Sobha One Residences RERA Details - PRM/KA/RERA/1250/304/PR/080526/008636 Bangalore

View the RERA registration, promoter, approval, building, inventory, document and construction-progress disclosures for Sobha One Residences under registration PRM/KA/RERA/1250/304/PR/080526/008636 in Bangalore, Karnataka. Data is sourced from rera.ka.

RERA

RERA Snapshot

The most important statutory project disclosures, generated dynamically from available RERA fields.

  • RERA Number PRM/KA/RERA/1250/304/PR/080526/008636
  • Project Name ONE RESIDENCES AT SOBHA ONE WORLD Ph4 W7 and 8
  • Project Type Residential/Group Housing
  • Project Status New Launch
  • District Bengaluru Rural
  • Taluka Hosakote
  • Original Completion 30 September 2033
  • Documents 146 Verified
Timeline

Project Timeline & Completion Details

Key statutory dates from registration through proposed completion and permit validity.

Proposed Start 01 October 2026 Expected commencement of civil works and foundation on site.
Original Completion 30 September 2033 Mandated date for project handover to the allottees and final compliance filing.
Promoter

Promoter, Organisation & Member Details

Declared promoter entity, address and corporate identifiers on file with the authority.

Primary Promoter

SOBHA LIMITED
Registered Address D/O, Guru Rudraiah Kalmath, #149/1, 9TH main,15th cross, Wilson garden , Bengaluru Urban , Karnataka - 560030,D/O, Guru Rudraiah Kalmath, #149/1, 9TH main,15th cross, Wilson garden , Bengaluru Urban , Karnataka - 560030 ,Bengaluru East ,Bengaluru Urban-560030
Experience Details
Location

Land, Address & Location Details

Land parcel, zoning and geo-coordinates as recorded in the project filing.

Address SY NO 51/2, 52/1, 58, 59/1, 59/2, 59/3, 60/5, 60/4, 60/3 55/3, 55/10, 55/4, 55/5, 55/6, 55/7, 55/11 175/1 of , Amanidoddakere Village, Kasaba Hobli , Hosakote , Bengaluru Rural, Karnataka - 562114

RERA Coordinates

Latitude, Longitude 13.058182, 77.775577
Plans

Plans & Approvals

Statutory approvals obtained or pending against the project site.

Plan Approval No. STRRPA/TP/CC/652/2025-26/318
Authority Satellite Town Ring Road Planning Authority
Approved Date 07 May 2026

Understand this Project's RERA details

Get clear answers and additional support from our RERA experts.

RERA Banner
Buildings

Buildings, Towers & Building-Level Details

Statutory building-level disclosures including tower height, sanctioned floors, structural counts and parking areas.

Building Detail
Name No. of Basements No. of Slab No. of Slits No. of Open Parking Building Type Height of Tower No. of Floors No. of Units
Wing 07 3 47 0 175 Residential 146.5 46 175
Wing 08 3 47 0 265 Residential 146.5 46 265

Scroll horizontally to view all building-level fields. Values marked "-" were not disclosed in the source RERA record.

Inventory

Unit Inventory & Configuration Details

Configuration mix and floor-level disclosures with both grouped and raw RERA views.

