residential New Launch Source: rera.ka

Godrej Parkshire RERA Details - PRM/KA/RERA/1250/304/PR/090126/008393 Bangalore

View the RERA registration, promoter, approval, building, inventory, document and construction-progress disclosures for Godrej Parkshire under registration PRM/KA/RERA/1250/304/PR/090126/008393 in Bangalore, Karnataka. Data is sourced from rera.ka.

RERA

RERA Snapshot

The most important statutory project disclosures, generated dynamically from available RERA fields.

  • RERA Number PRM/KA/RERA/1250/304/PR/090126/008393
  • Project Name GODREJ PARKSHIRE
  • Project Type Residential/Group Housing
  • Project Status New Launch
  • District Bengaluru Rural
  • Taluka Hosakote
  • Original Completion 31 December 2030
  • Documents 113 Verified
Timeline

Project Timeline & Completion Details

Key statutory dates from registration through proposed completion and permit validity.

Proposed Start 01 March 2026 Expected commencement of civil works and foundation on site.
Original Completion 31 December 2030 Mandated date for project handover to the allottees and final compliance filing.
Promoter

Promoter, Organisation & Member Details

Declared promoter entity, address and corporate identifiers on file with the authority.

Primary Promoter

Godrej Properties Limited
Registered Address Unit No. 4 and 5, 9th floor, No. 1-15, Godrej Centre Indiranagar,BM Kaval, Old Madras Road ,Bengaluru South ,Bengaluru Urban-560038
Location

Land, Address & Location Details

Land parcel, zoning and geo-coordinates as recorded in the project filing.

Address Sy no 36/1, 36/2, 36/3, 36/4A1, 36/4A2, 36/4B1, 36/4B2, 36/5, 36/6, 36/7, 36/8, 36/9, 66/1, 66/2, 66/3, 67/1A1, 67/1A2, 67/1A3, 67/1B1, 67/1B2, 67/1B3 , 67/2, 67/3, 67/4, 68/1, 68/2, 68/3, 68/4 and 68/5 Sarkariguttahalli Village, Kasaba Hobli , Hosakote , Bengaluru Rural, Karnataka - 562114

RERA Coordinates

Latitude, Longitude 13.047105, 77.783611
Plans

Plans & Approvals

Statutory approvals obtained or pending against the project site.

Plan Approval No. CC/445/2025-26
Authority Hoskote Planning Authority
Approved Date 29 December 2025

Understand this Project's RERA details

Get clear answers and additional support from our RERA experts.

RERA Banner
Buildings

Buildings, Towers & Building-Level Details

Statutory building-level disclosures including tower height, sanctioned floors, structural counts and parking areas.

Building Detail
Name No. of Basements No. of Slab No. of Slits No. of Open Parking Building Type Height of Tower No. of Floors No. of Units
A 2 29 0 226 Residential 86.75 28 226
B 2 29 0 226 Residential 86.75 28 226
C 2 29 0 220 Residential 86.75 28 220
D 2 29 0 230 Residential 86.75 28 230
E 2 29 0 230 Residential 86.75 28 230

Scroll horizontally to view all building-level fields. Values marked "-" were not disclosed in the source RERA record.

Inventory

Unit Inventory & Configuration Details

Configuration mix and floor-level disclosures with both grouped and raw RERA views.

