Jai Skyway RERA Details - PRM/KA/RERA/1250/304/PR/270726/008844 Bangalore

View the RERA registration, promoter, approval, building, inventory, document and construction-progress disclosures for Jai Skyway under registration PRM/KA/RERA/1250/304/PR/270726/008844 in Bangalore, Karnataka. Data is sourced from rera.ka.

RERA

RERA Snapshot

The most important statutory project disclosures, generated dynamically from available RERA fields.

  • RERA Number PRM/KA/RERA/1250/304/PR/270726/008844
  • Project Name JAI SKYWAY
  • Project Type Residential/Group Housing
  • Project Status New Launch
  • District Bengaluru Rural
  • Taluka Hosakote
  • Original Completion 15 December 2030
  • Documents 82 Verified
Timeline

Project Timeline & Completion Details

Key statutory dates from registration through proposed completion and permit validity.

Proposed Start 01 July 2026 Expected commencement of civil works and foundation on site.
Original Completion 15 December 2030 Mandated date for project handover to the allottees and final compliance filing.
Promoter

Promoter, Organisation & Member Details

Declared promoter entity, address and corporate identifiers on file with the authority.

Primary Promoter

JAI SHELTERS
Registered Address SHOP NO 101 KODIGEHALLI MAIN ROAD ,AYYAPPA NAGAR,KR PURAM ,Bengaluru East ,Bengaluru East ,Bengaluru Urban-560036
Location

Land, Address & Location Details

Land parcel, zoning and geo-coordinates as recorded in the project filing.

Address SITE NO 1,2,3 SY 80 , Situated at Doddahullur Village, Kasaba Hobli, Hoskote Taluk, Bangalore Rural District , Hosakote , Bengaluru Rural, Karnataka - 562114

RERA Coordinates

Latitude, Longitude 13.103043074443628, 77.81409308465577
Plans

Plans & Approvals

Statutory approvals obtained or pending against the project site.

Plan Approval No. CC/607/2025-26
Authority Hoskote Planning Authority
Approved Date 22 April 2026

Understand this Project's RERA details

Get clear answers and additional support from our RERA experts.

RERA Banner
Buildings

Buildings, Towers & Building-Level Details

Statutory building-level disclosures including tower height, sanctioned floors, structural counts and parking areas.

Building Detail
Name No. of Basements No. of Slab No. of Slits No. of Open Parking Building Type Height of Tower No. of Floors No. of Units
JAI SKYWAY 1 6 1 103 Residential 14.95 4 105

Scroll horizontally to view all building-level fields. Values marked "-" were not disclosed in the source RERA record.

Inventory

Unit Inventory & Configuration Details

Configuration mix and floor-level disclosures with both grouped and raw RERA views.

Total Units -
Configurations 2
Inventory Type RESIDENTIAL
Configuration Distribution
2 BHK 0 units
3 BHK 0 units
  • JAI SKYWAY
Floor-Wise Inventory Explorer
Floor Apartment Type Carpet Area No. of Unit
-1 3 BHK 98 G01
-1 3 BHK 94 G02
-1 3 BHK 90 G03
-1 2 BHK 79 G04
-1 2 BHK 79 G05
-1 3 BHK 90 G06
-1 3 BHK 92 G07
-1 2 BHK 74 G08
-1 2 BHK 74 G09
-1 3 BHK 90 G10
-1 2 BHK 77 G11
-1 2 BHK 77 G12
-1 2 BHK 77 G13
-1 3 BHK 100 G14
-1 3 BHK 100 G15
-1 3 BHK 100 G16
-1 3 BHK 92 G17
-1 3 BHK 92 G18
-1 3 BHK 94 G19
-1 2 BHK 74 G20
-1 3 BHK 89 G21
GF 2 BHK 77 111
GF 3 BHK 101 101
GF 3 BHK 94 102
GF 3 BHK 90 103
GF 2 BHK 79 104
GF 2 BHK 79 105
GF 3 BHK 90 106
GF 3 BHK 94 107
GF 2 BHK 76 108
GF 2 BHK 76 109
GF 3 BHK 96 110
GF 2 BHK 77 112
GF 2 BHK 77 113
GF 3 BHK 100 114
GF 3 BHK 100 115
GF 3 BHK 100 116
GF 3 BHK 92 117
GF 3 BHK 92 118
GF 3 BHK 94 119
GF 2 BHK 76 120
GF 3 BHK 91 121
1 3 BHK 101 201
1 3 BHK 94 202
1 3 BHK 90 203
1 2 BHK 79 204
1 2 BHK 79 205
1 3 BHK 90 206
1 3 BHK 94 207
1 2 BHK 76 208
1 2 BHK 76 209
1 3 BHK 96 210
1 2 BHK 77 211
1 2 BHK 77 212
1 2 BHK 77 213
1 3 BHK 100 214
1 3 BHK 100 215
1 3 BHK 100 216
1 3 BHK 92 217
1 3 BHK 92 218
1 3 BHK 94 219
1 2 BHK 76 220
1 3 BHK 91 221
2 3 BHK 101 301
2 3 BHK 94 302
2 3 BHK 90 303
2 2 BHK 79 304
2 2 BHK 79 305
2 3 BHK 90 306
2 3 BHK 94 307
2 2 BHK 76 308
2 2 BHK 76 309
2 3 BHK 96 310
2 2 BHK 77 311
2 2 BHK 77 312
2 2 BHK 77 313
2 3 BHK 100 314
2 3 BHK 100 315
2 3 BHK 100 316
2 3 BHK 92 317
2 3 BHK 92 318
2 3 BHK 94 319
2 2 BHK 76 320
2 3 BHK 91 321
3 3 BHK 101 401
3 3 BHK 94 402
3 3 BHK 90 403
3 2 BHK 79 404
3 2 BHK 79 405
3 3 BHK 90 406
3 3 BHK 94 407
3 2 BHK 76 408
3 2 BHK 76 409
3 3 BHK 96 410
3 2 BHK 77 411
3 2 BHK 77 412
3 2 BHK 77 413
3 3 BHK 100 414
3 3 BHK 100 415
3 3 BHK 100 416
3 3 BHK 92 417
3 3 BHK 92 418
3 3 BHK 94 419
3 2 BHK 76 42J
3 3 BHK 91 421
Parking

