Squareyards Logo
Blogs
Sell or Rent Property
Login
Rera Banner
residential New Launch Source: rera.ka

Sobha One Residences RERA Details - PRM/KA/RERA/1250/304/PR/080526/008638 Bangalore

View the RERA registration, promoter, approval, building, inventory, document and construction-progress disclosures for Sobha One Residences under registration PRM/KA/RERA/1250/304/PR/080526/008638 in Bangalore, Karnataka. Data is sourced from rera.ka.

RERA

RERA Snapshot

The most important statutory project disclosures, generated dynamically from available RERA fields.

  • RERA Number PRM/KA/RERA/1250/304/PR/080526/008638
  • Project Name ONE RESIDENCES AT SOBHA ONE WORLD Ph5 W9,10,11
  • Project Type Residential/Group Housing
  • Project Status New Launch
  • District Bengaluru Rural
  • Taluka Hosakote
  • Original Completion 28 February 2033
  • Documents 148 Verified
Timeline

Project Timeline & Completion Details

Key statutory dates from registration through proposed completion and permit validity.

Proposed Start 18 August 2026 Expected commencement of civil works and foundation on site.
Original Completion 28 February 2033 Mandated date for project handover to the allottees and final compliance filing.
Promoter

Promoter, Organisation & Member Details

Declared promoter entity, address and corporate identifiers on file with the authority.

Primary Promoter

SOBHA LIMITED
Registered Address Sobha Limited Sarjapur-Marthahalli OuterRing Road,Bellandur Post ,Bengaluru East ,Bengaluru Urban-560103
Experience Details
Location

Land, Address & Location Details

Land parcel, zoning and geo-coordinates as recorded in the project filing.

Address SY NO. 63/1, 63/2, 54/3, 54/2, 54/1, 55/9, 55/2, 56/2(P), 56/3(P), 56/4(P), 56/5(P), 56/6(P), 56/7(P), 57/6(P), 57/5, 57/4, 57/3C, 57/2, 57/3A(P) , 57/3B(P), 58, 171/1A(P), 174/8, 174/7(P), 174/6(P), 174/5(P),174/4 of Amanidoddakere Village, Kasaba Hobli , Hosakote , Bengaluru Rural, Karnataka - 562114

RERA Coordinates

Latitude, Longitude 13.058182, 77.775577
Plans

Plans & Approvals

Statutory approvals obtained or pending against the project site.

Plan Approval No. STRRPA/TP/CC/652/2025-26/318
Authority Satellite Town Ring Road Planning Authority
Approved Date 07 May 2026

Understand this Project's RERA details

Get clear answers and additional support from our RERA experts.

RERA Banner
Buildings

Buildings, Towers & Building-Level Details

Statutory building-level disclosures including tower height, sanctioned floors, structural counts and parking areas.

Building Detail
Name No. of Basements No. of Slab No. of Slits No. of Open Parking Building Type Height of Tower No. of Floors No. of Units
Wing 09 3 48 0 179 Residential 149.55 47 179
Wing 10 3 48 0 271 Residential 149.55 47 271
Wing 11 3 48 0 271 Residential 149.55 47 271

Scroll horizontally to view all building-level fields. Values marked "-" were not disclosed in the source RERA record.

Inventory

Unit Inventory & Configuration Details

Configuration mix and floor-level disclosures with both grouped and raw RERA views.

