Squareyards Logo
Blogs
Sell or Rent Property
Login
Rera Banner
residential New Launch Source: rera.ka

JP Iris RERA Details - PRM/KA/RERA/1250/304/PR/300126/008440 Bangalore

View the RERA registration, promoter, approval, building, inventory, document and construction-progress disclosures for JP Iris under registration PRM/KA/RERA/1250/304/PR/300126/008440 in Bangalore, Karnataka. Data is sourced from rera.ka.

RERA

RERA Snapshot

The most important statutory project disclosures, generated dynamically from available RERA fields.

  • RERA Number PRM/KA/RERA/1250/304/PR/300126/008440
  • Project Name JP IRIS BLOCK-B
  • Project Type Residential/Group Housing
  • Project Status New Launch
  • District Bengaluru Rural
  • Taluka Hosakote
  • Original Completion 31 December 2028
  • Documents 62 Verified
Timeline

Project Timeline & Completion Details

Key statutory dates from registration through proposed completion and permit validity.

Proposed Start 01 January 2026 Expected commencement of civil works and foundation on site.
Original Completion 31 December 2028 Mandated date for project handover to the allottees and final compliance filing.
Promoter

Promoter, Organisation & Member Details

Declared promoter entity, address and corporate identifiers on file with the authority.

Primary Promoter

JP Housing Corporation
Registered Address Site No.32 and 33, 4th floor, Near Bajaj KTM Show room,AIR Extension, Hoskote ,Hosakote ,Bengaluru Rural-562114
Location

Land, Address & Location Details

Land parcel, zoning and geo-coordinates as recorded in the project filing.

Address KHATA No.15700/206/2Part/206/20/206/29Part/206/30/206/33/206/35, PID No.34-532-1079 AND Sy Nos.206/2Part, 206/20, 206/29Part, 206/30, 206/33 & , 206/35 OF HOSKOTE VILLAGE, KASABA HOBLI , Hosakote , Bengaluru Rural, Karnataka - 562114

RERA Coordinates

Latitude, Longitude 13.05802, 77.787189
Plans

Plans & Approvals

Statutory approvals obtained or pending against the project site.

Plan Approval No. HSK-LBPAS-10890/25-26/BP
Authority Hoskote Planning Authority
Approved Date 18 October 2025

Understand this Project's RERA details

Get clear answers and additional support from our RERA experts.

RERA Banner
Buildings

Buildings, Towers & Building-Level Details

Statutory building-level disclosures including tower height, sanctioned floors, structural counts and parking areas.

Building Detail
Name No. of Basements No. of Slab No. of Slits No. of Open Parking Building Type Height of Tower No. of Floors No. of Units
Tower 0 5 1 88 Residential 14.95 3 88

Scroll horizontally to view all building-level fields. Values marked "-" were not disclosed in the source RERA record.

Inventory

Unit Inventory & Configuration Details

Configuration mix and floor-level disclosures with both grouped and raw RERA views.