Total Units -
Configurations 2
Inventory Type RESIDENTIAL
Configuration Distribution
3 BHK 0 units
4 BHK 0 units
  • Wing 07
  • Wing 08
Floor-Wise Inventory Explorer
Floor Apartment Type Carpet Area No. of Unit
1 3 BHK 102.04 7021
1 3 BHK 102.04 7022
1 3 BHK 102.38 7023
1 3 BHK 97.77 7024
2 3 BHK 102.04 7031
2 3 BHK 102.04 7032
2 3 BHK 102.38 7033
2 3 BHK 97.77 7034
3 3 BHK 102.04 7041
3 3 BHK 102.04 7042
3 3 BHK 102.38 7043
3 3 BHK 102.38 7044
4 3 BHK 102.04 7051
4 3 BHK 102.04 7052
4 3 BHK 102.38 7053
4 3 BHK 102.38 7054
5 3 BHK 102.04 7061
5 3 BHK 102.04 7062
5 3 BHK 102.38 7063
5 3 BHK 102.38 7064
6 3 BHK 102.04 7071
6 3 BHK 102.04 7072
6 3 BHK 102.38 7073
6 3 BHK 102.38 7074
7 3 BHK 102.04 7081
7 3 BHK 102.04 7082
7 3 BHK 102.38 7083
7 3 BHK 102.38 7084
8 3 BHK 102.04 7091
8 3 BHK 102.04 7092
8 3 BHK 102.38 7093
8 3 BHK 102.38 7094
9 3 BHK 102.04 7101
9 3 BHK 102.04 7102
9 3 BHK 102.38 7103
9 3 BHK 102.38 7104
10 3 BHK 102.04 7111
10 3 BHK 102.04 7112
10 3 BHK 102.38 7113
10 3 BHK 102.38 7114
11 3 BHK 102.04 7121
11 3 BHK 102.04 7122
11 3 BHK 102.38 7123
11 3 BHK 102.38 7124
12 3 BHK 102.04 7131
12 3 BHK 102.04 7132
12 3 BHK 102.38 7133
12 3 BHK 102.38 7134
13 3 BHK 102.04 7141
13 3 BHK 102.04 7142
13 3 BHK 102.38 7143
13 3 BHK 102.38 7144
14 3 BHK 102.04 7151
14 3 BHK 102.04 7152
14 3 BHK 102.38 7153
14 3 BHK 102.38 7154
15 3 BHK 102.04 7161
15 3 BHK 102.04 7162
15 3 BHK 102.38 7163
15 3 BHK 102.38 7164
16 3 BHK 102.04 7171
16 3 BHK 102.04 7172
16 3 BHK 102.38 7173
16 3 BHK 102.38 7174
17 3 BHK 102.04 7181
17 3 BHK 102.04 7182
17 3 BHK 102.38 7183
17 3 BHK 102.38 7184
18 3 BHK 102.04 7191
18 3 BHK 102.04 7192
18 3 BHK 102.38 7194
19 3 BHK 102.04 7201
19 3 BHK 102.04 7202
19 3 BHK 102.38 7203
19 3 BHK 102.38 7204
20 3 BHK 102.04 7211
20 3 BHK 102.04 7212
20 3 BHK 102.38 7213
20 3 BHK 102.38 7214
21 3 BHK 102.04 7221
21 3 BHK 102.04 7222
21 3 BHK 102.38 7223
21 3 BHK 102.38 7224
22 3 BHK 102.04 7231
22 3 BHK 102.04 7232
22 3 BHK 102.38 7233
22 3 BHK 102.38 7234
23 3 BHK 102.04 7241
23 3 BHK 102.04 7242
23 3 BHK 102.38 7243
23 3 BHK 102.38 7244
24 3 BHK 102.04 7251
24 3 BHK 102.04 7252
24 3 BHK 102.38 7253
24 3 BHK 102.38 7254
25 3 BHK 102.38 7263
25 3 BHK 102.38 7264
26 3 BHK 102.04 7271
26 3 BHK 102.04 7272
26 3 BHK 102.38 7273
26 3 BHK 102.38 7274
27 3 BHK 102.04 7281
27 3 BHK 102.04 7282
27 3 BHK 102.38 7283
27 3 BHK 102.38 7284
28 3 BHK 102.04 7291
28 3 BHK 102.04 7292
28 3 BHK 102.38 7294
29 3 BHK 102.04 7301
29 3 BHK 102.04 7302
29 3 BHK 102.38 7303
29 3 BHK 102.38 7304
30 3 BHK 102.04 7311
30 3 BHK 102.04 7312
30 3 BHK 102.38 7313
30 3 BHK 102.38 7314
31 3 BHK 102.04 7321
31 3 BHK 102.04 7322
31 3 BHK 102.38 7323
31 3 BHK 102.38 7324
32 3 BHK 102.04 7331
32 3 BHK 102.04 7332
32 3 BHK 102.38 7333
32 3 BHK 102.38 7334
33 3 BHK 102.04 7341
33 3 BHK 102.04 7342
33 3 BHK 102.38 7343
33 3 BHK 102.38 7344
34 3 BHK 102.04 7351
34 3 BHK 102.04 7352
34 3 BHK 102.38 7353
34 3 BHK 102.38 7354
35 3 BHK 102.04 7361
35 3 BHK 102.04 7362
35 3 BHK 102.38 7363
35 3 BHK 102.38 7364
36 3 BHK 102.04 7371
36 3 BHK 102.04 7372
36 3 BHK 102.38 7373
36 3 BHK 102.38 7374
37 3 BHK 102.04 7381
37 3 BHK 102.04 7382
37 3 BHK 102.38 7383
37 3 BHK 102.38 7384
38 3 BHK 102.04 7391
38 3 BHK 102.04 7392
38 3 BHK 102.38 7394
39 3 BHK 102.04 7401
39 3 BHK 102.04 7402
39 3 BHK 102.38 7403
39 3 BHK 102.38 7404
40 3 BHK 102.04 7411
40 3 BHK 102.04 7412
40 3 BHK 102.38 7413
40 3 BHK 102.38 7414
41 3 BHK 102.04 7421
41 3 BHK 102.04 7422
41 3 BHK 102.38 7423
41 3 BHK 102.38 7424
42 3 BHK 102.04 7431
42 3 BHK 102.04 7432
42 3 BHK 102.38 7433
42 3 BHK 102.38 7434
43 3 BHK 102.04 7441
43 3 BHK 102.04 7442
43 3 BHK 102.38 7443
43 3 BHK 102.38 7444
44 3 BHK 102.04 7451
44 3 BHK 102.04 7452
44 3 BHK 102.38 7453
44 3 BHK 102.38 7454
45 3 BHK 102.04 7461
45 3 BHK 102.04 7462
45 3 BHK 102.38 7463
45 3 BHK 102.38 7464
Parking

