Squareyards Logo
Blogs
Sell or Rent Property
Login
Rera Banner
residential Under Construction Source: rera.ka

Mahindra Eden RERA Details - PRM/KA/RERA/1251/310/PR/060822/005141 Bangalore

View the RERA registration, promoter, approval, building, inventory, document and construction-progress disclosures for Mahindra Eden under registration PRM/KA/RERA/1251/310/PR/060822/005141 in Bangalore, Karnataka. Data is sourced from rera.ka.

RERA

RERA Snapshot

The most important statutory project disclosures, generated dynamically from available RERA fields.

  • RERA Number PRM/KA/RERA/1251/310/PR/060822/005141
  • Project Name MAHINDRA EDEN PHASE-2
  • Project Type Residential/Group Housing
  • Project Status Under Construction
  • District Bengaluru Urban
  • Taluka Bengaluru South
  • Original Completion 30 July 2027
  • Documents 86 Verified
Timeline

Project Timeline & Completion Details

Key statutory dates from registration through proposed completion and permit validity.

Proposed Start 01 August 2022 Expected commencement of civil works and foundation on site.
Original Completion 30 July 2027 Mandated date for project handover to the allottees and final compliance filing.
Promoter

Promoter, Organisation & Member Details

Declared promoter entity, address and corporate identifiers on file with the authority.

Primary Promoter

MAHINDRA LIFESPACE DEVELOPERS LIMITED
Registered Address Mahindra Lifespace Developers Limited Sy. No. 49 & 50/2, Holiday Village Road,Vajarahalli Village, Kanakapura Road, Bengaluru ,Bengaluru South ,Bengaluru Urban-560062
Experience Details
Location

Land, Address & Location Details

Land parcel, zoning and geo-coordinates as recorded in the project filing.

Address Mahindra Eden Sy. No. 49 & 50/2, Holiday Village Road , Vajarahalli Village, Kanakapura Road, Bengaluru , Bengaluru South , Bengaluru Urban, Karnataka - 560062

RERA Coordinates

Latitude, Longitude 12.86900, 77.54310
Plans

Plans & Approvals

Statutory approvals obtained or pending against the project site.

Plan Approval No. BBMP/CC/9799/21-22
Authority BBMP - Bruhat Bengaluru Mahanagara Palike
Approved Date 09 March 2022

Understand this Project's RERA details

Get clear answers and additional support from our RERA experts.

RERA Banner
Buildings

Buildings, Towers & Building-Level Details

Statutory building-level disclosures including tower height, sanctioned floors, structural counts and parking areas.

Building Detail
Name No. of Basements No. of Slab No. of Slits No. of Open Parking Building Type Height of Tower No. of Floors No. of Units
Wing-C 2 27 0 110 Residential 82.0 26 107
Wing-D 2 29 0 147 Residential 88.0 28 143

Scroll horizontally to view all building-level fields. Values marked "-" were not disclosed in the source RERA record.

Inventory

Unit Inventory & Configuration Details

Configuration mix and floor-level disclosures with both grouped and raw RERA views.

