View the RERA registration, promoter, approval, building, inventory, document and construction-progress disclosures for Sobha Hamptons Town Park under registration PRM/KA/RERA/1251/308/PR/230125/007419 in Bangalore, Karnataka. Data is sourced from rera.ka.

RERA

RERA Snapshot

The most important statutory project disclosures, generated dynamically from available RERA fields.

  • RERA Number PRM/KA/RERA/1251/308/PR/230125/007419
  • Project Name Sobha Hamptons -Townpark Phase 1 W4 to 6
  • Project Type Residential/Group Housing
  • Project Status Under Construction
  • District Bengaluru Urban
  • Taluka Anekal
  • Original Completion 30 June 2031
  • Documents 132 Verified
Timeline

Project Timeline & Completion Details

Key statutory dates from registration through proposed completion and permit validity.

Proposed Start 01 August 2025 Expected commencement of civil works and foundation on site.
Original Completion 30 June 2031 Mandated date for project handover to the allottees and final compliance filing.
Promoter

Promoter, Organisation & Member Details

Declared promoter entity, address and corporate identifiers on file with the authority.

Primary Promoter

SOBHA LIMITED
Registered Address Sobha Limited, Sarjapur-Marathahalli Outer Ring Road,Devarabisanahalli, Bellandur Post ,Bengaluru East ,Bengaluru Urban-560103
Experience Details
Location

Land, Address & Location Details

Land parcel, zoning and geo-coordinates as recorded in the project filing.

Address Survey nos 52/2(P), 54/1, 54/2, 54/3, 54/4, 54/5, 55/1, 55/2, 55/3, 55/4, 55/5, 56/3, 56/4, 56/5(P), 56/6, 56/7, 58/1(P), 59/1, 59/2, 60/1 , 73/1(P), 73/2(P), 73/3(P), 74/6(P), 74/7(P), 74/8(P), 74/11(P) AT YADAVANAHALLI VILLAGE, ATTIBELE HOBLI, ANEKAL TALUK , Anekal , Bengaluru Urban, Karnataka - 562107

RERA Coordinates

Latitude, Longitude 12.79128169469662, 77.74044010229798
Plans

Plans & Approvals

Statutory approvals obtained or pending against the project site.

Plan Approval No. 351/2024-25
Authority Anekal Planning Authority
Approved Date 21 January 2025

Understand this Project's RERA details

Get clear answers and additional support from our RERA experts.

RERA Banner
Buildings

Buildings, Towers & Building-Level Details

Statutory building-level disclosures including tower height, sanctioned floors, structural counts and parking areas.

Building Detail
Name No. of Basements No. of Slab No. of Slits No. of Open Parking Building Type Height of Tower No. of Floors No. of Units
WING-4 2 41 3 368 Residential 145.45 44 164
WING-5 2 41 3 368 Residential 145.45 44 164
WING-6 2 41 3 368 Residential 145.45 44 164

Scroll horizontally to view all building-level fields. Values marked "-" were not disclosed in the source RERA record.

Inventory

Unit Inventory & Configuration Details

Configuration mix and floor-level disclosures with both grouped and raw RERA views.

