residential New Launch Source: rera.ka

Sobha One Residences RERA Details - PRM/KA/RERA/1250/304/PR/080526/008634 Bangalore

View the RERA registration, promoter, approval, building, inventory, document and construction-progress disclosures for Sobha One Residences under registration PRM/KA/RERA/1250/304/PR/080526/008634 in Bangalore, Karnataka. Data is sourced from rera.ka.

RERA

RERA Snapshot

The most important statutory project disclosures, generated dynamically from available RERA fields.

  • RERA Number PRM/KA/RERA/1250/304/PR/080526/008634
  • Project Name ONE RESIDENCES AT SOBHA ONE WORLD Ph1 W1 and 2
  • Project Type Residential/Group Housing
  • Project Status New Launch
  • District Bengaluru Rural
  • Taluka Hosakote
  • Original Completion 31 July 2032
  • Documents 145 Verified
Timeline

Project Timeline & Completion Details

Key statutory dates from registration through proposed completion and permit validity.

Proposed Start 01 June 2026 Expected commencement of civil works and foundation on site.
Original Completion 31 July 2032 Mandated date for project handover to the allottees and final compliance filing.
Promoter

Promoter, Organisation & Member Details

Declared promoter entity, address and corporate identifiers on file with the authority.

Primary Promoter

SOBHA LIMITED
Registered Address Sobha Limited Sarjapur-Marthahalli Outer Ring Road,Bellandur Post ,Bengaluru East ,Bengaluru Urban-560103
Experience Details
Location

Land, Address & Location Details

Land parcel, zoning and geo-coordinates as recorded in the project filing.

Address SY. NO. 20(P), 21/1A, 21/1B, 21/2, 21/3, 21/4, 22/2, 26, 27, 32, 33/3, 34, 35/1, 35/2P2 (35/3), 35/2, 61/1, 62/2, 62/1 , Amanidoddakere Village, Kasaba Hobli , Hosakote , Bengaluru Rural, Karnataka - 562114

RERA Coordinates

Latitude, Longitude 13.058182, 77.775577
Plans

Plans & Approvals

Statutory approvals obtained or pending against the project site.

Plan Approval No. STRRPA/TP/CC/652/2025-26/318
Authority Satellite Town Ring Road Planning Authority
Approved Date 07 May 2026

Understand this Project's RERA details

Get clear answers and additional support from our RERA experts.

RERA Banner
Buildings

Buildings, Towers & Building-Level Details

Statutory building-level disclosures including tower height, sanctioned floors, structural counts and parking areas.

Building Detail
Name No. of Basements No. of Slab No. of Slits No. of Open Parking Building Type Height of Tower No. of Floors No. of Units
Wing 01 3 48 0 271 Residential 149.55 47 271
Wing 02 3 48 0 271 Residential 149.55 47 271

Scroll horizontally to view all building-level fields. Values marked "-" were not disclosed in the source RERA record.

Inventory

Unit Inventory & Configuration Details

Configuration mix and floor-level disclosures with both grouped and raw RERA views.