Total Units -
Configurations 3
Inventory Type RESIDENTIAL
Configuration Distribution
1 BHK 0 units
2 BHK 0 units
3 BHK 0 units
  • Wing 09
  • Wing 10
  • Wing 11
Floor-Wise Inventory Explorer
Floor Apartment Type Carpet Area No. of Unit
1 1 BHK 40.16 9021
1 1 BHK 40.16 9022
1 3 BHK 89.19 9023
1 3 BHK 89.19 9024
2 1 BHK 40.16 9031
2 1 BHK 40.16 9032
2 3 BHK 89.19 9033
2 3 BHK 89.19 9034
3 1 BHK 40.16 9041
3 1 BHK 40.16 9042
3 3 BHK 89.19 9043
3 3 BHK 89.19 9044
4 1 BHK 40.16 9051
4 1 BHK 40.16 9052
4 3 BHK 89.19 9053
4 3 BHK 89.19 9054
5 1 BHK 40.16 9061
5 1 BHK 40.16 9062
5 3 BHK 89.19 9063
5 3 BHK 89.19 9064
6 1 BHK 40.16 9071
6 1 BHK 40.16 9072
6 3 BHK 89.19 9073
6 3 BHK 89.19 9074
7 1 BHK 40.16 9081
7 1 BHK 40.16 9082
7 3 BHK 89.19 9083
7 3 BHK 89.19 9084
8 1 BHK 40.16 9091
8 1 BHK 40.16 9092
8 3 BHK 89.19 9093
8 3 BHK 89.19 9094
9 1 BHK 40.16 9101
9 1 BHK 40.16 9102
9 3 BHK 89.19 9103
9 3 BHK 89.19 9104
10 1 BHK 40.16 9111
10 1 BHK 40.16 9112
10 3 BHK 89.19 9113
10 3 BHK 89.19 9114
11 1 BHK 40.16 9121
11 1 BHK 40.16 9122
11 3 BHK 89.19 9123
11 3 BHK 89.19 9124
12 1 BHK 40.16 9131
12 1 BHK 40.16 9132
12 3 BHK 89.19 9133
12 3 BHK 89.19 9134
13 1 BHK 40.16 9141
13 1 BHK 40.16 9142
13 3 BHK 89.19 9143
13 3 BHK 89.19 9144
14 1 BHK 40.16 9151
14 1 BHK 40.16 9152
14 3 BHK 89.19 9153
14 3 BHK 89.19 9154
15 1 BHK 40.16 9161
15 1 BHK 40.16 9162
15 3 BHK 89.19 9163
15 3 BHK 89.19 9164
16 1 BHK 40.16 9171
16 1 BHK 40.16 9172
16 3 BHK 89.19 9173
16 3 BHK 89.19 9174
17 1 BHK 40.16 9181
17 1 BHK 40.16 9182
17 3 BHK 89.19 9183
17 3 BHK 89.19 9184
18 1 BHK 40.16 9192
18 3 BHK 89.19 9193
18 3 BHK 89.19 9194
19 1 BHK 40.16 9201
19 1 BHK 40.16 9202
19 3 BHK 89.19 9203
19 3 BHK 89.19 9204
20 1 BHK 40.16 9211
20 1 BHK 40.16 9212
20 3 BHK 89.19 9213
20 3 BHK 89.19 9214
21 1 BHK 40.16 9221
21 1 BHK 40.16 9222
21 3 BHK 89.19 9223
21 3 BHK 89.19 9224
22 1 BHK 40.16 9231
22 1 BHK 40.16 9232
22 3 BHK 89.19 9233
22 3 BHK 89.19 9234
23 1 BHK 40.16 9241
23 1 BHK 40.16 9242
23 3 BHK 89.19 9243
23 3 BHK 89.19 9244
24 1 BHK 40.16 9251
24 1 BHK 40.16 9252
24 3 BHK 89.19 9253
24 3 BHK 89.19 9254
25 1 BHK 40.16 9261
25 1 BHK 40.16 9262
26 1 BHK 40.16 9271
26 1 BHK 40.16 9272
26 3 BHK 89.19 9273
26 3 BHK 89.19 9274
27 1 BHK 40.16 9281
27 1 BHK 40.16 9282
27 3 BHK 89.19 9283
27 3 BHK 89.19 9284
28 1 BHK 40.16 9292
28 3 BHK 89.19 9293
28 3 BHK 89.19 9294
29 1 BHK 40.16 9301
29 1 BHK 40.16 9302
29 3 BHK 89.19 9303
29 3 BHK 89.19 9304
30 1 BHK 40.16 9311
30 1 BHK 40.16 9312
30 3 BHK 89.19 9313
30 3 BHK 89.19 9314
31 1 BHK 40.16 9321
31 1 BHK 40.16 9322
31 3 BHK 89.19 9323
31 3 BHK 89.19 9324
32 1 BHK 40.16 9331
32 1 BHK 40.16 9332
32 3 BHK 89.19 9333
32 3 BHK 89.19 9334
33 1 BHK 40.16 9341
33 1 BHK 40.16 9342
33 3 BHK 89.19 9343
33 3 BHK 89.19 9344
34 1 BHK 40.16 9351
34 1 BHK 40.16 9352
34 3 BHK 89.19 9353
34 3 BHK 89.19 9354
35 1 BHK 40.16 9361
35 1 BHK 40.16 9362
35 3 BHK 89.19 9363
35 3 BHK 89.19 9364
36 1 BHK 40.16 9371
36 1 BHK 40.16 9372
36 3 BHK 89.19 9373
36 3 BHK 89.19 9374
37 1 BHK 40.16 9381
37 1 BHK 40.16 9382
37 3 BHK 89.19 9383
37 3 BHK 89.19 9384
38 1 BHK 40.16 9392
38 3 BHK 89.19 9393
38 3 BHK 89.19 9394
39 1 BHK 40.16 9401
39 1 BHK 40.16 9402
39 3 BHK 89.19 9403
39 3 BHK 89.19 9404
40 1 BHK 40.16 9411
40 1 BHK 40.16 9412
40 3 BHK 89.19 9413
40 3 BHK 89.19 9414
41 1 BHK 40.16 9421
41 1 BHK 40.16 9422
41 3 BHK 89.19 9423
41 3 BHK 89.19 9424
42 1 BHK 40.16 9431
42 1 BHK 40.16 9432
42 3 BHK 89.19 9433
42 3 BHK 89.19 9434
43 1 BHK 40.16 9441
43 1 BHK 40.16 9442
43 3 BHK 89.19 9443
43 3 BHK 89.19 9444
44 1 BHK 40.16 9451
44 1 BHK 40.16 9452
44 3 BHK 89.19 9453
44 3 BHK 89.19 9454
45 1 BHK 40.16 9461
45 1 BHK 40.16 9462
45 3 BHK 89.19 9463
45 3 BHK 89.19 9464
46 1 BHK 40.16 9471
46 1 BHK 40.16 9472
46 3 BHK 89.19 9473
46 3 BHK 89.19 9474
Parking

