Squareyards Logo
Blogs
Sell or Rent Property
Login
Rera Banner
residential Under Construction Source: rera.ka

Adarsh Paradise RERA Details - PRM/KA/RERA/1250/304/PR/130723/006063 Bangalore

View the RERA registration, promoter, approval, building, inventory, document and construction-progress disclosures for Adarsh Paradise under registration PRM/KA/RERA/1250/304/PR/130723/006063 in Bangalore, Karnataka. Data is sourced from rera.ka.

RERA

RERA Snapshot

The most important statutory project disclosures, generated dynamically from available RERA fields.

  • RERA Number PRM/KA/RERA/1250/304/PR/130723/006063
  • Project Name ADARSH PARADISE
  • Project Type Residential/Group Housing
  • Project Status Under Construction
  • District Bengaluru Rural
  • Taluka Hosakote
  • Original Completion 31 December 2026
  • Documents 88 Verified
Timeline

Project Timeline & Completion Details

Key statutory dates from registration through proposed completion and permit validity.

Proposed Start 01 October 2022 Expected commencement of civil works and foundation on site.
Original Completion 31 December 2026 Mandated date for project handover to the allottees and final compliance filing.
Promoter

Promoter, Organisation & Member Details

Declared promoter entity, address and corporate identifiers on file with the authority.

Primary Promoter

A1 BUILDERS
Registered Address Ramaswamy Building, Sy No-120/4, Seegehalli Village,Seegehalli ,Hosakote ,Bengaluru Rural-560067
Location

Land, Address & Location Details

Land parcel, zoning and geo-coordinates as recorded in the project filing.

Address SY Nos.90/3, 91/2 , MUNICIPAL KHATHA No.8713/90/3/91/2 OF DANDUPALYA VILLAGE , KASABA HOBLI, HOSKOTE EXTENSION , Hosakote , Bengaluru Rural, Karnataka - 562114

RERA Coordinates

Latitude, Longitude 13.071440, 77.808086
Plans

Plans & Approvals

Statutory approvals obtained or pending against the project site.

Plan Approval No. HSK-LBPAS-10315/21-22/BP
Authority Local Planing Authority
Approved Date 27 May 2022

Understand this Project's RERA details

Get clear answers and additional support from our RERA experts.

RERA Banner
Buildings

Buildings, Towers & Building-Level Details

Statutory building-level disclosures including tower height, sanctioned floors, structural counts and parking areas.

Building Detail
Name No. of Basements No. of Slab No. of Slits No. of Open Parking Building Type Height of Tower No. of Floors No. of Units
Adarsh Paradise 1 6 0 266 Residential 14.95 4 238

Scroll horizontally to view all building-level fields. Values marked "-" were not disclosed in the source RERA record.

Inventory

Unit Inventory & Configuration Details

Configuration mix and floor-level disclosures with both grouped and raw RERA views.

