3 BHK 109.81 A-1172
16 3 BHK 105.82 A-1173
16 3 BHK 105.82 A-1174
16 Studio 16.16 A-1175
16 2 BHK 92.53 A-1176
16 2 BHK 92.53 A-1177
16 Studio 16.16 A-1178
16 3 BHK 105.91 A-1179
16 3 BHK 105.91 A-11710
17 3 BHK 109.81 A-1181
17 3 BHK 109.81 A-1182
17 3 BHK 105.82 A-1183
17 3 BHK 105.82 A-1184
17 Studio 16.16 A-1185
17 2 BHK 92.53 A-1186
17 2 BHK 92.53 A-1187
17 Studio 16.16 A-1188
17 3 BHK 105.91 A-1189
17 3 BHK 105.91 A-11810
Parking

Parking, Garage & Area Details

Parking provision declared in the sanctioned plan.

Type Proposed Booked Work Done
Garage - - -
Covered Parking - - -
Open Parking - - -
Development

Development Works & Common Area Disclosures

Project-level common infrastructure disclosures as reported by the developer to the RERA authority.

Sub Structure Earth Work And Other Leveling Preparation Work % not reported Sub Structure Foundation Footing Work % not reported Sub Structure Upto Plinth Level % not reported
Sub Structure Sub-structure Flooring (Parking Floor, More Than One Floor Below General Ground Level) % not reported Sub Structure Retaining Wall (All Types) % not reported Sup Structure Rcc Or Ms Framed Structure % not reported
Sup Structure Masonry Construction % not reported Sup Structure Plastering Inside , Outside & Ceiling % not reported Sup Structure Joinery: Doors, Windows, Ventilators Etc % not reported
Sup Structure Basic Work Of Water Supply, Sanitary And Electrification % not reported Sup Structure Dadoing, Skirting, Flooring, Tiles Work (All Types) % not reported Sup Structure Railing And Grill Fixing % not reported
Finishing Works Electrification, Water Supply And Sanitary Finishing % not reported Finishing Works Painting % not reported Finishing Works Fire Prevention And Fire Fighting Fitting And Fixture With Network % not reported
Finishing Works Weather Proof Work(tile,concrete) % not reported Finishing Works Wardrobe, Showcase, Kitchen Cabinet, Puja Work % not reported Finishing Works Elevation Work % not reported
Finishing Works Internal And External Work Including Landscapes As Per Sanctioned Drawings % not reported Internal Infrastructure Water Supply % not reported Internal Infrastructure Sewage And Drainage System % not reported
Internal Infrastructure Water Conservation/rain Water Harvesting/recharge Of Ground Water % not reported Internal Infrastructure Energy Management % not reported Internal Infrastructure Fire Protection And Fire Safety Requirements % not reported
Internal Infrastructure Solid Waste Management And Disposal % not reported Internal Infrastructure Emergency Evacuation Services % not reported External Infrastructure Water Supply % not reported
External Infrastructure Internal Roads & Footpaths % not reported External Infrastructure Sewage And Drainage System % not reported External Infrastructure Electricity Supply Transformer And Substation % not reported
External Infrastructure Solid Waste Management And Disposal % not reported External Infrastructure Emergency Evacuation Services % not reported External Infrastructure Storm Water Drains % not reported
External Infrastructure Use Of Renewable Energy % not reported External Infrastructure Water Conservation/rain Water Harvesting/recharge Of Ground Water % not reported External Infrastructure Fire Protection And Fire Safety Requirements % not reported
External Infrastructure Sewage Treatment Plant (Stp) % not reported External Infrastructure Parks & Tree Planting % not reported External Infrastructure Street Lighting % not reported
Amenities Electricity % not reported Amenities Smart Home Automation % not reported Amenities Cctv Surveillance % not reported
Amenities Club House % not reported Amenities Community Hall % not reported Amenities Outdoor Sports Facility % not reported
Amenities Indoor Sports Facility % not reported Amenities Swimming Pool % not reported Amenities Gym % not reported
Amenities Parks % not reported Amenities Power Backup % not reported Amenities Water & Sanitation % not reported
Amenities Air Conditioning - Provision Only For Units And Selected Amenities % not reported Common Areas Staircases % not reported Common Areas Lifts % not reported
Common Areas Corridor/lobbies % not reported Common Areas Fire Escapes % not reported Common Areas Common Entrance And Exit For The Building/common Portico/foyer/verandah % not reported
Common Areas Basement % not reported Common Areas Terrace % not reported Common Areas Outer Wall % not reported
Common Areas Open Parking Areas % not reported Common Areas Provision For Lodging Of Management Staff And Security Staff % not reported Common Areas Water Conservation And Renewable Energy % not reported
Common Areas Common Storage Spaces % not reported
Documents

RERA Documents & Filings

All statutory documents uploaded by the promoter to the authority portal.