Total Units -
Configurations 2
Inventory Type RESIDENTIAL
Configuration Distribution
3 BHK 0 units
4 BHK 0 units
  • Wing 01
  • Wing 02
Floor-Wise Inventory Explorer
Floor Apartment Type Carpet Area No. of Unit
1 3 BHK 102.04 1021
1 3 BHK 102.04 1022
1 3 BHK 103.19 1023
1 3 BHK 103.19 1024
1 4 BHK 138.01 1025
1 4 BHK 138.24 1026
2 3 BHK 102.04 1031
2 3 BHK 102.04 1032
2 3 BHK 103.19 1033
2 3 BHK 103.19 1034
2 4 BHK 138.01 1035
2 4 BHK 138.24 1036
3 3 BHK 102.04 1041
3 3 BHK 102.04 1042
3 3 BHK 103.19 1043
3 3 BHK 103.19 1044
3 4 BHK 138.01 1045
3 4 BHK 138.24 1046
4 3 BHK 102.04 1051
4 3 BHK 102.04 1052
4 3 BHK 103.19 1053
4 3 BHK 103.19 1054
4 4 BHK 138.01 1055
4 4 BHK 138.24 1056
5 3 BHK 102.04 1061
5 3 BHK 102.04 1062
5 3 BHK 103.19 1063
5 3 BHK 103.19 1064
5 4 BHK 138.01 1065
5 4 BHK 138.24 1066
6 3 BHK 102.04 1071
6 3 BHK 102.04 1072
6 3 BHK 103.19 1073
6 3 BHK 103.19 1074
6 4 BHK 138.01 1075
6 4 BHK 138.24 1076
7 3 BHK 102.04 1081
7 3 BHK 102.04 1082
7 3 BHK 103.19 1083
7 3 BHK 103.19 1084
7 4 BHK 138.01 1085
7 4 BHK 138.24 1086
8 3 BHK 102.04 1091
8 3 BHK 102.04 1092
8 3 BHK 103.19 1093
8 3 BHK 103.19 1094
8 4 BHK 138.01 1095
8 4 BHK 138.24 1096
9 3 BHK 102.04 1101
9 3 BHK 102.04 1102
9 3 BHK 103.19 1103
9 3 BHK 103.19 1104
9 4 BHK 138.01 1105
9 4 BHK 138.24 1106
10 3 BHK 102.04 1111
10 3 BHK 102.04 1112
10 3 BHK 103.19 1113
10 3 BHK 103.19 1114
10 4 BHK 138.01 1115
10 4 BHK 138.24 1116
11 3 BHK 102.04 1121
11 3 BHK 102.04 1122
11 3 BHK 103.19 1123
11 3 BHK 103.19 1124
11 4 BHK 138.01 1125
11 4 BHK 138.24 1126
12 3 BHK 102.04 1131
12 3 BHK 102.04 1132
12 3 BHK 103.19 1133
12 3 BHK 103.19 1134
12 4 BHK 138.01 1135
12 4 BHK 138.24 1136
13 3 BHK 102.04 1141
13 3 BHK 102.04 1142
13 3 BHK 103.19 1143
13 3 BHK 103.19 1144
13 4 BHK 138.01 1145
13 4 BHK 138.24 1146
14 3 BHK 102.04 1151
14 3 BHK 102.04 1152
14 3 BHK 103.19 1153
14 3 BHK 103.19 1154
14 4 BHK 138.01 1155
14 4 BHK 138.24 1156
15 3 BHK 102.04 1161
15 3 BHK 102.04 1162
15 3 BHK 103.19 1163
15 3 BHK 103.19 1164
15 4 BHK 138.01 1165
15 4 BHK 138.24 1166
16 3 BHK 102.04 1171
16 3 BHK 102.04 1172
16 3 BHK 103.19 1173
16 3 BHK 103.19 1174
16 4 BHK 138.01 1175
16 4 BHK 138.24 1176
17 3 BHK 102.04 1181
17 3 BHK 102.04 1182
17 3 BHK 103.19 1183
17 3 BHK 103.19 1184
17 4 BHK 138.01 1185
17 4 BHK 138.24 1186
18 3 BHK 102.04 1192
18 3 BHK 103.19 1193
18 3 BHK 103.19 1194
18 4 BHK 138.01 1195
18 4 BHK 138.24 1196
19 3 BHK 102.04 1201
19 3 BHK 102.04 1202
19 3 BHK 103.19 1203
19 3 BHK 103.19 1204
19 4 BHK 138.01 1205
19 4 BHK 138.24 1206
20 3 BHK 102.04 1211
20 3 BHK 102.04 1212
20 3 BHK 103.19 1213
20 3 BHK 103.19 1214
20 4 BHK 138.01 1215
20 4 BHK 138.24 1216
21 3 BHK 102.04 1221
21 3 BHK 102.04 1222
21 3 BHK 103.19 1223
21 3 BHK 103.19 1224
21 4 BHK 138.01 1225
21 4 BHK 138.24 1226
22 3 BHK 102.04 1231
22 3 BHK 102.04 1232
22 3 BHK 103.19 1233
22 3 BHK 103.19 1234
22 4 BHK 138.01 1235
22 4 BHK 138.24 1236
23 3 BHK 102.04 1241
