residential Under Construction Source: rera.ka

TG Heritage RERA Details - PRM/KA/RERA/1251/310/PR/160123/005621 Bangalore

View the RERA registration, promoter, approval, building, inventory, document and construction-progress disclosures for TG Heritage under registration PRM/KA/RERA/1251/310/PR/160123/005621 in Bangalore, Karnataka. Data is sourced from rera.ka.

RERA

RERA Snapshot

The most important statutory project disclosures, generated dynamically from available RERA fields.

  • RERA Number PRM/KA/RERA/1251/310/PR/160123/005621
  • Project Name TG Heritage
  • Project Type Residential/Group Housing
  • Project Status Under Construction
  • District Bengaluru Urban
  • Taluka Bengaluru South
  • Original Completion 31 December 2027
  • Documents 79 Verified
Timeline

Project Timeline & Completion Details

Key statutory dates from registration through proposed completion and permit validity.

Proposed Start 13 January 2023 Expected commencement of civil works and foundation on site.
Original Completion 31 December 2027 Mandated date for project handover to the allottees and final compliance filing.
Promoter

Promoter, Organisation & Member Details

Declared promoter entity, address and corporate identifiers on file with the authority.

Primary Promoter

T G DEVELOPERS
Registered Address No.107, TG Citadel, BTM Layout,Doctors Colony ,Off Bannerghatta Road, Bengaluru ,Bengaluru South ,Bengaluru Urban-560076
Experience Details
Location

Land, Address & Location Details

Land parcel, zoning and geo-coordinates as recorded in the project filing.

Address Sy No.1/1, TG Heritage, Mallasandra Village , Uttarahalli Hobli , Bengaluru South , Bengaluru Urban, Karnataka - 560062

RERA Coordinates

Latitude, Longitude 12.8666681, 77.5422673
Plans

Plans & Approvals

Statutory approvals obtained or pending against the project site.

Plan Approval No. BDA/NAMA/ASA/AA-03/THA-SA-02/S/24/2022-23
Authority BDA - Bangalore Development Authority
Approved Date 29 August 2022

Understand this Project's RERA details

Get clear answers and additional support from our RERA experts.

RERA Banner
Buildings

Buildings, Towers & Building-Level Details

Statutory building-level disclosures including tower height, sanctioned floors, structural counts and parking areas.

Building Detail
Name No. of Basements No. of Slab No. of Slits No. of Open Parking Building Type Height of Tower No. of Floors No. of Units
TG Heritage 1 6 0 97 Residential 0.0 4 84

Scroll horizontally to view all building-level fields. Values marked "-" were not disclosed in the source RERA record.

Inventory

Unit Inventory & Configuration Details

Configuration mix and floor-level disclosures with both grouped and raw RERA views.

Total Units -
Configurations 3
Inventory Type RESIDENTIAL
Configuration Distribution
1 BHK 0 units
2 BHK 0 units
3 BHK 0 units
  • TG Heritage
Floor-Wise Inventory Explorer
Floor Apartment Type Carpet Area No. of Unit
-1 3 BHK 80.99 001
-1 3 BHK 80.99 002
-1 3 BHK 80.99 003
-1 1 BHK 52.09 004
-1 3 BHK 80.99 005
-1 3 BHK 80.99 006
-1 3 BHK 86.34 007
-1 3 BHK 88.13 008
-1 2 BHK 64.15 009
-1 2 BHK 66.19 010
-1 1 BHK 60.16 011
-1 1 BHK 45.43 014
-1 3 BHK 87.25 015
-1 2 BHK 66.19 017
-1 2 BHK 66.19 018
GF 3 BHK 80.99 101
GF 3 BHK 80.99 102
GF 3 BHK 80.99 103
GF 3 BHK 80.99 104
GF 3 BHK 80.99 105
GF 3 BHK 80.99 106
GF 3 BHK 86.34 107
GF 3 BHK 88.13 108
GF 2 BHK 64.15 109
GF 2 BHK 66.19 110
GF 2 BHK 64.96 111
GF 2 BHK 66.19 114
GF 3 BHK 87.25 115
GF 2 BHK 66.19 117
GF 2 BHK 66.19 118
1 3 BHK 80.99 201
1 3 BHK 80.99 202
1 3 BHK 80.99 203
1 3 BHK 80.99 204
1 3 BHK 80.99 205
1 3 BHK 80.99 206
1 3 BHK 86.34 207
1 3 BHK 88.13 208
1 2 BHK 64.15 209
1 2 BHK 66.19 210
1 2 BHK 64.96 211
1 3 BHK 90.19 212
1 2 BHK 64.15 213
1 2 BHK 66.19 214
1 3 BHK 87.25 215
1 3 BHK 88.13 216
1 2 BHK 66.19 217
1 2 BHK 66.19 218
2 3 BHK 80.99 301
2 3 BHK 80.99 302
2 3 BHK 80.99 303
2 3 BHK 80.99 304
2 3 BHK 80.99 305
2 3 BHK 80.99 306
2 3 BHK 86.34 307
2 3 BHK 88.13 308
2 2 BHK 64.15 309
2 2 BHK 66.19 310
2 2 BHK 64.96 311
2 2 BHK 90.19 312
2 2 BHK 64.15 313
2 2 BHK 66.19 314
2 3 BHK 87.25 315
2 3 BHK 88.13 316
2 2 BHK 66.19 317
2 2 BHK 66.19 318
3 3 BHK 80.99 401
3 3 BHK 80.99 402
3 3 BHK 80.99 403
3 3 BHK 80.99 404
3 3 BHK 80.99 405
3 3 BHK 80.99 406
3 3 BHK 86.34 407
3 3 BHK 88.13 408
3 2 BHK 64.15 409
3 2 BHK 66.19 410
3 2 BHK 64.96 411
3 3 BHK 90.19 412
3 2 BHK 64.15 413
3 2 BHK 66.19 414
3 3 BHK 87.25 415
3 3 BHK 88.13 416
3 2 BHK 66.19 417
3 2 BHK 66.19 418
Parking