Total Units -
Configurations 2
Inventory Type RESIDENTIAL
Configuration Distribution
2 BHK 0 units
3 BHK 0 units
  • A
  • B
  • C
  • D
  • E
Floor-Wise Inventory Explorer
Floor Apartment Type Carpet Area No. of Unit
-1 2 BHK 74.97 A0001
-1 2 BHK 68.27 A0002
-1 2 BHK 68.27 A0003
GF 3 BHK 88.88 A0101
GF 2 BHK 68.27 A0102
GF 2 BHK 68.27 A0103
GF 3 BHK 88.34 A0104
GF 3 BHK 88.34 A0105
GF 2 BHK 61.39 A0106
GF 2 BHK 61.39 A0107
GF 2 BHK 61.39 A0108
1 3 BHK 88.88 A0201
1 2 BHK 68.27 A0202
1 2 BHK 68.27 A0203
1 3 BHK 88.34 A0204
1 3 BHK 88.34 A0205
1 2 BHK 61.39 A0206
1 2 BHK 61.39 A0207
1 2 BHK 61.39 A0208
2 3 BHK 88.88 A0301
2 2 BHK 68.27 A0302
2 2 BHK 68.27 A0303
2 3 BHK 88.34 A0304
2 3 BHK 88.34 A0305
2 2 BHK 61.39 A0306
2 2 BHK 61.39 A0307
2 2 BHK 61.39 A0308
3 3 BHK 88.88 A0401
3 2 BHK 68.27 A0402
3 2 BHK 68.27 A0403
3 3 BHK 88.34 A0404
3 3 BHK 88.34 A0405
3 2 BHK 61.39 A0406
3 2 BHK 61.39 A0407
3 2 BHK 61.39 A0408
4 3 BHK 88.88 A0501
4 2 BHK 68.27 A0502
4 2 BHK 68.27 A0503
4 3 BHK 88.34 A0504
4 3 BHK 88.34 A0505
4 2 BHK 61.39 A0506
4 2 BHK 61.39 A0507
4 2 BHK 61.39 A0508
5 3 BHK 88.88 A0601
5 2 BHK 68.27 A0602
5 2 BHK 68.27 A0603
5 3 BHK 88.34 A0604
5 3 BHK 88.34 A0605
5 2 BHK 61.39 A0606
5 2 BHK 61.39 A0607
5 2 BHK 61.39 A0608
6 3 BHK 88.88 A0701
6 2 BHK 68.27 A0702
6 2 BHK 68.27 A0703
6 3 BHK 88.34 A0704
6 3 BHK 88.34 A0705
6 2 BHK 61.39 A0706
6 2 BHK 61.39 A0707
6 2 BHK 61.39 A0708
7 3 BHK 88.88 A0801
7 2 BHK 68.27 A0802
7 2 BHK 68.27 A0803
7 3 BHK 88.34 A0804
7 3 BHK 88.34 A0805
7 2 BHK 61.39 A0806
7 2 BHK 61.39 A0807
7 2 BHK 61.39 A0808
8 3 BHK 88.88 A0901
8 2 BHK 68.27 A0902
8 2 BHK 68.27 A0903
8 3 BHK 88.34 A0904
8 3 BHK 88.34 A0905
8 2 BHK 61.39 A0906
8 2 BHK 61.39 A0907
8 2 BHK 61.39 A0908
9 3 BHK 88.88 A1001
9 2 BHK 68.27 A1002
9 2 BHK 68.27 A1003
9 3 BHK 88.34 A1004
9 3 BHK 88.34 A1005
9 2 BHK 61.39 A1006
9 2 BHK 61.39 A1007
9 2 BHK 61.39 A1008
10 3 BHK 88.88 A1101
10 2 BHK 68.27 A1102
10 2 BHK 68.27 A1103
10 3 BHK 88.34 A1104
10 3 BHK 88.34 A1105
10 2 BHK 61.39 A1106
10 2 BHK 61.39 A1107
10 2 BHK 61.39 A1108
11 3 BHK 88.88 A1201
11 2 BHK 68.27 A1202
11 2 BHK 68.27 A1203
11 3 BHK 88.34 A1204
11 3 BHK 88.34 A1205
11 2 BHK 61.39 A1206
11 2 BHK 61.39 A1207
11 2 BHK 61.39 A1208
12 3 BHK 88.88 A1301
12 2 BHK 68.27 A1302
12 2 BHK 68.27 A1303
12 3 BHK 88.34 A1304
12 3 BHK 88.34 A1305
12 2 BHK 61.39 A1306
12 2 BHK 61.39 A1307
12 2 BHK 61.39 A1308
13 3 BHK 88.88 A1401
13 2 BHK 68.27 A1402
13 2 BHK 68.27 A1403