Total Units -
Configurations 3
Inventory Type RESIDENTIAL
Configuration Distribution
1 BHK 0 units
2 BHK 0 units
3 BHK 0 units
  • Tower
Floor-Wise Inventory Explorer
Floor Apartment Type Carpet Area No. of Unit
-1 2 BHK 66.27 B-001
-1 2 BHK 66.13 B-002
-1 2 BHK 66.13 B-003
-1 2 BHK 51.32 B-004
-1 2 BHK 60.81 B-005
-1 2 BHK 63.8 B-006
-1 3 BHK 79.76 B-007
-1 2 BHK 70.98 B-008
-1 2 BHK 62.76 B-009
-1 3 BHK 85.85 B-010
-1 3 BHK 90.13 B-011
-1 3 BHK 80.48 B-012
-1 3 BHK 94.76 B-013
-1 3 BHK 88.34 B-014
-1 2 BHK 60.77 B-015
-1 3 BHK 89.83 B-016
-1 3 BHK 79.11 B-017
-1 3 BHK 79.11 B-018
-1 3 BHK 74.75 B-019
-1 1 BHK 46.56 B-020
-1 2 BHK 64.7 B-021
-1 2 BHK 64.7 B-022
GF 2 BHK 66.27 B-101
GF 2 BHK 66.13 B-102
GF 2 BHK 66.13 B-103
GF 2 BHK 51.32 B-104
GF 2 BHK 60.81 B-105
GF 2 BHK 63.8 B-106
GF 3 BHK 79.76 B-107
GF 2 BHK 70.98 B-108
GF 2 BHK 62.76 B-109
GF 3 BHK 85.85 B-110
GF 3 BHK 90.13 B-111
GF 3 BHK 80.48 B-112
GF 3 BHK 94.76 B-113
GF 3 BHK 88.34 B-114
GF 2 BHK 60.77 B-115
GF 3 BHK 89.83 B-116
GF 3 BHK 79.11 B-117
GF 3 BHK 79.11 B-118
GF 3 BHK 74.75 B-119
GF 1 BHK 46.56 B-120
GF 2 BHK 64.7 B-121
GF 2 BHK 64.7 B-122
1 2 BHK 66.27 B-201
1 2 BHK 66.13 B-202
1 2 BHK 66.13 B-203
1 2 BHK 51.32 B-204
1 2 BHK 60.81 B-205
1 2 BHK 63.8 B-206
1 3 BHK 79.76 B-207
1 2 BHK 70.98 B-208
1 2 BHK 62.76 B-209
1 3 BHK 85.85 B-210
1 3 BHK 90.13 B-211
1 3 BHK 80.48 B-212
1 3 BHK 94.76 B-213
1 3 BHK 88.34 B-214
1 2 BHK 60.77 B-215
1 3 BHK 89.83 B-216
1 3 BHK 79.11 B-217
1 3 BHK 79.11 B-218
1 3 BHK 74.75 B-219
1 1 BHK 46.56 B-220
1 2 BHK 64.7 B-221
1 2 BHK 64.7 B-222
2 2 BHK 66.27 A-301
2 2 BHK 66.13 A-302
2 2 BHK 66.13 A-303
2 2 BHK 51.32 A-304
2 2 BHK 60.81 A-305
2 2 BHK 63.8 A-306
2 3 BHK 79.76 A-307
2 2 BHK 70.98 A-308
2 2 BHK 62.76 A-309
2 3 BHK 85.85 A-310
2 3 BHK 90.13 A-311
2 3 BHK 80.48 A-312
2 3 BHK 94.76 A-313
2 3 BHK 88.34 A-314
2 2 BHK 60.77 A-315
2 3 BHK 89.83 A-316
2 3 BHK 79.11 A-317
2 3 BHK 79.11 A-318
2 3 BHK 74.75 A-319
2 1 BHK 46.56 A-320
2 2 BHK 64.7 A-321
2 2 BHK 64.7 A-322
Parking

Parking, Garage & Area Details

Parking provision declared in the sanctioned plan.

Type Proposed Booked Work Done
Garage - - -
Covered Parking - - -
Open Parking - - -
Development

Development Works & Common Area Disclosures

Project-level common infrastructure disclosures as reported by the developer to the RERA authority.

Sub Structure Earth Work And Other Leveling Preparation Work % not reported Sub Structure Foundation Footing Work % not reported Sub Structure Upto Plinth Level % not reported
Sub Structure Sub-structure Flooring (Parking Floor, More Than One Floor Below General Ground Level) % not reported Sub Structure Retaining Wall (All Types) % not reported Sup Structure Rcc Or Ms Framed Structure % not reported
Sup Structure Masonry Construction % not reported Sup Structure Plastering Inside , Outside & Ceiling % not reported Sup Structure Joinery: Doors, Windows, Ventilators Etc % not reported
Sup Structure Basic Work Of Water Supply, Sanitary And Electrification % not reported Sup Structure Dadoing, Skirting, Flooring, Tiles Work (All Types) % not reported Sup Structure Railing And Grill Fixing % not reported
Finishing Works Electrification, Water Supply And Sanitary Finishing % not reported Finishing Works Painting % not reported Finishing Works Fire Prevention And Fire Fighting Fitting And Fixture With Network % not reported
Finishing Works Weather Proof Work(tile,concrete) % not reported Finishing Works Wardrobe, Showcase, Kitchen Cabinet, Puja Work % not reported Finishing Works Elevation Work % not reported
Finishing Works Internal And External Work Including Landscapes As Per Sanctioned Drawings % not reported Internal Infrastructure Water Supply % not reported Internal Infrastructure Sewage And Drainage System % not reported
Internal Infrastructure Water Conservation/rain Water Harvesting/recharge Of Ground Water % not reported Internal Infrastructure Energy Management % not reported Internal Infrastructure Fire Protection And Fire Safety Requirements % not reported
Internal Infrastructure Solid Waste Management And Disposal % not reported Internal Infrastructure Emergency Evacuation Services % not reported External Infrastructure Water Supply % not reported
External Infrastructure Internal Roads & Footpaths % not reported External Infrastructure Sewage And Drainage System % not reported External Infrastructure Electricity Supply Transformer And Substation % not reported
External Infrastructure Solid Waste Management And Disposal % not reported External Infrastructure Emergency Evacuation Services % not reported External Infrastructure Storm Water Drains % not reported
External Infrastructure Use Of Renewable Energy % not reported External Infrastructure Water Conservation/rain Water Harvesting/recharge Of Ground Water % not reported External Infrastructure Fire Protection And Fire Safety Requirements % not reported
External Infrastructure Sewage Treatment Plant (Stp) % not reported External Infrastructure Parks & Tree Planting % not reported External Infrastructure Street Lighting % not reported
Amenities Electricity % not reported Amenities Smart Home Automation % not reported Amenities Cctv Surveillance % not reported
Amenities Club House % not reported Amenities Community Hall % not reported Amenities Outdoor Sports Facility % not reported
Amenities Indoor Sports Facility % not reported Amenities Swimming Pool % not reported Amenities Gym % not reported
Amenities Parks % not reported Amenities Power Backup % not reported Amenities Piped Gas % not reported
Amenities Water And Sanitation % not reported Amenities Air Conditioning % not reported Common Areas Staircases % not reported
Common Areas Lifts % not reported Common Areas Corridor/lobbies % not reported Common Areas Fire Escapes % not reported
Common Areas Common Entrance And Exit For The Building/common Portico/foyer/verandah % not reported Common Areas Basement % not reported Common Areas Terrace % not reported
Common Areas Outer Wall % not reported Common Areas Open Parking Areas % not reported Common Areas Provision For Lodging Of Management Staff And Security Staff % not reported
Common Areas Water Conservation And Renewable Energy % not reported Common Areas Common Storage Spaces % not reported
Documents