Parking, Garage & Area Details

Parking provision declared in the sanctioned plan.

Type Proposed Booked Work Done
Garage - - -
Covered Parking - - -
Open Parking - - -
Development

Development Works & Common Area Disclosures

Project-level common infrastructure disclosures as reported by the developer to the RERA authority.

Sub Structure Earth Work And Other Leveling Preparation Work % not reported Sub Structure Foundation Footing Work % not reported Sub Structure Upto Plinth Level % not reported
Sub Structure Sub-structure Flooring (Parking Floor, More Than One Floor Below General Ground Level) % not reported Sub Structure Retaining Wall (All Types) % not reported Sup Structure Rcc Or Ms Framed Structure % not reported
Sup Structure Masonry Construction % not reported Sup Structure Plastering Inside , Outside & Ceiling % not reported Sup Structure Joinery: Doors, Windows, Ventilators Etc % not reported
Sup Structure Basic Work Of Water Supply, Sanitary And Electrification % not reported Sup Structure Dadoing, Skirting, Flooring, Tiles Work (All Types) % not reported Sup Structure Railing And Grill Fixing % not reported
Finishing Works Electrification, Water Supply And Sanitary Finishing % not reported Finishing Works Painting % not reported Finishing Works Fire Prevention And Fire Fighting Fitting And Fixture With Network % not reported
Finishing Works Weather Proof Work(tile,concrete) % not reported Finishing Works Wardrobe, Showcase, Kitchen Cabinet, Puja Work % not reported Finishing Works Elevation Work % not reported
Finishing Works Internal And External Work Including Landscapes As Per Sanctioned Drawings % not reported Internal Infrastructure Water Supply % not reported Internal Infrastructure Sewage And Drainage System % not reported
Internal Infrastructure Water Conservation/rain Water Harvesting/recharge Of Ground Water % not reported Internal Infrastructure Energy Management % not reported Internal Infrastructure Fire Protection And Fire Safety Requirements % not reported
Internal Infrastructure Solid Waste Management And Disposal % not reported Internal Infrastructure Emergency Evacuation Services % not reported External Infrastructure Water Supply % not reported
External Infrastructure Internal Roads & Footpaths % not reported External Infrastructure Sewage And Drainage System % not reported External Infrastructure Electricity Supply Transformer And Substation % not reported
External Infrastructure Solid Waste Management And Disposal % not reported External Infrastructure Emergency Evacuation Services % not reported External Infrastructure Storm Water Drains % not reported
External Infrastructure Use Of Renewable Energy % not reported External Infrastructure Water Conservation/rain Water Harvesting/recharge Of Ground Water % not reported External Infrastructure Fire Protection And Fire Safety Requirements % not reported
External Infrastructure Sewage Treatment Plant (Stp) % not reported External Infrastructure Parks & Tree Planting % not reported External Infrastructure Street Lighting % not reported
Amenities Electricity % not reported Amenities Smart Home Automation % not reported Amenities Cctv Surveillance % not reported
Amenities Club House % not reported Amenities Community Hall % not reported Amenities Outdoor Sports Facility % not reported
Amenities Indoor Sports Facility % not reported Amenities Swimming Pool % not reported Amenities Gym % not reported
Amenities Parks % not reported Amenities Power Backup % not reported Amenities Piped Gas % not reported
Amenities Water And Sanitation % not reported Amenities Air Conditioning % not reported Common Areas Staircases % not reported
Common Areas Lifts % not reported Common Areas Corridor/lobbies % not reported Common Areas Fire Escapes % not reported
Common Areas Common Entrance And Exit For The Building/common Portico/foyer/verandah % not reported Common Areas Basement % not reported Common Areas Terrace % not reported
Common Areas Outer Wall % not reported Common Areas Open Parking Areas % not reported Common Areas Provision For Lodging Of Management Staff And Security Staff % not reported
Common Areas Water Conservation And Renewable Energy % not reported Common Areas Common Storage Spaces % not reported
Documents