13 3 BHK 88.34 A1404
13 3 BHK 88.34 A1405
13 2 BHK 61.39 A1406
13 2 BHK 61.39 A1407
13 2 BHK 61.39 A1408
14 3 BHK 88.88 A1501
14 2 BHK 68.27 A1502
14 2 BHK 68.27 A1503
14 3 BHK 88.34 A1504
14 3 BHK 88.34 A1505
14 2 BHK 61.39 A1506
14 2 BHK 61.39 A1507
14 2 BHK 61.39 A1508
15 3 BHK 88.88 A1601
15 2 BHK 68.27 A1602
15 2 BHK 68.27 A1603
15 3 BHK 88.34 A1604
15 3 BHK 88.34 A1605
15 2 BHK 61.39 A1606
15 2 BHK 61.39 A1607
15 2 BHK 61.39 A1608
16 3 BHK 88.88 A1701
16 2 BHK 68.27 A1702
16 2 BHK 68.27 A1703
16 3 BHK 88.34 A1704
16 3 BHK 88.34 A1705
16 2 BHK 61.39 A1706
16 2 BHK 61.39 A1707
16 2 BHK 61.39 A1708
17 3 BHK 88.88 A1801
17 2 BHK 68.27 A1802
17 2 BHK 68.27 A1803
17 3 BHK 88.34 A1804
17 3 BHK 88.34 A1805
17 2 BHK 61.39 A1806
17 2 BHK 61.39 A1807
17 2 BHK 61.39 A1808
18 3 BHK 88.88 A1901
18 2 BHK 68.27 A1902
18 2 BHK 68.27 A1903
18 3 BHK 88.34 A1904
18 3 BHK 88.34 A1905
18 2 BHK 61.39 A1906
18 2 BHK 61.39 A1908
19 3 BHK 88.88 A2001
19 2 BHK 68.27 A2002
19 2 BHK 68.27 A2003
19 3 BHK 88.34 A2004
19 3 BHK 88.34 A2005
19 2 BHK 61.39 A2006
19 2 BHK 61.39 A2007
19 2 BHK 61.39 A2008
20 3 BHK 88.88 A2101
20 2 BHK 68.27 A2102
20 2 BHK 68.27 A2103
20 3 BHK 88.34 A2104
20 3 BHK 88.34 A2105
20 2 BHK 61.39 A2106
20 2 BHK 61.39 A2107
20 2 BHK 61.39 A2108
21 3 BHK 88.88 A2201
21 2 BHK 68.27 A2202
21 2 BHK 68.27 A2203
21 3 BHK 88.34 A2204
21 3 BHK 88.34 A2205
21 2 BHK 61.39 A2206
21 2 BHK 61.39 A2207
21 2 BHK 61.39 A2208
22 3 BHK 88.88 A2301
22 2 BHK 68.27 A2302
22 2 BHK 68.27 A2303
22 3 BHK 88.34 A2304
22 3 BHK 88.34 A2305
22 2 BHK 61.39 A2306
22 2 BHK 61.39 A2307
22 2 BHK 61.39 A2308
23 3 BHK 88.88 A2401
23 2 BHK 68.27 A2402
23 2 BHK 68.27 A2403
23 3 BHK 88.34 A2404
23 3 BHK 88.34 A2405
23 2 BHK 61.39 A2406
23 2 BHK 61.39 A2407
23 2 BHK 61.39 A2408
24 3 BHK 88.88 A2501
24 2 BHK 68.27 A2502
24 2 BHK 68.27 A2503
24 3 BHK 88.34 A2504
24 3 BHK 88.34 A2505
24 2 BHK 61.39 A2506
24 2 BHK 61.39 A2507
24 2 BHK 61.39 A2508
25 3 BHK 88.88 A2601
25 2 BHK 68.27 A2602
25 2 BHK 68.27 A2603
25 3 BHK 88.34 A2604
25 3 BHK 88.34 A2605
25 2 BHK 61.39 A2606
25 2 BHK 61.39 A2607
25 2 BHK 61.39 A2608
26 3 BHK 88.88 A2701
26 2 BHK 68.27 A2702
26 2 BHK 68.27 A2703
26 3 BHK 88.34 A2704
26 3 BHK 88.34 A2705
26 2 BHK 61.39 A2706
26 2 BHK 61.39 A2707
26 2 BHK 61.39 A2708
27 3 BHK 88.88 A2801
27 2 BHK 68.27 A2802
27 2 BHK 68.27 A2803
27 3 BHK 88.34 A2804
27 3 BHK 88.34 A2805
27 2 BHK 61.39 A2806
27 2 BHK 61.39 A2807
27 2 BHK 61.39 A2808
Parking

