Squareyards Logo
Blogs
Sell or Rent Property
Login
Rera Banner
residential Under Construction Source: rera.ka

Casagrand Casablanca RERA Details - PRM/KA/RERA/1251/310/PR/040524/006862 Bangalore

View the RERA registration, promoter, approval, building, inventory, document and construction-progress disclosures for Casagrand Casablanca under registration PRM/KA/RERA/1251/310/PR/040524/006862 in Bangalore, Karnataka. Data is sourced from rera.ka.

RERA

RERA Snapshot

The most important statutory project disclosures, generated dynamically from available RERA fields.

  • RERA Number PRM/KA/RERA/1251/310/PR/040524/006862
  • Project Name CASAGRAND CASABLANCA
  • Project Type Residential/Group Housing
  • Project Status Under Construction
  • District Bengaluru Urban
  • Taluka Bengaluru South
  • Original Completion 04 May 2029
  • Documents 107 Verified
Timeline

Project Timeline & Completion Details

Key statutory dates from registration through proposed completion and permit validity.

Proposed Start 30 May 2024 Expected commencement of civil works and foundation on site.
Original Completion 04 May 2029 Mandated date for project handover to the allottees and final compliance filing.
Promoter

Promoter, Organisation & Member Details

Declared promoter entity, address and corporate identifiers on file with the authority.

Primary Promoter

CASAGRAND LOTUS PRIVATE LIMITED
Registered Address Salma Bizhouse, No.34/1, 4th Floor, Meanee Avenue Road,  ,Opp to Lakeside Hospital, Ulsoor Road, Near Ulsoor Lake ,Bengaluru South ,Bengaluru Urban-560042
Location

Land, Address & Location Details

Land parcel, zoning and geo-coordinates as recorded in the project filing.

Address SY.NO.18/1A5, 18/3, 18/1A7,18/1A8,18/1A9,18/1A10,18/1A11 AND 18/1A12 OF MALLASANDRA VILLAGE , UTTARAHALLI HOBLI, WARD NO.198 , Bengaluru South , Bengaluru Urban, Karnataka - 560062

RERA Coordinates

Latitude, Longitude 12.855161, 77.542153
Plans

Plans & Approvals

Statutory approvals obtained or pending against the project site.

Plan Approval No. BBMP/Addl.Dir/JDSOUTH/0002/24-25
Authority BBMP - Bruhat Bengaluru Mahanagara Palike
Approved Date 25 April 2024

Understand this Project's RERA details

Get clear answers and additional support from our RERA experts.

RERA Banner
Buildings

Buildings, Towers & Building-Level Details

Statutory building-level disclosures including tower height, sanctioned floors, structural counts and parking areas.

Building Detail
Name No. of Basements No. of Slab No. of Slits No. of Open Parking Building Type Height of Tower No. of Floors No. of Units
Tower 1 2 18 0 328 Residential 59.7 17 227
Tower 2 2 18 0 328 Residential 59.7 17 227
Tower 3 1 16 0 160 Residential 55.5 15 64
Tower 4 1 17 0 254 Residential 56.4 16 287

Scroll horizontally to view all building-level fields. Values marked "-" were not disclosed in the source RERA record.

Inventory

Unit Inventory & Configuration Details

Configuration mix and floor-level disclosures with both grouped and raw RERA views.

