residential Under Construction Source: rera.ka

Sobha Madison Heights Town Park RERA Details - PRM/KA/RERA/1251/308/PR/230125/007420 Bangalore

View the RERA registration, promoter, approval, building, inventory, document and construction-progress disclosures for Sobha Madison Heights Town Park under registration PRM/KA/RERA/1251/308/PR/230125/007420 in Bangalore, Karnataka. Data is sourced from rera.ka.

RERA

RERA Snapshot

The most important statutory project disclosures, generated dynamically from available RERA fields.

  • RERA Number PRM/KA/RERA/1251/308/PR/230125/007420
  • Project Name Sobha Madison Heights-Townpark Phase 1 W5 to 7
  • Project Type Residential/Group Housing
  • Project Status Under Construction
  • District Bengaluru Urban
  • Taluka Anekal
  • Original Completion 31 December 2030
  • Documents 132 Verified
Timeline

Project Timeline & Completion Details

Key statutory dates from registration through proposed completion and permit validity.

Proposed Start 01 August 2025 Expected commencement of civil works and foundation on site.
Original Completion 31 December 2030 Mandated date for project handover to the allottees and final compliance filing.
Promoter

Promoter, Organisation & Member Details

Declared promoter entity, address and corporate identifiers on file with the authority.

Primary Promoter

SOBHA LIMITED
Registered Address Sobha Limited, Sarjapur-Marathahalli Outer Ring Road,Devarabisanahalli, Bellandur Post ,Bengaluru East ,Bengaluru Urban-560103
Experience Details
Location

Land, Address & Location Details

Land parcel, zoning and geo-coordinates as recorded in the project filing.

Address Survey nos 52/2(P), 54/1, 54/2,54/3,54/4, 54/5, 55/1, 55/2, 55/3, 55/4, 55/5, 56/3, 56/4, 56/5(P) , 56/6, 56/7, 58/1(P), 59/1 , 59/2, 60/1, 73/1(P), 73/2(P), 73/3(P), 74/6(P), 74/7(P), 74/8(P), 74/11(P) AT YADAVANAHALLI VILLAGE, ATTIBELE HOBLI, ANEKAL TALUK , Anekal , Bengaluru Urban, Karnataka - 562107

RERA Coordinates

Latitude, Longitude 12.79128169469662, 77.74044010229798
Plans

Plans & Approvals

Statutory approvals obtained or pending against the project site.

Plan Approval No. 351/2024-25
Authority Anekal Planning Authority
Approved Date 21 January 2025

Understand this Project's RERA details

Get clear answers and additional support from our RERA experts.

RERA Banner
Buildings

Buildings, Towers & Building-Level Details

Statutory building-level disclosures including tower height, sanctioned floors, structural counts and parking areas.

Building Detail
Name No. of Basements No. of Slab No. of Slits No. of Open Parking Building Type Height of Tower No. of Floors No. of Units
WING -5 2 41 1 160 Residential 129.525 41 160
WING -6 2 41 1 160 Residential 129.525 41 160
WING -7 2 41 1 160 Residential 129.525 41 160

Scroll horizontally to view all building-level fields. Values marked "-" were not disclosed in the source RERA record.

Inventory

Unit Inventory & Configuration Details

Configuration mix and floor-level disclosures with both grouped and raw RERA views.