Total Units -
Configurations 3
Inventory Type RESIDENTIAL
Configuration Distribution
2 BHK 0 units
3 BHK 0 units
4 BHK 0 units
  • WING-4
  • WING-5
  • WING-6
Floor-Wise Inventory Explorer
Floor Apartment Type Carpet Area No. of Unit
3 3 BHK 114.55 4041
3 4 BHK 133.94 4042
3 3 BHK 111.65 4043
3 3 BHK 112.16 4044
4 3 BHK 114.55 4051
4 4 BHK 133.94 4052
4 3 BHK 111.65 4053
4 3 BHK 112.16 4054
5 4 BHK 133.94 4061
5 4 BHK 133.94 4062
5 3 BHK 111.65 4063
5 3 BHK 112.16 4064
6 4 BHK 133.94 4071
6 4 BHK 133.94 4072
6 3 BHK 111.65 4073
6 3 BHK 112.16 4074
7 4 BHK 133.94 4081
7 4 BHK 133.94 4082
7 3 BHK 111.65 4083
7 3 BHK 112.16 4084
8 4 BHK 133.94 4091
8 4 BHK 133.94 4092
8 3 BHK 111.65 4093
8 3 BHK 112.16 4094
9 4 BHK 133.94 4101
9 4 BHK 133.94 4102
9 3 BHK 111.65 4103
9 3 BHK 112.16 4104
10 4 BHK 133.94 4111
10 4 BHK 133.94 4112
10 3 BHK 111.65 4113
10 3 BHK 112.16 4114
11 4 BHK 133.94 4121
11 4 BHK 133.94 4122
11 3 BHK 111.65 4123
11 3 BHK 112.16 4124
12 4 BHK 133.94 4131
12 4 BHK 133.94 4132
12 3 BHK 111.65 4133
12 3 BHK 112.16 4134
13 4 BHK 133.94 4141
13 4 BHK 133.94 4142
13 3 BHK 111.65 4143
13 3 BHK 112.16 4144
14 4 BHK 133.94 4151
14 4 BHK 133.94 4152
14 3 BHK 111.65 4153
14 3 BHK 112.16 4154
15 4 BHK 133.94 4161
15 4 BHK 133.94 4162
15 3 BHK 111.65 4163
15 3 BHK 112.16 4164
16 4 BHK 133.94 4171
16 4 BHK 133.94 4172
16 3 BHK 111.65 4173
16 3 BHK 112.16 4174
17 4 BHK 133.94 4181
17 4 BHK 133.94 4182
17 3 BHK 111.65 4183
17 3 BHK 112.16 4184
18 4 BHK 133.94 4191
18 4 BHK 133.94 4192
18 3 BHK 111.65 4193
18 3 BHK 112.16 4194
19 4 BHK 133.94 4201
19 3 BHK 114.47 4202
19 2 BHK 93.36 4203
19 3 BHK 112.16 4204
20 4 BHK 133.94 4211
20 4 BHK 133.94 4212
20 3 BHK 111.65 4213
20 3 BHK 112.16 4214
21 4 BHK 133.94 4221
21 4 BHK 133.94 4222
21 3 BHK 111.65 4223
21 3 BHK 112.16 4224
22 4 BHK 133.94 4231
22 4 BHK 133.94 4232
22 3 BHK 111.65 4233
22 3 BHK 112.16 4234
23 4 BHK 133.94 4241
23 4 BHK 133.94 4242
23 3 BHK 111.65 4243
23 3 BHK 112.16 4244
24 4 BHK 133.94 4251
24 4 BHK 133.94 4252
24 3 BHK 111.65 4253
24 3 BHK 112.16 4254
25 4 BHK 133.94 4261
25 4 BHK 133.94 4262
25 3 BHK 111.65 4263
25 3 BHK 112.16 4264
26 4 BHK 133.94 4271
26 4 BHK 133.94 4272
26 3 BHK 111.65 4273
26 3 BHK 112.16 4274
27 4 BHK 133.94 4281
27 4 BHK 133.94 4282
27 3 BHK 111.65 4283
27 3 BHK 112.16 4284
28 4 BHK 133.94 4291
28 4 BHK 133.94 4292
28 3 BHK 111.65 4293
28 3 BHK 112.16 4294
29 4 BHK 133.94 4301
29 3 BHK 114.47 4302
29 2 BHK 93.36 4303
29 3 BHK 112.16 4304
30 4 BHK 133.94 4311
30 4 BHK 133.94 4312
30 3 BHK 111.65 4313
30 3 BHK 112.16 4314
31 4 BHK 133.94 4321
31 4 BHK 133.94 4322
31 3 BHK 111.65 4323
31 3 BHK 112.16 4324
32 4 BHK 133.94 4331
32 4 BHK 133.94 4332
32 3 BHK 111.65 4333
32 3 BHK 112.16 4334
33 4 BHK 133.94 4341
33 4 BHK 133.94 4342
33 3 BHK 111.65 4343
33 3 BHK 112.16 4344
34 4 BHK 133.94 4351
34 4 BHK 133.94 4352
34 3 BHK 111.65 4353
34 3 BHK 112.16 4354
35 4 BHK 133.94 4361
35 4 BHK 133.94 4362
35 3 BHK 111.65 4363
35 3 BHK 112.16 4364
36 4 BHK 133.94 4371
36 4 BHK 133.94 4372
36 3 BHK 111.65 4373
36 3 BHK 112.16 4374
37 4 BHK 133.94 4381
37 4 BHK 133.94 4382
37 3 BHK 111.65 4383
37 3 BHK 112.16 4384
38 4 BHK 133.94 4391
38 4 BHK 133.94 4392
38 3 BHK 111.65 4393
38 3 BHK 112.16 4394
39 4 BHK 133.94 4401
39 3 BHK 114.47 4402
39 2 BHK 93.36 4403
39 3 BHK 112.16 4404
40 4 BHK 133.94 4411
40 4 BHK 133.94 4412
40 3 BHK 111.65 4413
40 3 BHK 112.16 4414
41 4 BHK 133.94 4421
41 4 BHK 133.94 4422
41 3 BHK 111.65 4423
41 3 BHK 112.16 4424
42 4 BHK 133.94 4431
42 4 BHK 133.94 4432
42 3 BHK 111.65 4433
42 3 BHK 112.16 4434
43 4 BHK 133.94 4441
43 4 BHK 133.94 4442
43 3 BHK 111.65 4443
43 3 BHK 112.16 4444
Parking

Parking, Garage & Area Details

Parking provision declared in the sanctioned plan.