Parking, Garage & Area Details

Parking provision declared in the sanctioned plan.

Type Proposed Booked Work Done
Garage - - -
Covered Parking - - -
Open Parking - - -
Development

Development Works & Common Area Disclosures

Project-level common infrastructure disclosures as reported by the developer to the RERA authority.

Sub Structure Earth Work And Other Leveling Preparation Work % not reported Sub Structure Foundation Footing Work % not reported Sub Structure Upto Plinth Level % not reported
Sub Structure Sub-structure Flooring (Parking Floor, More Than One Floor Below General Ground Level) % not reported Sub Structure Retaining Wall (All Types) % not reported Sup Structure Rcc Or Ms Framed Structure % not reported
Sup Structure Masonry Construction % not reported Sup Structure Plastering Inside , Outside & Ceiling % not reported Sup Structure Joinery: Doors, Windows, Ventilators Etc % not reported
Sup Structure Basic Work Of Water Supply, Sanitary And Electrification % not reported Sup Structure Dadoing, Skirting, Flooring, Tiles Work (All Types) % not reported Sup Structure Railing And Grill Fixing % not reported
Finishing Works Electrification, Water Supply And Sanitary Finishing % not reported Finishing Works Painting % not reported Finishing Works Fire Prevention And Fire Fighting Fitting And Fixture With Network % not reported
Finishing Works Weather Proof Work(tile,concrete) % not reported Finishing Works Wardrobe, Showcase, Kitchen Cabinet, Puja Work % not reported Finishing Works Elevation Work % not reported
Finishing Works Internal And External Work Including Landscapes As Per Sanctioned Drawings % not reported Finishing Works Other Works % not reported Internal Infrastructure Water Supply % not reported
Internal Infrastructure Sewage And Drainage System % not reported Internal Infrastructure Water Conservation/rain Water Harvesting/recharge Of Ground Water % not reported Internal Infrastructure Energy Management % not reported
Internal Infrastructure Fire Protection And Fire Safety Requirements % not reported Internal Infrastructure Solid Waste Management And Disposal % not reported Internal Infrastructure Emergency Evacuation Services % not reported
External Infrastructure Water Supply % not reported External Infrastructure Internal Roads & Footpaths % not reported External Infrastructure Sewage And Drainage System % not reported
External Infrastructure Electricity Supply Transformer And Substation % not reported External Infrastructure Solid Waste Management And Disposal % not reported External Infrastructure Emergency Evacuation Services % not reported
External Infrastructure Storm Water Drains % not reported External Infrastructure Use Of Renewable Energy % not reported External Infrastructure Water Conservation/rain Water Harvesting/recharge Of Ground Water % not reported
External Infrastructure Fire Protection And Fire Safety Requirements % not reported External Infrastructure Sewage Treatment Plant (Stp) % not reported External Infrastructure Parks & Tree Planting % not reported
External Infrastructure Street Lighting % not reported Amenities Electricity % not reported Amenities Smart Home Automation % not reported
Amenities Cctv Surveillance % not reported Amenities Club House % not reported Amenities Community Hall % not reported
Amenities Outdoor Sports Facility % not reported Amenities Indoor Sports Facility % not reported Amenities Swimming Pool % not reported
Amenities Gym % not reported Amenities Parks % not reported Amenities Power Backup % not reported
Amenities Piped Gas % not reported Amenities Water And Sanitation % not reported Amenities Air Conditioning % not reported
Common Areas Staircases % not reported Common Areas Lifts % not reported Common Areas Corridor/lobbies % not reported
Common Areas Fire Escapes % not reported Common Areas Common Entrance And Exit For The Building/common Portico/foyer/verandah % not reported Common Areas Basement % not reported
Common Areas Terrace % not reported Common Areas Outer Wall % not reported Common Areas Open Parking Areas % not reported
Common Areas Provision For Lodging Of Management Staff And Security Staff % not reported Common Areas Water Conservation And Renewable Energy % not reported Common Areas Common Storage Spaces % not reported
Documents

RERA Documents & Filings

All statutory documents uploaded by the promoter to the authority portal.

