residential New Launch Source: rera.ka

Godrej Vanantara RERA Details - PRM/KA/RERA/1251/310/PR/130526/008653 Bangalore

View the RERA registration, promoter, approval, building, inventory, document and construction-progress disclosures for Godrej Vanantara under registration PRM/KA/RERA/1251/310/PR/130526/008653 in Bangalore, Karnataka. Data is sourced from rera.ka.

RERA

RERA Snapshot

The most important statutory project disclosures, generated dynamically from available RERA fields.

  • RERA Number PRM/KA/RERA/1251/310/PR/130526/008653
  • Project Name Godrej Vanantara
  • Project Type Residential/Group Housing
  • Project Status New Launch
  • District Bengaluru Urban
  • Taluka Bengaluru South
  • Original Completion 31 May 2031
  • Documents 130 Verified
Timeline

Project Timeline & Completion Details

Key statutory dates from registration through proposed completion and permit validity.

Proposed Start 15 May 2026 Expected commencement of civil works and foundation on site.
Original Completion 31 May 2031 Mandated date for project handover to the allottees and final compliance filing.
Promoter

Promoter, Organisation & Member Details

Declared promoter entity, address and corporate identifiers on file with the authority.

Primary Promoter

GODREJ IRISMARK PRIVATE LIMITED
Registered Address 9th Floor, Unit no.4 and 5, Godrej Centre Indiranagar,,Old Madras Road, Indiranagar ,Bengaluru East ,Bengaluru Urban-560038
Location

Land, Address & Location Details

Land parcel, zoning and geo-coordinates as recorded in the project filing.

Address Sy No.64, 65/2, 66/ 1, 65/ 1, 66/2, 61 / 5, 61 /6, 61 /7, 61 /8, 68/ 4, , Hommadevanahal village, Begur Hobl, Bangalore South Taluk,Bangalore. , Bengaluru South , Bengaluru Urban, Karnataka - 560083

RERA Coordinates

Latitude, Longitude 12.837959191368133, 77.6021966966848
Plans

Plans & Approvals

Statutory approvals obtained or pending against the project site.

Plan Approval No. BDA/NA.MA/A.S/A.A-3/T.A-2/S/04/2026-27
Authority BDA - Bangalore Development Authority
Approved Date 02 May 2026

Understand this Project's RERA details

Get clear answers and additional support from our RERA experts.

RERA Banner
Buildings

Buildings, Towers & Building-Level Details

Statutory building-level disclosures including tower height, sanctioned floors, structural counts and parking areas.

Building Detail
Name No. of Basements No. of Slab No. of Slits No. of Open Parking Building Type Height of Tower No. of Floors No. of Units
Tower P 3 33 0 130 Residential 101.3 32 130
Tower A 3 31 0 122 Residential 95.4 30 122
Tower B 3 31 0 122 Residential 95.4 30 122
Tower C 3 31 0 122 Residential 95.4 30 122
Tower D 3 31 0 122 Residential 95.4 30 122
Tower E 3 31 0 122 Residential 95.4 30 122
Tower F 3 31 0 122 Residential 95.4 30 122
Tower G 3 31 0 122 Residential 95.4 30 122
Tower H 3 31 0 122 Residential 95.4 30 122
Tower J 3 31 0 122 Residential 95.4 30 122
Tower K 3 33 0 196 Residential 101.3 32 130
Tower L 3 33 0 196 Residential 101.3 32 130
Tower M 3 33 0 130 Residential 101.3 32 130
Tower N 3 33 0 130 Residential 101.3 32 130
Tower Q 3 33 0 130 Residential 101.3 32 130
Tower R 3 33 0 130 Residential 101.3 32 130

Scroll horizontally to view all building-level fields. Values marked "-" were not disclosed in the source RERA record.

Inventory

Unit Inventory & Configuration Details

Configuration mix and floor-level disclosures with both grouped and raw RERA views.