Total Units -
Configurations 3
Inventory Type RESIDENTIAL
Configuration Distribution
1 BHK 0 units
2 BHK 0 units
3 BHK 0 units
  • WING -5
  • WING -6
  • WING -7
Floor-Wise Inventory Explorer
Floor Apartment Type Carpet Area No. of Unit
GF 2 BHK 75.7 5012
GF 1 BHK 44.62 5013
GF 2 BHK 81.7 5014
1 2 BHK 75.7 5021
1 2 BHK 75.7 5022
1 1 BHK 44.62 5023
1 2 BHK 81.7 5024
2 2 BHK 75.7 5031
2 2 BHK 75.7 5032
2 1 BHK 44.62 5033
2 2 BHK 81.7 5034
3 2 BHK 75.7 5041
3 2 BHK 75.7 5042
3 1 BHK 44.62 5043
3 2 BHK 81.7 5044
4 2 BHK 75.7 5051
4 2 BHK 75.7 5052
4 1 BHK 44.62 5053
4 2 BHK 81.7 5054
5 2 BHK 75.7 5061
5 2 BHK 75.7 5062
5 1 BHK 44.62 5063
5 2 BHK 81.7 5064
6 2 BHK 75.7 5071
6 2 BHK 75.7 5072
6 1 BHK 44.62 5073
6 2 BHK 81.7 5074
7 2 BHK 75.7 5081
7 2 BHK 75.7 5082
7 1 BHK 44.62 5083
7 2 BHK 81.7 5084
8 2 BHK 75.7 5091
8 2 BHK 75.7 5092
8 1 BHK 44.62 5093
8 2 BHK 81.7 5094
9 2 BHK 75.7 5101
9 2 BHK 75.7 5102
9 1 BHK 44.62 5103
9 2 BHK 81.7 5104
10 2 BHK 75.7 5111
10 2 BHK 75.7 5112
10 1 BHK 44.62 5113
10 2 BHK 81.7 5114
11 2 BHK 75.7 5121
11 2 BHK 75.7 5122
11 1 BHK 44.62 5123
11 2 BHK 81.7 5124
12 2 BHK 75.7 5131
12 2 BHK 75.7 5132
12 1 BHK 44.62 5133
12 2 BHK 81.7 5134
13 2 BHK 75.7 5141
13 2 BHK 75.7 5142
13 1 BHK 44.62 5143
13 2 BHK 81.7 5144
14 2 BHK 75.7 5151
14 2 BHK 75.7 5152
14 1 BHK 44.62 5153
14 2 BHK 81.7 5154
15 2 BHK 75.7 5161
15 2 BHK 75.7 5162
15 1 BHK 44.62 5163
15 2 BHK 81.7 5164
16 2 BHK 75.7 5171
16 2 BHK 75.7 5172
16 1 BHK 44.62 5173
16 2 BHK 81.7 5174
17 2 BHK 75.7 5181
17 2 BHK 75.7 5182
17 1 BHK 44.62 5183
17 2 BHK 81.7 5184
18 2 BHK 75.7 5191
18 2 BHK 75.7 5192
18 1 BHK 44.62 5193
18 2 BHK 81.7 5194
19 2 BHK 75.7 5201
19 2 BHK 75.7 5202
19 2 BHK 81.7 5204
20 2 BHK 75.7 5211
20 2 BHK 75.7 5212
20 1 BHK 44.62 5213
20 2 BHK 81.7 5214
21 2 BHK 75.7 5221
21 2 BHK 75.7 5222
21 1 BHK 44.62 5223
21 2 BHK 81.7 5224
22 2 BHK 75.7 5231
22 2 BHK 75.7 5232
22 1 BHK 44.62 5233
22 2 BHK 81.7 5234
23 2 BHK 75.7 5241
23 2 BHK 75.7 5242
23 1 BHK 44.62 5243
23 2 BHK 81.7 5244
24 2 BHK 75.7 5251
24 2 BHK 75.7 5252
24 1 BHK 44.62 5253
24 2 BHK 81.7 5254
25 2 BHK 75.7 5261
25 2 BHK 75.7 5262
25 1 BHK 44.62 5263
25 2 BHK 81.7 5264
26 2 BHK 75.7 5271
26 2 BHK 75.7 5272
26 1 BHK 44.62 5273
26 2 BHK 81.7 5274
27 2 BHK 75.7 5281
27 2 BHK 75.7 5282
27 1 BHK 44.62 5283
27 2 BHK 81.7 5284
28 2 BHK 75.7 5291
28 2 BHK 75.7 5292
28 1 BHK 44.62 5293
28 2 BHK 81.7 5294
29 2 BHK 75.7 5301
29 2 BHK 75.7 5302
29 2 BHK 81.7 5304
30 2 BHK 75.7 5311
30 2 BHK 75.7 5312
30 1 BHK 44.62 5313
30 2 BHK 81.7 5314
31 2 BHK 75.7 5321
31 2 BHK 75.7 5322
31 1 BHK 44.62 5323
31 2 BHK 81.7 5324
32 2 BHK 75.7 5331
32 2 BHK 75.7 5332
32 1 BHK 44.62 5333
32 2 BHK 81.7 5334
33 2 BHK 75.7 5341
33 2 BHK 75.7 5342
33 1 BHK 44.62 5343
33 2 BHK 81.7 5344
34 2 BHK 75.7 5351
34 2 BHK 75.7 5352
34 1 BHK 44.62 5353
34 2 BHK 81.7 5354
35 2 BHK 75.7 5361
35 2 BHK 75.7 5362
35 1 BHK 44.62 5363
35 2 BHK 81.7 5364
36 2 BHK 75.7 5371
36 2 BHK 75.7 5372
36 1 BHK 44.62 5373
36 2 BHK 81.7 5374
37 2 BHK 75.7 5381
37 2 BHK 75.7 5382
37 1 BHK 44.62 5383
37 2 BHK 81.7 5384
38 2 BHK 75.7 5391
38 2 BHK 75.7 5392
38 1 BHK 44.62 5393
38 2 BHK 81.7 5394
39 2 BHK 75.7 5401
39 2 BHK 75.7 5402
39 2 BHK 81.7 5404
40 2 BHK 75.7 5411
40 2 BHK 75.7 5412
40 1 BHK 44.62 5413
40 2 BHK 81.7 5414
Parking

Parking, Garage & Area Details

Parking provision declared in the sanctioned plan.

