Mahindra Newhaven RERA Details - PRM/KA/RERA/1251/310/PR/160425/007668 Bangalore

View the RERA registration, promoter, approval, building, inventory, document and construction-progress disclosures for Mahindra Newhaven under registration PRM/KA/RERA/1251/310/PR/160425/007668 in Bangalore, Karnataka. Data is sourced from rera.ka.

RERA

RERA Snapshot

The most important statutory project disclosures, generated dynamically from available RERA fields.

  • RERA Number PRM/KA/RERA/1251/310/PR/160425/007668
  • Project Name MAHINDRA NEWHAVEN
  • Project Type Residential/Group Housing
  • Project Status Under Construction
  • District Bengaluru Urban
  • Taluka Bengaluru South
  • Original Completion 28 December 2029
  • Documents 80 Verified
Timeline

Project Timeline & Completion Details

Key statutory dates from registration through proposed completion and permit validity.

Proposed Start 01 March 2025 Expected commencement of civil works and foundation on site.
Original Completion 28 December 2029 Mandated date for project handover to the allottees and final compliance filing.
Promoter

Promoter, Organisation & Member Details

Declared promoter entity, address and corporate identifiers on file with the authority.

Primary Promoter

MAHINDRA LIFESPACE DEVELOPERS LIMITED
Registered Address Mahindra Lifespace Developers Limited, Sy. No. 49 & 50/2, Holiday Village Road,Vajarahalli Village, Kanakapura Road ,Bengaluru South ,Bengaluru Urban-560062
Experience Details
Location

Land, Address & Location Details

Land parcel, zoning and geo-coordinates as recorded in the project filing.

Address Sy No 62, Katha No 269/1/245/62 , Basapura Village , Bengaluru South , Bengaluru Urban, Karnataka - 560068

RERA Coordinates

Latitude, Longitude 12.871308, 77.642053
Plans

Plans & Approvals

Statutory approvals obtained or pending against the project site.

Plan Approval No. BBMP/Addl.Dir/JDSOUTH/0043/24-25
Authority BBMP - Bruhat Bengaluru Mahanagara Palike
Approved Date 09 April 2025

Understand this Project's RERA details

Get clear answers and additional support from our RERA experts.

RERA Banner
Buildings

Buildings, Towers & Building-Level Details

Statutory building-level disclosures including tower height, sanctioned floors, structural counts and parking areas.

Building Detail
Name No. of Basements No. of Slab No. of Slits No. of Open Parking Building Type Height of Tower No. of Floors No. of Units
Wing A 1 26 0 121 Residential 78.5 25 119

Scroll horizontally to view all building-level fields. Values marked "-" were not disclosed in the source RERA record.

Inventory

Unit Inventory & Configuration Details

Configuration mix and floor-level disclosures with both grouped and raw RERA views.