Promoter Registration Certificate
Promoter Pan Card
Promoter Address Proof
Affidavit
1 Completion Certificate
2 Completion Certificate
Fd 1 Balance Sheet.Pdf
Fd 2 Balance Sheet 2020 21.Pdf
Fd 3 Balance Sheet.Pdf
Fd 4 P & L Account.Pdf
Fd 5 Profit And Loss 2020 21.Pdf
Fd 6 Profit And Loss 2019 20.Pdf
Fd 7 NOT APPLICABLE.Pdf
Fd 8 NOT APPLICABLE.Pdf
Fd 9 NOT APPLICABLE.Pdf
Fd 10 Cashflow Statement.Pdf
Fd 11 Cashflow Statement.Pdf
Fd 12 Cashflow Statement.Pdf
Fd 13 Audiors Report.Pdf
Fd 14 NOT APPLICABLE.Pdf
Fd 15 Audiors Report.Pdf
Fd 16 ITR.Pdf
Fd 17 ITR.Pdf
Fd 18 ITR.Pdf
Pd 1 Self Attested PAN Card*( Annexure - 66 )
Pd 2 Commencement Certificate*( Annexure - 67 )
Pd 5 Approved Layout Plan*( Annexure - 70 )
Pd 8 Existing Section Plan And Specification( Annexure - 73 )
Pd 10 Project Specifications*( Annexure - 75 )
Pd 12 Area Development Plan Of Project Area*( Annexure - 77 )
Pd 14 Advocate Search Report*( Annexure - 79 )
Pd 16 Collaboration Agreement Development Agreement Joint Development Agreement Other Agreement*( Annexure - 81 )
Pd 19 Conversion Certificate Under Section 95 Of The KLR Act 1964*( Annexure - 84 )
Pd 20 Any Other Document (Rights Title Interest Name)*( Annexure - 85 )
Pd 21 Proforma Of Agreement For Sale*( Annexure - 86 )
Pd 22 Proforma Of Allotment Letter*( Annexure - 87 )
Pd 24 Brochure*( Annexure - 89 )
Dc 1 Declaration (Form B)*( Annexure - 90 )
Dc 2 Section 3(1) Notarized Affidavit*( Annexure - 91 )
Dc 3 JD AFFIDAVIT CUM DECLARATION*( Annexure - 92 )
Noc 7 KSPCB( Annexure - 99 )
Dr 1 Utilisation Certificate( Annexure - 108 )
Dr 2 Transfer Of Development Rights Certificate( Annexure - 109 )
Dr 3 Relinquishment Deed( Annexure - 110 )
Photo 1 Project Photo
Od 1 TG Heritage Guideline Value Certificate.Pdf
Od 2 Title Deed.Pdf
Od 3 Organizational Chart.Pdf
Od 4 STRUCTURAL STABILITY CERTIFICATE.Pdf
Od 5 CDP Plan.Pdf
Od 6 Location Demarcation.Jpg
Od 7 Village Map.Pdf
Od 8 Basement.Pdf
Od 9 Ground Floor.Pdf
Od 10 Elevation & Section.Pdf
Od 11 First Floor.Pdf
Od 12 Second Floor.Pdf
Od 13 Third Floor.Pdf
Od 14 Fourth Floor.Pdf
Od 15 Terrace Plan.Pdf
Od 16 STP DEMARCATION.Pdf
Ed 1 15-12-2022
Ed 2 15-12-2022
Ed 3 15-12-2022
Ed 4 15-12-2022
Ed 5 15-12-2022
Ed 6 15-12-2022
Ed 7 15-12-2022
Ed 8 15-12-2022
Ed 9 15-12-2022
Ed 10 30-12-2022
Ed 11 30-12-2022
Ed 12 30-12-2022
Ld Rtc
Ld Mutation
Ld Encumbrance Certificate
Ld Conversion Order
Ld Sale Deed
Ld Khatha
Bank

Bank & Cost Disclosure

Declared project cost and the designated escrow account on file.

Project Account Bank ICICI Bank
Account Number (RERA) 777705749001
IFSC ICIC0001007
Branch Address Bannerghatta Road