Type Proposed Booked Work Done
Garage - - -
Covered Parking - - -
Open Parking - - -
Development

Development Works & Common Area Disclosures

Project-level common infrastructure disclosures as reported by the developer to the RERA authority.

Sub Structure Earth Work And Other Leveling Preparation Work % not reported Sub Structure Foundation Footing Work % not reported Sub Structure Upto Plinth Level % not reported
Sub Structure Sub-structure Flooring (Parking Floor, More Than One Floor Below General Ground Level) % not reported Sub Structure Retaining Wall (All Types) % not reported Sup Structure Rcc Or Ms Framed Structure % not reported
Sup Structure Masonry Construction % not reported Sup Structure Plastering Inside , Outside & Ceiling % not reported Sup Structure Joinery: Doors, Windows, Ventilators Etc % not reported
Sup Structure Basic Work Of Water Supply, Sanitary And Electrification % not reported Sup Structure Dadoing, Skirting, Flooring, Tiles Work (All Types) % not reported Sup Structure Railing And Grill Fixing % not reported
Finishing Works Electrification, Water Supply And Sanitary Finishing % not reported Finishing Works Painting % not reported Finishing Works Fire Prevention And Fire Fighting Fitting And Fixture With Network % not reported
Finishing Works Weather Proof Work(tile,concrete) % not reported Finishing Works Wardrobe, Showcase, Kitchen Cabinet, Puja Work % not reported Finishing Works Elevation Work % not reported
Finishing Works Internal And External Work Including Landscapes As Per Sanctioned Drawings % not reported Internal Infrastructure Water Supply % not reported Internal Infrastructure Sewage And Drainage System % not reported
Internal Infrastructure Water Conservation/rain Water Harvesting/recharge Of Ground Water % not reported Internal Infrastructure Energy Management % not reported Internal Infrastructure Fire Protection And Fire Safety Requirements % not reported
Internal Infrastructure Solid Waste Management And Disposal % not reported Internal Infrastructure Emergency Evacuation Services % not reported External Infrastructure Water Supply % not reported
External Infrastructure Internal Roads & Footpaths % not reported External Infrastructure Sewage And Drainage System % not reported External Infrastructure Electricity Supply Transformer And Substation % not reported
External Infrastructure Solid Waste Management And Disposal % not reported External Infrastructure Emergency Evacuation Services % not reported External Infrastructure Storm Water Drains % not reported
External Infrastructure Use Of Renewable Energy % not reported External Infrastructure Water Conservation/rain Water Harvesting/recharge Of Ground Water % not reported External Infrastructure Fire Protection And Fire Safety Requirements % not reported
External Infrastructure Sewage Treatment Plant (Stp) % not reported External Infrastructure Parks & Tree Planting % not reported External Infrastructure Street Lighting % not reported
Amenities Electricity % not reported Amenities Smart Home Automation % not reported Amenities Cctv Surveillance % not reported
Amenities Club House % not reported Amenities Community Hall % not reported Amenities Outdoor Sports Facility % not reported
Amenities Indoor Sports Facility % not reported Amenities Swimming Pool % not reported Amenities Gym % not reported
Amenities Parks % not reported Amenities Power Backup % not reported Amenities Piped Gas % not reported
Amenities Water And Sanitation % not reported Amenities Air Conditioning % not reported Common Areas Staircases % not reported
Common Areas Lifts % not reported Common Areas Corridor/lobbies % not reported Common Areas Fire Escapes % not reported
Common Areas Common Entrance And Exit For The Building/common Portico/foyer/verandah % not reported Common Areas Basement % not reported Common Areas Terrace % not reported
Common Areas Outer Wall % not reported Common Areas Open Parking Areas % not reported Common Areas Provision For Lodging Of Management Staff And Security Staff % not reported
Common Areas Water Conservation And Renewable Energy % not reported Common Areas Common Storage Spaces % not reported
Documents

RERA Documents & Filings

All statutory documents uploaded by the promoter to the authority portal.