Type Proposed Booked Work Done
Garage - - -
Covered Parking - - -
Open Parking - - -
Development

Development Works & Common Area Disclosures

Project-level common infrastructure disclosures as reported by the developer to the RERA authority.

Sub Structure Earth Work And Other Leveling Preparation Work % not reported Sub Structure Foundation Footing Work % not reported Sub Structure Upto Plinth Level % not reported
Sub Structure Sub-structure Flooring (Parking Floor, More Than One Floor Below General Ground Level) % not reported Sub Structure Retaining Wall (All Types) % not reported Sup Structure Rcc Or Ms Framed Structure % not reported
Sup Structure Masonry Construction % not reported Sup Structure Plastering Inside , Outside & Ceiling % not reported Sup Structure Joinery: Doors, Windows, Ventilators Etc % not reported
Sup Structure Basic Work Of Water Supply, Sanitary And Electrification % not reported Sup Structure Dadoing, Skirting, Flooring, Tiles Work (All Types) % not reported Sup Structure Railing And Grill Fixing % not reported
Finishing Works Electrification, Water Supply And Sanitary Finishing % not reported Finishing Works Painting % not reported Finishing Works Fire Prevention And Fire Fighting Fitting And Fixture With Network % not reported
Finishing Works Weather Proof Work(tile,concrete) % not reported Finishing Works Wardrobe, Showcase, Kitchen Cabinet, Puja Work % not reported Finishing Works Elevation Work % not reported
Finishing Works Internal And External Work Including Landscapes As Per Sanctioned Drawings % not reported Internal Infrastructure Water Supply % not reported Internal Infrastructure Sewage And Drainage System % not reported
Internal Infrastructure Water Conservation/rain Water Harvesting/recharge Of Ground Water % not reported Internal Infrastructure Energy Management % not reported Internal Infrastructure Fire Protection And Fire Safety Requirements % not reported
Internal Infrastructure Solid Waste Management And Disposal % not reported Internal Infrastructure Emergency Evacuation Services % not reported External Infrastructure Water Supply % not reported
External Infrastructure Internal Roads & Footpaths % not reported External Infrastructure Sewage And Drainage System % not reported External Infrastructure Electricity Supply Transformer And Substation % not reported
External Infrastructure Solid Waste Management And Disposal % not reported External Infrastructure Emergency Evacuation Services % not reported External Infrastructure Storm Water Drains % not reported
External Infrastructure Use Of Renewable Energy % not reported External Infrastructure Water Conservation/rain Water Harvesting/recharge Of Ground Water % not reported External Infrastructure Fire Protection And Fire Safety Requirements % not reported
External Infrastructure Sewage Treatment Plant (Stp) % not reported External Infrastructure Parks & Tree Planting % not reported External Infrastructure Street Lighting % not reported
Amenities Electricity % not reported Amenities Smart Home Automation % not reported Amenities Cctv Surveillance % not reported
Amenities Club House % not reported Amenities Community Hall % not reported Amenities Outdoor Sports Facility % not reported
Amenities Indoor Sports Facility % not reported Amenities Swimming Pool % not reported Amenities Gym % not reported
Amenities Parks % not reported Amenities Power Backup % not reported Amenities Piped Gas % not reported
Amenities Water And Sanitation % not reported Amenities Air Conditioning % not reported Common Areas Staircases % not reported
Common Areas Lifts % not reported Common Areas Corridor/lobbies % not reported Common Areas Fire Escapes % not reported
Common Areas Common Entrance And Exit For The Building/common Portico/foyer/verandah % not reported Common Areas Basement % not reported Common Areas Terrace % not reported
Common Areas Outer Wall % not reported Common Areas Open Parking Areas % not reported Common Areas Provision For Lodging Of Management Staff And Security Staff % not reported
Common Areas Water Conservation And Renewable Energy % not reported Common Areas Common Storage Spaces % not reported
Documents

RERA Documents & Filings

All statutory documents uploaded by the promoter to the authority portal.