Total Units -
Configurations 3
Inventory Type RESIDENTIAL
Configuration Distribution
2 BHK 0 units
3 BHK 0 units
4 BHK 0 units
  • Tower P
  • Tower A
  • Tower B
  • Tower C
  • Tower D
  • Tower E
  • Tower F
  • Tower G
  • Tower H
  • Tower J
  • Tower K
  • Tower L
  • Tower M
  • Tower N
  • Tower Q
  • Tower R
Floor-Wise Inventory Explorer
Floor Apartment Type Carpet Area No. of Unit
-1 3BHK-3Toilet 128.576 P-002
-1 3BHK-3Toilet 129.323 P-003
-1 3BHK-2Toilet 104.662 P-004
GF 3BHK-3Toilet 128.576 P-102
GF 3BHK-3Toilet 129.323 P-103
GF 3BHK-2Toilet 104.662 P-104
1 3BHK-2Toilet 104.662 P-201
1 3BHK-3Toilet 128.576 P-202
1 3BHK-3Toilet 129.323 P-203
1 3BHK-2Toilet 104.662 P-204
2 3BHK-2Toilet 104.662 P-301
2 3BHK-3Toilet 128.576 P-302
2 3BHK-3Toilet 129.323 P-303
2 3BHK-2Toilet 104.662 P-304
3 3BHK-2Toilet 104.662 P-401
3 3BHK-3Toilet 128.576 P-402
3 3BHK-3Toilet 129.323 P-403
3 3BHK-2Toilet 104.662 P-404
4 3BHK-2Toilet 104.662 P-501
4 3BHK-3Toilet 128.576 P-502
4 3BHK-3Toilet 129.323 P-503
4 3BHK-2Toilet 104.662 P-504
5 3BHK-2Toilet 104.662 P-601
5 3BHK-3Toilet 128.576 P-602
5 3BHK-3Toilet 129.323 P-603
5 3BHK-2Toilet 104.662 P-604
6 3BHK-2Toilet 104.662 P-701
6 3BHK-3Toilet 128.576 P-702
6 3BHK-3Toilet 129.323 P-703
6 3BHK-2Toilet 104.662 P-704
7 3BHK-2Toilet 104.662 P-801
7 3BHK-3Toilet 128.576 P-802
7 3BHK-3Toilet 129.323 P-803
7 3BHK-2Toilet 104.662 P-804
8 3BHK-2Toilet 104.662 P-901
8 3BHK-3Toilet 128.576 P-902
8 3BHK-3Toilet 129.323 P-903
8 3BHK-2Toilet 104.662 P-904
9 3BHK-2Toilet 104.662 P-1001
9 3BHK-3Toilet 128.576 P-1002
9 3BHK-3Toilet 129.323 P-1003
9 3BHK-2Toilet 104.662 P-1004
10 3BHK-2Toilet 104.662 P-1101
10 3BHK-3Toilet 128.576 P-1102
10 3BHK-3Toilet 129.323 P-1103
10 3BHK-2Toilet 104.662 P-1104
11 3BHK-2Toilet 104.662 P-1201
11 3BHK-3Toilet 128.576 P-1202
11 3BHK-3Toilet 129.323 P-1203
11 3BHK-2Toilet 104.662 P-1204
12 3BHK-2Toilet 104.662 P-1301
12 3BHK-3Toilet 128.576 P-1302
12 3BHK-3Toilet 129.323 P-1303
12 3BHK-2Toilet 104.662 P-1304
13 3BHK-2Toilet 104.662 P- 1401
13 3BHK-3Toilet 128.576 P- 1402
13 3BHK-3Toilet 129.323 P- 1403
13 3BHK-2Toilet 104.662 P- 1404
14 3BHK-2Toilet 104.662 P- 1501
14 3BHK-3Toilet 128.576 P- 1502
14 3BHK-3Toilet 129.323 P- 1503