Promoter Registration Certificate
Promoter Pan Card
Promoter Address Proof
Affidavit
Fd 1 Balance Sheet FY 2024.Pdf
Fd 2 Balance Sheet FY 2023.Pdf
Fd 3 Balance Sheet Mar 2022.Pdf
Fd 4 Profit Loss Statement FY 2024.Pdf
Fd 5 Profit Loss Statement FY 2023.Pdf
Fd 6 Profit Loss Statement Mar 2022.Pdf
Fd 7 ITR AY 2023 24.Pdf
Fd 8 ITR AY 2022 23.Pdf
Fd 9 ITR AY 2021 22.Pdf
Fd 10 Standalone Financials March 2024.Pdf
Fd 11 Standalone Financials March 2023.Pdf
Fd 12 DR 2021 22.Pdf
Fd 13 Cash Flow FY 2024.Pdf
Fd 14 Cash Flow FY 2023.Pdf
Fd 15 Cash Flow Mar 2022.Pdf
Fd 16 Auditors Report FY 2023-24.Pdf
Fd 17 Auditors Report Mar 2023.Pdf
Fd 18 Auditors Report Mar 2022.Pdf
Pd 1 Commencement Certificate( Annexure - 80 )
Pd 2 Approved Building Plan( Annexure - 81 )
Pd 3 Sectional Drawing Of The Apartments( Annexure - 82 )
Pd 4 Certificate From Registered Engineer Indicating The Structural Safety Of The Building( Annexure - 83 )
Pd 5 Project Specifications( Annexure - 84 )
Pd 6 Brochure( Annexure - 85 )
Pd 7 Relinquishment Deed( Annexure - 86 )
Pd 8 Proforma Of Agreement For Sale( Annexure - 87 )
Pd 9 Proforma Of Allotment Letter( Annexure - 88 )
Dc 1 Declaration (Form B)( Annexure - 89 )
Dc 2 Section 3(1) Notarized Affidavit( Annexure - 90 )
Dc 3 JD AFFIDAVIT CUM DECLARATION( Annexure - 91 )
Dc 4 Advocate Search Report( Annexure - 92 )
Noc 1 ESCOM Electricity( Annexure - 95 )
Noc 2 KWSSB Water( Annexure - 96 )
Noc 3 KSPCB( Annexure - 97 )
Noc 4 SEIAA( Annexure - 98 )
Noc 5 Fire Force Department( Annexure - 99 )
Noc 6 Airport Authority Of India( Annexure - 100 )
Noc 7 BSNL( Annexure - 101 )
Photo 1 Project Photo
Od 1 STP Madison Heights Phase-1 Carpet Area Demarcation W5 To W7.Pdf
Od 2 Madison Heights Phase-1 Ameniites.Pdf
Od 3 STP Madison Heights Phase-1 Carpet Area.Pdf
Od 4 Sobha Madison Heights -Phase 1 Common Areas And Amenities.Pdf
Od 5 HAL NOC - Town Park 3.Pdf
Od 6 Syno 56-3-CLU Dt 19112019.Pdf
Od 7 Syno 52-2-CLU Dt 19112019.Pdf
Od 8 Syno 54-1-CLU Dt 19112019.Pdf
Od 9 Syno 54-3-CLU Dt 19112019.Pdf
Od 10 Syno 54-4-CLU Dt 19112019.Pdf
Od 11 Syno 54-5-CLU Dt 19112019.Pdf
Od 12 Syno 56-4 CLU Dt 19112019.Pdf
Od 13 KSRSAC Report - Town Park 3.Pdf
Od 14 VILLAGE MAP Demarcation.Pdf
Od 15 CDP - TOWNPARK.Png
Od 16 Town Park 3-DP.Pdf
Od 17 DP Order - Town Park 3.Pdf
Od 18 1 STP 1 Technical Write Up.Pdf
Od 19 2 STP 2 Technical Write Up.Pdf
Od 20 3 STP 3 Drawing.Pdf
Od 21 4 STP 3 Technical Write Up.Pdf
Od 22 5 STP 2 Drawing.Pdf
Od 23 6 STP1 Layout.Pdf
Od 24 SyNo 74-7 148-2 74-6 74-11-CLU Dt 19112019.Pdf
Od 25 SyNo 148-1 74-6 CLU Dt 19112019 2.Pdf