RERA Documents & Filings

All statutory documents uploaded by the promoter to the authority portal.

Promoter Registration Certificate
Promoter Pan Card
Promoter Address Proof
Affidavit
Fd 1 JPHC ITR FY-2024-25.Pdf
Fd 2 JPHC ITR FY-2023-24.Pdf
Fd 3 JPHC ITR FY-2022-23.Pdf
Fd 4 JPHC ITR FY-2024-25.Pdf
Fd 5 JPHC ITR FY-2023-24.Pdf
Fd 6 JPHC ITR FY-2022-23.Pdf
Fd 7 JPHC ITR FY-2024-25.Pdf
Fd 8 JPHC ITR FY-2023-24.Pdf
Fd 9 JPHC ITR FY-2022-23.Pdf
Pd 1 Commencement Certificate( Annexure - 80 )
Pd 2 Approved Building Plan( Annexure - 81 )
Pd 3 Sectional Drawing Of The Apartments( Annexure - 82 )
Pd 4 Certificate From Registered Engineer Indicating The Structural Safety Of The Building( Annexure - 83 )
Pd 5 Project Specifications( Annexure - 84 )
Pd 7 Relinquishment Deed( Annexure - 86 )
Pd 8 Proforma Of Agreement For Sale( Annexure - 87 )
Pd 9 Proforma Of Allotment Letter( Annexure - 88 )
Dc 1 Declaration (Form B)( Annexure - 89 )
Dc 2 Section 3(1) Notarized Affidavit( Annexure - 90 )
Dc 3 JD AFFIDAVIT CUM DECLARATION( Annexure - 91 )
Dc 4 Advocate Search Report( Annexure - 92 )
Noc 1 ESCOM Electricity( Annexure - 95 )
Noc 2 KWSSB Water( Annexure - 96 )
Noc 3 KSPCB( Annexure - 97 )
Photo 1 Project Photo
Photo 2 Project Photo
Od 1 Clarification On Sales - JP IRIS BLOCK-B.Pdf
Od 2 LAND COST CALCULATION SHEET - JP IRIS BLOCK-B.Pdf
Od 3 GPA-206-2.Pdf
Od 4 GPA-206-20.Pdf
Od 5 GPA-206-29.Pdf
Od 6 GPA-206-30.Pdf
Od 7 GPA-206-33.Pdf
Od 8 GPA-206-35.Pdf
Od 9 206-SUREVY RECORDS.Pdf
Od 10 ADLR Sketch And Village Map.Pdf
Od 11 GROUND FLOOR.Pdf
Od 12 STILT FLOOR.Pdf
Od 13 TYPICAL FLOOR.Pdf
Od 14 BOREWELL GPS PHOTO.Jpeg
Od 15 AREA STATEMENT-JP IRIS BLOCK-B.Pdf
Od 16 Estimation -JP IRIS BLOCK-B.Pdf
Od 17 JP IRIS BLOCK - B - 60 KLD STP.Pdf
Od 18 SINGLE SITE PLAN-206.Pdf
Od 19 SSP-LETTER-206.Pdf
Od 20 Satellite Image Demaarcation - HOSKOTE-206-G.Pdf
Od 21 CDP Map Demarcation - HOSKOTE-206.Pdf
Ed 1 24-01-2026
Ed 2 24-01-2026
Ed 3 24-01-2026
Ed 4 24-01-2026
Ed 5 24-01-2026
Ld Rtc
Ld Mutation
Ld Encumbrance Certificate
Ld Conversion Order
Ld Sale Deed
Ld Khatha
Bank

Bank & Cost Disclosure

Declared project cost and the designated escrow account on file.

Project Account Bank Canara Bank
Account Number (RERA) 120037027273
IFSC CNRB0005580
Branch Address SME Branch, Hoskote
Country/City