Total Units -
Configurations 2
Inventory Type RESIDENTIAL
Configuration Distribution
2 BHK 0 units
3 BHK 0 units
  • Adarsh Paradise
Floor-Wise Inventory Explorer
Floor Apartment Type Carpet Area No. of Unit
-1 2 BHK 62.63 A - 001
-1 2 BHK 62.63 A - 002
-1 2 BHK 62.63 A - 003
-1 2 BHK 61.71 A - 004
-1 2 BHK 61.71 A - 005
-1 2 BHK 61.71 A - 006
-1 2 BHK 62.63 B - 001
-1 2 BHK 62.63 B - 002
-1 2 BHK 62.63 B - 003
-1 2 BHK 62.63 B - 004
-1 2 BHK 61.71 B - 005
-1 2 BHK 61.71 B - 006
-1 2 BHK 61.71 B - 007
-1 2 BHK 61.71 B - 008
-1 3 BHK 84.4 C - 001
-1 2 BHK 61.87 C - 002
-1 2 BHK 62.63 C - 003
-1 2 BHK 62.63 C - 004
-1 2 BHK 62.63 C - 005
-1 2 BHK 61.71 C - 006
-1 2 BHK 61.71 C - 007
-1 2 BHK 62.63 C - 008
-1 2 BHK 61.71 C - 009
-1 3 BHK 84.48 C - 010
-1 2 BHK 62.63 D - 001
-1 2 BHK 62.63 D - 002
-1 2 BHK 62.63 D - 003
-1 2 BHK 62.63 D - 004
-1 2 BHK 60.72 D - 005
-1 2 BHK 60.72 D - 006
-1 2 BHK 60.72 D - 007
-1 2 BHK 60.72 D - 008
-1 2 BHK 62.63 E - 001
-1 2 BHK 62.63 E - 002
-1 2 BHK 62.63 E - 003
-1 2 BHK 60.72 E - 004
-1 2 BHK 60.72 E - 005
-1 2 BHK 60.72 E - 006
-1 2 BHK 62.63 F - 001
-1 3 BHK 86.53 F - 002
-1 3 BHK 86.53 F - 003
-1 3 BHK 86.53 F - 004
-1 3 BHK 86.53 F - 005
-1 2 BHK 61.71 F - 006
-1 2 BHK 62.63 F - 007
-1 2 BHK 61.71 F - 008
GF 2 BHK 62.63 A - 101
GF 2 BHK 62.63 A - 102
GF 2 BHK 62.63 A - 103
GF 2 BHK 61.71 A - 104
GF 2 BHK 61.71 A - 105
GF 2 BHK 61.71 A - 106
GF 2 BHK 62.63 B - 101
GF 2 BHK 62.63 B - 102
GF 2 BHK 62.63 B - 103
GF 2 BHK 62.63 B - 104
GF 2 BHK 61.71 B - 105
GF 2 BHK 61.71 B - 106
GF 2 BHK 61.71 B - 107
GF 2 BHK 61.71 B - 108
GF 3 BHK 84.4 C - 101
GF 2 BHK 61.87 C - 102
GF 2 BHK 61.71 C - 103
GF 2 BHK 62.63 C - 104
GF 2 BHK 62.63 C - 105
GF 2 BHK 61.71 C - 106
GF 2 BHK 62.63 C - 107
GF 2 BHK 61.71 C - 108
GF 2 BHK 61.71 C - 109
GF 2 BHK 62.63 C - 110
GF 2 BHK 61.71 C - 111
GF 3 BHK 84.48 C - 112
GF 2 BHK 62.63 D - 101
GF 2 BHK 62.63 D - 102
GF 2 BHK 62.63 D - 103
GF 2 BHK 62.63 D - 104
GF 2 BHK 61.71 D - 105
GF 2 BHK 61.71 D - 106
GF 2 BHK 61.71 D - 107
GF 2 BHK 61.71 D - 108
GF 2 BHK 62.63 E -101
GF 2 BHK 62.63 E -102
GF 2 BHK 62.63 E -103
GF 2 BHK 61.71 E -104
GF 2 BHK 61.71 E -105
GF 2 BHK 61.71 E -106
GF 2 BHK 62.63 F - 101
GF 3 BHK 86.53 F - 102
GF 3 BHK 86.53 F - 103
GF 3 BHK 86.53 F - 104
GF 3 BHK 86.53 F - 105
GF 2 BHK 61.71 F - 106
GF 2 BHK 62.63 F - 107
GF 2 BHK 61.71 F - 108
1 2 BHK 62.63 A - 201
1 2 BHK 62.63 A - 202
1 2 BHK 62.63 A - 203
1 2 BHK 61.71 A - 204
1 2 BHK 61.71 A - 205
1 2 BHK 61.71 A - 206
1 2 BHK 62.63 B - 201
1 2 BHK 62.63 B - 202
1 2 BHK 62.63 B - 203
1 2 BHK 62.63 B - 204
1 2 BHK 61.71 B - 205
1 2 BHK 61.71 B - 206
1 2 BHK 61.71 B - 207
1 2 BHK 61.71 B - 208
1 3 BHK 84.4 C -201
1 2 BHK 61.87 C -202
1 2 BHK 61.71 C -203
1 2 BHK 62.63 C -204