Total Units -
Configurations 5
Inventory Type RESIDENTIAL
Configuration Distribution
2 BHK 0 units
3 BHK 0 units
4 BHK 0 units
5 BHK 0 units
STUDIO 0 units
  • Tower 1
  • Tower 2
  • Tower 3
  • Tower 4
Floor-Wise Inventory Explorer
Floor Apartment Type Carpet Area No. of Unit
-1 3 BHK 118.02 G01
-1 3 BHK 94.6 G02
-1 3 BHK 118.02 G03
-1 3 BHK 94.6 G04
-1 2 BHK 75.06 G06
-1 3 BHK 118.02 G07
-1 2 BHK 75.06 G08
-1 3 BHK 118.02 G09
-1 2 BHK 75.06 G10
-1 3 BHK 118.02 G11
-1 3 BHK 94.6 G12
-1 3 BHK 94.6 G13
GF 3 BHK 118.02 101
GF 3 BHK 94.6 102
GF 3 BHK 118.02 103
GF 3 BHK 94.6 104
GF 2 BHK 95.72 105
GF 2 BHK 75.06 106
GF 3 BHK 118.02 107
GF 2 BHK 75.06 108
GF 3 BHK 118.02 109
GF 2 BHK 75.06 110
GF 3 BHK 118.02 111
GF 3 BHK 94.6 112
GF 3 BHK 94.6 113
1 3 BHK 118.02 201
1 3 BHK 94.6 202
1 3 BHK 118.02 203
1 3 BHK 94.6 204
1 3 BHK 118.02 205
1 2 BHK 75.06 206
1 3 BHK 118.02 207
1 2 BHK 75.06 208
1 3 BHK 118.02 209
1 2 BHK 75.06 210
1 3 BHK 118.02 211
1 3 BHK 94.6 212
1 3 BHK 94.6 213
2 3 BHK 118.02 301
2 3 BHK 94.6 302
2 3 BHK 118.02 303
2 3 BHK 94.6 304
2 3 BHK 118.02 305
2 2 BHK 75.06 306
2 3 BHK 118.02 307
2 2 BHK 75.06 308
2 3 BHK 118.02 309
2 2 BHK 75.06 310
2 3 BHK 118.02 311
2 3 BHK 94.6 312
2 3 BHK 94.6 313
3 3 BHK 118.02 401
3 3 BHK 94.6 402
3 3 BHK 118.02 403
3 3 BHK 94.6 404
3 3 BHK 118.02 405
3 2 BHK 75.06 406
3 3 BHK 118.02 407
3 2 BHK 75.06 408
3 3 BHK 118.02 409
3 2 BHK 75.06 410
3 3 BHK 118.02 411
3 3 BHK 94.6 412
3 3 BHK 94.6 413
4 3 BHK 118.02 501
4 3 BHK 94.6 502
4 3 BHK 118.02 503
4 3 BHK 94.6 504
4 3 BHK 118.02 505
4 2 BHK 75.06 506
4 3 BHK 118.02 507
4 2 BHK 75.06 508
4 3 BHK 118.02 509
4 2 BHK 75.06 510
4 3 BHK 118.02 511
4 3 BHK 94.6 512
4 3 BHK 94.6 513
5 3 BHK 118.02 601
5 3 BHK 94.6 602
5 3 BHK 118.02 603
5 3 BHK 94.6 604
5 3 BHK 118.02 605
5 2 BHK 75.06 606
5 3 BHK 118.02 607
5 2 BHK 75.06 608
5 3 BHK 118.02 609
5 2 BHK 75.06 610
5 3 BHK 118.02 611
5 3 BHK 94.6 612
5 3 BHK 94.6 613
6 3 BHK 118.02 701
6 3 BHK 94.6 702
6 3 BHK 118.02 703
6 3 BHK 94.6 704
6 3 BHK 118.02 705
6 2 BHK 75.06 706
6 3 BHK 118.02 707
6 2 BHK 75.06 708
6 3 BHK 118.02 709
6 2 BHK 75.06 710
6 3 BHK 118.02 711
6 3 BHK 94.6 712
6 3 BHK 94.6 713
7 3 BHK 118.02 801
7 3 BHK 94.6 802
7 3 BHK 118.02 803
7 3 BHK 94.6 804
7 3 BHK 118.02 805
7 2 BHK 75.06 806
7 3 BHK 118.02 807