14 3BHK-2Toilet 104.662 P- 1504
15 3BHK-2Toilet 104.662 P- 1601
15 3BHK-3Toilet 128.576 P- 1602
15 3BHK-3Toilet 129.323 P- 1603
15 3BHK-2Toilet 104.662 P- 1604
16 3BHK-2Toilet 104.662 P- 1701
16 3BHK-3Toilet 128.576 P- 1702
16 3BHK-3Toilet 129.323 P- 1703
16 3BHK-2Toilet 104.662 P- 1704
17 3BHK-2Toilet 104.662 P- 1801
17 3BHK-3Toilet 128.576 P- 1802
17 3BHK-3Toilet 129.323 P- 1803
17 3BHK-2Toilet 104.662 P- 1804
18 3BHK-2Toilet 104.662 P- 1901
18 3BHK-3Toilet 128.576 P- 1902
18 3BHK-3Toilet 129.323 P- 1903
18 3BHK-2Toilet 104.662 P- 1904
19 3BHK-2Toilet 104.662 P- 2001
19 3BHK-3Toilet 128.576 P- 2002
19 3BHK-3Toilet 129.323 P- 2003
19 2BHK-2Toilet 91.239 P- 2004
20 3BHK-2Toilet 104.662 P- 2101
20 3BHK-3Toilet 128.576 P- 2102
20 3BHK-3Toilet 129.323 P- 2103
20 3BHK-2Toilet 104.662 P- 2104
21 3BHK-2Toilet 104.662 P- 2201
21 3BHK-3Toilet 128.576 P- 2202
21 3BHK-3Toilet 129.323 P- 2203
21 3BHK-2Toilet 104.662 P- 2204
22 3BHK-2Toilet 104.662 P- 2301
22 3BHK-3Toilet 128.576 P- 2302
22 3BHK-3Toilet 129.323 P- 2303
22 3BHK-2Toilet 104.662 P- 2304
23 3BHK-2Toilet 104.662 P- 2401
23 3BHK-3Toilet 128.576 P- 2402
23 3BHK-3Toilet 129.323 P- 2403
23 3BHK-2Toilet 104.662 P- 2404
24 3BHK-2Toilet 104.662 P- 2501
24 3BHK-3Toilet 128.576 P- 2502
24 3BHK-3Toilet 129.323 P- 2503
24 3BHK-2Toilet 104.662 P- 2504
25 3BHK-2Toilet 104.662 P- 2601
25 3BHK-3Toilet 128.576 P- 2602
25 3BHK-3Toilet 129.323 P- 2603
25 3BHK-2Toilet 104.662 P- 2604
26 3BHK-2Toilet 104.662 P- 2701
26 3BHK-3Toilet 128.576 P- 2702
26 3BHK-3Toilet 129.323 P- 2703
26 3BHK-2Toilet 104.662 P- 2704
27 3BHK-2Toilet 104.662 P- 2801
27 3BHK-3Toilet 128.576 P- 2802
27 3BHK-3Toilet 129.323 P- 2803
27 3BHK-2Toilet 104.662 P- 2804
28 3BHK-2Toilet 104.662 P- 2901
28 3BHK-3Toilet 128.576 P- 2902
28 3BHK-3Toilet 129.323 P- 2903
28 3BHK-2Toilet 104.662 P- 2904
29 3BHK-2Toilet 104.662 P- 3001
29 3BHK-3Toilet 128.576 P- 3002
29 3BHK-3Toilet 129.323 P- 3003
29 2BHK-2Toilet 91.239 P- 3004
30 3BHK-2Toilet 104.662 P- 3101
30 3BHK-3Toilet 128.576 P- 3102
30 3BHK-3Toilet 129.323 P- 3103
30 3BHK-2Toilet 104.662 P- 3104
31 3BHK-2Toilet 104.662 P-3201
31 3BHK-3Toilet 128.576 P-3202
31 3BHK-3Toilet 129.323 P-3203
31 3BHK-2Toilet 104.662 P-3204
Parking