Parking, Garage & Area Details

Parking provision declared in the sanctioned plan.

Type Proposed Booked Work Done
Garage - - -
Covered Parking - - -
Open Parking - - -
Development

Development Works & Common Area Disclosures

Project-level common infrastructure disclosures as reported by the developer to the RERA authority.

Sub Structure Earth Work And Other Leveling Preparation Work % not reported Sub Structure Foundation Footing Work % not reported Sub Structure Upto Plinth Level % not reported
Sub Structure Sub-structure Flooring (Parking Floor, More Than One Floor Below General Ground Level) % not reported Sub Structure Retaining Wall (All Types) % not reported Sup Structure Rcc Or Ms Framed Structure % not reported
Sup Structure Masonry Construction % not reported Sup Structure Plastering Inside , Outside & Ceiling % not reported Sup Structure Joinery: Doors, Windows, Ventilators Etc % not reported
Sup Structure Basic Work Of Water Supply, Sanitary And Electrification % not reported Sup Structure Dadoing, Skirting, Flooring, Tiles Work (All Types) % not reported Sup Structure Railing And Grill Fixing % not reported
Finishing Works Electrification, Water Supply And Sanitary Finishing % not reported Finishing Works Painting % not reported Finishing Works Fire Prevention And Fire Fighting Fitting And Fixture With Network % not reported
Finishing Works Weather Proof Work(tile,concrete) % not reported Finishing Works Wardrobe, Showcase, Kitchen Cabinet, Puja Work % not reported Finishing Works Elevation Work % not reported
Finishing Works Internal And External Work Including Landscapes As Per Sanctioned Drawings % not reported Internal Infrastructure Water Supply % not reported Internal Infrastructure Sewage And Drainage System % not reported
Internal Infrastructure Water Conservation/rain Water Harvesting/recharge Of Ground Water % not reported Internal Infrastructure Energy Management % not reported Internal Infrastructure Fire Protection And Fire Safety Requirements % not reported
Internal Infrastructure Solid Waste Management And Disposal % not reported Internal Infrastructure Emergency Evacuation Services % not reported External Infrastructure Water Supply % not reported
External Infrastructure Internal Roads & Footpaths % not reported External Infrastructure Sewage And Drainage System % not reported External Infrastructure Electricity Supply Transformer And Substation % not reported
External Infrastructure Solid Waste Management And Disposal % not reported External Infrastructure Emergency Evacuation Services % not reported External Infrastructure Storm Water Drains % not reported
External Infrastructure Use Of Renewable Energy % not reported External Infrastructure Water Conservation/rain Water Harvesting/recharge Of Ground Water % not reported External Infrastructure Fire Protection And Fire Safety Requirements % not reported
External Infrastructure Sewage Treatment Plant (Stp) % not reported External Infrastructure Parks & Tree Planting % not reported External Infrastructure Street Lighting % not reported
Amenities Electricity % not reported Amenities Smart Home Automation % not reported Amenities Cctv Surveillance % not reported
Amenities Club House % not reported Amenities Community Hall % not reported Amenities Outdoor Sports Facility % not reported
Amenities Indoor Sports Facility % not reported Amenities Swimming Pool % not reported Amenities Gym % not reported
Amenities Parks % not reported Amenities Power Backup % not reported Amenities Piped Gas % not reported
Amenities Water And Sanitation % not reported Amenities Air Conditioning % not reported Common Areas Staircases % not reported
Common Areas Lifts % not reported Common Areas Corridor/lobbies % not reported Common Areas Fire Escapes % not reported
Common Areas Common Entrance And Exit For The Building/common Portico/foyer/verandah % not reported Common Areas Basement % not reported Common Areas Terrace % not reported
Common Areas Outer Wall % not reported Common Areas Open Parking Areas % not reported Common Areas Provision For Lodging Of Management Staff And Security Staff % not reported
Common Areas Water Conservation And Renewable Energy % not reported Common Areas Common Storage Spaces % not reported
Documents