7 2 BHK 75.06 808
7 3 BHK 118.02 809
7 2 BHK 75.06 810
7 3 BHK 118.02 811
7 3 BHK 94.6 812
7 3 BHK 94.6 813
8 3 BHK 118.02 901
8 3 BHK 94.6 902
8 3 BHK 118.02 903
8 3 BHK 94.6 904
8 3 BHK 118.02 905
8 2 BHK 75.06 906
8 3 BHK 118.02 907
8 2 BHK 75.06 908
8 3 BHK 118.02 909
8 2 BHK 75.06 910
8 3 BHK 118.02 911
8 3 BHK 94.6 912
8 3 BHK 94.6 913
9 3 BHK 118.02 1001
9 3 BHK 94.6 1002
9 3 BHK 118.02 1003
9 3 BHK 94.6 1004
9 3 BHK 118.02 1005
9 2 BHK 75.06 1006
9 3 BHK 118.02 1007
9 2 BHK 75.06 1008
9 3 BHK 118.02 1009
9 2 BHK 75.06 1010
9 3 BHK 118.02 1011
9 3 BHK 94.6 1012
9 3 BHK 94.6 1013
10 3 BHK 118.02 1101
10 3 BHK 94.6 1102
10 3 BHK 118.02 1103
10 3 BHK 94.6 1104
10 3 BHK 118.02 1105
10 2 BHK 75.06 1106
10 3 BHK 118.02 1107
10 2 BHK 75.06 1108
10 3 BHK 118.02 1109
10 2 BHK 75.06 1110
10 3 BHK 118.02 1111
10 3 BHK 94.6 1112
10 3 BHK 94.6 1113
11 3 BHK 118.02 1201
11 3 BHK 94.6 1202
11 3 BHK 118.02 1203
11 3 BHK 94.6 1204
11 3 BHK 118.02 1205
11 2 BHK 75.06 1206
11 3 BHK 118.02 1207
11 2 BHK 75.06 1208
11 3 BHK 118.02 1209
11 2 BHK 75.06 1210
11 3 BHK 118.02 1211
11 3 BHK 94.6 1212
11 3 BHK 94.6 1213
12 3 BHK 118.02 1301
12 3 BHK 94.6 1302
12 3 BHK 118.02 1303
12 3 BHK 94.6 1304
12 3 BHK 118.02 1305
12 2 BHK 75.06 1306
12 3 BHK 118.02 1307
12 2 BHK 75.06 1308
12 3 BHK 118.02 1309
12 2 BHK 75.06 1310
12 3 BHK 118.02 1311
12 3 BHK 94.6 1312
12 3 BHK 94.6 1313
13 3 BHK 118.02 1401
13 3 BHK 94.6 1402
13 3 BHK 118.02 1403
13 3 BHK 94.6 1404
13 3 BHK 118.02 1405
13 2 BHK 75.06 1406
13 3 BHK 118.02 1407
13 2 BHK 75.06 1408
13 3 BHK 118.02 1409
13 2 BHK 75.06 1410
13 3 BHK 118.02 1411
13 3 BHK 94.6 1412
13 3 BHK 94.6 1413
14 3 BHK 118.02 1501
14 3 BHK 94.6 1502
14 3 BHK 118.02 1503
14 3 BHK 94.6 1504
14 3 BHK 118.02 1505
14 2 BHK 75.06 1506
14 3 BHK 118.02 1507
14 2 BHK 75.06 1508
14 3 BHK 118.02 1509
14 2 BHK 75.06 1510
14 3 BHK 118.02 1511
14 3 BHK 94.6 1512
14 3 BHK 94.6 1513
15 5 BHK 222.92 1601
15 3 BHK 94.6 1602
15 5 BHK 222.92 1603
15 3 BHK 94.6 1604
15 5 BHK 222.92 1605
15 2 BHK 75.06 1606
15 5 BHK 222.92 1607
15 2 BHK 75.06 1608
15 5 BHK 222.92 1609
15 2 BHK 75.06 1610
15 5 BHK 222.92 1611
15 3 BHK 94.6 1612
15 3 BHK 94.6 1613
16 3 BHK 94.6 1702
16 3 BHK 94.6 1704
16 2 BHK 75.06 1706
16 2 BHK 75.06 1708
16 2 BHK 75.06 1710
16 3 BHK 94.6 1712
16 3 BHK 94.6 1713
Parking