Total Units -
Configurations 3
Inventory Type RESIDENTIAL
Configuration Distribution
3 BHK 0 units
4 BHK 0 units
5 BHK 0 units
  • Wing A
Floor-Wise Inventory Explorer
Floor Apartment Type Carpet Area No. of Unit
GF 3 BHK+S 117.61 A0101
GF 3 BHK 110.39 A0102
GF 3 BHK+S 120.9 A0103
GF 4 BHK 136.86 A0104
1 3 BHK+S 117.61 A0201
1 3 BHK 110.39 A0202
1 3 BHK+S 120.9 A0203
1 4 BHK 136.86 A0204
1 4 BHK 136.86 A0205
2 3 BHK+S 117.61 A0301
2 3 BHK 110.39 A0302
2 3 BHK+S 120.9 A0303
2 4 BHK 136.86 A0304
2 4 BHK 136.86 A0305
3 3 BHK+S 117.61 A0401
3 3 BHK 110.39 A0402
3 3 BHK+S 120.9 A0403
3 4 BHK 136.86 A0404
3 4 BHK 136.86 A0405
4 3 BHK+S 117.61 A0501
4 3 BHK 110.39 A0502
4 3 BHK+S 120.9 A0503
4 4 BHK 136.86 A0504
4 4 BHK 136.86 A0505
5 3 BHK+S 117.61 A0601
5 3 BHK 110.39 A0602
5 3 BHK+S 120.9 A0603
5 4 BHK 136.86 A0604
5 4 BHK 136.86 A0605
6 3 BHK+S 117.61 A0701
6 3 BHK 110.39 A0702
6 3 BHK+S 120.9 A0703
6 4 BHK 136.86 A0704
6 4 BHK 136.86 A0705
7 3 BHK+S 117.61 A0801
7 3 BHK 110.39 A0802
7 3 BHK+S 120.9 A0803
7 4 BHK 136.86 A0804
7 4 BHK 136.86 A0805
8 3 BHK+S 117.61 A0901
8 3 BHK 110.39 A0902
8 3 BHK+S 120.9 A0903
8 4 BHK 136.86 A0904
8 4 BHK 136.86 A0905
9 3 BHK+S 117.61 A1001
9 3 BHK 110.39 A1002
9 3 BHK+S 120.9 A1003
9 4 BHK 136.86 A1004
9 4 BHK 136.86 A1005
10 3 BHK+S 117.61 A1101
10 3 BHK 110.39 A1102
10 3 BHK+S 120.9 A1103
10 4 BHK 136.86 A1104
10 4 BHK 136.86 A1105
11 3 BHK+S 117.61 A1201
11 3 BHK 110.39 A1202
11 3 BHK+S 120.9 A1203
11 4 BHK 136.86 A1204
11 4 BHK 136.86 A1205
12 3 BHK+S 117.61 A1301
12 3 BHK 110.39 A1302
12 3 BHK+S 120.9 A1303
12 4 BHK 136.86 A1304
12 4 BHK 136.86 A1305
13 3 BHK+S 117.61 A1401
13 3 BHK 110.39 A1402
13 3 BHK+S 120.9 A1403
13 4 BHK 136.86 A1404
13 4 BHK 136.86 A1405
14 3 BHK+S 117.61 A1501
14 3 BHK 110.39 A1502
14 3 BHK+S 120.9 A1503
14 4 BHK 136.86 A1504
14 4 BHK 136.86 A1505
15 3 BHK+S 117.61 A1601
15 3 BHK 110.39 A1602
15 3 BHK+S 120.9 A1603
15 4 BHK 136.86 A1604
15 4 BHK 136.86 A1605
16 3 BHK+S 117.61 A1701
16 3 BHK 110.39 A1702
16 3 BHK+S 120.9 A1703
16 4 BHK 136.86 A1704
16 4 BHK 136.86 A1705
17 3 BHK+S 117.61 A1801
17 3 BHK 110.39 A1802
17 3 BHK+S 120.9 A1803
17 4 BHK 136.86 A1804
17 4 BHK 136.86 A1805
18 3 BHK+S 117.61 A1901
18 3 BHK 110.39 A1902
18 3 BHK+S 120.9 A1903
18 3 BHK 116.99 A1904
18 3 BHK 116.99 A1905
19 3 BHK+S 117.61 A2001
19 3 BHK 110.39 A2002
19 3 BHK+S 120.9 A2003
19 4 BHK 136.86 A2004
19 4 BHK 136.86 A2005
20 3 BHK+S 117.61 A2101
20 3 BHK 110.39 A2102
20 3 BHK+S 120.9 A2103
20 4 BHK 136.86 A2104
20 4 BHK 136.86 A2105
21 3 BHK+S 117.61 A2201
21 3 BHK 110.39 A2202
21 3 BHK+S 120.9 A2203
21 4 BHK 136.86 A2204
21 4 BHK 136.86 A2205
22 3 BHK+S 117.61 A2301
22 3 BHK 110.39 A2302
22 3 BHK+S 120.9 A2303
22 4 BHK 136.86 A2304
22 4 BHK 136.86 A2305
23 3 BHK+S 117.61 A2401
23 3 BHK 110.39 A2402
23 3 BHK+S 120.9 A2403
23 5BHK Pent 232.81 A2404
23 5BHK Pent 232.81 A2405
Parking

Parking, Garage & Area Details

Parking provision declared in the sanctioned plan.

Type Proposed Booked Work Done
Garage - - -
Covered Parking - - -
Open Parking - - -
Development

Development Works & Common Area Disclosures

Project-level common infrastructure disclosures as reported by the developer to the RERA authority.