RERA Documents & Filings

All statutory documents uploaded by the promoter to the authority portal.

Ed 2 08-05-2026
Promoter Registration Certificate
Promoter Pan Card
Promoter Address Proof
Fd 1 Financials FY 2024-25.Pdf
Fd 2 Balance Sheet Mar 2024.Pdf
Fd 3 Balance Sheet Mar 2023.Pdf
Fd 4 Financials FY 2024-25.Pdf
Fd 5 Profit Loss Statement Mar 2024.Pdf
Fd 6 Profit Loss Statement Mar 2023.Pdf
Fd 7 ITR AY 2025-26.Pdf
Fd 8 ITR Ack AY 2024 25.Pdf
Fd 9 ITR AY 2023 24.Pdf
Fd 10 Financials FY 2024-25.Pdf
Fd 11 DR 2023 24.Pdf
Fd 12 Financials FY 2022-23.Pdf
Fd 13 Financials FY 2024-25.Pdf
Fd 14 Cash Flow Mar 2024.Pdf
Fd 15 Cash Flow Mar 2023.Pdf
Fd 16 Financials FY 2024-25.Pdf
Fd 17 Auditors Report FY 2023 2024.Pdf
Fd 18 Auditors Report Mar 2023.Pdf
Pd 1 Commencement Certificate( Annexure - 80 )
Pd 2 Approved Building Plan( Annexure - 81 )
Pd 3 Sectional Drawing Of The Apartments( Annexure - 82 )
Pd 4 Certificate From Registered Engineer Indicating The Structural Safety Of The Building( Annexure - 83 )
Pd 5 Project Specifications( Annexure - 84 )
Pd 6 Brochure( Annexure - 85 )
Pd 7 Relinquishment Deed( Annexure - 86 )
Pd 8 Proforma Of Agreement For Sale( Annexure - 87 )
Pd 9 Proforma Of Allotment Letter( Annexure - 88 )
Dc 1 Declaration (Form B)( Annexure - 89 )
Dc 2 Section 3(1) Notarized Affidavit( Annexure - 90 )
Dc 3 JD AFFIDAVIT CUM DECLARATION( Annexure - 91 )
Dc 4 Advocate Search Report( Annexure - 92 )
Noc 1 ESCOM Electricity( Annexure - 95 )
Noc 2 KWSSB Water( Annexure - 96 )
Noc 3 KSPCB( Annexure - 97 )
Noc 4 SEIAA( Annexure - 98 )
Noc 5 Fire Force Department( Annexure - 99 )
Noc 6 Airport Authority Of India( Annexure - 100 )
Noc 7 BSNL( Annexure - 101 )
Photo 1 Project Photo
Photo 2 Project Photo
Photo 3 Project Photo
Photo 4 Project Photo
Photo 5 Project Photo
Photo 6 Project Photo
Photo 7 Project Photo
Od 1 Development Plan.Pdf
Od 2 Development Plan Letter.Pdf
Od 3 1 Land Cost Calculation Attested All Phases.Pdf
Od 4 2 AREA BIFURCATION DETAILS.Pdf
Od 5 3 ADLR Sketch.Pdf
Od 6 4 CDP Demarcation.Pdf
Od 7 5 Village Map Demarcation.Pdf
Od 8 Clarification On Sales Ph5.Pdf
Od 9 Area Demarcation PHASE 05.Pdf
Od 10 6 Amenities Details.Pdf
Od 11 7 Common Area Details.Pdf
Od 12 8 Water Source With Borewell Photos.Pdf
Od 13 9 SDL To Sobha Limited.Pdf