23 3 BHK 102.04 1242
23 3 BHK 103.19 1243
23 3 BHK 103.19 1244
23 4 BHK 138.01 1245
23 4 BHK 138.24 1246
24 3 BHK 102.04 1251
24 3 BHK 102.04 1252
24 3 BHK 103.19 1253
24 3 BHK 103.19 1254
24 4 BHK 138.01 1255
24 4 BHK 138.24 1256
25 3 BHK 102.04 1261
25 3 BHK 102.04 1262
25 3 BHK 103.19 1263
25 3 BHK 103.19 1264
26 3 BHK 102.04 1271
26 3 BHK 102.04 1272
26 3 BHK 103.19 1273
26 3 BHK 103.19 1274
26 4 BHK 138.01 1275
26 4 BHK 138.24 1276
27 3 BHK 102.04 1281
27 3 BHK 102.04 1282
27 3 BHK 103.19 1283
27 3 BHK 103.19 1284
27 4 BHK 138.01 1285
27 4 BHK 138.24 1286
28 3 BHK 102.04 1292
28 3 BHK 103.19 1293
28 3 BHK 103.19 1294
28 4 BHK 138.01 1295
28 4 BHK 138.24 1296
29 3 BHK 102.04 1301
29 3 BHK 102.04 1302
29 3 BHK 103.19 1303
29 3 BHK 103.19 1304
29 4 BHK 138.01 1305
29 4 BHK 138.24 1306
30 3 BHK 102.04 1311
30 3 BHK 102.04 1312
30 3 BHK 103.19 1313
30 3 BHK 103.19 1314
30 4 BHK 138.01 1315
30 4 BHK 138.24 1316
31 3 BHK 102.04 1321
31 3 BHK 102.04 1322
31 3 BHK 103.19 1323
31 3 BHK 103.19 1324
31 4 BHK 138.01 1325
31 4 BHK 138.24 1326
32 3 BHK 102.04 1331
32 3 BHK 102.04 1332
32 3 BHK 103.19 1333
32 3 BHK 103.19 1334
32 4 BHK 138.01 1335
32 4 BHK 138.24 1336
33 3 BHK 102.04 1341
33 3 BHK 102.04 1342
33 3 BHK 103.19 1343
33 3 BHK 103.19 1344
33 4 BHK 138.01 1345
33 4 BHK 138.24 1346
34 3 BHK 102.04 1351
34 3 BHK 102.04 1352
34 3 BHK 103.19 1353
34 3 BHK 103.19 1354
34 4 BHK 138.01 1355
34 4 BHK 138.24 1356
35 3 BHK 102.04 1361
35 3 BHK 102.04 1362
35 3 BHK 103.19 1363
35 3 BHK 103.19 1364
35 4 BHK 138.01 1365
35 4 BHK 138.24 1366
36 3 BHK 102.04 1371
36 3 BHK 102.04 1372
36 3 BHK 103.19 1373
36 3 BHK 103.19 1374
36 4 BHK 138.01 1375
36 4 BHK 138.24 1376
37 3 BHK 102.04 1381
37 3 BHK 102.04 1382
37 3 BHK 103.19 1383
37 3 BHK 103.19 1384
37 4 BHK 138.01 1385
37 4 BHK 138.24 1386
38 3 BHK 102.04 1392
38 3 BHK 103.19 1393
38 3 BHK 103.19 1394
38 4 BHK 138.01 1395
38 4 BHK 138.24 1396
39 3 BHK 102.04 1401
39 3 BHK 102.04 1402
39 3 BHK 103.19 1403
39 3 BHK 103.19 1404
39 4 BHK 138.01 1405
39 4 BHK 138.24 1406
40 3 BHK 102.04 1411
40 3 BHK 102.04 1412
40 3 BHK 103.19 1413
40 3 BHK 103.19 1414
40 4 BHK 138.01 1415
40 4 BHK 138.24 1416
41 3 BHK 102.04 1421
41 3 BHK 102.04 1422
41 3 BHK 103.19 1423
41 3 BHK 103.19 1424
41 4 BHK 138.01 1425
41 4 BHK 138.24 1426
42 3 BHK 102.04 1431
42 3 BHK 102.04 1432
42 3 BHK 103.19 1433
42 3 BHK 103.19 1434
42 4 BHK 138.01 1435
42 4 BHK 138.24 1436
43 3 BHK 102.04 1441
43 3 BHK 102.04 1442
43 3 BHK 103.19 1443
43 3 BHK 103.19 1444
43 4 BHK 138.01 1445
43 4 BHK 138.24 1446
44 3 BHK 102.04 1451
44 3 BHK 102.04 1452
44 3 BHK 103.19 1453
44 3 BHK 103.19 1454
44 4 BHK 138.01 1455
44 4 BHK 138.24 1456
45 3 BHK 102.04 1461
45 3 BHK 102.04 1462
45 3 BHK 103.19 1463
45 3 BHK 103.19 1464
45 4 BHK 138.01 1465
45 4 BHK 138.24 1466
46 3 BHK 102.04 1471
46 3 BHK 102.04 1472
46 3 BHK 103.19 1473
46 3 BHK 103.19 1474
46 4 BHK 138.01 1475
46 4 BHK 138.24 1476
Parking