RERA Documents & Filings

All statutory documents uploaded by the promoter to the authority portal.

Promoter Registration Certificate
Promoter Pan Card
Promoter Address Proof
Fd 1 Financials FY 2024-25.Pdf
Fd 2 Balance Sheet Mar 2024.Pdf
Fd 3 Balance Sheet Mar 2023.Pdf
Fd 4 Financials FY 2024-25.Pdf
Fd 5 Profit Loss Statement Mar 2024.Pdf
Fd 6 Profit Loss Statement Mar 2023.Pdf
Fd 7 ITR AY 2025-26.Pdf
Fd 8 ITR Ack AY 2024 25.Pdf
Fd 9 ITR AY 2023 24.Pdf
Fd 10 Financials FY 2024-25.Pdf
Fd 11 DR 2023 24.Pdf
Fd 12 DR 2022 23.Pdf
Fd 13 Financials FY 2024-25.Pdf
Fd 14 Cash Flow Mar 2024.Pdf
Fd 15 Cash Flow Mar 2023.Pdf
Fd 16 Financials FY 2024-25.Pdf
Fd 17 Auditors Report FY 2023 2024.Pdf
Fd 18 Auditors Report Mar 2023.Pdf
Pd 1 Commencement Certificate( Annexure - 80 )
Pd 2 Approved Building Plan( Annexure - 81 )
Pd 3 Sectional Drawing Of The Apartments( Annexure - 82 )
Pd 4 Certificate From Registered Engineer Indicating The Structural Safety Of The Building( Annexure - 83 )
Pd 5 Project Specifications( Annexure - 84 )
Pd 6 Brochure( Annexure - 85 )
Pd 7 Relinquishment Deed( Annexure - 86 )
Pd 8 Proforma Of Agreement For Sale( Annexure - 87 )
Pd 9 Proforma Of Allotment Letter( Annexure - 88 )
Dc 1 Declaration (Form B)( Annexure - 89 )
Dc 2 Section 3(1) Notarized Affidavit( Annexure - 90 )
Dc 4 Advocate Search Report( Annexure - 92 )
Noc 1 ESCOM Electricity( Annexure - 95 )
Noc 2 KWSSB Water( Annexure - 96 )
Noc 3 KSPCB( Annexure - 97 )
Noc 4 SEIAA( Annexure - 98 )
Noc 5 Fire Force Department( Annexure - 99 )
Noc 6 Airport Authority Of India( Annexure - 100 )
Noc 7 BSNL( Annexure - 101 )
Photo 1 Project Photo
Photo 2 Project Photo
Photo 3 Project Photo
Photo 4 Project Photo
Photo 5 Project Photo
Photo 6 Project Photo
Photo 7 Project Photo
Od 1 Development Plan.Pdf
Od 2 Development Plan Letter.Pdf
Od 3 1 Land Cost Calculation Attested All Phases.Pdf
Od 4 2 AREA BIFURCATION DETAILS.Pdf
Od 5 3 ADLR Sketch.Pdf
Od 6 4 CDP Demarcation.Pdf
Od 7 5 Village Map Demarcation.Pdf
Od 8 6 Amenities Details.Pdf
Od 9 7 Common Area Details.Pdf
Od 10 8 Water Source With Borewell Photos.Pdf
Od 11 9 SDL To Sobha Limited.Pdf
Od 12 Tippani Hissa 50 51 52 55 59 60 60 175.Pdf
Od 13 Akarbandh 51 52 54 55 59 60 175.Pdf
Od 14 Sketch 51 55 56 57 59 60.Pdf