Promoter Registration Certificate
Promoter Pan Card
Promoter Address Proof
Affidavit
Fd 1 Annexure 60-BS 22-23.Pdf
Fd 2 Annexure 60-BS 2021-22.Pdf
Fd 3 Annexure 60-BS 2020-21.Pdf
Fd 4 Annexure 61-P & L 22-23.Pdf
Fd 5 Annexure 61-P & L 2021-22.Pdf
Fd 6 Annexure 61- P & L 2020-21.Pdf
Fd 7 Annexure 62-DR 22-23.Pdf
Fd 8 Annexure 62-DR 2021-22.Pdf
Fd 9 Annexure 62-DR 2020-21.Pdf
Fd 10 Annexure 63-CF 22-23.Pdf
Fd 11 Annexure 63-CF 2021-22.Pdf
Fd 12 Annexure 63-CF 2020-21.Pdf
Fd 13 Annexure 64-AR 22-23.Pdf
Fd 14 Annexure 64-AR 2021-22.Pdf
Fd 15 Annexure 64-AR2020-21.Pdf
Fd 16 Annexure 65-ITR 2022-23.Pdf
Fd 17 Annexure 65-ITR 2021-22.Pdf
Fd 18 Annexure 65-ITR 2020-21.Pdf
Pd 1 Self Attested PAN Card*( Annexure - 66 )
Pd 2 Commencement Certificate*( Annexure - 67 )
Pd 3 Electricity Permission Letter*( Annexure - 68 )
Pd 4 Water Permission Letter*( Annexure - 69 )
Pd 6 Approved Building Plotting Plan*( Annexure - 71 )
Pd 7 Existing Layout Plan( Annexure - 72 )
Pd 8 Existing Section Plan And Specification( Annexure - 73 )
Pd 9 Sectional Drawing Of The Apartments*( Annexure - 74 )
Pd 10 Project Specifications*( Annexure - 75 )
Pd 11 Approved Section Of Building Infrastructure Plan Of Plotting*( Annexure - 76 )
Pd 13 Certificate From Registered Engineer Indicating The Structural Safety Of The Building*( Annexure - 78 )
Pd 14 Advocate Search Report*( Annexure - 79 )
Pd 16 Collaboration Agreement Development Agreement Joint Development Agreement Other Agreement*( Annexure - 81 )
Pd 19 Conversion Certificate Under Section 95 Of The KLR Act 1964*( Annexure - 84 )
Pd 21 Proforma Of Agreement For Sale*( Annexure - 86 )
Pd 22 Proforma Of Allotment Letter*( Annexure - 87 )
Dc 1 Declaration (Form B)*( Annexure - 90 )
Dc 2 Section 3(1) Notarized Affidavit*( Annexure - 91 )
Noc 1 ESCOM Electricity*( Annexure - 93 )
Noc 2 KWSSB Water*( Annexure - 94 )
Noc 5 Fire Force Department( Annexure - 97 )
Noc 6 Airport Authority Of India( Annexure - 98 )
Noc 7 KSPCB( Annexure - 99 )
Noc 8 SEIAA( Annexure - 100 )
Noc 9 BSNL( Annexure - 101 )
Photo 1 Project Photo
Photo 2 Project Photo
Od 1 Sale Deed (Lease Deed) 01413 20-21.Pdf
Od 2 Sale Deed (Lease Deed) 00882 22-23.Pdf
Od 3 CDP Map Demarcation.Pdf
Od 4 STP Demarcation And Design.Pdf
Od 5 Location Demarcation.Pdf
Od 6 Site On Village Map.Jpg
Od 7 Engineer Estimation Breakup.Pdf
Od 8 1 Site Plan.Pdf
Od 9 2 Basement Floor Plan.Pdf
Od 10 3 Ground Floor Plan.Pdf
Od 11 4 Typical 15 To 18 Floor & Terrance Plan.Pdf
Od 12 5 First Floor & Typical 2nd To 13.Pdf
Od 13 6 Sectional Drawings.Pdf
Od 14 7 First Second And Terrace Floor Plan.Pdf
Od 15 8 Sectional & Elevation Site Key Plan.Pdf
Od 16 Guidelines Value.Pdf
Od 17 Demarcation Plan.Pdf
Od 18 AREA Statement Certified By Architect.Pdf
Ed 1 05-03-2024
Ed 2 05-03-2024
Ld Rtc
Ld Mutation
Ld Encumbrance Certificate
Ld Sale Deed
Ld Khatha
Bank

Bank & Cost Disclosure

Declared project cost and the designated escrow account on file.

Project Account Bank FEDERAL BANK OF INDIA
Account Number (RERA) 15350200009431
IFSC FDRL0001535
Branch Address Indiranagar
Country/City