Parking, Garage & Area Details

Parking provision declared in the sanctioned plan.

Type Proposed Booked Work Done
Garage - - -
Covered Parking - - -
Open Parking - - -
Development

Development Works & Common Area Disclosures

Project-level common infrastructure disclosures as reported by the developer to the RERA authority.

Sub Structure Earth Work And Other Leveling Preparation Work % not reported Sub Structure Foundation Footing Work % not reported Sub Structure Upto Plinth Level % not reported
Sub Structure Sub-structure Flooring (Parking Floor, More Than One Floor Below General Ground Level) % not reported Sub Structure Retaining Wall (All Types) % not reported Sup Structure Rcc Or Ms Framed Structure % not reported
Sup Structure Masonry Construction % not reported Sup Structure Plastering Inside , Outside & Ceiling % not reported Sup Structure Joinery: Doors, Windows, Ventilators Etc % not reported
Sup Structure Basic Work Of Water Supply, Sanitary And Electrification % not reported Sup Structure Dadoing, Skirting, Flooring, Tiles Work (All Types) % not reported Sup Structure Railing And Grill Fixing % not reported
Finishing Works Electrification, Water Supply And Sanitary Finishing % not reported Finishing Works Painting % not reported Finishing Works Fire Prevention And Fire Fighting Fitting And Fixture With Network % not reported
Finishing Works Weather Proof Work(tile,concrete) % not reported Finishing Works Wardrobe, Showcase, Kitchen Cabinet, Puja Work % not reported Finishing Works Elevation Work % not reported
Finishing Works Internal And External Work Including Landscapes As Per Sanctioned Drawings % not reported Internal Infrastructure Water Supply % not reported Internal Infrastructure Sewage And Drainage System % not reported
Internal Infrastructure Water Conservation/rain Water Harvesting/recharge Of Ground Water % not reported Internal Infrastructure Energy Management % not reported Internal Infrastructure Fire Protection And Fire Safety Requirements % not reported
Internal Infrastructure Solid Waste Management And Disposal % not reported Internal Infrastructure Emergency Evacuation Services % not reported External Infrastructure Water Supply % not reported
External Infrastructure Internal Roads & Footpaths % not reported External Infrastructure Sewage And Drainage System % not reported External Infrastructure Electricity Supply Transformer And Substation % not reported
External Infrastructure Solid Waste Management And Disposal % not reported External Infrastructure Emergency Evacuation Services % not reported External Infrastructure Storm Water Drains % not reported
External Infrastructure Use Of Renewable Energy % not reported External Infrastructure Water Conservation/rain Water Harvesting/recharge Of Ground Water % not reported External Infrastructure Fire Protection And Fire Safety Requirements % not reported
External Infrastructure Sewage Treatment Plant (Stp) % not reported External Infrastructure Parks & Tree Planting % not reported External Infrastructure Street Lighting % not reported
Amenities Electricity % not reported Amenities Smart Home Automation % not reported Amenities Cctv Surveillance % not reported
Amenities Club House % not reported Amenities Community Hall % not reported Amenities Outdoor Sports Facility % not reported
Amenities Indoor Sports Facility % not reported Amenities Swimming Pool % not reported Amenities Gym % not reported
Amenities Parks % not reported Amenities Power Backup % not reported Amenities Piped Gas % not reported
Amenities Water And Sanitation % not reported Amenities Air Conditioning % not reported Common Areas Staircases % not reported
Common Areas Lifts % not reported Common Areas Corridor/lobbies % not reported Common Areas Fire Escapes % not reported
Common Areas Common Entrance And Exit For The Building/common Portico/foyer/verandah % not reported Common Areas Basement % not reported Common Areas Terrace % not reported
Common Areas Outer Wall % not reported Common Areas Open Parking Areas % not reported Common Areas Provision For Lodging Of Management Staff And Security Staff % not reported
Common Areas Water Conservation And Renewable Energy % not reported Common Areas Common Storage Spaces % not reported
Documents