Parking, Garage & Area Details

Parking provision declared in the sanctioned plan.

Type Proposed Booked Work Done
Garage - - -
Covered Parking - - -
Open Parking - - -
Development

Development Works & Common Area Disclosures

Project-level common infrastructure disclosures as reported by the developer to the RERA authority.

Sub Structure Earth Work And Other Leveling Preparation Work % not reported Sub Structure Foundation Footing Work % not reported Sub Structure Upto Plinth Level % not reported
Sub Structure Sub-structure Flooring (Parking Floor, More Than One Floor Below General Ground Level) % not reported Sub Structure Retaining Wall (All Types) % not reported Sup Structure Rcc Or Ms Framed Structure % not reported
Sup Structure Masonry Construction % not reported Sup Structure Plastering Inside , Outside & Ceiling % not reported Sup Structure Joinery: Doors, Windows, Ventilators Etc % not reported
Sup Structure Basic Work Of Water Supply, Sanitary And Electrification % not reported Sup Structure Dadoing, Skirting, Flooring, Tiles Work (All Types) % not reported Sup Structure Railing And Grill Fixing % not reported
Finishing Works Electrification, Water Supply And Sanitary Finishing % not reported Finishing Works Painting % not reported Finishing Works Fire Prevention And Fire Fighting Fitting And Fixture With Network % not reported
Finishing Works Weather Proof Work(tile,concrete) % not reported Finishing Works Wardrobe, Showcase, Kitchen Cabinet, Puja Work % not reported Finishing Works Elevation Work % not reported
Finishing Works Internal And External Work Including Landscapes As Per Sanctioned Drawings % not reported Internal Infrastructure Water Supply % not reported Internal Infrastructure Sewage And Drainage System % not reported
Internal Infrastructure Water Conservation/rain Water Harvesting/recharge Of Ground Water % not reported Internal Infrastructure Energy Management % not reported Internal Infrastructure Fire Protection And Fire Safety Requirements % not reported
Internal Infrastructure Solid Waste Management And Disposal % not reported Internal Infrastructure Emergency Evacuation Services % not reported External Infrastructure Water Supply % not reported
External Infrastructure Internal Roads & Footpaths % not reported External Infrastructure Sewage And Drainage System % not reported External Infrastructure Electricity Supply Transformer And Substation % not reported
External Infrastructure Solid Waste Management And Disposal % not reported External Infrastructure Emergency Evacuation Services % not reported External Infrastructure Storm Water Drains % not reported
External Infrastructure Use Of Renewable Energy % not reported External Infrastructure Water Conservation/rain Water Harvesting/recharge Of Ground Water % not reported External Infrastructure Fire Protection And Fire Safety Requirements % not reported
External Infrastructure Sewage Treatment Plant (Stp) % not reported External Infrastructure Parks & Tree Planting % not reported External Infrastructure Street Lighting % not reported
Amenities Electricity % not reported Amenities Smart Home Automation % not reported Amenities Cctv Surveillance % not reported
Amenities Club House % not reported Amenities Community Hall % not reported Amenities Outdoor Sports Facility % not reported
Amenities Indoor Sports Facility % not reported Amenities Swimming Pool % not reported Amenities Gym % not reported
Amenities Parks % not reported Amenities Power Backup % not reported Amenities Piped Gas % not reported
Amenities Water And Sanitation % not reported Amenities Air Conditioning % not reported Common Areas Staircases % not reported
Common Areas Lifts % not reported Common Areas Corridor/lobbies % not reported Common Areas Fire Escapes % not reported
Common Areas Common Entrance And Exit For The Building/common Portico/foyer/verandah % not reported Common Areas Basement % not reported Common Areas Terrace % not reported
Common Areas Outer Wall % not reported Common Areas Open Parking Areas % not reported Common Areas Provision For Lodging Of Management Staff And Security Staff % not reported
Common Areas Water Conservation And Renewable Energy % not reported Common Areas Common Storage Spaces % not reported
Documents

RERA Documents & Filings

All statutory documents uploaded by the promoter to the authority portal.

