Squareyards Logo
Blogs
Download App Sell or Rent Property
Login
Rera Banner
residential New Launch Source: rera.ka

Brigade Meadows Azalea RERA Details - PRM/KA/RERA/1251/310/PR/180826/008875 Bangalore

View the RERA registration, promoter, approval, building, inventory, document and construction-progress disclosures for Brigade Meadows Azalea under registration PRM/KA/RERA/1251/310/PR/180826/008875 in Bangalore, Karnataka. Data is sourced from rera.ka.

RERA

RERA Snapshot

The most important statutory project disclosures, generated dynamically from available RERA fields.

  • RERA Number PRM/KA/RERA/1251/310/PR/180826/008875
  • Project Name Azalea at Brigade Meadows
  • Project Type Residential/Group Housing
  • Project Status New Launch
  • District Bengaluru Urban
  • Taluka Bengaluru South
  • Original Completion 31 July 2029
  • Documents 65 Verified
Timeline

Project Timeline & Completion Details

Key statutory dates from registration through proposed completion and permit validity.

Proposed Start 24 August 2026 Expected commencement of civil works and foundation on site.
Original Completion 31 July 2029 Mandated date for project handover to the allottees and final compliance filing.
Promoter

Promoter, Organisation & Member Details

Declared promoter entity, address and corporate identifiers on file with the authority.

Primary Promoter

Brigade Enterprises Limited
Registered Address 29th & 30th Floor, World Trade Center, Brigade Gateway Campus,,26/1, Dr. Rajkumar Road, Malleswaram-Rajajinagar ,Bengaluru North ,Bengaluru Urban-560055
Location

Land, Address & Location Details

Land parcel, zoning and geo-coordinates as recorded in the project filing.

RERA Coordinates

Latitude, Longitude 12.813652591205617, 77.51034524111977
Plans

Plans & Approvals

Statutory approvals obtained or pending against the project site.

Plan Approval No. GBDA/CC/45/2025-26
Authority Local Planing Authority
Approved Date 08 June 2026

Understand this Project's RERA details

Get clear answers and additional support from our RERA experts.

RERA Banner
Buildings

Buildings, Towers & Building-Level Details

Statutory building-level disclosures including tower height, sanctioned floors, structural counts and parking areas.

Building Detail
Name No. of Basements No. of Slab No. of Slits No. of Open Parking Building Type Height of Tower No. of Floors No. of Units
Tower A 2 6 0 55 Residential 20.525 5 40

Scroll horizontally to view all building-level fields. Values marked "-" were not disclosed in the source RERA record.

Inventory

Unit Inventory & Configuration Details

Configuration mix and floor-level disclosures with both grouped and raw RERA views.

Total Units -
Configurations 2
Inventory Type RESIDENTIAL
Configuration Distribution
1 BHK 0 units
2 BHK 0 units
  • Tower A
Floor-Wise Inventory Explorer
Floor Apartment Type Carpet Area No. of Unit
-1 2 BHK 73.84 A 0004
-1 2 BHK 76.58 A 0005
GF 2 BHK 75.74 A 0101
GF 2 BHK 73.84 A 0102
GF 2 BHK 73.84 A 0103
GF 2 BHK 73.84 A 0104
GF 2 BHK 76.58 A 0105
GF 1 BHK 53.2 A 0106
GF 1 BHK 47.92 A 0107
GF 2 BHK 75.74 A 0108
1 2 BHK 75.74 A 0201
1 2 BHK 73.84 A 0202
1 2 BHK 73.84 A 0203
1 2 BHK 73.84 A 0204
1 2 BHK 76.58 A 0205
1 1 BHK 53.2 A 0206
1 1 BHK 47.92 A 0207
1 2 BHK 75.74 A 0208
2 2 BHK 75.74 A 0301
2 2 BHK 73.84 A 0302
2 2 BHK 73.84 A 0303
2 2 BHK 73.84 A 0304
2 2 BHK 76.58 A 0305
2 1 BHK 53.2 A 0306
2 1 BHK 47.92 A 0307
2 2 BHK 75.74 A 0308
3 2 BHK 75.74 A 0401
3 2 BHK 73.84 A 0402
3 2 BHK 73.84 A 0403
3 2 BHK 73.84 A 0404
3 2 BHK 76.58 A 0405
3 1 BHK 53.2 A 0406
3 1 BHK 47.92 A 0407
3 2 BHK 75.74 A 0408
4 2 BHK 75.74 A 0501
4 2 BHK 73.84 A 0502
4 2 BHK 73.84 A 0503
4 2 BHK 73.84 A 0504
4 2 BHK 76.58 A 0505
4 2 BHK 75.74 A 0508
Parking

Parking, Garage & Area Details

Parking provision declared in the sanctioned plan.

