Squareyards Logo
Blogs
Sell or Rent Property
Login
Rera Banner
residential Under Construction Source: rera.ka

JP Lavender RERA Details - PRM/KA/RERA/1250/304/PR/180524/006898 Bangalore

View the RERA registration, promoter, approval, building, inventory, document and construction-progress disclosures for JP Lavender under registration PRM/KA/RERA/1250/304/PR/180524/006898 in Bangalore, Karnataka. Data is sourced from rera.ka.

RERA

RERA Snapshot

The most important statutory project disclosures, generated dynamically from available RERA fields.

  • RERA Number PRM/KA/RERA/1250/304/PR/180524/006898
  • Project Name JP LAVENDER BLOCK-A
  • Project Type Residential/Group Housing
  • Project Status Under Construction
  • District Bengaluru Rural
  • Taluka Hosakote
  • Original Completion 31 December 2026
  • Documents 86 Verified
Timeline

Project Timeline & Completion Details

Key statutory dates from registration through proposed completion and permit validity.

Proposed Start 01 April 2024 Expected commencement of civil works and foundation on site.
Original Completion 31 December 2026 Mandated date for project handover to the allottees and final compliance filing.
Promoter

Promoter, Organisation & Member Details

Declared promoter entity, address and corporate identifiers on file with the authority.

Primary Promoter

JP Housing Corporation
Registered Address Khatha No.8251, No.3, 2nd Floor, ,NH-75, Hoskote, ,Hosakote ,Bengaluru Rural-562114
Location

Land, Address & Location Details

Land parcel, zoning and geo-coordinates as recorded in the project filing.

Address Khata No 15659/288/5/288/10/288/11 (PID No 41/542/381), Sy no 288/5, 288/10 and 288/11 of Hoskote Village , Kasaba Hobli , Hosakote , Bengaluru Rural, Karnataka - 562114

RERA Coordinates

Latitude, Longitude 13.058758, 77.782596
Plans

Plans & Approvals

Statutory approvals obtained or pending against the project site.

Plan Approval No. HSK-LBPAS-10656/23-24/BP
Authority Local Planing Authority
Approved Date 15 March 2024

Understand this Project's RERA details

Get clear answers and additional support from our RERA experts.

RERA Banner
Buildings

Buildings, Towers & Building-Level Details

Statutory building-level disclosures including tower height, sanctioned floors, structural counts and parking areas.

Building Detail
Name No. of Basements No. of Slab No. of Slits No. of Open Parking Building Type Height of Tower No. of Floors No. of Units
Block A 0 4 1 84 Residential 14.95 3 76

Scroll horizontally to view all building-level fields. Values marked "-" were not disclosed in the source RERA record.

Inventory

Unit Inventory & Configuration Details

Configuration mix and floor-level disclosures with both grouped and raw RERA views.

Total Units -
Configurations 2
Inventory Type RESIDENTIAL
Configuration Distribution
2 BHK 0 units
3 BHK 0 units
  • Block A
Floor-Wise Inventory Explorer
Floor Apartment Type Carpet Area No. of Unit
-1 2 BHK 71.21 001
-1 2 BHK 76.51 002
-1 2 BHK 76.51 003
-1 2 BHK 76.51 004
-1 2 BHK 76.51 005
-1 2 BHK 76.51 006
-1 2 BHK 76.51 007
-1 2 BHK 76.51 008
-1 3 BHK 115.87 009
-1 3 BHK 100.3 010
-1 3 BHK 103.3 011
-1 2 BHK 72.44 012
-1 3 BHK 80.8 013
-1 2 BHK 67.66 014
-1 3 BHK 99.62 015
-1 3 BHK 99.61 016
-1 3 BHK 99.61 017
-1 3 BHK 99.61 018
-1 3 BHK 99.61 019
GF 2 BHK 71.21 101
GF 2 BHK 76.51 102
GF 2 BHK 76.51 103
GF 2 BHK 76.51 104
GF 2 BHK 76.51 105
GF 2 BHK 76.51 106
GF 2 BHK 76.51 107
GF 2 BHK 76.51 108
GF 3 BHK 115.87 109
GF 3 BHK 100.3 110
GF 3 BHK 103.3 111
GF 2 BHK 72.44 112
GF 3 BHK 80.8 113
GF 2 BHK 67.66 114
GF 3 BHK 99.62 115
GF 3 BHK 99.61 116
GF 3 BHK 99.61 117
GF 3 BHK 99.61 118
GF 3 BHK 99.61 119
1 2 BHK 71.21 201
1 2 BHK 76.51 202
1 2 BHK 76.51 203
1 2 BHK 76.51 204
1 2 BHK 76.51 205
1 2 BHK 76.51 206
1 2 BHK 76.51 207
1 2 BHK 76.51 208
1 3 BHK 115.87 209
1 3 BHK 100.3 210
1 3 BHK 103.3 211
1 2 BHK 72.44 212
1 3 BHK 80.8 213
1 2 BHK 67.66 214
1 3 BHK 99.62 215
1 3 BHK 99.61 216
1 3 BHK 99.61 217
1 3 BHK 99.61 218
1 3 BHK 99.61 219
2 2 BHK 71.21 301
2 2 BHK 76.51 302
2 2 BHK 76.51 303
2 2 BHK 76.51 304
2 2 BHK 76.51 305
2 2 BHK 76.51 306
2 2 BHK 76.51 307
2 2 BHK 76.51 308
2 3 BHK 115.87 309
2 3 BHK 100.3 310
2 3 BHK 103.3 311
2 2 BHK 72.44 312
2 3 BHK 80.8 313
2 2 BHK 67.66 314
2 3 BHK 99.62 315
2 3 BHK 99.61 316
2 3 BHK 99.61 317
2 3 BHK 99.61 318
2 3 BHK 99.61 319
Parking