Promoter Registration Certificate
Promoter Pan Card
Promoter Address Proof
Affidavit
Fd 1 Jai Shelters FY 24-25.Pdf
Fd 2 Jai Shelters FY 23-24.Pdf
Fd 3 NA RERA 1.Pdf
Fd 4 NA RERA 1.Pdf
Fd 5 NA RERA 1.Pdf
Fd 6 NA RERA 1.Pdf
Fd 7 Jai Shelters FY 24-25.Pdf
Fd 8 Jai Shelters FY 23-24.Pdf
Fd 9 NA RERA 1.Pdf
Pd 1 Commencement Certificate( Annexure - 80 )
Pd 2 Approved Building Plan( Annexure - 81 )
Pd 3 Sectional Drawing Of The Apartments( Annexure - 82 )
Pd 4 Certificate From Registered Engineer Indicating The Structural Safety Of The Building( Annexure - 83 )
Pd 5 Project Specifications( Annexure - 84 )
Pd 6 Brochure( Annexure - 85 )
Pd 7 Relinquishment Deed( Annexure - 86 )
Pd 8 Proforma Of Agreement For Sale( Annexure - 87 )
Pd 9 Proforma Of Allotment Letter( Annexure - 88 )
Dc 1 Declaration (Form B)( Annexure - 89 )
Dc 2 Section 3(1) Notarized Affidavit( Annexure - 90 )
Dc 3 JD AFFIDAVIT CUM DECLARATION( Annexure - 91 )
Dc 4 Advocate Search Report( Annexure - 92 )
Noc 1 ESCOM Electricity( Annexure - 95 )
Noc 2 KWSSB Water( Annexure - 96 )
Noc 3 KSPCB( Annexure - 97 )
Noc 4 SEIAA( Annexure - 98 )
Noc 5 Fire Force Department( Annexure - 99 )
Noc 6 Airport Authority Of India( Annexure - 100 )
Noc 7 BSNL( Annexure - 101 )
Noc 8 Lift Authorities( Annexure - 102 )
Noc 9 BMRCL( Annexure - 103 )
Noc 10 NOC In Case Of Building Proposals Abutting To Neighbouring Properties( Annexure - 104 )
Noc 11 Bangalore Urban Arts Commission( Annexure - 105 )
Noc 12 Inspector Of Factories Controller Of Explosives Railways( Annexure - 106 )
Noc 13 Coastal Regulation Zone Authority( Annexure - 107 )
Photo 1 Project Photo
Od 1 LAYOUT PLAN.Pdf
Od 2 LAYOUT APPROVAL ORDER.Pdf
Od 3 AMALGAMATION PLAN.Pdf
Od 4 Amalgamation Doddahulluru ORDER.Pdf
Od 5 RELIQUESTMENT DEED.Pdf
Od 6 STP INSTALATION CLARIFICATION.Pdf
Od 7 Jai Skyway STP - 02-06-2026 (1).Pdf
Od 8 JAI SKYWAY - Estimate (1).Pdf
Od 9 Hoskote Pearl Garden Sale Deed.Pdf
Od 10 HOSKOTE 3.Pdf
Od 11 HOSKOTE 4.Pdf
Od 12 ECC-03012026-8844645.Pdf
Od 13 Uma Ekhatha.Pdf
Od 14 Property Receipt 00485 1503004012 25-26.Pdf
Od 15 RELIQUESTMENT DEED.Pdf
Od 16 WATER.Pdf
Od 17 Clarification For Source Of Water.Pdf
Od 18 Stamp Duty.Pdf
Od 19 Land Cost Caluculation.Pdf
Od 20 Structural Stability Certificate.Pdf
Ed 1 02-07-2026
Ed 2 02-07-2026
Ed 3 02-07-2026
Ed 4 02-07-2026
Ed 5 02-07-2026
Ed 6 02-07-2026
Ed 7 02-07-2026
Ed 8 02-07-2026
Ed 9 02-07-2026
Ed 10 02-07-2026
Ed 11 02-07-2026
Ed 12 02-07-2026
Ed 13 02-07-2026
Ed 14 02-07-2026
Ed 15 02-07-2026
Ed 16 17-07-2026
Ed 17 17-07-2026
Ld Rtc
Ld Mutation
Ld Encumbrance Certificate
Ld Conversion Order
Ld Khatha
Bank

Bank & Cost Disclosure

Declared project cost and the designated escrow account on file.

Project Account Bank AU Small Finance Bank
Account Number (RERA) 3699999900999999
IFSC AU810002646
Branch Address Rajapalya area near Hoodi Circle
Country/City