Type Proposed Booked Work Done
Garage - - -
Covered Parking - - -
Open Parking - - -
Development

Development Works & Common Area Disclosures

Project-level common infrastructure disclosures as reported by the developer to the RERA authority.

Sub Structure Earth Work And Other Leveling Preparation Work % not reported Sub Structure Foundation Footing Work % not reported Sub Structure Upto Plinth Level % not reported
Sub Structure Sub-structure Flooring (Parking Floor, More Than One Floor Below General Ground Level) % not reported Sub Structure Retaining Wall (All Types) % not reported Sup Structure Rcc Or Ms Framed Structure % not reported
Sup Structure Masonry Construction % not reported Sup Structure Plastering Inside , Outside & Ceiling % not reported Sup Structure Joinery: Doors, Windows, Ventilators Etc % not reported
Sup Structure Basic Work Of Water Supply, Sanitary And Electrification % not reported Sup Structure Dadoing, Skirting, Flooring, Tiles Work (All Types) % not reported Sup Structure Railing And Grill Fixing % not reported
Finishing Works Electrification, Water Supply And Sanitary Finishing % not reported Finishing Works Painting % not reported Finishing Works Fire Prevention And Fire Fighting Fitting And Fixture With Network % not reported
Finishing Works Weather Proof Work(tile,concrete) % not reported Finishing Works Wardrobe, Showcase, Kitchen Cabinet, Puja Work % not reported Finishing Works Elevation Work % not reported
Finishing Works Internal And External Work Including Landscapes As Per Sanctioned Drawings % not reported Internal Infrastructure Water Supply % not reported Internal Infrastructure Sewage And Drainage System % not reported
Internal Infrastructure Water Conservation/rain Water Harvesting/recharge Of Ground Water % not reported Internal Infrastructure Energy Management % not reported Internal Infrastructure Fire Protection And Fire Safety Requirements % not reported
Internal Infrastructure Solid Waste Management And Disposal % not reported Internal Infrastructure Emergency Evacuation Services % not reported External Infrastructure Water Supply % not reported
External Infrastructure Internal Roads & Footpaths % not reported External Infrastructure Sewage And Drainage System % not reported External Infrastructure Electricity Supply Transformer And Substation % not reported
External Infrastructure Solid Waste Management And Disposal % not reported External Infrastructure Emergency Evacuation Services % not reported External Infrastructure Storm Water Drains % not reported
External Infrastructure Use Of Renewable Energy % not reported External Infrastructure Water Conservation/rain Water Harvesting/recharge Of Ground Water % not reported External Infrastructure Fire Protection And Fire Safety Requirements % not reported
External Infrastructure Sewage Treatment Plant (Stp) % not reported External Infrastructure Parks & Tree Planting % not reported External Infrastructure Street Lighting % not reported
Amenities Electricity % not reported Amenities Smart Home Automation % not reported Amenities Cctv Surveillance % not reported
Amenities Club House % not reported Amenities Community Hall % not reported Amenities Outdoor Sports Facility % not reported
Amenities Indoor Sports Facility % not reported Amenities Swimming Pool % not reported Amenities Gym % not reported
Amenities Parks % not reported Amenities Power Backup % not reported Amenities Piped Gas % not reported
Amenities Water And Sanitation % not reported Amenities Air Conditioning % not reported Amenities Café/dining/ Kitchen / Pantry % not reported
Amenities Library / Art Room % not reported Amenities Gym & Physiotherapy % not reported Amenities Multipurpose Hall / Prefunction Lobby / Store % not reported
Amenities Nurse Station & Medical Room % not reported Amenities Gym / Physiotherapy % not reported Amenities Nurse Station / Medical Room % not reported
Common Areas Staircases % not reported Common Areas Lifts % not reported Common Areas Corridor/lobbies % not reported
Common Areas Fire Escapes % not reported Common Areas Common Entrance And Exit For The Building/common Portico/foyer/verandah % not reported Common Areas Basement % not reported
Common Areas Terrace % not reported Common Areas Outer Wall % not reported Common Areas Open Parking Areas % not reported
Common Areas Provision For Lodging Of Management Staff And Security Staff % not reported Common Areas Water Conservation And Renewable Energy % not reported Common Areas Common Storage Spaces % not reported
Documents

RERA Documents & Filings

All statutory documents uploaded by the promoter to the authority portal.