Promoter Registration Certificate
Promoter Pan Card
Promoter Address Proof
Affidavit
4 Completion Certificate
Fd 1 Balance Sheet FY 2024.Pdf
Fd 2 Balance Sheet FY 2023.Pdf
Fd 3 Balance Sheet Mar 2022.Pdf
Fd 4 Profit Loss Statement FY 2024.Pdf
Fd 5 Profit Loss Statement FY 2023.Pdf
Fd 6 Profit Loss Statement Mar 2022.Pdf
Fd 7 ITR Ack AY 2024 25.Pdf
Fd 8 ITR AY 2023 24.Pdf
Fd 9 ITR AY 2022 23.Pdf
Fd 10 Standalone Financials March 2024.Pdf
Fd 11 Standalone Financials March 2023.Pdf
Fd 12 DR 2021 22.Pdf
Fd 13 Cash Flow FY 2024.Pdf
Fd 14 Cash Flow FY 2023.Pdf
Fd 15 Cash Flow Mar 2022.Pdf
Fd 16 Auditors Report FY 2023-24.Pdf
Fd 17 Auditors Report Mar 2023.Pdf
Fd 18 Auditors Report Mar 2022.Pdf
Pd 1 Commencement Certificate( Annexure - 80 )
Pd 2 Approved Building Plan( Annexure - 81 )
Pd 3 Sectional Drawing Of The Apartments( Annexure - 82 )
Pd 4 Certificate From Registered Engineer Indicating The Structural Safety Of The Building( Annexure - 83 )
Pd 5 Project Specifications( Annexure - 84 )
Pd 6 Brochure( Annexure - 85 )
Pd 7 Relinquishment Deed( Annexure - 86 )
Pd 8 Proforma Of Agreement For Sale( Annexure - 87 )
Pd 9 Proforma Of Allotment Letter( Annexure - 88 )
Dc 1 Declaration (Form B)( Annexure - 89 )
Dc 2 Section 3(1) Notarized Affidavit( Annexure - 90 )
Dc 3 JD AFFIDAVIT CUM DECLARATION( Annexure - 91 )
Dc 4 Advocate Search Report( Annexure - 92 )
Noc 1 ESCOM Electricity( Annexure - 95 )
Noc 2 KWSSB Water( Annexure - 96 )
Noc 3 KSPCB( Annexure - 97 )
Noc 4 SEIAA( Annexure - 98 )
Noc 5 Fire Force Department( Annexure - 99 )
Noc 6 Airport Authority Of India( Annexure - 100 )
Noc 7 BSNL( Annexure - 101 )
Photo 1 Project Photo
Od 1 HAL NOC - Town Park 3.Pdf
Od 2 KSRSAC Report - Town Park 3.Pdf
Od 3 All Phases Demarcation.Pdf
Od 4 Hamptons Phase-1 Amenities.Pdf
Od 5 STP Hamptons Phase-1 Carpet Area.Pdf
Od 6 Sobha Hamptons -Phase 1 Common Area And Amenities.Pdf
Od 7 Town Park 3-DP.Pdf
Od 8 DP Letter - Town Park 3.Pdf
Od 9 Syno 52-2-CLU Dt 19112019.Pdf
Od 10 Syno 54-1-CLU Dt 19112019.Pdf
Od 11 Syno 54-3-CLU Dt 19112019.Pdf
Od 12 Syno 54-4-CLU Dt 19112019.Pdf
Od 13 Syno 54-5-CLU Dt 19112019.Pdf
Od 14 Syno 56-3-CLU Dt 19112019.Pdf
Od 15 Syno 56-4 CLU Dt 19112019.Pdf
Od 16 SyNo 74-7 148-2 74-6 74-11-CLU Dt 19112019.Pdf
Od 17 SyNo 148-1 74-6 CLU Dt 19112019 2.Pdf
Od 18 1 STP 1 Technical Write Up.Pdf
Od 19 2 STP 2 Technical Write Up.Pdf
Od 20 3 STP 3 Dwg.Pdf
Od 21 4 STP 3 Technical Write Up.Pdf
Od 22 5 STP 2 Drawing.Pdf
Od 23 6 STP1 Layout.Pdf
Od 24 VILLAGE MAP Demarcation.Pdf
Od 25 CDP - TOWNPARK.Png