RERA Documents & Filings

All statutory documents uploaded by the promoter to the authority portal.

Promoter Registration Certificate
Promoter Pan Card
Promoter Address Proof
Fd 1 Financials FY 2024-25.Pdf
Fd 2 Balance Sheet Mar 2024.Pdf
Fd 3 Balance Sheet Mar 2023.Pdf
Fd 4 Financials FY 2024-25.Pdf
Fd 5 Auditors Report FY 2023 2024.Pdf
Fd 6 Profit Loss Statement Mar 2023.Pdf
Fd 7 ITR AY 2025-26.Pdf
Fd 8 ITR Ack AY 2024 25.Pdf
Fd 9 ITR AY 2023 24.Pdf
Fd 10 Financials FY 2024-25.Pdf
Fd 11 DR 2023 24.Pdf
Fd 12 DR 2022 23.Pdf
Fd 13 Financials FY 2024-25.Pdf
Fd 14 Cash Flow Mar 2024.Pdf
Fd 15 Cash Flow Mar 2023.Pdf
Fd 16 Financials FY 2024-25.Pdf
Fd 17 Auditors Report FY 2023 2024.Pdf
Fd 18 Auditors Report Mar 2023.Pdf
Pd 1 Commencement Certificate( Annexure - 80 )
Pd 2 Approved Building Plan( Annexure - 81 )
Pd 3 Sectional Drawing Of The Apartments( Annexure - 82 )
Pd 4 Certificate From Registered Engineer Indicating The Structural Safety Of The Building( Annexure - 83 )
Pd 5 Project Specifications( Annexure - 84 )
Pd 6 Brochure( Annexure - 85 )
Pd 7 Relinquishment Deed( Annexure - 86 )
Pd 8 Proforma Of Agreement For Sale( Annexure - 87 )
Pd 9 Proforma Of Allotment Letter( Annexure - 88 )
Dc 1 Declaration (Form B)( Annexure - 89 )
Dc 2 Section 3(1) Notarized Affidavit( Annexure - 90 )
Dc 4 Advocate Search Report( Annexure - 92 )
Noc 1 ESCOM Electricity( Annexure - 95 )
Noc 2 KWSSB Water( Annexure - 96 )
Noc 3 KSPCB( Annexure - 97 )
Noc 4 SEIAA( Annexure - 98 )
Noc 5 Fire Force Department( Annexure - 99 )
Noc 6 Airport Authority Of India( Annexure - 100 )
Noc 7 BSNL( Annexure - 101 )
Photo 1 Project Photo
Photo 2 Project Photo
Photo 3 Project Photo
Photo 4 Project Photo
Photo 5 Project Photo
Photo 6 Project Photo
Photo 7 Project Photo
Od 1 Development Plan.Pdf
Od 2 Development Plan Letter.Pdf
Od 3 1 Land Cost Calculation Attested All Phases.Pdf
Od 4 2 AREA BIFURCATION DETAILS.Pdf
Od 5 3 ADLR Sketch.Pdf
Od 6 4 CDP Demarcation.Pdf
Od 7 5 Village Map Demarcation.Pdf
Od 8 Litigation Affidavits-Ph 1 W 1 & 2.Pdf
Od 9 Clarification On Sales Ph1.Pdf
Od 10 Eng Estimation Summary Ph1.Pdf
Od 11 6 Amenities Details.Pdf
Od 12 7 Common Area Details.Pdf
Od 13 8 Water Source With Borewell Photos.Pdf