Ld Rtc
Ld Mutation
Promoter Registration Certificate
Promoter Pan Card
Promoter Address Proof
Fd 1 Balance Sheet - 2024-25.Pdf
Fd 2 Balance Sheet - 2023-24.Pdf
Fd 3 Balance Sheet - 2022-23 With CA UDIN.Pdf
Fd 4 Profit And Loss - 2024-25.Pdf
Fd 5 Profit And Loss Account - 2023-24.Pdf
Fd 6 Profit And Loss - 2022-23 With CA UDIN.Pdf
Fd 7 ITRV - 2024-25.Pdf
Fd 8 ITRV - 2023-24.Pdf
Fd 9 BEL ITR Ack FY 21-22.Pdf
Fd 10 Board'S Report - 2024-25 - Compressed.Pdf
Fd 11 Board Report - 2023-24.Pdf
Fd 12 Directors Report - 2022-23.Pdf
Fd 13 Cash Flow Statement - 2024-25.Pdf
Fd 14 Cash Flow Statement - 2023-24.Pdf
Fd 15 Cash Flow Statement - 2022-23.Pdf
Fd 16 Audit Report - 2024-25 - Compressed.Pdf
Fd 17 Auditor Report - 2023-24.Pdf
Fd 18 Auditors Report - 2022-23.Pdf
Pd 1 Commencement Certificate( Annexure - 80 )
Pd 2 Approved Building Plan( Annexure - 81 )
Pd 3 Sectional Drawing Of The Apartments( Annexure - 82 )
Pd 4 Certificate From Registered Engineer Indicating The Structural Safety Of The Building( Annexure - 83 )
Pd 5 Project Specifications( Annexure - 84 )
Pd 6 Brochure( Annexure - 85 )
Pd 7 Relinquishment Deed( Annexure - 86 )
Pd 8 Proforma Of Agreement For Sale( Annexure - 87 )
Pd 9 Proforma Of Allotment Letter( Annexure - 88 )
Dc 1 Declaration (Form B)( Annexure - 89 )
Dc 2 Section 3(1) Notarized Affidavit( Annexure - 90 )
Dc 4 Advocate Search Report( Annexure - 92 )
Noc 1 ESCOM Electricity( Annexure - 95 )
Noc 2 KWSSB Water( Annexure - 96 )
Noc 3 KSPCB( Annexure - 97 )
Noc 5 Fire Force Department( Annexure - 99 )
Noc 6 Airport Authority Of India( Annexure - 100 )
Photo 1 Project Photo
Od 1 Site Plan.Pdf
Od 2 Lower Basement.Pdf
Od 3 Upper Basement.Pdf
Od 4 Ground Floor.Pdf
Od 5 First, Typical (2nd To 4th), Fifth & Terrace Floor1.Pdf
Od 6 Elevation.Pdf
Od 7 Section1.Pdf
Od 8 Azalea At Brigade Meadows - Litigation.Pdf
Od 9 CDP Plan.Pdf
Od 10 Village Map.Pdf
Od 11 Undertaking - BESCOM NOC.Pdf
Od 12 Undertaking - Water NOC.Pdf
Od 13 Azalea At Brigade Meadows - STP Report.Pdf
Od 14 Azalea At Brigade Meadows - STP Plan.Pdf
Od 15 Brigade Meadows - Modfied Development Plan.Pdf
Od 16 Brigade Meadows - Single Layout Development Letter.Pdf
Ed 1 12-08-2026
Ed 2 12-08-2026
Ed 3 12-08-2026
Ed 4 12-08-2026
Ld Encumbrance Certificate
Ld Conversion Order
Ld Sale Deed
Ld Khatha
Bank

Bank & Cost Disclosure

Declared project cost and the designated escrow account on file.

Project Account Bank KOTAK MAHINDRA BANK
Account Number (RERA) 5211759792
IFSC KKBK0008066
Branch Address M G Road, Bangalore
Country/City