Parking, Garage & Area Details

Parking provision declared in the sanctioned plan.

Type Proposed Booked Work Done
Garage - - -
Covered Parking - - -
Open Parking - - -
Development

Development Works & Common Area Disclosures

Project-level common infrastructure disclosures as reported by the developer to the RERA authority.

Sub Structure Earth Work And Other Leveling Preparation Work % not reported Sub Structure Foundation Footing Work % not reported Sub Structure Upto Plinth Level % not reported
Sub Structure Sub-structure Flooring (Parking Floor, More Than One Floor Below General Ground Level) % not reported Sub Structure Retaining Wall (All Types) % not reported Sup Structure Rcc Or Ms Framed Structure % not reported
Sup Structure Masonry Construction % not reported Sup Structure Plastering Inside , Outside & Ceiling % not reported Sup Structure Joinery: Doors, Windows, Ventilators Etc % not reported
Sup Structure Basic Work Of Water Supply, Sanitary And Electrification % not reported Sup Structure Dadoing, Skirting, Flooring, Tiles Work (All Types) % not reported Sup Structure Railing And Grill Fixing % not reported
Finishing Works Electrification, Water Supply And Sanitary Finishing % not reported Finishing Works Painting % not reported Finishing Works Fire Prevention And Fire Fighting Fitting And Fixture With Network % not reported
Finishing Works Weather Proof Work(tile,concrete) % not reported Finishing Works Wardrobe, Showcase, Kitchen Cabinet, Puja Work % not reported Finishing Works Elevation Work % not reported
Finishing Works Internal And External Work Including Landscapes As Per Sanctioned Drawings % not reported Internal Infrastructure Water Supply % not reported Internal Infrastructure Sewage And Drainage System % not reported
Internal Infrastructure Water Conservation/rain Water Harvesting/recharge Of Ground Water % not reported Internal Infrastructure Energy Management % not reported Internal Infrastructure Fire Protection And Fire Safety Requirements % not reported
Internal Infrastructure Solid Waste Management And Disposal % not reported Internal Infrastructure Emergency Evacuation Services % not reported External Infrastructure Water Supply % not reported
External Infrastructure Internal Roads & Footpaths % not reported External Infrastructure Sewage And Drainage System % not reported External Infrastructure Electricity Supply Transformer And Substation % not reported
External Infrastructure Solid Waste Management And Disposal % not reported External Infrastructure Emergency Evacuation Services % not reported External Infrastructure Storm Water Drains % not reported
External Infrastructure Use Of Renewable Energy % not reported External Infrastructure Water Conservation/rain Water Harvesting/recharge Of Ground Water % not reported External Infrastructure Fire Protection And Fire Safety Requirements % not reported
External Infrastructure Sewage Treatment Plant (Stp) % not reported External Infrastructure Parks & Tree Planting % not reported External Infrastructure Street Lighting % not reported
Amenities Electricity % not reported Amenities Smart Home Automation % not reported Amenities Cctv Surveillance % not reported
Amenities Club House % not reported Amenities Community Hall % not reported Amenities Outdoor Sports Facility % not reported
Amenities Indoor Sports Facility % not reported Amenities Swimming Pool % not reported Amenities Gym % not reported
Amenities Parks % not reported Amenities Power Backup % not reported Amenities Piped Gas % not reported
Amenities Water And Sanitation % not reported Amenities Air Conditioning % not reported Common Areas Staircases % not reported
Common Areas Lifts % not reported Common Areas Corridor/lobbies % not reported Common Areas Fire Escapes % not reported
Common Areas Common Entrance And Exit For The Building/common Portico/foyer/verandah % not reported Common Areas Basement % not reported Common Areas Terrace % not reported
Common Areas Outer Wall % not reported Common Areas Open Parking Areas % not reported Common Areas Provision For Lodging Of Management Staff And Security Staff % not reported
Common Areas Water Conservation And Renewable Energy % not reported Common Areas Common Storage Spaces % not reported
Documents

RERA Documents & Filings

All statutory documents uploaded by the promoter to the authority portal.