Parking, Garage & Area Details

Parking provision declared in the sanctioned plan.

Type Proposed Booked Work Done
Garage - - -
Covered Parking - - -
Open Parking - - -
Development

Development Works & Common Area Disclosures

Project-level common infrastructure disclosures as reported by the developer to the RERA authority.

Sub Structure Earth Work And Other Leveling Preparation Work % not reported Sub Structure Foundation Footing Work % not reported Sub Structure Upto Plinth Level % not reported
Sub Structure Sub-structure Flooring (Parking Floor, More Than One Floor Below General Ground Level) % not reported Sub Structure Retaining Wall (All Types) % not reported Sup Structure Rcc Or Ms Framed Structure % not reported
Sup Structure Masonry Construction % not reported Sup Structure Plastering Inside , Outside & Ceiling % not reported Sup Structure Joinery: Doors, Windows, Ventilators Etc % not reported
Sup Structure Basic Work Of Water Supply, Sanitary And Electrification % not reported Sup Structure Dadoing, Skirting, Flooring, Tiles Work (All Types) % not reported Sup Structure Railing And Grill Fixing % not reported
Finishing Works Electrification, Water Supply And Sanitary Finishing % not reported Finishing Works Painting % not reported Finishing Works Fire Prevention And Fire Fighting Fitting And Fixture With Network % not reported
Finishing Works Weather Proof Work(tile,concrete) % not reported Finishing Works Wardrobe, Showcase, Kitchen Cabinet, Puja Work % not reported Finishing Works Elevation Work % not reported
Finishing Works Internal And External Work Including Landscapes As Per Sanctioned Drawings % not reported Internal Infrastructure Water Supply % not reported Internal Infrastructure Sewage And Drainage System % not reported
Internal Infrastructure Water Conservation/rain Water Harvesting/recharge Of Ground Water % not reported Internal Infrastructure Energy Management % not reported Internal Infrastructure Fire Protection And Fire Safety Requirements % not reported
Internal Infrastructure Solid Waste Management And Disposal % not reported Internal Infrastructure Emergency Evacuation Services % not reported External Infrastructure Water Supply % not reported
External Infrastructure Internal Roads & Footpaths % not reported External Infrastructure Sewage And Drainage System % not reported External Infrastructure Electricity Supply Transformer And Substation % not reported
External Infrastructure Solid Waste Management And Disposal % not reported External Infrastructure Emergency Evacuation Services % not reported External Infrastructure Storm Water Drains % not reported
External Infrastructure Use Of Renewable Energy % not reported External Infrastructure Water Conservation/rain Water Harvesting/recharge Of Ground Water % not reported External Infrastructure Fire Protection And Fire Safety Requirements % not reported
External Infrastructure Sewage Treatment Plant (Stp) % not reported External Infrastructure Parks & Tree Planting % not reported External Infrastructure Street Lighting % not reported
Amenities Electricity % not reported Amenities Smart Home Automation % not reported Amenities Cctv Surveillance % not reported
Amenities Club House % not reported Amenities Community Hall % not reported Amenities Outdoor Sports Facility % not reported
Amenities Indoor Sports Facility % not reported Amenities Swimming Pool % not reported Amenities Gym % not reported
Amenities Parks % not reported Amenities Power Backup % not reported Amenities Piped Gas % not reported
Amenities Water And Sanitation % not reported Amenities Air Conditioning % not reported Common Areas Staircases % not reported
Common Areas Lifts % not reported Common Areas Corridor/lobbies % not reported Common Areas Fire Escapes % not reported
Common Areas Common Entrance And Exit For The Building/common Portico/foyer/verandah % not reported Common Areas Basement % not reported Common Areas Terrace % not reported
Common Areas Outer Wall % not reported Common Areas Open Parking Areas % not reported Common Areas Provision For Lodging Of Management Staff And Security Staff % not reported
Common Areas Water Conservation And Renewable Energy % not reported Common Areas Common Storage Spaces % not reported
Documents

RERA Documents & Filings

All statutory documents uploaded by the promoter to the authority portal.