1 2 BHK 62.63 C -205
1 2 BHK 61.71 C -206
1 2 BHK 62.63 C -207
1 2 BHK 61.71 C -208
1 2 BHK 61.71 C -209
1 2 BHK 62.63 C -210
1 2 BHK 61.71 C -211
1 3 BHK 84.48 C -212
1 2 BHK 62.63 D - 201
1 2 BHK 62.63 D - 202
1 2 BHK 62.63 D - 203
1 2 BHK 62.63 D - 204
1 2 BHK 61.71 D - 205
1 2 BHK 61.71 D - 206
1 2 BHK 61.71 D - 207
1 2 BHK 61.71 D - 208
1 2 BHK 62.63 E - 201
1 2 BHK 62.63 E - 202
1 2 BHK 62.63 E - 203
1 2 BHK 61.71 E - 204
1 2 BHK 61.71 E - 205
1 2 BHK 61.71 E - 206
1 2 BHK 62.63 F - 201
1 3 BHK 86.53 F - 202
1 3 BHK 86.53 F - 203
1 3 BHK 86.53 F - 204
1 3 BHK 86.53 F - 205
1 2 BHK 61.71 F - 206
1 2 BHK 62.63 F - 207
1 2 BHK 61.71 F - 208
2 2 BHK 62.63 A - 301
2 2 BHK 62.63 A - 302
2 2 BHK 62.63 A - 303
2 2 BHK 61.71 A - 304
2 2 BHK 61.71 A - 305
2 2 BHK 61.71 A - 306
2 2 BHK 62.63 B - 301
2 2 BHK 62.63 B - 302
2 2 BHK 62.63 B - 303
2 2 BHK 62.63 B - 304
2 2 BHK 61.71 B - 305
2 2 BHK 61.71 B - 306
2 2 BHK 61.71 B - 307
2 2 BHK 61.71 B - 308
2 3 BHK 84.4 C - 301
2 2 BHK 61.87 C - 302
2 2 BHK 61.71 C - 303
2 2 BHK 62.63 C - 304
2 2 BHK 62.63 C - 305
2 2 BHK 61.71 C - 306
2 2 BHK 62.63 C - 307
2 2 BHK 61.71 C - 308
2 2 BHK 61.71 C - 309
2 2 BHK 62.63 C - 310
2 2 BHK 61.71 C - 311
2 3 BHK 84.48 C - 312
2 2 BHK 62.63 D - 301
2 2 BHK 62.63 D - 302
2 2 BHK 62.63 D - 303
2 2 BHK 62.63 D - 304
2 2 BHK 61.71 D - 305
2 2 BHK 61.71 D - 306
2 2 BHK 61.71 D - 307
2 2 BHK 61.71 D - 308
2 2 BHK 62.63 E - 301
2 2 BHK 62.63 E - 302
2 2 BHK 62.63 E - 303
2 2 BHK 61.71 E - 304
2 2 BHK 61.71 E - 305
2 2 BHK 61.71 E - 306
2 2 BHK 62.63 F - 301
2 3 BHK 86.53 F - 302
2 3 BHK 86.53 F - 303
2 3 BHK 86.53 F - 304
2 3 BHK 86.53 F - 305
2 2 BHK 61.71 F - 306
2 2 BHK 62.63 F - 307
2 2 BHK 61.71 F - 308
3 2 BHK 62.63 A - 401
3 2 BHK 62.63 A - 402
3 2 BHK 62.63 A - 403
3 2 BHK 61.71 A - 404
3 2 BHK 61.71 A - 405
3 2 BHK 61.71 A - 406
3 2 BHK 62.63 B -401
3 2 BHK 62.63 B -402
3 2 BHK 62.63 B -403
3 2 BHK 62.63 B -404
3 2 BHK 61.71 B -405
3 2 BHK 61.71 B -406
3 2 BHK 61.71 B -407
3 2 BHK 61.71 B -408
3 3 BHK 84.4 C - 401
3 2 BHK 61.87 C - 402
3 2 BHK 61.71 C - 403
3 2 BHK 62.63 C - 404
3 2 BHK 62.63 C - 405
3 2 BHK 61.71 C - 406
3 2 BHK 62.63 C - 407
3 2 BHK 61.71 C - 408
3 2 BHK 61.71 C - 409
3 2 BHK 62.63 C - 410
3 2 BHK 61.71 C - 411
3 3 BHK 84.48 C - 412
3 2 BHK 62.63 D - 401
3 2 BHK 62.63 D - 402
3 2 BHK 62.63 D - 403
3 2 BHK 62.63 D - 404
3 2 BHK 61.71 D - 405
3 2 BHK 61.71 D - 406
3 2 BHK 61.71 D - 407
3 2 BHK 61.71 D - 408
3 2 BHK 62.63 E - 401
3 2 BHK 62.63 E - 402
3 2 BHK 62.63 E - 403
3 2 BHK 61.71 E - 404
3 2 BHK 61.71 E - 405
3 2 BHK 61.71 E - 406
3 2 BHK 62.63 F - 401
3 3 BHK 86.53 F - 402
3 3 BHK 86.53 F - 403
3 3 BHK 86.53 F - 404
3 3 BHK 86.53 F - 405
3 2 BHK 61.71 F - 406
3 2 BHK 62.63 F - 407
3 2 BHK 61.71 F - 408
Parking