Od 26 Townpark - Location Demarcation.Pdf
Od 27 1 Sy No 56-6 Sale Deed 5089 2023-24.Pdf
Od 28 2 Sy No 59-2-Release Deed Dt 31012019 Doc 7861-18-19.Pdf
Od 29 3 Sy No 73-1-Confirmation Deed Doc No-5171 19-20.Pdf
Od 30 4 Sale Deed Sy No 55-1 Yadavanahalli.Pdf
Od 31 5 SY NO 55-3 ABSOLUTE SALE DEED 2906-2022-23.Pdf
Od 32 6 SY NO 58-1- CONFIRMATION DEED 1242-2019-20.Pdf
Od 33 7 SY NO 74-8 & OTHERS RELEASE DEED 12936-2023-24.Pdf
Od 34 8 Sy No 55-4-Assignment Deed Dt 25102021 Doc 5050-21-22.Pdf
Od 35 9 Sy No 74-6 Dtd 28-09-2012 Doc No 3662 Of 2017-18.Pdf
Od 36 10 Syno 52-2-Sale Deed Dt 15-06-2005, Doc No 4214-05-06 LO.Pdf
Od 37 11 Sy No 54-1-Sale Deed Dt 29092023 Doc 8305-2023-24.Pdf
Od 38 12 Syno 54-2-Sale Deed Dt 15 12 2017, Doc 5205-2017-18 (USP).Pdf
Od 39 13 Sy No 54-3 Sale Deed Dt 27 09 2017, Doc 3680-2017-18 (USP).Pdf
Od 40 14 Sy No 54-4-Sale Deed Dt 27-09-2017 Doc 3663-17-18 7.Pdf
Od 41 15 Syno 54-5-Sale Deed Dt 27 09 2017, Doc 3680-2017-18 (USP).Pdf
Od 42 16 Sy No 55-2Exchange Deed - Doc No 7188 21-22.Pdf
Od 43 17 Sy No 55-5-Sale Deed Doc 2785 13-14.Pdf
Od 44 18 Sy No 56-3-SALE DEED - SY NO 54-1, 56-3 56-4 DOC NO 8305-2023-24.Pdf
Od 45 19 Syno 56-4 Sale Deed 8305-2023-24 Dtd29-09-2023.Pdf
Od 46 20 Sy No56-5-Sale Deed Dt 02112023 Doc 9846-23-24.Pdf
Od 47 21 Sy No 56-7-Confirmation Deed Dt 10102023 Doc 7257-2023-24.Pdf
Od 48 22 Syno 59-1-Confirmation Deed Doc No 8132 18-19.Pdf
Od 49 23 Syno 73-2-SALE DEED 2713 -2015-16.Pdf
Od 50 24 SY No 74-7-Dtd 20-09-017 Doc No 2320-2017-18.Pdf
Od 51 25 Sy No 60-1 Release Deed Dt 06072021 Doc 1541-21-22.Pdf
Od 52 26 Sy No 73-3-Sale Deed Dt 01-02-2023 Doc 9225-22-23.Pdf
Od 53 27 Sy No 74-11-Dtd 28-9-12-Doc3663-2017-18.Pdf
Od 54 Land Cost Attestation Copy R1.Pdf
Od 55 1 Akarband For All Sy Nos Doc 1.Pdf
Od 56 2 Akarband For All Sy Nos Doc 2.Pdf
Ed 1 22-01-2025
Ed 2 22-01-2025
Ed 3 22-01-2025
Ed 4 22-01-2025
Ed 5 22-01-2025
Ed 6 22-01-2025
Ed 7 22-01-2025
Ed 8 22-01-2025
Ed 9 22-01-2025
Ed 10 22-01-2025
Ed 11 22-01-2025
Ed 12 22-01-2025
Ed 13 22-01-2025
Ed 14 22-01-2025
Ed 15 22-01-2025
Ed 16 22-01-2025
Ed 17 22-01-2025
Ed 18 22-01-2025
Ed 19 22-01-2025
Ed 20 22-01-2025
Ed 21 22-01-2025
Ed 22 22-01-2025
Ed 23 22-01-2025
Ed 24 22-01-2025
Ed 25 22-01-2025
Ed 26 22-01-2025
Ed 27 22-01-2025
Ld Rtc
Ld Mutation
Ld Encumbrance Certificate
Ld Conversion Order
Ld Khatha
Bank

Bank & Cost Disclosure

Declared project cost and the designated escrow account on file.

Project Account Bank KOTAK MAHINDRA BANK
Account Number (RERA) 0249886304
IFSC KKBK0008066
Branch Address MG Road, Bangalore
Country/City