Sub Structure Earth Work And Other Leveling Preparation Work % not reported Sub Structure Foundation Footing Work % not reported Sub Structure Upto Plinth Level % not reported
Sub Structure Sub-structure Flooring (Parking Floor, More Than One Floor Below General Ground Level) % not reported Sub Structure Retaining Wall (All Types) % not reported Sup Structure Rcc Or Ms Framed Structure % not reported
Sup Structure Masonry Construction % not reported Sup Structure Plastering Inside , Outside & Ceiling % not reported Sup Structure Joinery: Doors, Windows, Ventilators Etc % not reported
Sup Structure Basic Work Of Water Supply, Sanitary And Electrification % not reported Sup Structure Dadoing, Skirting, Flooring, Tiles Work (All Types) % not reported Sup Structure Railing And Grill Fixing % not reported
Finishing Works Electrification, Water Supply And Sanitary Finishing % not reported Finishing Works Painting % not reported Finishing Works Fire Prevention And Fire Fighting Fitting And Fixture With Network % not reported
Finishing Works Weather Proof Work(tile,concrete) % not reported Finishing Works Wardrobe, Showcase, Kitchen Cabinet, Puja Work % not reported Finishing Works Elevation Work % not reported
Finishing Works Internal And External Work Including Landscapes As Per Sanctioned Drawings % not reported Internal Infrastructure Water Supply % not reported Internal Infrastructure Sewage And Drainage System % not reported
Internal Infrastructure Water Conservation/rain Water Harvesting/recharge Of Ground Water % not reported Internal Infrastructure Energy Management % not reported Internal Infrastructure Fire Protection And Fire Safety Requirements % not reported
Internal Infrastructure Solid Waste Management And Disposal % not reported Internal Infrastructure Emergency Evacuation Services % not reported External Infrastructure Water Supply % not reported
External Infrastructure Internal Roads & Footpaths % not reported External Infrastructure Sewage And Drainage System % not reported External Infrastructure Electricity Supply Transformer And Substation % not reported
External Infrastructure Solid Waste Management And Disposal % not reported External Infrastructure Emergency Evacuation Services % not reported External Infrastructure Storm Water Drains % not reported
External Infrastructure Use Of Renewable Energy % not reported External Infrastructure Water Conservation/rain Water Harvesting/recharge Of Ground Water % not reported External Infrastructure Fire Protection And Fire Safety Requirements % not reported
External Infrastructure Sewage Treatment Plant (Stp) % not reported External Infrastructure Parks & Tree Planting % not reported External Infrastructure Street Lighting % not reported
Amenities Electricity % not reported Amenities Smart Home Automation % not reported Amenities Cctv Surveillance % not reported
Amenities Club House % not reported Amenities Community Hall % not reported Amenities Outdoor Sports Facility % not reported
Amenities Indoor Sports Facility % not reported Amenities Swimming Pool % not reported Amenities Gym % not reported
Amenities Parks % not reported Amenities Power Backup % not reported Amenities Piped Gas % not reported
Amenities Water And Sanitation % not reported Amenities Air Conditioning % not reported Common Areas Staircases % not reported
Common Areas Lifts % not reported Common Areas Corridor/lobbies % not reported Common Areas Fire Escapes % not reported
Common Areas Common Entrance And Exit For The Building/common Portico/foyer/verandah % not reported Common Areas Basement % not reported Common Areas Terrace % not reported
Common Areas Outer Wall % not reported Common Areas Open Parking Areas % not reported Common Areas Provision For Lodging Of Management Staff And Security Staff % not reported
Common Areas Water Conservation And Renewable Energy % not reported Common Areas Common Storage Spaces % not reported
Documents

RERA Documents & Filings

All statutory documents uploaded by the promoter to the authority portal.