Total Units -
Configurations 3
Inventory Type RESIDENTIAL
Configuration Distribution
1 BHK 0 units
2 BHK 0 units
3 BHK 0 units
  • Wing-C
  • Wing-D
Floor-Wise Inventory Explorer
Floor Apartment Type Carpet Area No. of Unit
-1 3 BHK 119.8 C-0001
-1 3 BHK 119.8 C-0002
-1 3 BHK 105.4 C-0003
GF 3 BHK 119.8 C-0101
GF 3 BHK 119.8 C-0102
GF 3 BHK 105.4 C-0103
GF 3 BHK 105.4 C-0104
1 3 BHK 119.8 C-0201
1 3 BHK 119.8 C-0202
1 3 BHK 105.4 C-0203
1 3 BHK 105.4 C-0204
2 3 BHK 119.8 C-0301
2 3 BHK 119.8 C-0302
2 3 BHK 105.4 C-0303
2 3 BHK 105.4 C-0304
3 3 BHK 119.8 C-0401
3 3 BHK 119.8 C-0402
3 3 BHK 105.4 C-0403
3 3 BHK 105.4 C-0404
4 3 BHK 119.8 C-0501
4 3 BHK 119.8 C-0502
4 3 BHK 105.4 C-0503
4 3 BHK 105.4 C-0504
5 3 BHK 119.8 C-0601
5 3 BHK 119.8 C-0602
5 3 BHK 105.4 C-0603
5 3 BHK 105.4 C-0604
6 3 BHK 119.8 C-0701
6 3 BHK 119.8 C-0702
6 3 BHK 105.4 C-0703
6 3 BHK 105.4 C-0704
7 3 BHK 119.8 C-0801
7 3 BHK 119.8 C-0802
7 3 BHK 105.4 C-0803
7 3 BHK 105.4 C-0804
8 3 BHK 119.8 C-0901
8 3 BHK 119.8 C-0902
8 3 BHK 105.4 C-0903
8 3 BHK 105.4 C-0904
9 3 BHK 119.8 C-1001
9 3 BHK 119.8 C-1002
9 3 BHK 105.4 C-1003
9 3 BHK 105.4 C-1004
10 3 BHK 119.8 C-1101
10 3 BHK 119.8 C-1102
10 3 BHK 105.4 C-1103
10 3 BHK 105.4 C-1104
11 3 BHK 119.8 C-1201
11 3 BHK 119.8 C-1202
11 3 BHK 105.4 C-1203
11 3 BHK 105.4 C-1204
12 3 BHK 119.8 C-1301
12 3 BHK 119.8 C-1302
12 3 BHK 105.4 C-1303
12 3 BHK 105.4 C-1304
13 3 BHK 119.8 C-1401
13 3 BHK 119.8 C-1402
13 3 BHK 105.4 C-1403
13 3 BHK 105.4 C-1404
14 3 BHK 119.8 C-1501
14 3 BHK 119.8 C-1502
14 3 BHK 105.4 C-1503
14 3 BHK 105.4 C-1504
15 3 BHK 119.8 C-1601
15 3 BHK 119.8 C-1602
15 3 BHK 105.4 C-1603
15 3 BHK 105.4 C-1604
16 3 BHK 119.8 C-1701
16 3 BHK 119.8 C-1702
16 3 BHK 105.4 C-1703
16 3 BHK 105.4 C-1704
17 3 BHK 119.8 C-1801
17 3 BHK 119.8 C-1802
17 3 BHK 105.4 C-1803
17 3 BHK 105.4 C-1804
18 3 BHK 119.8 C-1901
18 3 BHK 119.8 C-1902
18 3 BHK 105.4 C-1903
18 3 BHK 62.4 C-1904
19 3 BHK 119.8 C-2001
19 3 BHK 119.8 C-2002
19 3 BHK 105.4 C-2003
19 3 BHK 105.4 C-2004
20 3 BHK 119.8 C-2101
20 3 BHK 119.8 C-2102
20 3 BHK 105.4 C-2103
20 3 BHK 105.4 C-2104
21 3 BHK 119.8 C-2201
21 3 BHK 119.8 C-2202
21 3 BHK 105.4 C-2203
21 3 BHK 105.4 C-2204
22 3 BHK 119.8 C-2301
22 3 BHK 119.8 C-2302
22 3 BHK 105.4 C-2303
22 3 BHK 105.4 C-2304
23 3 BHK 119.8 C-2401
23 3 BHK 119.8 C-2402
23 3 BHK 105.4 C-2403
23 3 BHK 105.4 C-2404
24 3 BHK 119.8 C-2501
24 3 BHK 119.8 C-2502
24 3 BHK 105.4 C-2503
24 3 BHK 105.4 C-2504
25 3 BHK 119.8 C-2601
25 3 BHK 119.8 C-2602
25 3 BHK 105.4 C-2603
25 3 BHK 105.4 C-2604
Parking

Parking, Garage & Area Details

Parking provision declared in the sanctioned plan.

Type Proposed Booked Work Done
Garage - - -
Covered Parking - - -
Open Parking - - -
Development

Development Works & Common Area Disclosures

Project-level common infrastructure disclosures as reported by the developer to the RERA authority.