Promoter Registration Certificate
Promoter Pan Card
Promoter Address Proof
Affidavit
Fd 1 FY 2025-BS.Pdf
Fd 2 FY 2024-BS.Pdf
Fd 3 FY 2023- BS.Pdf
Fd 4 FY 2025-P&L.Pdf
Fd 5 FY 2024-P&L.Pdf
Fd 6 FY 2023-P&L.Pdf
Fd 7 ACK FY 24-25.Pdf
Fd 8 ACK FY 23-24.Pdf
Od 55 DP Plan Compressed.Pdf
Fd 9 ACK FY 22-23.Pdf
Fd 10 1NA.Pdf
Fd 11 1NA.Pdf
Fd 12 1NA.Pdf
Fd 13 FY 2025-Cash Flow.Pdf
Fd 14 FY 2024-Cash Flow.Pdf
Fd 15 FY 2023-Cash Flow.Pdf
Fd 16 FY 2025 Auditors Report.Pdf
Fd 17 FY 2024- Auditors Report.Pdf
Fd 18 FY 2023-Auditors Repo.Pdf
Pd 1 Commencement Certificate( Annexure - 80 )
Pd 2 Approved Building Plan( Annexure - 81 )
Pd 3 Sectional Drawing Of The Apartments( Annexure - 82 )
Pd 4 Certificate From Registered Engineer Indicating The Structural Safety Of The Building( Annexure - 83 )
Pd 5 Project Specifications( Annexure - 84 )
Pd 6 Brochure( Annexure - 85 )
Pd 7 Relinquishment Deed( Annexure - 86 )
Pd 8 Proforma Of Agreement For Sale( Annexure - 87 )
Pd 9 Proforma Of Allotment Letter( Annexure - 88 )
Dc 1 Declaration (Form B)( Annexure - 89 )
Dc 2 Section 3(1) Notarized Affidavit( Annexure - 90 )
Dc 3 JD AFFIDAVIT CUM DECLARATION( Annexure - 91 )
Dc 4 Advocate Search Report( Annexure - 92 )
Noc 1 ESCOM Electricity( Annexure - 95 )
Noc 2 KWSSB Water( Annexure - 96 )
Noc 3 KSPCB( Annexure - 97 )
Noc 4 SEIAA( Annexure - 98 )
Noc 5 Fire Force Department( Annexure - 99 )
Noc 6 Airport Authority Of India( Annexure - 100 )
Noc 7 BSNL( Annexure - 101 )
Noc 8 Lift Authorities( Annexure - 102 )
Noc 9 BMRCL( Annexure - 103 )
Noc 10 NOC In Case Of Building Proposals Abutting To Neighbouring Properties( Annexure - 104 )
Noc 11 Bangalore Urban Arts Commission( Annexure - 105 )
Noc 12 Inspector Of Factories Controller Of Explosives Railways( Annexure - 106 )
Noc 13 Coastal Regulation Zone Authority( Annexure - 107 )
Photo 1 Project Photo
Photo 2 Project Photo
Photo 3 Project Photo
Photo 4 Project Photo
Photo 5 Project Photo
Od 1 FIRE NOC ORDER COPY GODREJ IRISMARK 4-2-26.Pdf
Od 2 Water NOC From Gram Panchayat.Pdf
Od 3 Tree Cutting 12 09 25.Pdf
Od 4 Tree Cutting NOC 23 12 2025 Compressed.Pdf
Od 5 Updated Amenities.Pdf
Od 6 Firefighting, Drinking Water And Renewable Energy Confirmation.Pdf
Od 7 No Sales Declaration.Pdf
Od 8 Building Plan Top Sheet-1.Pdf
Od 9 North Parcel Basement-1 Floor Plan.Pdf
Od 10 North Parcel Basement-2 Floor Plan.Pdf
Od 11 North Parcel Basement-3 Floor Plan.Pdf
Od 12 North Parcel Building-1-Elevation-A.Pdf
Od 13 North Parcel Building-1-Section-AA.Pdf
Od 14 North Parcel Building-1-Tower-A- All Floor Plan.Pdf
Od 15 North Parcel Building-1-Tower-B- All Floor Plan.Pdf
Od 16 North Parcel Building-1-Tower-C- All Floor Plan.Pdf