Promoter Registration Certificate
Promoter Pan Card
Promoter Address Proof
Affidavit
Fd 1 Balance Sheet FY 23 24.Pdf
Fd 2 Balance Sheet FY 22 23.Pdf
Fd 3 Balance Sheet FY 21 22.Pdf
Fd 4 Profit And Loss FY 23 24.Pdf
Fd 5 Profit And Loss FY 22 23.Pdf
Fd 6 Profit And Loss FY 21 22.Pdf
Fd 7 ITR FY 23-24.Pdf
Fd 8 ITR FY 22-23.Pdf
Fd 9 ITR FY 21 22.Pdf
Fd 10 Directors Report FY 23 24.Pdf
Fd 11 Directors Report FY 22 23.Pdf
Fd 12 Directors Report FY 21 22.Pdf
Fd 13 Cash Flow FY 23 24.Pdf
Fd 14 Cash Flow FY 22 23.Pdf
Fd 15 Cash Flow FY 21 22.Pdf
Fd 16 Auditors Report FY 23 24.Pdf
Fd 17 Auditors Report FY 22 23.Pdf
Fd 18 Auditors Report FY 21 22.Pdf
Pd 1 Commencement Certificate( Annexure - 80 )
Pd 2 Approved Building Plan( Annexure - 81 )
Pd 3 Sectional Drawing Of The Apartments( Annexure - 82 )
Pd 4 Certificate From Registered Engineer Indicating The Structural Safety Of The Building( Annexure - 83 )
Pd 5 Project Specifications( Annexure - 84 )
Pd 6 Brochure( Annexure - 85 )
Pd 7 Relinquishment Deed( Annexure - 86 )
Pd 8 Proforma Of Agreement For Sale( Annexure - 87 )
Pd 9 Proforma Of Allotment Letter( Annexure - 88 )
Dc 1 Declaration (Form B)( Annexure - 89 )
Dc 2 Section 3(1) Notarized Affidavit( Annexure - 90 )
Dc 3 JD AFFIDAVIT CUM DECLARATION( Annexure - 91 )
Dc 4 Advocate Search Report( Annexure - 92 )
Noc 1 ESCOM Electricity( Annexure - 95 )
Noc 2 KWSSB Water( Annexure - 96 )
Noc 3 KSPCB( Annexure - 97 )
Noc 4 SEIAA( Annexure - 98 )
Noc 5 Fire Force Department( Annexure - 99 )
Noc 6 Airport Authority Of India( Annexure - 100 )
Photo 1 Project Photo
Od 1 CDP Map.Pdf
Od 2 Change Of Land Use.Pdf
Od 3 Village Map.Pdf
Od 4 Akarbandh.Pdf
Od 5 Hissa Tippani.Pdf
Od 6 ADLR Survey Sketch.Pdf
Od 7 No Mortgage Affidavit.Pdf
Od 8 Area Statement.Pdf
Od 9 Carpet Area.Pdf
Od 10 Common Area And Amenities Details.Pdf
Od 11 GHS - Name Change & COI.Pdf
Od 12 Old Sale Deed - Woodstock Ambience Dated 05 10 2017.Pdf
Od 13 Old Sale Deed Dated 11 08 2015 Registered On 12 08 2015 As Document No 3228 2015-16.Pdf
Od 14 Old Sale Deed Dated 21 09 1984 Registered As Document No 3845-1984-85.Pdf
Od 15 Land Cost Calculation.Pdf
Od 16 Single Plot Layout Order.Pdf
Od 17 Single Plot Layout Plan.Pdf
Od 18 STP PLAN & SECTION DETAILS.Pdf
Od 19 Abstract Estimation.Pdf
Ed 1 29-03-2025
Ed 2 29-03-2025
Ed 3 29-03-2025
Ed 4 29-03-2025
Ed 5 29-03-2025
Ed 6 29-03-2025
Ed 7 29-03-2025
Ed 8 29-03-2025
Ed 9 29-03-2025
Ed 10 29-03-2025
Ed 11 29-03-2025
Ed 12 29-03-2025
Ed 13 09-04-2025
Ld Rtc
Ld Mutation
Ld Encumbrance Certificate
Ld Conversion Order
Ld Sale Deed
Ld Khatha
Bank

Bank & Cost Disclosure

Declared project cost and the designated escrow account on file.

Project Account Bank Axis Bank
Account Number (RERA) 919020087032388
IFSC UTIB0001541
Branch Address Nitesh Times Square Building No.08, 3rd Floor, M.G. Road, Bangalore
Country/City