Sub Structure Earth Work And Other Leveling Preparation Work % not reported Sub Structure Foundation Footing Work % not reported Sub Structure Upto Plinth Level % not reported
Sub Structure Sub-structure Flooring (Parking Floor, More Than One Floor Below General Ground Level) % not reported Sub Structure Retaining Wall (All Types) % not reported Sup Structure Rcc Or Ms Framed Structure % not reported
Sup Structure Masonry Construction % not reported Sup Structure Plastering Inside , Outside & Ceiling % not reported Sup Structure Joinery: Doors, Windows, Ventilators Etc % not reported
Sup Structure Basic Work Of Water Supply, Sanitary And Electrification % not reported Sup Structure Dadoing, Skirting, Flooring, Tiles Work (All Types) % not reported Sup Structure Railing And Grill Fixing % not reported
Finishing Works Electrification, Water Supply And Sanitary Finishing % not reported Finishing Works Painting % not reported Finishing Works Fire Prevention And Fire Fighting Fitting And Fixture With Network % not reported
Finishing Works Weather Proof Work(tile,concrete) % not reported Finishing Works Wardrobe, Showcase, Kitchen Cabinet, Puja Work % not reported Finishing Works Elevation Work % not reported
Finishing Works Internal And External Work Including Landscapes As Per Sanctioned Drawings % not reported Internal Infrastructure Water Supply % not reported Internal Infrastructure Sewage And Drainage System % not reported
Internal Infrastructure Water Conservation/rain Water Harvesting/recharge Of Ground Water % not reported Internal Infrastructure Energy Management % not reported Internal Infrastructure Fire Protection And Fire Safety Requirements % not reported
Internal Infrastructure Solid Waste Management And Disposal % not reported Internal Infrastructure Emergency Evacuation Services % not reported External Infrastructure Water Supply % not reported
External Infrastructure Internal Roads & Footpaths % not reported External Infrastructure Sewage And Drainage System % not reported External Infrastructure Electricity Supply Transformer And Substation % not reported
External Infrastructure Solid Waste Management And Disposal % not reported External Infrastructure Emergency Evacuation Services % not reported External Infrastructure Storm Water Drains % not reported
External Infrastructure Use Of Renewable Energy % not reported External Infrastructure Water Conservation/rain Water Harvesting/recharge Of Ground Water % not reported External Infrastructure Fire Protection And Fire Safety Requirements % not reported
External Infrastructure Sewage Treatment Plant (Stp) % not reported External Infrastructure Parks & Tree Planting % not reported External Infrastructure Street Lighting % not reported
Amenities Electricity % not reported Amenities Smart Home Automation % not reported Amenities Cctv Surveillance % not reported
Amenities Club House % not reported Amenities Community Hall % not reported Amenities Outdoor Sports Facility % not reported
Amenities Indoor Sports Facility % not reported Amenities Swimming Pool % not reported Amenities Gym % not reported
Amenities Parks % not reported Amenities Power Backup % not reported Amenities Piped Gas % not reported
Amenities Water And Sanitation % not reported Amenities Air Conditioning % not reported Amenities Nebula Lounge % not reported
Amenities Burma Bridge % not reported Amenities Swinging Cocoons % not reported Amenities Yoga & Meditation Space % not reported
Amenities Contemplation Zone % not reported Amenities Camping Zone % not reported Amenities Sand Pit % not reported
Amenities Water Lava % not reported Amenities Reflexology Path % not reported Amenities Nest House % not reported
Amenities Al Fresco Gym % not reported Amenities Net Bridge % not reported Amenities Pet Park % not reported
Amenities Pergola Sit-out % not reported Amenities Multipurpose Hall % not reported Amenities Guest Rooms % not reported
Amenities Indoor Gym With Aerobics Zone % not reported Common Areas Staircases % not reported Common Areas Lifts % not reported
Common Areas Corridor/lobbies % not reported Common Areas Fire Escapes % not reported Common Areas Common Entrance And Exit For The Building/common Portico/foyer/verandah % not reported
Common Areas Basement % not reported Common Areas Terrace % not reported Common Areas Outer Wall % not reported
Common Areas Open Parking Areas % not reported Common Areas Provision For Lodging Of Management Staff And Security Staff % not reported Common Areas Water Conservation And Renewable Energy % not reported
Common Areas Common Storage Spaces % not reported Common Areas Staircases And Lift Lobbies, Corridor, Lobbies, Corridor % not reported
Documents

RERA Documents & Filings

All statutory documents uploaded by the promoter to the authority portal.