Parking, Garage & Area Details

Parking provision declared in the sanctioned plan.

Type Proposed Booked Work Done
Garage - - -
Covered Parking - - -
Open Parking - - -
Development

Development Works & Common Area Disclosures

Project-level common infrastructure disclosures as reported by the developer to the RERA authority.

Sub Structure Earth Work And Other Leveling Preparation Work % not reported Sub Structure Foundation Footing Work % not reported Sub Structure Upto Plinth Level % not reported
Sub Structure Sub-structure Flooring (Parking Floor, More Than One Floor Below General Ground Level) % not reported Sub Structure Retaining Wall (All Types) % not reported Sup Structure Rcc Or Ms Framed Structure % not reported
Sup Structure Masonry Construction % not reported Sup Structure Plastering Inside , Outside & Ceiling % not reported Sup Structure Joinery: Doors, Windows, Ventilators Etc % not reported
Sup Structure Basic Work Of Water Supply, Sanitary And Electrification % not reported Sup Structure Dadoing, Skirting, Flooring, Tiles Work (All Types) % not reported Sup Structure Railing And Grill Fixing % not reported
Finishing Works Electrification, Water Supply And Sanitary Finishing % not reported Finishing Works Painting % not reported Finishing Works Fire Prevention And Fire Fighting Fitting And Fixture With Network % not reported
Finishing Works Weather Proof Work(tile,concrete) % not reported Finishing Works Wardrobe, Showcase, Kitchen Cabinet, Puja Work % not reported Finishing Works Elevation Work % not reported
Finishing Works Internal And External Work Including Landscapes As Per Sanctioned Drawings % not reported Internal Infrastructure Water Supply % not reported Internal Infrastructure Sewage And Drainage System % not reported
Internal Infrastructure Water Conservation/rain Water Harvesting/recharge Of Ground Water % not reported Internal Infrastructure Energy Management % not reported Internal Infrastructure Fire Protection And Fire Safety Requirements % not reported
Internal Infrastructure Solid Waste Management And Disposal % not reported Internal Infrastructure Emergency Evacuation Services % not reported External Infrastructure Water Supply % not reported
External Infrastructure Internal Roads & Footpaths % not reported External Infrastructure Sewage And Drainage System % not reported External Infrastructure Electricity Supply Transformer And Substation % not reported
External Infrastructure Solid Waste Management And Disposal % not reported External Infrastructure Emergency Evacuation Services % not reported External Infrastructure Storm Water Drains % not reported
External Infrastructure Use Of Renewable Energy % not reported External Infrastructure Water Conservation/rain Water Harvesting/recharge Of Ground Water % not reported External Infrastructure Fire Protection And Fire Safety Requirements % not reported
External Infrastructure Sewage Treatment Plant (Stp) % not reported External Infrastructure Parks & Tree Planting % not reported External Infrastructure Street Lighting % not reported
Amenities Electricity % not reported Amenities Smart Home Automation % not reported Amenities Cctv Surveillance % not reported
Amenities Club House % not reported Amenities Community Hall % not reported Amenities Outdoor Sports Facility % not reported
Amenities Indoor Sports Facility % not reported Amenities Swimming Pool % not reported Amenities Gym % not reported
Amenities Parks % not reported Amenities Power Backup % not reported Amenities Piped Gas % not reported
Amenities Water And Sanitation % not reported Amenities Air Conditioning % not reported Common Areas Staircases % not reported
Common Areas Lifts % not reported Common Areas Corridor/lobbies % not reported Common Areas Fire Escapes % not reported
Common Areas Common Entrance And Exit For The Building/common Portico/foyer/verandah % not reported Common Areas Basement % not reported Common Areas Terrace % not reported
Common Areas Outer Wall % not reported Common Areas Open Parking Areas % not reported Common Areas Provision For Lodging Of Management Staff And Security Staff % not reported
Common Areas Water Conservation And Renewable Energy % not reported Common Areas Common Storage Spaces % not reported
Documents