Promoter Registration Certificate
Promoter Pan Card
Promoter Address Proof
Affidavit
Fd 1 Balance Sheet 2022-23.Pdf
Fd 2 Balance Sheet 2021-22.Pdf
Fd 3 Balance Sheet 2021-22.Pdf
Fd 4 Profit And Loss 2022-23.Pdf
Fd 5 Profit And Loss 2021-22.Pdf
Fd 6 Profit And Loss 2021-22.Pdf
Fd 7 Not Available.Pdf
Fd 8 Not Available.Pdf
Fd 9 Not Available.Pdf
Fd 10 Statement Of Income 2022-23.Pdf
Fd 11 Statement Of Income 2021-22.Pdf
Fd 12 Statement Of Income 2020-21.Pdf
Fd 13 Audit Report FY-2022-23.Pdf
Fd 14 Audit Report FY-2021-22.Pdf
Fd 15 Audit Report 2020-21.Pdf
Fd 16 JPHC ITR FY-2022-23.Pdf
Fd 17 ITR FY 2021-22.Pdf
Fd 18 ITR 2020-21.Pdf
Pd 1 Self Attested PAN Card*( Annexure - 66 )
Pd 2 Commencement Certificate*( Annexure - 67 )
Pd 3 Electricity Permission Letter*( Annexure - 68 )
Pd 4 Water Permission Letter*( Annexure - 69 )
Pd 6 Approved Building Plotting Plan*( Annexure - 71 )
Pd 8 Existing Section Plan And Specification( Annexure - 73 )
Pd 9 Sectional Drawing Of The Apartments*( Annexure - 74 )
Pd 10 Project Specifications*( Annexure - 75 )
Pd 11 Approved Section Of Building Infrastructure Plan Of Plotting*( Annexure - 76 )
Pd 12 Area Development Plan Of Project Area*( Annexure - 77 )
Pd 13 Certificate From Registered Engineer Indicating The Structural Safety Of The Building*( Annexure - 78 )
Pd 14 Advocate Search Report*( Annexure - 79 )
Pd 15 Urban Land Ceiling*( Annexure - 80 )
Pd 16 Collaboration Agreement Development Agreement Joint Development Agreement Other Agreement*( Annexure - 81 )
Pd 17 Change Of Land Use*( Annexure - 82 )
Pd 18 District Magistrate*( Annexure - 83 )
Pd 19 Conversion Certificate Under Section 95 Of The KLR Act 1964*( Annexure - 84 )
Pd 20 Any Other Document (Rights Title Interest Name)*( Annexure - 85 )
Pd 21 Proforma Of Agreement For Sale*( Annexure - 86 )
Pd 22 Proforma Of Allotment Letter*( Annexure - 87 )
Pd 24 Brochure*( Annexure - 89 )
Dc 1 Declaration (Form B)*( Annexure - 90 )
Dc 2 Section 3(1) Notarized Affidavit*( Annexure - 91 )
Dc 3 JD AFFIDAVIT CUM DECLARATION*( Annexure - 92 )
Noc 1 ESCOM Electricity*( Annexure - 93 )
Noc 2 KWSSB Water*( Annexure - 94 )
Noc 7 KSPCB( Annexure - 99 )
Photo 1 Project Photo
Od 1 95 KLD STP SBR-76 Units-ENG.Pdf
Od 2 COST OF CONSTRUCTION-BLOCK-A.Pdf
Od 3 HOSKOTE-288 GOOGLE 76 UNITS.Pdf
Od 4 CDP Master Extract.Pdf
Od 5 JOINT Sketch.Pdf
Od 6 JP LAVENDER BLOCK-A-AREA STATEMENT.Pdf
Od 7 Project Plan Approval.Pdf
Od 8 SSP PLAN-76 UNITS.Pdf
Od 9 288-1-Phodi.Pdf
Od 10 Amalgamated Khata.Pdf
Od 11 Death Certificate-Narayanappa.Pdf
Od 12 Death Certificate-Muniyappa.Pdf
Od 13 Guidance Value-2018-19.Pdf
Od 14 288-1-Phodi.Pdf
Od 15 Mother Deed-Partition Deed.Pdf
Od 16 Partition Deed.Pdf
Od 17 RELEASE DEED.Pdf
Od 18 STP Demarcation.Pdf
Ed 1 17-05-2024
Ed 2 17-05-2024
Ed 3 17-05-2024
Ed 4 17-05-2024
Ed 5 17-05-2024
Ed 6 17-05-2024
Ed 7 17-05-2024
Ed 8 17-05-2024
Ed 9 17-05-2024
Ed 10 17-05-2024
Ed 11 17-05-2024
Ed 12 17-05-2024
Ld Rtc
Ld Mutation
Ld Encumbrance Certificate
Ld Conversion Order
Ld Sale Deed
Ld Khatha
Bank

Bank & Cost Disclosure

Declared project cost and the designated escrow account on file.

Project Account Bank Axis Bank
Account Number (RERA) 924020023871376
IFSC UTIB0001202
Branch Address Hoskote
Country/City