Parking, Garage & Area Details

Parking provision declared in the sanctioned plan.

Type Proposed Booked Work Done
Garage - - -
Covered Parking - - -
Open Parking - - -
Development

Development Works & Common Area Disclosures

Project-level common infrastructure disclosures as reported by the developer to the RERA authority.

Sub Structure Earth Work And Other Leveling Preparation Work % not reported Sub Structure Foundation Footing Work % not reported Sub Structure Upto Plinth Level % not reported
Sub Structure Sub-structure Flooring (Parking Floor, More Than One Floor Below General Ground Level) % not reported Sub Structure Retaining Wall (All Types) % not reported Sup Structure Rcc Or Ms Framed Structure % not reported
Sup Structure Masonry Construction % not reported Sup Structure Plastering Inside , Outside & Ceiling % not reported Sup Structure Joinery: Doors, Windows, Ventilators Etc % not reported
Sup Structure Basic Work Of Water Supply, Sanitary And Electrification % not reported Sup Structure Dadoing, Skirting, Flooring, Tiles Work (All Types) % not reported Sup Structure Railing And Grill Fixing % not reported
Finishing Works Electrification, Water Supply And Sanitary Finishing % not reported Finishing Works Painting % not reported Finishing Works Fire Prevention And Fire Fighting Fitting And Fixture With Network % not reported
Finishing Works Weather Proof Work(tile,concrete) % not reported Finishing Works Wardrobe, Showcase, Kitchen Cabinet, Puja Work % not reported Finishing Works Elevation Work % not reported
Finishing Works Internal And External Work Including Landscapes As Per Sanctioned Drawings % not reported Internal Infrastructure Water Supply % not reported Internal Infrastructure Sewage And Drainage System % not reported
Internal Infrastructure Water Conservation/rain Water Harvesting/recharge Of Ground Water % not reported Internal Infrastructure Energy Management % not reported Internal Infrastructure Fire Protection And Fire Safety Requirements % not reported
Internal Infrastructure Solid Waste Management And Disposal % not reported Internal Infrastructure Emergency Evacuation Services % not reported External Infrastructure Water Supply % not reported
External Infrastructure Internal Roads & Footpaths % not reported External Infrastructure Sewage And Drainage System % not reported External Infrastructure Electricity Supply Transformer And Substation % not reported
External Infrastructure Solid Waste Management And Disposal % not reported External Infrastructure Emergency Evacuation Services % not reported External Infrastructure Storm Water Drains % not reported
External Infrastructure Use Of Renewable Energy % not reported External Infrastructure Water Conservation/rain Water Harvesting/recharge Of Ground Water % not reported External Infrastructure Fire Protection And Fire Safety Requirements % not reported
External Infrastructure Sewage Treatment Plant (Stp) % not reported External Infrastructure Parks & Tree Planting % not reported External Infrastructure Street Lighting % not reported
Amenities Electricity % not reported Amenities Smart Home Automation % not reported Amenities Cctv Surveillance % not reported
Amenities Club House % not reported Amenities Community Hall % not reported Amenities Outdoor Sports Facility % not reported
Amenities Indoor Sports Facility % not reported Amenities Swimming Pool % not reported Amenities Gym % not reported
Amenities Parks % not reported Amenities Power Backup % not reported Amenities Piped Gas % not reported
Amenities Water And Sanitation % not reported Amenities Air Conditioning % not reported Common Areas Staircases % not reported
Common Areas Lifts % not reported Common Areas Corridor/lobbies % not reported Common Areas Fire Escapes % not reported
Common Areas Common Entrance And Exit For The Building/common Portico/foyer/verandah % not reported Common Areas Basement % not reported Common Areas Terrace % not reported
Common Areas Outer Wall % not reported Common Areas Open Parking Areas % not reported Common Areas Provision For Lodging Of Management Staff And Security Staff % not reported
Common Areas Water Conservation And Renewable Energy % not reported Common Areas Common Storage Spaces % not reported
Documents

RERA Documents & Filings

All statutory documents uploaded by the promoter to the authority portal.