Od 15 Eng Estimation Summary Ph4.Pdf
Od 16 1 Sobha-Syno174-2 4 6 & 8 Opinion.Pdf
Od 17 2 Sobha-Syno65-1 2 3 4 Opinion.Pdf
Od 18 3 Sobha-Syno62-1 2 3 4 & 5 Opinion.Pdf
Od 19 4 Sobha-Syno60-1 2 3 4 & 5 Opinion.Pdf
Od 20 5 Sobha-Syno59-1 2 3 Opinion.Pdf
Od 21 6 Sobha-Syno56-3 4 5 And 6 Opinion.Pdf
Od 22 7 Sobha-Syno35-1 2 3 Opinion.Pdf
Od 23 8 Sobha-Syno31-1 2 3 & 4 Opinion.Pdf
Od 24 9 Sobha-Syno21-1A 1B 2 3 And 4 Opinion.Pdf
Od 25 10 Sobha-Syno22-2 Opinion.Pdf
Od 26 11 Sobha-Syno26 Opinion.Pdf
Od 27 12 Sobha-Syno27 Opinion.Pdf
Od 28 13 Sobha-Syno32 Opinion.Pdf
Od 29 14 Sobha-Syno33-1-2 & 3 Opinion.Pdf
Od 30 15 Sobha-Syno36-1 & 2 Opinion.Pdf
Od 31 16 Sobha-Syno50 Opinion.Pdf
Od 32 17 Sobha-Syno52-1 Opinion.Pdf
Od 33 18 Sobha-Syno54-1-2 & 3 Opinion.Pdf
Od 34 19 Sobha-Syno57-3A-3B & 3C Opinion.Pdf
Od 35 20 Sobha-Syno58 Opinion.Pdf
Od 36 21 Sobha-Syno61-1 & 3 Opinion.Pdf
Od 37 22 Sobha-Syno173-1 Opinion.Pdf
Od 38 Area Demarcation PHASE 04.Pdf
Od 39 Clarification On Sales Ph4.Pdf
Od 40 Litigation Affidavit -Ph 4 W 7 & 8.Pdf
Ed 1 08-05-2026
Ed 2 08-05-2026
Ed 3 08-05-2026
Ed 4 08-05-2026
Ed 5 08-05-2026
Ed 6 08-05-2026
Ed 7 08-05-2026
Ed 8 08-05-2026
Ed 9 08-05-2026
Ed 10 08-05-2026
Ed 11 08-05-2026
Ed 12 08-05-2026
Ed 13 08-05-2026
Ed 14 08-05-2026
Ed 15 08-05-2026
Ed 16 08-05-2026
Ed 17 08-05-2026
Ed 18 08-05-2026
Ed 19 08-05-2026
Ed 20 08-05-2026
Ed 21 08-05-2026
Ed 22 08-05-2026
Ed 23 08-05-2026
Ed 24 08-05-2026
Ed 25 08-05-2026
Ed 26 08-05-2026
Ed 27 08-05-2026
Ed 28 08-05-2026
Ed 29 08-05-2026
Ed 30 08-05-2026
Ed 31 08-05-2026
Ed 32 08-05-2026
Ed 33 08-05-2026
Ed 34 08-05-2026
Ed 35 08-05-2026
Ed 36 08-05-2026
Ed 37 08-05-2026
Ed 38 08-05-2026
Ed 39 08-05-2026
Ed 40 08-05-2026
Ed 41 08-05-2026
Ed 42 08-05-2026
Ed 43 08-05-2026
Ed 44 08-05-2026
Ed 45 08-05-2026
Ed 46 08-05-2026
Ed 47 08-05-2026
Ed 48 08-05-2026
Ed 49 08-05-2026
Ed 50 08-05-2026
Ed 51 08-05-2026
Ed 52 08-05-2026
Ed 53 08-05-2026
Ld Rtc
Ld Mutation
Ld Encumbrance Certificate
Ld Conversion Order
Ld Sale Deed
Ld Khatha
Bank

Bank & Cost Disclosure

Declared project cost and the designated escrow account on file.

Project Account Bank Axis Bank
Account Number (RERA) 925020033650713
IFSC UTIB0001541
Branch Address MG Road
Country/City