Promoter Registration Certificate
Promoter Pan Card
Promoter Address Proof
Affidavit
Fd 1 Balance Sheet FY 20 21.Pdf
Fd 2 Balance Sheet FY 19 20.Pdf
Fd 3 Balance Sheet FY 18 19.Pdf
Fd 4 Profit And Loss FY 20 21.Pdf
Fd 5 Profit And Loss FY 19 20.Pdf
Fd 6 Profit And Loss FY 18 19.Pdf
Fd 7 Directors Report FY 20 21.Pdf
Fd 8 Directors Report FY 19 20.Pdf
Fd 9 Director Report FY 18 19.Pdf
Fd 10 Cash Flow FY 20 21.Pdf
Fd 11 Cash Flow FY 19 20.Pdf
Fd 12 Cash Flow FY 19 20.Pdf
Fd 13 Annual Report 2020 21.Pdf
Fd 14 Annual Report 2019 20.Pdf
Fd 15 Annual Report 2018 19.Pdf
Fd 16 ITR AY 2020 21.Pdf
Fd 17 ITR AY 2019 20.Pdf
Fd 18 ITR AY 2018 19.Pdf
Pd 1 Self Attested PAN Card*( Annexure - 66 )
Pd 2 Commencement Certificate*( Annexure - 67 )
Pd 3 Electricity Permission Letter*( Annexure - 68 )
Pd 4 Water Permission Letter*( Annexure - 69 )
Pd 5 Approved Layout Plan*( Annexure - 70 )
Pd 6 Approved Building Plotting Plan*( Annexure - 71 )
Pd 7 Existing Layout Plan( Annexure - 72 )
Pd 8 Existing Section Plan And Specification( Annexure - 73 )
Pd 9 Sectional Drawing Of The Apartments*( Annexure - 74 )
Pd 10 Project Specifications*( Annexure - 75 )
Pd 11 Approved Section Of Building Infrastructure Plan Of Plotting*( Annexure - 76 )
Pd 12 Area Development Plan Of Project Area*( Annexure - 77 )
Pd 13 Certificate From Registered Engineer Indicating The Structural Safety Of The Building*( Annexure - 78 )
Pd 14 Advocate Search Report*( Annexure - 79 )
Pd 15 Urban Land Ceiling*( Annexure - 80 )
Pd 16 Collaboration Agreement Development Agreement Joint Development Agreement Other Agreement*( Annexure - 81 )
Pd 17 Change Of Land Use*( Annexure - 82 )
Pd 18 District Magistrate*( Annexure - 83 )
Pd 19 Conversion Certificate Under Section 95 Of The KLR Act 1964*( Annexure - 84 )
Pd 20 Any Other Document (Rights Title Interest Name)*( Annexure - 85 )
Pd 21 Proforma Of Agreement For Sale*( Annexure - 86 )
Pd 22 Proforma Of Allotment Letter*( Annexure - 87 )
Pd 24 Brochure*( Annexure - 89 )
Dc 1 Declaration (Form B)*( Annexure - 90 )
Dc 2 Section 3(1) Notarized Affidavit*( Annexure - 91 )
Dc 3 JD AFFIDAVIT CUM DECLARATION*( Annexure - 92 )
Noc 1 ESCOM Electricity*( Annexure - 93 )
Noc 2 KWSSB Water*( Annexure - 94 )
Noc 5 Fire Force Department( Annexure - 97 )
Noc 6 Airport Authority Of India( Annexure - 98 )
Noc 7 KSPCB( Annexure - 99 )
Noc 8 SEIAA( Annexure - 100 )
Noc 9 BSNL( Annexure - 101 )
Dr 1 Utilisation Certificate( Annexure - 108 )
Dr 2 Transfer Of Development Rights Certificate( Annexure - 109 )
Dr 3 Relinquishment Deed( Annexure - 110 )
Photo 1 Project Photo
Od 1 No Mortgage Affidavit.Pdf
Od 2 Rectification Deed.Pdf
Od 3 BDA DP Approved Plan.Pdf
Od 4 1 BBMP SITE PLAN STP & RWH.Pdf
Od 5 2 BBMP LOWER BASEMENT FLOOR PLAN.Pdf
Od 6 3 BBMPUPPER BASEMENT FLOOR PLAN.Pdf
Od 7 4 BBMP GROUND FLOOR PLAN.Pdf
Od 8 5 BBMP WING C GF-26F TERRACE SECTN.Pdf
Od 9 6 BBMP WING D GF-28F TERRACE & SECTN.Pdf
Od 10 7 BBMP COMBINED SECTION WING C & D.Pdf
Od 11 8 BBMP COMBINED ELEVATION WING C & D.Pdf
Od 12 CDP Plan.Pdf
Od 13 Guideline Value - Vajarahalli Village.Pdf
Ed 1 27-07-2022
Ed 2 27-07-2022
Ed 3 27-07-2022
Ed 4 27-07-2022
Ed 5 27-07-2022
Ed 6 27-07-2022
Ed 7 27-07-2022
Ed 8 27-07-2022
Ld Rtc
Ld Mutation
Ld Encumbrance Certificate
Ld Conversion Order
Ld Sale Deed
Ld Khatha
Bank

Bank & Cost Disclosure

Declared project cost and the designated escrow account on file.

Project Account Bank Axis Bank
Account Number (RERA) 922020023276890
IFSC UTIB0004024
Branch Address Kanakapura Road, Raghuvanahalli, Bangalore – 560062
Country/City