Parking, Garage & Area Details

Parking provision declared in the sanctioned plan.

Type Proposed Booked Work Done
Garage - - -
Covered Parking - - -
Open Parking - - -
Development

Development Works & Common Area Disclosures

Project-level common infrastructure disclosures as reported by the developer to the RERA authority.

Internal Infrastructure Sewage And Drainage System % not reported Sub Structure Earth Work And Other Leveling Preparation Work % not reported Sub Structure Foundation Footing Work % not reported
Sub Structure Upto Plinth Level % not reported Sub Structure Sub-structure Flooring (Parking Floor, More Than One Floor Below General Ground Level) % not reported Sub Structure Retaining Wall (All Types) % not reported
Sup Structure Rcc Or Ms Framed Structure % not reported Sup Structure Masonry Construction % not reported Sup Structure Plastering Inside , Outside & Ceiling % not reported
Sup Structure Joinery: Doors, Windows, Ventilators Etc % not reported Sup Structure Basic Work Of Water Supply, Sanitary And Electrification % not reported Sup Structure Dadoing, Skirting, Flooring, Tiles Work (All Types) % not reported
Sup Structure Railing And Grill Fixing % not reported Finishing Works Electrification, Water Supply And Sanitary Finishing % not reported Finishing Works Painting % not reported
Finishing Works Fire Prevention And Fire Fighting Fitting And Fixture With Network % not reported Finishing Works Weather Proof Work(tile,concrete) % not reported Finishing Works Wardrobe, Showcase, Kitchen Cabinet, Puja Work % not reported
Finishing Works Elevation Work % not reported Finishing Works Internal And External Work Including Landscapes As Per Sanctioned Drawings % not reported Internal Infrastructure Water Supply % not reported
Internal Infrastructure Water Conservation/rain Water Harvesting/recharge Of Ground Water % not reported Internal Infrastructure Energy Management % not reported Internal Infrastructure Fire Protection And Fire Safety Requirements % not reported
Internal Infrastructure Solid Waste Management And Disposal % not reported Internal Infrastructure Emergency Evacuation Services % not reported External Infrastructure Water Supply % not reported
External Infrastructure Internal Roads & Footpaths % not reported External Infrastructure Sewage And Drainage System % not reported External Infrastructure Electricity Supply Transformer And Substation % not reported
External Infrastructure Solid Waste Management And Disposal % not reported External Infrastructure Emergency Evacuation Services % not reported External Infrastructure Storm Water Drains % not reported
External Infrastructure Use Of Renewable Energy % not reported External Infrastructure Water Conservation/rain Water Harvesting/recharge Of Ground Water % not reported External Infrastructure Fire Protection And Fire Safety Requirements % not reported
External Infrastructure Sewage Treatment Plant (Stp) % not reported External Infrastructure Parks & Tree Planting % not reported External Infrastructure Street Lighting % not reported
Amenities Electricity % not reported Amenities Smart Home Automation % not reported Amenities Cctv Surveillance % not reported
Amenities Club House % not reported Amenities Community Hall % not reported Amenities Outdoor Sports Facility % not reported
Amenities Indoor Sports Facility % not reported Amenities Swimming Pool % not reported Amenities Gym % not reported
Amenities Parks % not reported Amenities Power Backup % not reported Amenities Piped Gas % not reported
Amenities Water And Sanitation % not reported Amenities Air Conditioning % not reported Common Areas Staircases % not reported
Common Areas Lifts % not reported Common Areas Corridor/lobbies % not reported Common Areas Fire Escapes % not reported
Common Areas Common Entrance And Exit For The Building/common Portico/foyer/verandah % not reported Common Areas Basement % not reported Common Areas Terrace % not reported
Common Areas Outer Wall % not reported Common Areas Open Parking Areas % not reported Common Areas Provision For Lodging Of Management Staff And Security Staff % not reported
Common Areas Water Conservation And Renewable Energy % not reported Common Areas Common Storage Spaces % not reported
Documents

RERA Documents & Filings

All statutory documents uploaded by the promoter to the authority portal.