Od 26 KSRSAC Report - Town Park 3.Pdf
Od 27 1 Sy No 56-6 Sale Deed 5089 2023-24.Pdf
Od 28 2 Sy No 59-2-Release Deed Dt 31012019 Doc 7861-18-19.Pdf
Od 29 3 Sy No 73-1-Confirmation Deed Doc No-5171 19-20.Pdf
Od 30 4 Sale Deed Sy No 55-1 Yadavanahalli.Pdf
Od 31 5 SY NO 55-3 ABSOLUTE SALE DEED 2906-2022-23.Pdf
Od 32 6 SY NO 58-1- CONFIRMATION DEED 1242-2019-20.Pdf
Od 33 7 SY NO 74-8 & OTHERS RELEASE DEED 12936-2023-24.Pdf
Od 34 8 Sy No 55-4-Assignment Deed Dt 25102021 Doc 5050-21-22.Pdf
Od 35 9 Sy No 74-6 Dtd 28-09-2012 Doc No 3662 Of 2017-18.Pdf
Od 36 10 Syno 52-2-Sale Deed Dt 15-06-2005, Doc No 4214-05-06 LO.Pdf
Od 37 11 Sy No 54-1-Sale Deed Dt 29092023 Doc 8305-2023-24.Pdf
Od 38 12 Syno 54-2-Sale Deed Dt 15 12 2017, Doc 5205-2017-18 (USP).Pdf
Od 39 13 Sy No 54-3 Sale Deed Dt 27 09 2017, Doc 3680-2017-18 (USP).Pdf
Od 40 14 Sy No 54-4-Sale Deed Dt 27-09-2017 Doc 3663-17-18 7.Pdf
Od 41 15 Syno 54-5-Sale Deed Dt 27 09 2017, Doc 3680-2017-18 (USP).Pdf
Od 42 16 Sy No 55-2Exchange Deed - Doc No 7188 21-22.Pdf
Od 43 17 Sy No 55-5-Sale Deed Doc 2785 13-14.Pdf
Od 44 18 Sy No 56-3-SALE DEED - SY NO 54-1, 56-3 56-4 DOC NO 8305-2023-24.Pdf
Od 45 19 Syno 56-4 Sale Deed 8305-2023-24 Dtd29-09-2023.Pdf
Od 46 20 Sy No56-5-Sale Deed Dt 02112023 Doc 9846-23-24.Pdf
Od 47 21 Sy No 56-7-Confirmation Deed Dt 10102023 Doc 7257-2023-24.Pdf
Od 48 22 Syno 59-1-Confirmation Deed Doc No 8132 18-19.Pdf
Od 49 23 Syno 73-2-SALE DEED 2713 -2015-16.Pdf
Od 50 24 SY No 74-7-Dtd 20-09-017 Doc No 2320-2017-18.Pdf
Od 51 25 Sy No 60-1 Release Deed Dt 06072021 Doc 1541-21-22.Pdf
Od 52 26 Sy No 73-3-Sale Deed Dt 01-02-2023 Doc 9225-22-23.Pdf
Od 53 27 Sy No 74-11-Dtd 28-9-12-Doc3663-2017-18.Pdf
Od 54 Land Cost Attestation Copy R1.Pdf
Od 55 1 Akarband For All Sy Nos Doc 1.Pdf
Od 56 2 Akarband For All Sy Nos Doc 2.Pdf
Ed 1 22-01-2025
Ed 2 22-01-2025
Ed 3 22-01-2025
Ed 4 22-01-2025
Ed 5 22-01-2025
Ed 6 22-01-2025
Ed 7 22-01-2025
Ed 8 22-01-2025
Ed 9 22-01-2025
Ed 10 22-01-2025
Ed 11 22-01-2025
Ed 12 22-01-2025
Ed 13 22-01-2025
Ed 14 22-01-2025
Ed 15 22-01-2025
Ed 16 22-01-2025
Ed 17 22-01-2025
Ed 18 22-01-2025
Ed 19 22-01-2025
Ed 20 22-01-2025
Ed 21 22-01-2025
Ed 22 22-01-2025
Ed 23 22-01-2025
Ed 24 22-01-2025
Ed 25 22-01-2025
Ed 26 22-01-2025
Ed 27 22-01-2025
Ed 28 22-01-2025
Ld Rtc
Ld Mutation
Ld Encumbrance Certificate
Ld Conversion Order
Ld Khatha
Bank

Bank & Cost Disclosure

Declared project cost and the designated escrow account on file.

Project Account Bank KOTAK MAHINDRA BANK
Account Number (RERA) 0249886359
IFSC KKBK0008066
Branch Address MG Road, Bangalore
Country/City