Od 14 Area Demarcation PHASE 01.Pdf
Od 15 Hissa And Tippani Sy No 20,21,22,26,27,33,35.Pdf
Od 16 Akarbandh 20,21,22,26,27,32,33,62.Pdf
Od 17 9 SDL To Sobha Limited.Pdf
Od 18 1 Sobha-Syno174-2 4 6 & 8 Opinion.Pdf
Od 19 2 Sobha-Syno65-1 2 3 4 Opinion.Pdf
Od 20 3 Sobha-Syno62-1 2 3 4 & 5 Opinion.Pdf
Od 21 4 Sobha-Syno60-1 2 3 4 & 5 Opinion.Pdf
Od 22 5 Sobha-Syno59-1 2 3 Opinion.Pdf
Od 23 6 Sobha-Syno56-3 4 5 And 6 Opinion.Pdf
Od 24 7 Sobha-Syno35-1 2 3 Opinion.Pdf
Od 25 8 Sobha-Syno31-1 2 3 & 4 Opinion.Pdf
Od 26 9 Sobha-Syno21-1A 1B 2 3 And 4 Opinion.Pdf
Od 27 10 Sobha-Syno22-2 Opinion.Pdf
Od 28 11 Sobha-Syno26 Opinion.Pdf
Od 29 12 Sobha-Syno27 Opinion.Pdf
Od 30 13 Sobha-Syno32 Opinion.Pdf
Od 31 14 Sobha-Syno33-1-2 & 3 Opinion.Pdf
Od 32 15 Sobha-Syno36-1 & 2 Opinion.Pdf
Od 33 16 Sobha-Syno50 Opinion.Pdf
Od 34 17 Sobha-Syno52-1 Opinion.Pdf
Od 35 18 Sobha-Syno54-1-2 & 3 Opinion.Pdf
Od 36 19 Sobha-Syno57-3A-3B & 3C Opinion.Pdf
Od 37 20 Sobha-Syno58 Opinion.Pdf
Od 38 21 Sobha-Syno61-1 & 3 Opinion.Pdf
Od 39 22 Sobha-Syno173-1 Opinion.Pdf
Ed 1 08-05-2026
Ed 2 08-05-2026
Ed 3 08-05-2026
Ed 4 08-05-2026
Ed 5 08-05-2026
Ed 6 08-05-2026
Ed 7 08-05-2026
Ed 8 08-05-2026
Ed 9 08-05-2026
Ed 10 08-05-2026
Ed 11 08-05-2026
Ed 12 08-05-2026
Ed 13 08-05-2026
Ed 14 08-05-2026
Ed 15 08-05-2026
Ed 16 08-05-2026
Ed 17 08-05-2026
Ed 18 08-05-2026
Ed 19 08-05-2026
Ed 20 08-05-2026
Ed 21 08-05-2026
Ed 22 08-05-2026
Ed 23 08-05-2026
Ed 24 08-05-2026
Ed 25 08-05-2026
Ed 26 08-05-2026
Ed 27 08-05-2026
Ed 28 08-05-2026
Ed 29 08-05-2026
Ed 30 08-05-2026
Ed 31 08-05-2026
Ed 32 08-05-2026
Ed 33 08-05-2026
Ed 34 08-05-2026
Ed 35 08-05-2026
Ed 36 08-05-2026
Ed 37 08-05-2026
Ed 38 08-05-2026
Ed 39 08-05-2026
Ed 40 08-05-2026
Ed 41 08-05-2026
Ed 42 08-05-2026
Ed 43 08-05-2026
Ed 44 08-05-2026
Ed 45 08-05-2026
Ed 46 08-05-2026
Ed 47 08-05-2026
Ed 48 08-05-2026
Ed 49 08-05-2026
Ed 50 08-05-2026
Ed 51 08-05-2026
Ed 52 08-05-2026
Ed 53 08-05-2026
Ld Rtc
Ld Mutation
Ld Encumbrance Certificate
Ld Conversion Order
Ld Sale Deed
Ld Khatha
Bank

Bank & Cost Disclosure

Declared project cost and the designated escrow account on file.

Project Account Bank Axis Bank
Account Number (RERA) 925020033650713
IFSC UTIB0001541
Branch Address M G Road
Country/City