RERA Documents & Filings

All statutory documents uploaded by the promoter to the authority portal.

Promoter Registration Certificate
Promoter Pan Card
Promoter Address Proof
Affidavit
Fd 1 GPL Balance Sheet FY 202425.Pdf
Fd 2 GPL Balance Sheet FY 202324.Pdf
Fd 3 GPL Balance Sheet FY 202223.Pdf
Fd 4 GPL Profit And Loss FY 202425.Pdf
Fd 5 GPL Profit Loss Account FY 202324.Pdf
Fd 6 GPL Profit And Loss FY 202223.Pdf
Fd 7 ITR Ack FY 2024-25.Pdf
Fd 8 GPL ITR FY 202324.Pdf
Fd 9 GPL ITR FY 202223.Pdf
Fd 10 GPL Directors Report 2024-25.Pdf
Fd 11 Directors Report 2023-24.Pdf
Fd 12 GPL Director Report FY 202223.Pdf
Fd 13 GPL Cash Flow Statement FY 202425.Pdf
Fd 14 GPL Cash Flow Statement FY 202324.Pdf
Fd 15 GPL Cash Flow Statement FY 202223.Pdf
Fd 16 GPL Auditor Report FY 202425.Pdf
Fd 17 GPL Auditor Report FY 2324.Pdf
Fd 18 GPL Auditor Report FY 202223.Pdf
Pd 1 Commencement Certificate( Annexure - 80 )
Pd 2 Approved Building Plan( Annexure - 81 )
Pd 3 Sectional Drawing Of The Apartments( Annexure - 82 )
Pd 4 Certificate From Registered Engineer Indicating The Structural Safety Of The Building( Annexure - 83 )
Pd 5 Project Specifications( Annexure - 84 )
Pd 7 Relinquishment Deed( Annexure - 86 )
Pd 8 Proforma Of Agreement For Sale( Annexure - 87 )
Pd 9 Proforma Of Allotment Letter( Annexure - 88 )
Dc 1 Declaration (Form B)( Annexure - 89 )
Dc 2 Section 3(1) Notarized Affidavit( Annexure - 90 )
Dc 3 JD AFFIDAVIT CUM DECLARATION( Annexure - 91 )
Dc 4 Advocate Search Report( Annexure - 92 )
Noc 1 ESCOM Electricity( Annexure - 95 )
Noc 2 KWSSB Water( Annexure - 96 )
Noc 3 KSPCB( Annexure - 97 )
Noc 4 SEIAA( Annexure - 98 )
Noc 5 Fire Force Department( Annexure - 99 )
Noc 6 Airport Authority Of India( Annexure - 100 )
Noc 7 BSNL( Annexure - 101 )
Photo 1 Project Photo
Photo 2 Project Photo
Photo 3 Project Photo
Photo 4 Project Photo
Od 1 Clarification On Sold And Unsold Lands.Pdf
Od 2 Land Cost Calculation Sheet.Pdf
Od 3 GPA- Hoskote.Pdf
Od 4 DP Work Order 03-10-2025.Pdf
Od 5 Sanctioned Development Plan 03-10-2025.Pdf
Od 6 ADLR Sketch Revised.Pdf
Od 7 Demarked Village & CDP Map Hoskote.Pdf
Od 8 Godrej Hosakote Drawing STP - 1030 KLD - PLAN.Pdf
Od 9 Godrej Hosakote Project- STP - 1030 KLD - Report.Pdf
Od 10 Building Plan Sheet 01.Pdf