Od 17 North Parcel Building-1-Tower-D- All Floor Plan.Pdf
Od 18 North Parcel Building-1-Tower-E- All Floor Plan.Pdf
Od 19 North Parcel Building-2-Elevation-A.Pdf
Od 20 North Parcel Building-2-Section-AA.Pdf
Od 21 North Parcel Building-2-Tower-F- All Floor Plan.Pdf
Od 22 North Parcel Building-2-Tower-G- All Floor Plan.Pdf
Od 23 North Parcel Building-2-Tower-H- All Floor Plan.Pdf
Od 24 North Parcel Building-2-Tower-J- All Floor Plan.Pdf
Od 25 North Parcel Building-4-Elevation-A.Pdf
Od 26 South Parcel Basement-1 Floor Plan.Pdf
Od 27 South Parcel Basement-2 Floor Plan.Pdf
Od 28 South Parcel Basement-3 Floor Plan.Pdf
Od 29 South Parcel Building-3-Elevation-A.Pdf
Od 30 South Parcel Building-3-Section-AA.Pdf
Od 31 South Parcel Building-3-Tower-K- Ground, 1st And 2nd Floor Plan.Pdf
Od 32 South Parcel Building-3-Tower-L- Ground, 1st And 2nd Floor Plan.Pdf
Od 33 South Parcel Building-4-Section-AA.Pdf
Od 34 South Parcel Building-4-Tower-M- All Floor Plan.Pdf
Od 35 South Parcel Building-4-Tower-N- All Floor Plan.Pdf
Od 36 South Parcel Building-5-Elevation-A.Pdf
Od 37 South Parcel Building-5-Section-AA.Pdf
Od 38 South Parcel Building-5-Tower-P- All Floor Plan.Pdf
Od 39 South Parcel Building-5-Tower-Q- All Floor Plan.Pdf
Od 40 South Parcel Building-5-Tower-R- All Floor Plan.Pdf
Od 41 South Parcel-Building-3-Tower-K-Typical, Refuge & Terrace Floor Plan.Pdf
Od 42 South Parcel-Building-3-Tower-L-Typical, Refuge & Terrace Floor Plan.Pdf
Od 43 20260427 CDP OVERLAP-Model.Pdf
Od 44 Village Map Bhannerghatta.Pdf
Od 45 Akarband - 64,65,66,57,68-1,94 (1).Pdf
Od 46 Akarband-61-1 To 20.Pdf
Od 47 ADLR Sketch Bannerghatta.Pdf
Od 48 Hommadevanahalli CLU Order.Pdf
Od 49 Land Calculation Sheet.Pdf
Od 50 20260428 VILLAGE MAP SUPERIMPOSED.Pdf
Od 51 Godrej Bannergetta-North Parcel-UG Sump & STP 760 KLD Plan With Section.Pdf
Od 52 Godrej Bannergetta-South Parcel-STP 710 KLD Plan With Section.Pdf
Od 53 LLP To Company Conversion.Pdf
Od 54 DP Order.Pdf
Od 56 FY 2026 IrismarkPvt Ltd.Pdf
Od 57 EC Copy Godrej Irismark LLP 16-1-26.Pdf
Od 58 TOR 06-11-2025.Pdf
Od 59 Cost Of Construction.Pdf
Od 60 20260427 CDP OVERLAP-Model.Pdf
Od 61 Unitwise Details.Pdf
Ed 1 13-05-2026
Ed 2 13-05-2026
Ed 3 13-05-2026
Ed 4 13-05-2026
Ed 5 13-05-2026
Ed 6 13-05-2026
Ed 7 13-05-2026
Ed 8 13-05-2026
Ed 9 13-05-2026
Ed 10 13-05-2026
Ld Rtc
Ld Mutation
Ld Encumbrance Certificate
Ld Conversion Order
Ld Sale Deed
Ld Khatha
Bank

Bank & Cost Disclosure

Declared project cost and the designated escrow account on file.

Project Account Bank HDFC
Account Number (RERA) 99999741690462
IFSC HDFC0000009
Branch Address Kasturba Gandhi Marg Bengaluru
Country/City