Promoter Registration Certificate
Promoter Pan Card
Promoter Address Proof
Affidavit
Fd 1 Not Available.Pdf
Fd 2 Not Available.Pdf
Fd 3 Not Available.Pdf
Fd 4 Not Available.Pdf
Fd 5 Not Available.Pdf
Fd 6 Not Available.Pdf
Fd 7 Not Available.Pdf
Fd 8 Not Available.Pdf
Fd 9 Not Available.Pdf
Fd 10 Not Available.Pdf
Fd 11 Not Available.Pdf
Fd 12 Not Available.Pdf
Fd 13 Not Available.Pdf
Fd 14 Not Available.Pdf
Fd 15 Not Available.Pdf
Fd 16 ITR 2021-22.Pdf
Fd 17 ITR 2020-21.Pdf
Fd 18 ITR 2019-20.Pdf
Pd 1 Self Attested PAN Card*( Annexure - 66 )
Pd 2 Commencement Certificate*( Annexure - 67 )
Pd 3 Electricity Permission Letter*( Annexure - 68 )
Pd 4 Water Permission Letter*( Annexure - 69 )
Pd 5 Approved Layout Plan*( Annexure - 70 )
Pd 6 Approved Building Plotting Plan*( Annexure - 71 )
Pd 7 Existing Layout Plan( Annexure - 72 )
Pd 8 Existing Section Plan And Specification( Annexure - 73 )
Pd 9 Sectional Drawing Of The Apartments*( Annexure - 74 )
Pd 10 Project Specifications*( Annexure - 75 )
Pd 11 Approved Section Of Building Infrastructure Plan Of Plotting*( Annexure - 76 )
Pd 12 Area Development Plan Of Project Area*( Annexure - 77 )
Pd 13 Certificate From Registered Engineer Indicating The Structural Safety Of The Building*( Annexure - 78 )
Pd 14 Advocate Search Report*( Annexure - 79 )
Pd 15 Urban Land Ceiling*( Annexure - 80 )
Pd 16 Collaboration Agreement Development Agreement Joint Development Agreement Other Agreement*( Annexure - 81 )
Pd 17 Change Of Land Use*( Annexure - 82 )
Pd 18 District Magistrate*( Annexure - 83 )
Pd 19 Conversion Certificate Under Section 95 Of The KLR Act 1964*( Annexure - 84 )
Pd 20 Any Other Document (Rights Title Interest Name)*( Annexure - 85 )
Pd 21 Proforma Of Agreement For Sale*( Annexure - 86 )
Pd 22 Proforma Of Allotment Letter*( Annexure - 87 )
Pd 24 Brochure*( Annexure - 89 )
Dc 1 Declaration (Form B)*( Annexure - 90 )
Dc 2 Section 3(1) Notarized Affidavit*( Annexure - 91 )
Dc 3 JD AFFIDAVIT CUM DECLARATION*( Annexure - 92 )
Noc 1 ESCOM Electricity*( Annexure - 93 )
Noc 2 KWSSB Water*( Annexure - 94 )
Photo 1 Project Photo
Od 1 Guidance Value.Pdf
Od 2 Development Plan.Pdf
Od 3 SEIAA NOC With Fee Paid Receipt.Pdf
Od 4 KSPCB NOC With Fee Paid Receipt.Pdf
Od 5 Area Statement.Pdf
Od 6 Google Demarcation.Pdf
Od 7 DP SANCTION LETTER.Pdf
Od 8 STP Design.Pdf
Od 9 Relinquishment Deed No 3530 CA.Pdf
Od 10 Relinquishment Deed 4588 Park & CA.Pdf
Od 11 Relinquishment Deed 5535.Pdf
Od 12 Relinquishment Deed 6068.Pdf
Od 13 Partition Deed No 620 Sy No 91-2.Pdf
Od 14 Old Deed 9042.Pdf
Od 15 Old Deed 9041.Pdf
Od 16 Old Deed 9039.Pdf
Od 17 Old Deed 9038.Pdf
Od 18 Old Deed 12335.Pdf
Od 19 Survey Sketch.Pdf
Od 20 STP Demarcation.Pdf
Od 21 CDP Extract.Pdf
Od 22 Village Map Demarcation.Pdf
Od 23 Krishna Murthy Financials Documents FY 2021-22.Pdf
Od 24 Krishna Murthy Financials Documents FY 2020-21.Pdf
Ed 1 30-06-2023
Ed 2 30-06-2023
Ed 3 30-06-2023
Ed 4 30-06-2023
Ed 5 30-06-2023
Ed 6 30-06-2023
Ed 7 11-07-2023
Ld Rtc
Ld Mutation
Ld Encumbrance Certificate
Ld Conversion Order
Ld Sale Deed
Ld Khatha
Bank

Bank & Cost Disclosure

Declared project cost and the designated escrow account on file.

Project Account Bank Karur Vysya Bank Ltd.
Account Number (RERA) 1322135000004893
IFSC KVBL0001322
Branch Address Hoskote
Country/City