Od 11 Building Plan Sheet 02.Pdf
Od 12 Building Plan Sheet 03.Pdf
Od 13 Building Plan Sheet 04.Pdf
Od 14 Building Plan Sheet 05.Pdf
Od 15 Building Plan Sheet 06.Pdf
Od 16 Building Plan Sheet 07.Pdf
Od 17 Building Plan Sheet 08.Pdf
Od 18 Building Plan Sheet 09.Pdf
Od 19 Building Plan Sheet 10.Pdf
Od 20 Building Plan Sheet 11.Pdf
Od 21 Building Plan Sheet 12.Pdf
Od 22 Building Plan Sheet 13.Pdf
Od 23 Building Plan Sheet 14.Pdf
Od 24 Building Plan Sheet 15.Pdf
Od 25 Building Plan Sheet 16.Pdf
Od 26 Building Plan Sheet 17.Pdf
Od 27 Building Plan Sheet 18.Pdf
Od 28 Building Plan Sheet 19.Pdf
Od 29 Building Plan Sheet 20.Pdf
Od 30 Building Plan Sheet 21.Pdf
Od 31 Building Plan Sheet 22.Pdf
Od 32 Building Plan Sheet 23.Pdf
Od 33 Estimation Summary Breakup.Pdf
Od 34 Borewell Permission.Pdf
Od 35 Clarification On Water Source.Pdf
Od 36 Tree Cutting NOC.Pdf
Od 37 Clarification On Building License.Pdf
Od 38 Survey Doc Sy No 36-1.Pdf
Od 39 Title Doc - 36-2 67-1A3 67-1B3 & 68-1 67-4.Pdf
Od 40 Survey Sketch - 36-2 67-1A3 67-1B3 & 68-1 67-4.Pdf
Od 41 Title Doc - 36-4A1 36-3 68-2 & 68-4.Pdf
Od 42 Survey Sketch - 36-4A1 36-3 68-2 & 68-4.Pdf
Od 43 Survey Sketch And Hissa Phodi Sy Nos 36-4A2-Rukmini.Pdf
Od 44 Survey Sketch And Hissa Phodi 36-4 B1.Pdf
Od 45 Survey Sketch And Hissa Phodi - 36-5.Pdf
Od 46 Title Doc And Survey Sketch 36-6.Pdf
Od 47 Survey Sketch And Title Doc 36-7.Pdf
Od 48 Title Doc 36-8.Pdf
Od 49 Survey Sketch And Title Doc 36-7.Pdf
Od 50 Survey Sketch, Gift Deed & Phodi Docs - 36-9 68-5 36-4B2 68-3.Pdf
Od 51 Title Doc - 36-9 68-5 36-4B2 68-3.Pdf
Od 52 Survey Sketch And Hissa Phodi - 66.Pdf
Od 53 Podi Sy 66 Sketch.Pdf
Od 54 Title Doc - 66.Pdf
Od 55 Partitition Deed-Rukmini - 67-1A1-67-1B1 & 67-2.Pdf
Od 56 Survey Sketch & Phodi Doc 67-1A1- 67-1B1 & 67-2- Anjana Gowda.Pdf
Od 57 Partition Doc - 67-1A2 67-1B2 & 67-3.Pdf
Od 58 Partition Doc - 67-1A2 67-1B2 & 67-3.Pdf
Ed 1 09-01-2026
Ed 2 09-01-2026
Ed 3 09-01-2026
Ed 4 09-01-2026
Ld Rtc
Ld Mutation
Ld Encumbrance Certificate
Ld Conversion Order
Ld Sale Deed
Ld Khatha
Bank

Bank & Cost Disclosure

Declared project cost and the designated escrow account on file.

Project Account Bank Axis Bank
Account Number (RERA) 925020033079428
IFSC UTIB0000009
Branch Address M G Road, Bangalore
Country/City