Promoter Registration Certificate
Promoter Pan Card
Promoter Address Proof
Affidavit
Fd 1 NA.Pdf
Fd 2 B S FY 2022-23.Pdf
Fd 3 NA.Pdf
Fd 4 NA.Pdf
Fd 5 P L FY 2022-23.Pdf
Fd 6 NA.Pdf
Fd 7 NA.Pdf
Fd 8 Directors Report FY 2022-23.Pdf
Fd 9 NA.Pdf
Fd 10 NA.Pdf
Fd 11 Cash Flow Statement FY 2022-23.Pdf
Fd 12 NA.Jpg
Fd 13 NA.Pdf
Fd 14 Auditors Report FY 2022-23.Pdf
Fd 15 NA.Pdf
Fd 16 NA.Pdf
Fd 17 ITR FY 2022-23.Pdf
Fd 18 NA.Pdf
Pd 1 Self Attested PAN Card*( Annexure - 66 )
Pd 2 Commencement Certificate*( Annexure - 67 )
Pd 3 Electricity Permission Letter*( Annexure - 68 )
Pd 4 Water Permission Letter*( Annexure - 69 )
Pd 5 Approved Layout Plan*( Annexure - 70 )
Pd 6 Approved Building Plotting Plan*( Annexure - 71 )
Pd 7 Existing Layout Plan( Annexure - 72 )
Pd 8 Existing Section Plan And Specification( Annexure - 73 )
Pd 9 Sectional Drawing Of The Apartments*( Annexure - 74 )
Pd 10 Project Specifications*( Annexure - 75 )
Pd 11 Approved Section Of Building Infrastructure Plan Of Plotting*( Annexure - 76 )
Pd 12 Area Development Plan Of Project Area*( Annexure - 77 )
Pd 13 Certificate From Registered Engineer Indicating The Structural Safety Of The Building*( Annexure - 78 )
Pd 14 Advocate Search Report*( Annexure - 79 )
Pd 15 Urban Land Ceiling*( Annexure - 80 )
Pd 17 Change Of Land Use*( Annexure - 82 )
Pd 18 District Magistrate*( Annexure - 83 )
Pd 19 Conversion Certificate Under Section 95 Of The KLR Act 1964*( Annexure - 84 )
Pd 20 Any Other Document (Rights Title Interest Name)*( Annexure - 85 )
Pd 21 Proforma Of Agreement For Sale*( Annexure - 86 )
Pd 22 Proforma Of Allotment Letter*( Annexure - 87 )
Pd 24 Brochure*( Annexure - 89 )
Dc 1 Declaration (Form B)*( Annexure - 90 )
Dc 2 Section 3(1) Notarized Affidavit*( Annexure - 91 )
Dc 3 JD AFFIDAVIT CUM DECLARATION*( Annexure - 92 )
Noc 1 ESCOM Electricity*( Annexure - 93 )
Noc 2 KWSSB Water*( Annexure - 94 )
Noc 5 Fire Force Department( Annexure - 97 )
Noc 6 Airport Authority Of India( Annexure - 98 )
Noc 7 KSPCB( Annexure - 99 )
Noc 8 SEIAA( Annexure - 100 )
Noc 9 BSNL( Annexure - 101 )
Dr 3 Relinquishment Deed( Annexure - 110 )
Photo 1 Project Photo
Od 1 FORESET NOC.Pdf
Od 2 HAL NOC.Pdf
Od 3 C G CASABLANCA STP.Pdf
Od 4 C G CASABLANCA STP-SECTIONS.Pdf
Od 5 CASABLANCA - Commencement Certificate Clarification Letter.Pdf
Od 6 CASABLANCA Construction Cost Certificate.Pdf
Od 7 CASABLANCA Sold Vs Unsold Letter.Pdf
Od 8 CASABLANCA STP Letter.Pdf
Od 9 CASAGRAND CASABLANCA AREA STATMENT Sign Copies.Pdf
Od 10 CDP DEMARCATION.Pdf
Od 11 Development Order.Pdf
Od 12 Development Plan.Pdf
Od 13 LOCATION DEMARCATION.Pdf
Od 14 VILLAGE MAP DEMARCATION.Pdf
Od 15 AOA CG Lotus.Pdf
Od 16 MOA CG Lotus.Pdf
Od 17 BETTERMENT RECEIPT.Pdf
Od 18 KATHA COPY NEW.Pdf
Od 19 TAX PAID RECEIPT 24 25.Pdf
Od 20 Affidavit.Pdf
Od 21 ALLEINATION 11E SKETCHES.Pdf
Od 22 Guideline Valuation REPORT.Pdf
Od 23 Khata Declaration.Pdf
Od 24 Khatha Fee Paid Receipt.Jpeg
Od 25 Old ALL Sy No EC'S.Pdf
Od 26 Sale Deed DN 487 1970-71.Pdf
Od 27 OLD MRs.Pdf
Od 28 Phodi Prathi.Pdf
Od 29 Survey Documents.Pdf
Od 30 AKARBAND HOLIDAY VILLAGE.Pdf
Ed 1 03-05-2024
Ed 2 03-05-2024
Ed 3 03-05-2024
Ed 4 03-05-2024
Ed 5 03-05-2024
Ed 6 03-05-2024
Ed 7 03-05-2024
Ed 8 03-05-2024
Ed 9 03-05-2024
Ed 10 03-05-2024
Ed 11 03-05-2024
Ed 12 03-05-2024
Ed 13 03-05-2024
Ed 14 03-05-2024
Ed 15 03-05-2024
Ld Rtc
Ld Mutation
Ld Encumbrance Certificate
Ld Conversion Order
Ld Sale Deed
Ld Khatha
Bank

Bank & Cost Disclosure

Declared project cost and the designated escrow account on file.

Project Account Bank HDFC
Account Number (RERA) 57500001491359
IFSC HDFC0001268
Branch Address Empire Infantry Road
Country/City