Od 14 Eng Estimation Summary Ph5.Pdf
Od 15 Akarbandh 52 54 55 56 57 63 171.Pdf
Od 16 Sketch 54 55 57 171.Pdf
Od 17 Phodi Hissa 54 55 56 57 63 171 187.Pdf
Od 18 1 Sobha-Syno174-2 4 6 & 8 Opinion.Pdf
Od 19 2 Sobha-Syno65-1 2 3 4 Opinion.Pdf
Od 20 3 Sobha-Syno62-1 2 3 4 & 5 Opinion.Pdf
Od 21 4 Sobha-Syno60-1 2 3 4 & 5 Opinion.Pdf
Od 22 5 Sobha-Syno59-1 2 3 Opinion.Pdf
Od 23 6 Sobha-Syno56-3 4 5 And 6 Opinion.Pdf
Od 24 7 Sobha-Syno35-1 2 3 Opinion.Pdf
Od 25 8 Sobha-Syno31-1 2 3 & 4 Opinion.Pdf
Od 26 9 Sobha-Syno21-1A 1B 2 3 And 4 Opinion.Pdf
Od 27 10 Sobha-Syno22-2 Opinion.Pdf
Od 28 11 Sobha-Syno26 Opinion.Pdf
Od 29 12 Sobha-Syno27 Opinion.Pdf
Od 30 13 Sobha-Syno32 Opinion.Pdf
Od 31 14 Sobha-Syno33-1-2 & 3 Opinion.Pdf
Od 32 15 Sobha-Syno36-1 & 2 Opinion.Pdf
Od 33 16 Sobha-Syno50 Opinion.Pdf
Od 34 17 Sobha-Syno52-1 Opinion.Pdf
Od 35 18 Sobha-Syno54-1-2 & 3 Opinion.Pdf
Od 36 19 Sobha-Syno57-3A-3B & 3C Opinion.Pdf
Od 37 20 Sobha-Syno58 Opinion.Pdf
Od 38 21 Sobha-Syno61-1 & 3 Opinion.Pdf
Od 39 22 Sobha-Syno173-1 Opinion.Pdf
Od 40 Litigation Affidavit-Ph 5 W 9, 10 & 11.Pdf
Ed 1 08-05-2026
Ed 3 08-05-2026
Ed 4 08-05-2026
Ed 5 08-05-2026
Ed 6 08-05-2026
Ed 7 08-05-2026
Ed 8 08-05-2026
Ed 9 08-05-2026
Ed 10 08-05-2026
Ed 11 08-05-2026
Ed 12 08-05-2026
Ed 13 08-05-2026
Ed 14 08-05-2026
Ed 15 08-05-2026
Ed 16 08-05-2026
Ed 17 08-05-2026
Ed 18 08-05-2026
Ed 19 08-05-2026
Ed 20 08-05-2026
Ed 21 08-05-2026
Ed 22 08-05-2026
Ed 23 08-05-2026
Ed 24 08-05-2026
Ed 25 08-05-2026
Ed 26 08-05-2026
Ed 27 08-05-2026
Ed 28 08-05-2026
Ed 29 08-05-2026
Ed 30 08-05-2026
Ed 31 08-05-2026
Ed 32 08-05-2026
Ed 33 08-05-2026
Ed 34 08-05-2026
Ed 35 08-05-2026
Ed 36 08-05-2026
Ed 37 08-05-2026
Ed 38 08-05-2026
Ed 39 08-05-2026
Ed 40 08-05-2026
Ed 41 08-05-2026
Ed 42 08-05-2026
Ed 43 08-05-2026
Ed 44 08-05-2026
Ed 45 08-05-2026
Ed 46 08-05-2026
Ed 47 08-05-2026
Ed 48 08-05-2026
Ed 49 08-05-2026
Ed 50 08-05-2026
Ed 51 08-05-2026
Ed 52 08-05-2026
Ed 53 08-05-2026
Ed 54 08-05-2026
Ld Rtc
Ld Mutation
Ld Encumbrance Certificate
Ld Conversion Order
Ld Sale Deed
Ld Khatha
Bank

Bank & Cost Disclosure

Declared project cost and the designated escrow account on file.

Project Account Bank Axis Bank
Account Number (RERA) 925020033650713
IFSC UTIB0001541
Branch Address MG Road
Country/City